RFP Attachment 4a Instruction for 10 Design

View the file

Other files

File Type Posted
Amendment__4_for_FA5270-14-R-0019.5Jan15.pdf PDF
Request_For_Information__05.Mini-MACC.FA5270-14-R-0019.pdf PDF
Request_For_Information__04.Mini-MACC.FA5270-14-R-0019.pdf PDF
Amendment__3_for_FA5270-14-R-0019.29Dec14.pdf PDF
Rev_SOW_Mini-MACC_Sample_Project_Updated_24DEC14.pdf PDF
Request_For_Information__03.Mini-MACC.FA5270-14-R-0019.pdf PDF
Mini-MACC_Pre-Proposal_Conference_Slide-16Dec14.pdf PDF
Preproposal_Conference_Meeting_Minutes.23Dec14.pdf PDF
Attachment__3_Blank_Cost_Estimate_Breakdown_Mini_MACC.updated_10Dec14.pdf PDF
Amend__2_for_FA5270-14-R-0019.10Dec14.pdf PDF
Attachment__2.SOW_Mini-MACC_Sample_Project_Updated_10DEC14.pdf PDF
Request_For_Information__02.Mini-MACC.FA5270-14-R-0019.pdf PDF
Request_For_Information__02.Mini-MACC.FA5270-14-R-0019.pdf PDF
Amend_01_Revised_Attachment_9.FA5270-14-R-0019.3Dec14.pdf PDF
Amend_01_for_FA5270-14-R-0019.3Dec14.pdf PDF
Request_For_Information__01.Mini-MACC.FA5270-14-R-0019.pdf PDF
RFP.Attachment_5_Construction_Narrative_Guidelines.pdf PDF
RFP.Attachment_6.Past Current_Projects'_List.pdf PDF
RFP.Attachment_4b._Instruction_for_35__Design.pdf PDF
RFP.Attachment_8_Question_Form.21Nov14.pdf PDF
Attachment_9___Site_Visit_Reservation_Form.21Nov14.pdf PDF
RFP.Attachment_2.SOW_Mini-MACC_Sample_Project.pdf PDF
FA5270-14-R-0019 _MINI-MACC _KAB.21Nov14.pdf PDF
RFP.Attachment_7.Past_Pefrormance_Questionnaire.21Nov14.pdf PDF
RFP.Attachment_3_Blank_Cost_Estimate_Breakdown.pdf PDF
RFP.Attachment_1.Mini-MACC_Specifications.21Nov14.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP.: FA5270-14-R-0019

Attachment #4a

INSTRUCTION FOR 10% CONCEPT DRAWINGS

Based on scope of project, the 10% design proposal shall include the following:

Site

Preliminary Site Plan (includes project boundaries, building orientation, location of streets -existing and proposed, parking lot layouts, service entrances, storm water management, utility services, paving, curbing, walks).

Site Paving, Grading, Drainage Plan if contours are provided in the RFP technical specifications and requires this plan as a Proposal submission.

Typical road and parking lot sections.

Pavement Design Analysis.

Typical utility trench detail (with select backfill)

Preliminary Landscaping Plan (including kind, size and type trees, shrubs and ground covering).

Outline Specifications (includes preliminary specifications on all site work items, including paving sections, earthwork, utilities, fire protection supply systems, miscellaneous site improvements).

Architectural

Preliminary Floor Plans (includes all levels and all rooms, furniture, preliminary equipment, doors, windows, special doors, shelves, vanities, counters, built-in cabinets and any special design features).

Preliminary Life Safety Plan and code analysis.

Enlarged Floor Plans as required to explain design solutions.

Roof Plan (includes roof slope and drainage).

Preliminary Cross Sections (indicating building heights, structures, general construction).

Preliminary Exterior Elevations (includes material indications, windows, doors, signs, etc.).

Typical Wall Sections (includes general construction and insulation).

Preliminary Finish Schedule.

Preliminary Door Schedule.

Details of special construction.

Outline Specifications (includes all architectural elements).

Structural

Codes to be used for design, complete design loads, and material strengths.

Special structural requirements including specific load conditions and deviations from the national code.

Preliminary Foundation and Framing Plans (includes typical foundations, floor and roof framing).

Outline Specifications (describing all structural elements and systems including soil compaction for foundations).

Descriptions of any deviation to structural system furnished by the Government.

Plumbing

Preliminary Plumbing Plans (includes plumbing fixtures, diagram of mains for water supply, sanitary waste and compressed air system).

Outline Specifications (describing all systems and major equipment).

HVAC

RFP.: FA5270-14-R-0019

Attachment #4a

Preliminary HVAC Plans (includes single line diagrams indicating zoning, distribution, capacities of equipment and central plant layout, if applicable).

Outline Specifications (describing all systems and major equipment).

Fire Protection

Preliminary Fire Protection Plans (includes site, fire system, densities, and occupancy/hazardous classification for each area).

A description of the control system such as activation of the system, interlocks with HVAC system and connection to detection and alarm system.

Define the type of Automatic Fire Detection that will be provided.

Outline Specifications (describing all systems and major equipment).

Electrical

Preliminary Electrical Plans (includes typical lighting and power layout, handicap requirements, fire alarm, telephone and sound systems, site lighting, service type and size).

Outline Specifications (includes all electrical items and electrical/electronic systems).

Define any hazardous area by class, division, and group as defined in the National Electrical Code, and indicate type of equipment proposed for use in the area.

Electronic Security Systems, Utility Monitoring and Control System have a integration and implementation plan ensuring operation with existing systems and equipment.