These are the pre-proposal site visit meeting minutes attenece sheet and presentation slides.
View the file
Other files for this federal contract opportunity
Show all 50
Multiple Award Construction Contract (MACC), Ramstein AB, Germany has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Attachment 1
U.S. Air Forces in Europe
Capt Christopher VanZoest
Procuring Contracting Officer
700 Contracting Squadron/LGCC
21 Oct 2014
Pre-Proposal Conference/Site Visit
Multiple Award Construction Contract (MACC)
Throughout the KMC and Spangdahlem AB
RFP # FA5613-14-R-0016
OVERALL BRIEFING CLASSIFICATION:
UNCLASSIFIED
Welcome and Introduction
86th Civil Engineer Squadron / Engineering Flight
(86 CES/CEN)
86 CES Commander: Lt Col Paul T. SILAS
Chief, Engineering Flight: Mr. Eric RUSHING
Chief, SABER: Mr. Michael KLINGEL
Technical Expert: Mr. Alvin SHALER
700th Contracting Squadron / Construction Flight
(700 CONS/LGCC)
LGCC Construction Flight Chief
& Procuring Contracting Officer: Capt Christopher VANZOEST
Contract Specialist: SSgt Clayton BODKIN
Agenda
Opening Remarks
Purpose
Rules of Engagement
Administrative Comments
Program/Requirements Description
Solicitation Overview/Advance Questions
Summary
Site Visit at Building 1123, Ramstein AB
Purpose
Provide prospective offerors an overall understanding of the objectives of this acquisition
Provide a summary and discuss the requirement
Explain significant elements of the solicitation
Answer advance questions submitted
Give prospective offerors an opportunity to visit the seed project site
Rules of Engagement
All communication regarding this source selection shall be through the Contracting Office (700 CONS/LGCC)
The Contract Specialist and PCO serve as the only points of contact for all inquiries and information regarding this acquisition
Any remarks, explanations, or answers to questions are supplemental guidance and do not override the terms of the solicitation
Terms of the solicitation remain unchanged unless the solicitation is formally amended in writing
Questions must be received in writing to receive an “official response”
Please do not use video/recording devices
Please turn off cell phones
Administrative Comments
Sign-In
Attendance Sheet will be posted on FedBizOpps (FBO)
Briefing Slides will be posted on FBO
Conference Minutes will be posted on FBO
Questions and Responses
Questions may be asked during the briefer’s presentation
Questions during the site visit may be asked but are preferred to be submitted in writing
Questions and the answers provided will be documented in the conference minutes
Program/Requirements
Description
Program/Requirements Description – presented by 86 CES/CEN
Seed Project – Renovate Bldg. 1123 to house USAFE band
Bldg. 1123 (≈12,000 SF) used as theater until 2009
35% Design or Concept Design
Basic standard practice building systems concept
Will not be given more consideration for >35%
Multidiscipline project for a chance to show your skills
Open for creative solutions with few constraints
Must satisfy UFC 4-171-04AN and SOW
Concept must address everything in Section L
Solicitation Overview/
Advance Questions
FBO
Contract Type and Structure
Period of Performance
Key Dates/Activities
Items of Note
Proposal Organization
Basis for Contract Award(s)
Evaluation Factors
Proposal Submission/Contract Documents
Questions and Answers
Summary
Contact Information
FedBizOpps (FBO)
FBO: RFP posted on FBO website on 10 Oct 2014 http://www.fbo.gov/
Solicitation No: FA5613-14-R-0016
Title: Multiple Award Construction Contract (MACC), Ramstein
AB, Germany
All supporting documents, notices, questions and answers, or any amendments will be posted on the FBO website
Submit all questions in writing via e-mail to the Contract
Specialist, SSgt Bodkin, and the PCO, Capt VanZoest, ASAP
Register to receive notification http://www.fbo.gov/
Contract Type and Structure
Acquisition is for a broad range of construction projects to be performed in Germany
Follow-on acquisition; incumbent contractors are:
F.K. Horn GmbH
SKE Support Services GmbH
Mickan General-Bau-Gesellschaft
Bilfinger Government Services GmbH
Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contract(s)
Task Orders (TOs) will be issued (Fair Opportunity; see H-6)
Multiple Award Contract(s)
Firm-Fixed-Price (FFP) Task Orders
Period of Performance
Basic Period : 6 Jul 2015 – 5 Jul 2016
Four One-Year Option Periods
First Option Year 6 Jul 2016 – 5 Jul 2017
Second Option Year 6 Jul 2017 – 5 Jul 2018
Third Option Year 6 Jul 2018 – 5 Jul 2019
Fourth Option Year 6 Jul 2019 – 5 Jul 2020
Extension of Services Option Period
This option provision may be exercised more than once, during any performance period, but the total extension of performance shall not exceed 6 months. Please refer to contract clause FAR 52.217-8.
