This document is a 35% Concept Design report for the repair of the Marbo Bulk Pumping Station (BPS), Tank 2, and Wells 1 & 3 located at Andersen Air Force Base in Guam. The design package, prepared by POND CDM Smith Joint Venture, outlines comprehensive rehabilitation and improvement work for multiple water infrastructure components. Specific improvements include installing a dual pump system at BPS 2 with new pump controls, rehabilitating the chlorination control room, replacing building walls, and adding sanitary connections. Tank 2 repairs involve leak inspection, wall repairs, installing new gauges and sensors, replacing ventilation components, and waterproofing. Wells 1 and 3 will be relocated, with existing buildings converted to electrical rooms, and new instrumentation and control systems added. The project also includes electrical upgrades, video surveillance, and intrusion detection systems.

The document is part of a federal contract opportunity (Solicitation Number FA524025R0001) valued between $20-100 million, set aside exclusively for HUBZone small businesses under NAICS code 237110. The project is situated at Andersen Air Force Base in Guam, with a planned performance period of 800 calendar days. The design was completed on July 12, 2024, and is part of a design-build contract for comprehensive water infrastructure repair and modernization. The concept design includes detailed technical specifications across civil, environmental, structural, mechanical, and electrical domains, with appendices covering hydraulic calculations, record drawings, sustainability checklists, and specifications.

View the file

Other files

File Type Posted
RFI - QA FA524025R0001_23 May 2025.pdf PDF
RFI - QA FA524025R0001_19 May 2025.pdf PDF
RFI - QA FA524025R0001_14 May 2025.pdf PDF
RFI - QA FA524025R0001_9 May 2025.pdf PDF
RFI - QA FA524025R0001_1 May 2025.pdf PDF
RFI - QA FA524025R0001_29 April 2025.pdf PDF
Solicitation Amendment FA524025R00010002 SF 30.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ)_Rev 24Apr25.docx DOCX document
Solicitation Amendment - FA524025R00010002.pdf PDF
Solicitation Amendment - FA524025R00010001.pdf PDF
Solicitation Amendment FA524025R00010001 SF 30.pdf PDF
Attachment 04 - Site Location Map.pdf PDF
Attachment 07 - Past Performance Fact Sheet.docx DOCX document
Attachment 05 - Attach A - 36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Attachment 13 - Project Requirement Price Schedule.pdf PDF
Attachment 09 - AAFB Installation Facilities Standards (IFS).pdf PDF
Attachment 10 - Wage Determination (GU20250001).pdf PDF
Attachment 01 - Statement of Work (SOW) dated 03 February 2025.pdf PDF
Attachment 12 - PIEE Proposal Manager Guide.pdf PDF
Solicitation - FA524025R0001.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 03 - AJJW 25-1071M 35 Percent Design Submittal dated 12 July 2024.pdf PDF
Attachment 06 - Attach B - AADB Contractor Antiterroism Awareness.pdf PDF
Attachment 11 - Common Construction Prevailing Wage Rates for Guam.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

1230067127E Cross-Out

1230067127E Cross-Out

BPS 2 (Marbo) - Andersen Airforce Base Project: Andersen Air Force Base User Provided

Date: 4/12/23 Calculated Calc By: Wothke

Description: Marbo BPS 2 Checked By:

Gravity: 32.2 ft/sec2 C (Hz/Wm): 130 Ductile Iron Pipe/PVC

Correction Factor for Sewage 1.05

Static Head:

Max WSE in Tank 2 364.00 Avg. WSE in Tank 2 357.50 Min. WSE in Tank 2 351.00

Min WL in Tank 4 548.00 417.81+10/(12*2) Maximum Water Level in Tank 4 566.20 CL Elevation of Pipe

K values Fitting

Entrance 1 Reducer 0.3

Frictional Losses: 90 Deg 0.2 Hazen Williams Equation (rearranged): 45 Deg 0.15

Friction loss through Pipe Hf = (10.44)(L ft)(Q gpm)^1,85 22.5 Deg 0.1

(C^1.85)(d in)^4.8655 Magmeter 0.15

Minor losses Hm = K* v2/2g Tee Straight 0.5

Tee Branch 1 HL = Hf + Hm Wye Straight 0.3

Check Valve 1 Butterfly Valve 0.4 Exit 1

TDH at Max WSE TDH at Avg. WSE TDH at Min WSE Plug Valve 0.5

Q = 650 gpm 208.45 214.95 221.45 Up to High Point Gate Valve 2.6

202.19 208.69 215.19 Up to Disch MH

Friction and Minor Losses Tank 2 to Booster Dia. Length K Capacity (Q) Capacity (Q) Velocity Hf Hm HL Total HL

