RFI - QA FA524025R0001_1 May 2025.pdf

PDF 203 KB Posted

Attached to
AJJW 25-1071M Repair Marbo BPS Tank 2, Wells 1 and 3
Solicitation number
FA524025R0001
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation FA524025R0001, related to the Repair of Marbo Bulk Plumbing Station (BPS) Tank 2 and Wells 1 & 3 at Andersen Air Force Base. The Q&A addresses six key questions from potential bidders, primarily focusing on project magnitude, past performance evaluation criteria, and site visit access requirements. The government clarified that for past performance evaluation, projects must be greater than $3 million to be considered relevant, and the project's overall magnitude ranges from $20 to $100 million. Additionally, the site visit location is outside the main Andersen Air Force Base and does not require a base pass, providing logistical clarity for potential contractors.

View the file

Other files

File Type Posted
RFI - QA FA524025R0001_23 May 2025.pdf PDF
RFI - QA FA524025R0001_19 May 2025.pdf PDF
RFI - QA FA524025R0001_14 May 2025.pdf PDF
RFI - QA FA524025R0001_9 May 2025.pdf PDF
RFI - QA FA524025R0001_29 April 2025.pdf PDF
Solicitation Amendment FA524025R00010002 SF 30.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ)_Rev 24Apr25.docx DOCX document
Solicitation Amendment - FA524025R00010002.pdf PDF
Solicitation Amendment - FA524025R00010001.pdf PDF
Solicitation Amendment FA524025R00010001 SF 30.pdf PDF
Attachment 04 - Site Location Map.pdf PDF
Attachment 07 - Past Performance Fact Sheet.docx DOCX document
Attachment 05 - Attach A - 36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Attachment 13 - Project Requirement Price Schedule.pdf PDF
Attachment 09 - AAFB Installation Facilities Standards (IFS).pdf PDF
Attachment 10 - Wage Determination (GU20250001).pdf PDF
Attachment 01 - Statement of Work (SOW) dated 03 February 2025.pdf PDF
Attachment 12 - PIEE Proposal Manager Guide.pdf PDF
Attachment 02 - AJJW 25-1071M 35 Percent Concept Design dated 12 July 2024.pdf PDF
Solicitation - FA524025R0001.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 03 - AJJW 25-1071M 35 Percent Design Submittal dated 12 July 2024.pdf PDF
Attachment 06 - Attach B - AADB Contractor Antiterroism Awareness.pdf PDF
Attachment 11 - Common Construction Prevailing Wage Rates for Guam.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Question/Comment Government Response

1442 and Section M – in the 1442 the magnitude of the project is noted as $20 to $100 million. In Section M, Evaluation Factors for Award, the relevant project size is noted a greater than $3,000,000. The Government’s requirement for the work is inconsistent. Is the project value $1M to $5M

Per FAR 36.204 and DFARS 236.204, the magnitude of construction refers to the estimated price range of the anticipated award. Section M references the evaluations factors to be used to make the award, particularly, the past performance factor. Under past performance, there are three (3) elements that the Government will assess: recency, relevancy, and performance quality. For a project to be considered RELEVANT, projects must meet all three criteria of SCOPE, MAGNITUDE, and COMPLEXITY. To meet the requirement of MAGNITUDE, projects that are submitted either through offeror PPQs or ratings received in the Federal Past Performance Information Retrieval System (PPIRS)/Contractor Performance Assessment Reporting System (CPARS) shall be greater than $3M. Any submission of a past project(s) $3M or less will be considered NOT RELEVANT.

1442 and Section M – in the 1442 the magnitude of the project is noted as $20 to $100 million. In Section M, Evaluation Factors for Award, the relevant project size is noted a greater than $3,000,000. The Government’s requirement for the work is inconsistent. Will the Government make the relevant project value(s) greater than $20,000,000?

Please see Response 1.

Section M – for an “Acceptable” evaluation of relevancy, will the Government require at least one project to be greater than $20,000,000 in contract value?

The Government will consider for evaluation completed projects that are greater than $3M. In accordance with Section M of the solicitation, magnitude refers to the value of past performance project information being evaluated and is only one of three criteria that offerors shall meet in order for a project to be considered RELEVANT. Acceptability refers to the Government's overall Past Performance Evaluation Rating of an offeror's proposal.

1442 and Section M – the Government defines “RELEVANT” as “Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation.” Which “magnitude” is the Government referring to, the value of the requirement as noted in the 1442, or the contract value greater than $3,000,000?

Please see Response 3.

1442 and Section M – If the Government’s response to the definition of relevancy is a project greater than $3,000,000, what is the relevance of the Magnitude noted on the 1442 of $20,000,000 to $100,000,000?

Please see Response 1.

I have a question about the site visit. Do the attendees need an Andersen Base Pass to access the sites? Or do they need any type of passes to enter Camp Skaggs, where it will be held?

The project site is located outside of the main Andersen Air Force Base and does not require an Andersen Air Force Base Pass.

FA524025R0001 - AJJW 25-1071M Repair Marbo Bulk Plumbing Station (BPS) Tank 2 and Wells 1 & 3 - Questions & Answers (Q&A)

***NO FURTHER ENTRIES***