No later than: 6 Jul 2020 – 5 Jan 2021
Key Dates/Activities
Proposals Due (Volumes I, II, & III) 12 Nov 2014 (1600 CET)
Past Performance Questionnaires Due
(directly from the references) 12 Nov 2014
Anticipated Contract Award(s) 1 Jun 2015
Anticipated Pre-Performance Conference 22 Jun 2015
Contract(s)/Performance Start 6 Jul 2015
Items of Note
Carefully read RFP to include Instructions to Offerors within
Section L, and Evaluation Factors for Award within Section M
Proposal based upon requirements in the Seed Project SOW
& Attachments, as well as the General Requirements &
Provisions, addressing the evaluation criteria in Section M
To be eligible for award, offeror must be registered in SAM
(System for Award Management) https://www.sam.gov
Structure proposal IAW Section L, Instructions to Offerors
Proposal shall be clear and concise containing sufficient detail for easy evaluation https://www.sam.gov/
Proposal Organization
Volume/Title Font & Size Page
Limits
Hard
Copies
Volume I – Technical Times New Roman, Size 12
20/ Unlimited
Volume II – Past Performance
Information
Times New Roman, Size 12
N/A 4
Volume III – Price Times New Roman, Size 12
N/A 3
One copy of each volume shall be marked “Original.” In addition to the specified hard copies, the offeror shall submit all volumes in electronic format using re-writable CDs concurrently with the hard copies. Electronic copies shall be submitted in a format readable by Microsoft (MS) Word 2007, MS Excel 2007, MS Project 2007, MS PowerPoint
2007, or later versions, and PDF, as applicable.
Note: The “Original” hard copy form of the offeror’s proposal shall take precedence if any inconsistencies or discrepancies exist between the offeror’s “Original” hard copy proposal and the electronic copy.
Basis for Contract Award(s)
Tradeoff process IAW DoD Source Selection Procedures and
FAR 15.101-1 using limited tradeoff (Past Performance Price
Tradeoff with Technical pass/fail)
Competitive best value source selection
Evaluate Technical proposal on pass/fail basis
Evaluate Past Performance and Price; tradeoffs may be made only between Past Performance and Price among those offerors who have been determined technically acceptable
Tradeoff Decision – Past Performance Approximately Equal to
Price
Price fair and reasonable is based on adequate price competition IAW FAR 15.305(a)(1) and FAR 15.404-1(b)(2)(i)
Basis for Contract Award(s)
Lowest priced proposal(s) may not necessarily receive the award(s)
Contractor must be determined responsible IAW FAR Part 9
Proposals shall conform to the solicitation requirements, to include all stated terms, conditions, representations, certifications, and technical requirements
The Government reserves the right to award without discussions based on the evaluation of initial proposals
Evaluation Factors
Volume I: Factor 1 – Technical Acceptability
Shall be evaluated on a Pass/Fail basis IAW the criteria set forth in
Section L, Instructions to Offerors, Paragraph C.2.a.
