Mini-MACC_Pre-Proposal_Conference_Slide-16Dec14.pdf
PDF 201 KB Posted
- Attached to
- Mini-Multiple Award Construction Contracts (MINI-MACC) for Kadena Air Base, Okinawa, Japan
- Solicitation number
- FA5270-14-R-0019
About this file
Pre-Proposal Conference Slide for FA5270-14-R-0019
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Pacific Air Forces
Mini-Multiple Award Construction Contract
(Mini-MACC) Kadena AB, Okinawa, Japan
Pre-Proposal Conference
Gary N. Wynder
Contracting Officer
Mark H. Rusks
Chief Project Engineer
16 Dec 2014
RFP NO. FA5270-14-R-0019
Mini-MACC
Overview
Notice
Introduction
Outline of the requirement
Introduction/General Requirements
Request for Proposal (SF1442)
Remarks/Fill-in Instruction
Sample Project
Q & A session
Joint Site Visit
Mini-MACC
Notice
Keep the sign-in sheet moving
Sign-in legibly; name, job title, company name, e-mail address, and tel #
Approx 1 hour and 30 minutes
Facility’s emergency exits and restrooms
Beverages (allowed)/ Food (not allowed)
Turn-off/Silent mode, cell phone and/or electronic devices
Mini-MACC
Introduction Mr. Gary N. Wynder, Contracting Officer, Chief Infrastructure
Flight, 18th Contracting Squadron (18 CONS)
Mr. Nick K. Apsens, Contracting Specialist/Team Lead, Infrastructure Flight (18 CONS)
Mr. Kiyoshi Higa, Contracting Specialist, Infrastructure Flight
(18 CONS)
Mr. Mark Ruksc, Chief Project Manager, 718th Civil Engineering
Squadron (718 CES)
MSgt John Karel, Project Engineer (718 CES)
Mini-MACC
Outline the requirement
Request For Proposal (RFP) No. FA5270-14-R-0019
Contract Type: Indefinite Delivery Indefinite Quantity
(IDIQ)
Project Description
The requirements will consist of multiple discipline for 1)
Design-build projects and 2) Construction only projects for U.S. Air Force and U.S. Army installations supported by the
718 CES and U.S. Army Directorate Public Works (DPW)
Installations include: Kadena Air Base, Okuma Recreation
Center, Military Family Housing (MFH) on Okinawa, and U.S.
Army Installations.
Mini-MACC
Outline the requirement
Performance Period
Basic Year + 5 Option Years (OY) (total of 6 years from the date of award)
Option Years are not guaranteed (Government’s unilateral right)
Preliminary written notice: at least 60 calendar days prior
Notice to exercise option: within 30 calendar days
Total Program Value: Not to exceed $96,000,000 (¥ equivalent) over a six year period (Basic + 5 OYs)
Mini-MACC
Outline the requirement
Contract Award:
Intention is between 6 to 8 contracts, however the government reserves the right to award to less than 6 or more than 8
Subsequent Task Orders (TOs):
Subsequent TOs will be issued on Firm-Fixed Price basis
Subsequent TOs will be issued on a competitive basis between Mini-MACC Contractors
See “MINI-MACC Task Order Procedures” Section H, Page 18 thru 22 of 69 for more detail information for subsequent TOs.
