RFP.Attachment_5_Construction_Narrative_Guidelines.pdf
PDF 217 KB Posted
- Attached to
- Mini-Multiple Award Construction Contracts (MINI-MACC) for Kadena Air Base, Okinawa, Japan
- Solicitation number
- FA5270-14-R-0019
About this file
RFP Attachment 5 Construction Narrative Guidelines
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5270-14-R-0019
Attachment #5
Narrative Guidelines
CONSTRUCTION NARRATIVE GUIDELINES
The Construction Narrative is an important part of an Offeror’s Proposal Package. The Construction Narrative indicates to the Government that the Offeror has a well structured plan for completing the proposed project. The Narrative must be written in English and should (at a minimum) address the work identified on the design and include the following information:
Included (Check)
Basic description of the project o Project Number and Name o Project Location o Project Summary
Construction Methods and Procedures o Describe construction process from concept to completion identifying key trades and tasks and sequencing required to complete the project (i.e., surveying, excavation, grading, forming, masonry, etc.)
o Include safety requirements and Personal Protective Equipment PPE use
Quality Control Plans which:
o Identify process of ensuring only high-quality materials and workmanship is provided to the Government o Describe inspection and surveillance of work procedures o Identify acceptance, rejection, documentation, and resolution of deficiencies processes and procedures
File details come from the government source that posted it. Updated .