Description (in.) (ft) (gpm) (cfs) (fps) (ft) (ft) (ft) (ft) Entrance 14 0 1.00 650 1.45 1.35 0.00 0.03 0.03 0.03

PIPE 14 20 0.00 650 1.45 1.35 0.01 0.00 0.01 0.04

90 Deg 14 0 0.20 650 1.45 1.35 0.00 0.01 0.01 0.05

PIPE 14 20 0.00 650 1.45 1.35 0.01 0.00 0.01 0.06

Tee Straight 14 0 0.50 650 1.45 1.35 0.00 0.01 0.01 0.06

PIPE 14 30 0.00 650 1.45 1.35 0.02 0.00 0.02 0.08

Tee Straight 14 0 0.50 650 1.45 1.35 0.00 0.01 0.01 0.09

PIPE 14 30 0.00 650 1.45 1.35 0.02 0.00 0.02 0.11

22.5 Deg 14 0 0.10 650 1.45 1.35 0.00 0.00 0.00 0.10

PIPE 14 5 0.00 650 1.45 1.35 0.00 0.00 0.00 0.10

Tee Branch 14 0 1.00 650 1.45 1.35 0.00 0.03 0.03 0.13

PIPE 14 5 0.00 650 1.45 1.35 0.00 0.00 0.00 0.13

Tee Straight 14 0 0.50 650 1.45 1.35 0.00 0.01 0.01 0.15

PIPE 14 10 0.00 650 1.45 1.35 0.01 0.00 0.01 0.15

22.5 Deg 14 0 0.10 650 1.45 1.35 0.00 0.00 0.00 0.13

PIPE 14 2 0.00 650 1.45 1.35 0.00 0.00 0.00 0.13

22.5 Deg 14 0 0.10 650 1.45 1.35 0.00 0.00 0.00 0.15

Reducer 12 0 0.30 650 1.45 1.84 0.00 0.02 0.02 0.16

PIPE 12 4 0.00 650 1.45 1.84 0.00 0.00 0.00 0.17

Gate Valve 12 0 2.60 650 1.45 1.84 0.00 0.14 0.14 0.28

Reducer 8 0 0.30 650 1.45 4.15 0.00 0.08 0.08 0.36 Length: 122.0 0.13

Sum Ks: 6.9 Booster to Tank 4 Dia. Length K Capacity (Q) Capacity (Q) Velocity Hf Hm HL Total HL

Description (in.) (ft) (gpm) (cfs) (fps) (ft) (ft) (ft) (ft)

Reducer 8 0 0.30 325 0.72 2.07 0.00 0.02 0.02 0.02 90 Deg 10 0 0.20 325 0.72 1.33 0.00 0.01 0.01 0.03 Reducer 10 0 0.30 325 0.72 1.33 0.00 0.01 0.01 0.04