Volume I shall be specific, complete and clearly demonstrate the ability to meet this solicitation requirement
Technical Rating Definitions
Rating Definition
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
Volume II: Factor 2 – Past Performance
An overall Performance Confidence Assessment shall be assigned using the ratings listed in Section M (see also slide 21)
Considers demonstrated record of present and past performance in providing construction services that meet customers’ needs
Assesses the degree of confidence in the offeror’s ability to successfully perform the requirements of this effort
Focuses on performance that is recent and relevant to this requirement to include the quality of performance on other contracts
Recency is ongoing contract performance or contract performance completed within the last 3 years from the issue date of this solicitation, except that ongoing efforts must have begun at least 3 months prior to the issue date of this solicitation
In determining relevancy, consideration will be given to such things as contracts of similar scope, magnitude, and complexity using the
Relevancy Definitions listed in Section M (see also slide 20)
Volume II: Factor 2 – Past Performance (cont.)
Provide Past Performance Information on at least 3 but no more than
6 recent and relevant contracts; current & correct POC information
Past Performance Questionnaire (Atch 5 to the RFP)
Send to each POC identified (see Section L, paragraph D.3.)
Completed questionnaires shall be submitted directly to the
Contract Specialist (SSgt Bodkin) by the POC
Completed questionnaires shall be considered source selection sensitive and SHALL NOT be released to the offeror
Due NLT the date set for receipt of proposals (currently 12 Nov
2014)
Government will use data obtained from offeror and other sources
(CPARS/PPIRS)
Past Performance Relevancy Definitions
Relevancy Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessment Ratings
Rating Description
Substantial
Confidence
Based on the offeror’s recent/relevant performance record, the
Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory
Confidence
Based on the offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the
Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the
Government has no expectation that the offeror will be able to successfully perform the required effort.
Unknown
Confidence (Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Volume III: Factor 3 – Price
Total evaluated price for the design-build seed project (calculated by adding the individual line items of the design and construction prices proposed) is the sole basis for evaluating price for contract award purposes and will be the only price discriminator among offerors
Evaluated for price reasonableness; comparison of proposed prices among offerors and comparison to the Independent Government
Estimate, as appropriate, and/or other proposal analysis techniques as described in FAR 15.404-1
Will not receive a rating
All prices shall be submitted in EURO currency
Incomplete proposed prices may be grounds for eliminating a proposal from competition on the basis that the offeror does not understand the requirement
Proposal Submission/
Contract Documents
Standard Form (SF) 1442 (page 1 and 2)
Offerors complete blocks 14-19, 20A, 20C, and sign block 20B
Offeror Representations & Certifications at Section K and SAM
Volume I – Technical
Volume II – Past Performance Information
Volume III – Price (includes SF 1442, Offeror Reps & Certs, all acknowledged solicitation amendments, POCs)
Acknowledge all amendments to the solicitation
SF 30, complete and sign block 15; or SF 1442 block 19
Identify company POC(s) authorized to negotiate/discuss proposal
If no exceptions are taken to any terms and conditions of the solicitation, include a statement to this effect
Questions and Answers
1st Set of Q&As published on FBO 20 Oct 2014
2nd Set of Q&As –currently working on answers; will be published on FBO
Submit any additional questions in writing via e-mail to the
Contract Specialist & PCO as soon as possible; requested no later than close of business 15 days prior to the RFP closing date
Summary
All communication regarding this source selection shall be through the Contracting Office
Contract Specialist & PCO serve as the only points of contact for all inquiries and information regarding this acquisition
Submit your proposal on time
Closing date 12 Nov 2014, 1600 CET
Offerors are strongly advised to thoroughly examine their proposals for accuracy, full documentation, clear explanations and compliance with all requirements of the RFP instructions
Contact Information
Website http://www.fbo.gov/
E-mail christopher.vanzoest@us.af.mil clayton.bodkin@us.af.mil
Telephone
+49-(0)631-536-6919 – PCO
+49-(0)631-536-8514 – Contract Specialist http://www.fbo.gov/ mailto:christopher.vanzoest@us.af.mil mailto:clayton.bodkin@us.af.mil
File details come from the government source that posted it. Updated .