Outline the requirement
Order Limitation (FAR 52.216-19):
Minimum Guarantee: $2,000 (or ¥ equivalent) for initial Task Order
Minimum Order: $2,000 (or ¥ equivalent)
Maximum Order which contractor is not obligated:
Single item over $750,000(or ¥ equivalent)
Combination of items over $1,500,000
Series of orders within 5 business days exceeding the above
Standard Form 1442 (Remarks)
Section A (Page 1 thru 2 of the SF 1442):
Block 13, Proposal shall be valid 240 calendar days from bid closing date. No offer/bid guarantee required
**DUE DATE 1400hrs, 9 JAN 2015
Block 14, 15, *19, 20A, 20B, and 20C are mandatory to be completed by the offeror
(Note) Block 19, Acknowledgement of Amendments, are mandatory to be completed by the offeror, if any amendment(s) is/are issued
Section B (Page 3 thru 7 of the SF1442): Contract Line
Items Number (CLIN) “Do Not Fill Prices on Section B”
CLIN 0001 (Basic Year)
CLIN 1001 (Option Year One)
CLIN 2001 (Option Year Two)
CLIN 3001 (Option Year Three)
CLIN 4001 (Option Year Four)
CLIN 5001 (Option Year Five)
**Price proposal for this Mini-MACC shall be provided using
Attachment 3, Price proposal for Mini-MACC Sample Project
(see Section J, Attachment 3)
Section C (Page 8 and Attachment 2 & 3 of the SF 1442):
Description and Specification
Sample project for bid, LXEZ 04-1490, Renovate Restrooms, Weekender Lounge, Bldg. 313, KAB, refer to the statement of work, (See Section J, Attachment #2, Sample Project’s
Statement of Work (SOW) and Attachment #3, Price Proposal for
Sample Project)
Section D: N/A
Section E (Page 9 thru 10 of the SF 1442): Inspection and Acceptance
Pre-Final Inspection, Final Inspection, BOD Inspection
The Contracting Officer assigns the Representatives of the
Contracting Officer (Inspectors) for the projects
Section F (Page 11 thru 12 of the SF 1442): Deliveries and Performance
Commencement, Prosecution, and Completion of work (FAR 52.211-10)
The number of days for commencement, prosecution and completion of work will be specified in the each Task Order
Section F: Deliveries and Performance (Continued)
Liquidated Damages (LD): If the contractor fails to complete the work within the time specified in the task order, the
Contractor shall pay liquidated damages to the Government.
Liquidate Damages, General Construction Project
LD rate will be determined by each TO
Liquidate Damages, MFH Project
LD rate will be determined by each TO
Section F: Deliveries and Performance (Continued)
The performance period shall be cited in each TO.
Actual construction time shall be negotiated and determined by each TO and work requirements, but in no event will actual construction time be less than
10 calendar days.
The government intends to issue Notice To Proceed
(NTP) within 40 calendar days after TO issued.
Section G (Page 13 and 14 of the SF 1442): Contract
Administration Data
Ensure to complete Offeror’s Point of Contact (POC)
Post Award Administrative Information:
Paying office will be cited on each task order.
Submit Invoices Electronically (Wide Area Work
Flow). DFARS Clause 252.232-7003, Electronic submission of Payment Requests.
Section H (Page 15 thru 22 of the SF 1442): Special
Contract Requirement
$/¥ Conversion Rate for this solicitation is
$1.00=¥103.9439 (FY 15 conversion rate)
Required Insurance
Automobile Property damage and Bodily Injuries minimum insurance amount
Property damage: ¥3,000,000, Bodily Injuries: ¥30,000,000
CONST-H-7204 Performance Bond (FAR 52.228-15)
100% of Task Order Construction Value
$150,000.00 or greater (or ¥equivalent)
Submit within 15 Calendar Days from the issuance of TO or prior to the receipt of the NTP whichever comes first.
Section H (Continued)
Mini-MACC Task Order Procedures
Only the contractors awarded contracts as a result of this solicitation will compete for subsequent TOs
The CO anticipates that competition will exist for each TO, if at least received two proposals are received
The TO will range from $2,000 (or ¥ equivalent) to $750,000
(or ¥ equivalent); however, some TO may exceed $750,000
(or ¥ equivalent) on a case by case basis but shall not exceed $937,500 (or ¥ equivalent).
Section I (Page 23 thru 44 of the SF 1442): Contract
Clauses
Incorporated by Reference and Full Text. Those incorporated by reference have the same force and effect as if they were given in full text.
Ensure to complete:
Hazardous Material ID & MSDS(FAR 52.223-3)
Hazardous Warning Labels (FAR 252.223-7001)
Performance of work by the contractor:
The (prime) contractor shall perform on the site, and with its own organization, work equivalent to at least 25% of the total amount of work to be performed under the contract.
Section J (Page 45 the SF 1442): Exhibits and
Attachments
Exhibits and Attachments
Attachment 1: Mini-MACC Specifications
Attachment 2: Mini-MACC Sample Project’s SOW
**Updated by the amendment 2 on 10 Dec 14
Attachment 3: Price Proposal for Mini-MACC Sample Project
**Updated by the amendment 2 on 10 Dec 14
Attachment 4a: Instruction for 10% Drawings for subsequent task order(s)
Attachment 4b: Instruction for preliminary 35% design submittal for sample project
Section J : Exhibits and Attachments (Continued)
Attachment 5: Construction Narrative Guidelines
Attachment 6: Offeror’s Past Performance Reference Listing
Attachment 7: Past Performance Questionnaire
Attachment 8: Question(s) Form
Attachment 9: Site Visit Reservation Form
Section K (Page 46 thru 52 of the SF 1442): Representation, Certifications and Other Statements of offerors :
Ensure to complete:
Annual Representations and Certifications(FAR 52.204-8)
Information Regarding Responsibility Matters (FAR 52.209-7)
Alternate A, Annual Representations and Certifications (FAR
252.204-7007)
Exemption from Japanese Customs Duties and Taxes
Pursuant To Status of Forces Agreement
Section L (Pages 53 thru 65 of the SF 1442):
Instructions, Conditions and Notices to Bidders
Proposal Preparation:
Part I, Technical Proposal: Preliminary 35% Design Submittal and Technical Narratives (not to exceed 50 pages), Original +
5 copies (total of 6) and One (1) Electronic Copy (CDR)
Part II, Past Performance Information:
- List of all projects completed within last 3 years since 21
Nov 14 (The RFP Issuance Date), Original + 5 copies (total of 6) and One (1) Electronic Copy (CDR)
- Past Performance Questionnaire (PPQ), No more than 5
PPQs completed by Customers of the offeror’s previously completed project
Section L: Instructions, Conditions and Notices to
Bidders (Continued)
Part II, Past Performance Information (Continued):
- Past Performance information: Original + 5 copies (total of
6) and One (1) Electronic Copy (CDR)
Request your customer to submit the PPQ or Construction
Contractor Appraisal Support System (CCAS)/Construction
Performance Assessment Reporting System (CPARS) for
Government’s projects to 18 CONS POC (Mr. Kiyoshi Higa).
Submission due date is Not Later Than1400 hours, 19 Dec 14
(Fri), JST
Section L: Instructions, Conditions and Notices to
Bidders (Continued)
Part III, Price Proposal:
- Completed Attachment 3, Price Proposal for Mini-MACC
Sample Project, of this RFP.
- SF 1442, Section A (Completed block 14, 15, 16, 19, 20A, 20
B and 20C) and Section K
Other submittals: Documentation(s) for Licensing, Bonding, Joint Venture Offerors, Teaming/Partnering Offerors and a copy of the Japanese Certification Skill License
Proposal Due Date is NLT 1400 hours, 9 Jan 15 (Fri), JST
Section M (Page 66 thru 69 of the SF 1442):
Evaluation Factors for Award
PPT: Past Performance history and technical acceptability will be evaluated on a basis significantly more important than , cost or price considerations
Evaluation factors and steps:
1. Technical Acceptability (pass/fail)
Assign an “Acceptable” or “Unacceptable”
2. Past Performance - Assign “Performance Confidence
Assessments Rating”
3. Price
More Info
Issued/posted Amendment 1 and Q & A, #1 on Federal Business
Opportunity site (FedBizOpps), 2 Dec 2014
Issued/posted Amendment 2 and Q & A, #2 on FedBizOpps, 9 Dec
PPQs or DD Form 2626, PRIRS, CCASS, ACASS due date is 19
Dec 14, 1400 hours, JST
Post Conference/Site Visit Request for Information (RFI) due date is 24 Dec 14, 1400 hours, JST
Proposal due date is 9 Jan 2015,1400 hrs, JST: Date stamp and drop into the bid box at B95 Front Area
Submit all documents in English
Sample project:
LXEZ 04-1490, Renovate Restrooms, Weekender
Lounge, Bldg. 313
Location: Kadena Air Base, Okinawa, Japan
Project Magnitude: $100,000 to $250,000 (or ¥ equivalent)
Reference: Section J, Attachment 2 and 3:
Preliminary 35% Design Submittals
Technical Narrative (NTE 50 pages)
Price Proposal
Questions?