PIPE 12 10 0.00 325 0.72 0.92 0.00 0.00 0.00 0.04

45 Deg 12 0 0.15 325 0.72 0.92 0.00 0.00 0.00 0.04

PIPE 12 15 0.00 325 0.72 0.92 0.01 0.00 0.01 0.05

45 Deg 12 0 0.15 325 0.72 0.92 0.00 0.00 0.00 0.05

PIPE 12 2 0.00 325 0.72 0.92 0.00 0.00 0.00 0.05

Tee Straight 12 0 0.50 325 0.72 0.92 0.00 0.01 0.01 0.06

PIPE 12 5 0.00 650 1.45 1.84 0.01 0.00 0.01 0.06

Tee Straight 12 0 0.50 650 1.45 1.84 0.00 0.03 0.03 0.09

PIPE 12 2 0.00 650 1.45 1.84 0.00 0.00 0.00 0.09

45 Deg 12 0 0.15 650 1.45 1.84 0.00 0.01 0.01 0.10

PIPE 12 2 0.00 650 1.45 1.84 0.00 0.00 0.00 0.10

45 Deg 12 0 0.15 650 1.45 1.84 0.00 0.01 0.01 0.11

PIPE 12 2 0.00 650 1.45 1.84 0.00 0.00 0.00 0.11

90 Deg 12 0 0.20 650 1.45 1.84 0.00 0.01 0.01 0.12 Gate Valve 12 0 2.60 650 1.45 1.84 0.00 0.14 0.14 0.27

PIPE 12 2 0.00 650 1.45 1.84 0.00 0.00 0.00 0.27

90 Deg 12 0 0.20 650 1.45 1.84 0.00 0.01 0.01 0.28

PIPE 12 113 0.00 650 1.45 1.84 0.14 0.00 0.14 0.42

22.5 Deg 12 0 0.10 650 1.45 1.84 0.00 0.01 0.01 0.42

PIPE 12 4000 0.00 650 1.45 1.84 4.83 0.00 4.83 5.26

Tee Straight 12 0 0.50 650 1.45 1.84 0.00 0.03 0.03 5.29

PIPE 12 800 0.00 650 1.45 1.84 0.97 0.00 0.97 6.25

Tee Straight 12 0 0.50 650 1.45 1.84 0.00 0.03 0.03 6.28

PIPE 12 8000 0.00 650 1.45 1.84 9.67 0.00 9.67 15.95

Tee Straight 12 0 0.50 650 1.45 1.84 0.00 0.03 0.03 15.98

PIPE 12 1000 0.00 650 1.45 1.84 1.21 0.00 1.21 17.16

90 Deg 12 0 0.20 650 1.45 1.84 0.00 0.01 0.01 17.17

PIPE 12 800 0.00 650 1.45 1.84 0.97 0.00 0.97 18.13

Exit 12 0 1.00 650 1.45 1.84 0.00 0.06 0.06 18.19

Length: 14753.0 18.19 Sum Ks: 14753.0

Headloss from Tank 2 to Tank 4 (ft): 18.32 Max Head Required 239.77 Min Head Required 220.51 Avg Head Required 227.01

David Smith

Well 1 - Andersen Airforce Base

Date: 4/12/23 Calculated Calc By: Wothke

Description: Well No. 1

Checked By:

Gravity: 32.2 ft/sec2 C (Hz/Wm): 130 Ductile Iron Pipe/PVC

Correction Factor for Sewage 1.05

Static Head:

Static Water Level 380.00

Pumping Water Level 390.00 Assumes 10-Foot Drawdown for Pumping Level Total Depth of Well 400.00

Elevation of Well 348.00 Elevation of Tank 2 Overflow 364.00

K values Fitting

Entrance 1 Reducer 0.3

Frictional Losses: 90 Deg 0.2

Hazen Williams Equation (rearranged): 45 Deg 0.15

Friction loss through Pipe Hf = (10.44)(L ft)(Q gpm)^1,85 22.5 Deg 0.1

(C^1.85)(d in)^4.8655 Magmeter 0.15

Minor losses Hm = K* v2/2g Tee Straight 0.5 Tee Branch 1

HL = Hf + Hm Wye Straight 0.3 Check Valve 1 Butterfly Valve 0.4 Exit 1

Static Water Level Pumping Water Level Total Depth of Well Plug Valve 0.5

Q = 320 gpm -16.00 -26.00 -36.00 Gate Valve 2.6 -24.77 -34.77 -44.77

Friction and Minor Losses Dia. Length K Capacity (Q) Capacity (Q) Velocity Hf Hm HL Total HL

Description (in.) (ft) (gpm) (cfs) (fps) (ft) (ft) (ft) (ft)

Entrance 6 0 1.00 320 0.71 3.63 0.00 0.22 0.22 0.22

PIPE 6 400 0.00 320 0.71 3.63 3.80 0.00 3.80 4.01

90 Deg 6 0 0.20 320 0.71 3.63 0.00 0.04 0.04 4.06

PIPE 6 2 0.00 320 0.71 3.63 0.02 0.00 0.02 4.08

Tee Straight 6 0 0.50 320 0.71 3.63 0.00 0.11 0.11 4.18

Check Valve 6 0 1.00 320 0.71 3.63 0.00 0.22 0.22 4.40

Magmeter 6 0 0.15 320 0.71 3.63 0.00 0.03 0.03 4.43

Gate Valve 6 0 2.60 320 0.71 3.63 0.00 0.56 0.56 4.99

45 Deg 6 0 0.15 320 0.71 3.63 0.00 0.03 0.03 5.02

PIPE 6 1 0.00 320 0.71 3.63 0.01 0.00 0.01 5.03

45 Deg 6 1 0.15 320 0.71 3.63 0.01 0.03 0.04 5.07

PIPE 6 5 0.00 320 0.71 3.63 0.05 0.00 0.05 5.12

90 Deg 6 0 0.20 320 0.71 3.63 0.00 0.04 0.04 5.16

PIPE 6 170 0.00 320 0.71 3.63 1.61 0.00 1.61 6.78

90 Deg 6 0 0.20 320 0.71 3.63 0.00 0.04 0.04 6.82

PIPE 6 20 0.00 320 0.71 3.63 0.19 0.00 0.19 7.01

Exit 6 0 1.00 320 0.71 3.63 0.00 0.22 0.22 7.23

Length: 599.0 7.23

Sum Ks: 7.2

Total Pump Head Required 423 Additional Efficiency Considerations 466

Well 3 - Andersen Airforce Base

Date: 4/12/23 Calculated Calc By: Wothke

Description: Well No. 3

Checked By:

Gravity: 32.2 ft/sec2 C (Hz/Wm): 130 Ductile Iron Pipe/PVC

Correction Factor for Sewage 1.05

Static Head:

Static Water Level 405.00

Pumping Water Level 416.00 Assumes 10-Foot Drawdown for Pumping Level Total Depth of Well 427.00

Elevation of Well 405.00 Elevation of Tank 2 Overflow 364.00

K values Fitting

Entrance 1 Reducer 0.3

Frictional Losses: 90 Deg 0.2

Hazen Williams Equation (rearranged): 45 Deg 0.15

Friction loss through Pipe Hf = (10.44)(L ft)(Q gpm)^1,85 22.5 Deg 0.1

(C^1.85)(d in)^4.8655 Magmeter 0.15

Minor losses Hm = K* v2/2g Tee Straight 0.5 Tee Branch 1

HL = Hf + Hm Wye Straight 0.3 Check Valve 1 Butterfly Valve 0.4 Exit 1

Static Water Level Pumping Water Level Total Depth of Well Plug Valve 0.5

Q = 225 gpm -41.00 -52.00 -63.00 Gate Valve 2.6

44.97 33.97 22.97

Friction and Minor Losses Dia. Length K Capacity (Q) Capacity (Q) Velocity Hf Hm HL Total HL

Description (in.) (ft) (gpm) (cfs) (fps) (ft) (ft) (ft) (ft)

Entrance 4 0 1.00 225 0.50 5.75 0.00 0.54 0.54 0.54

PIPE 4 427 0.00 225 0.50 5.75 15.20 0.00 15.20 15.73

90 Deg 4 0 0.20 225 0.50 5.75 0.00 0.11 0.11 15.84

PIPE 4 2 0.00 225 0.50 5.75 0.07 0.00 0.07 15.91

Tee Straight 4 0 0.50 225 0.50 5.75 0.00 0.27 0.27 16.18

Check Valve 4 0 1.00 225 0.50 5.75 0.00 0.54 0.54 16.72

Magmeter 4 0 0.15 225 0.50 5.75 0.00 0.08 0.08 16.80

Gate Valve 4 0 2.60 225 0.50 5.75 0.00 1.40 1.40 18.20

Reducer 4 0 0.30 225 0.50 5.75 0.00 0.16 0.16 18.36

45 Deg 6 0 0.15 225 0.50 2.55 0.00 0.02 0.02 18.22

PIPE 6 1 0.00 225 0.50 2.55 0.00 0.00 0.00 18.22

45 Deg 6 1 0.15 225 0.50 2.55 0.00 0.02 0.02 18.24

PIPE 6 5 0.00 225 0.50 2.55 0.02 0.00 0.02 18.27

90 Deg 6 0 0.20 225 0.50 2.55 0.00 0.02 0.02 18.29

PIPE 6 1710 0.00 225 0.50 2.55 8.46 0.00 8.46 26.75

90 Deg 6 0 0.20 225 0.50 2.55 0.00 0.02 0.02 26.77

PIPE 6 3500 0.00 225 0.50 2.55 17.32 0.00 17.32 44.10

90 Deg 6 0 0.20 225 0.50 2.55 0.00 0.02 0.02 44.12

PIPE 6 150 0.00 225 0.50 2.55 0.74 0.00 0.74 44.86

Exit 6 0 1.00 225 0.50 2.55 0.00 0.11 0.11 44.97

Length: 5796.0 44.97

Sum Ks: 7.7

Total Pump Head Required 431 Additional Efficiency Considerations 474

05010

1, 1, TDH (ft)

Fl ow

(M

GD

M ar bo B

PS

Sy st em

C ur ve

M ax

W

SE

S ys te m

C ur ve Av g.

W

SE

S ys te m C ur ve

M in

W

SE

S ys te m

C ur ve Pu m p

Cu rv e

UFGS TABLE OF CONTENTS - May 2024

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 02/24 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24 SUMMARY OF WORK

01 14 00 11/22, CHG 2: 05/24 WORK RESTRICTIONS

01 20 00 11/20, CHG 3: 02/23 PRICE AND PAYMENT PROCEDURES

01 30 00 11/20, CHG 3: 08/23 ADMINISTRATIVE REQUIREMENTS

01 31 23.13 20 08/23, CHG 1: 02/24 ELECTRONIC CONSTRUCTION AND FACILITY

SUPPORT CONTRACT MANAGEMENT SYSTEM

(eCMS)

01 32 01.00 10 08/23 PROJECT SCHEDULE

01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS

SCHEDULES

01 32 17.00 20 11/23 COST-LOADED NETWORK ANALYSIS SCHEDULES

(NAS)

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 16.00 10 05/16 DESIGN DATA (DESIGN AFTER AWARD)

01 33 29 02/21 SUSTAINABILITY REQUIREMENTS AND

REPORTING

01 35 13 11/20, CHG 1: 02/22 SPECIAL PROJECT PROCEDURES

01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 29.13 11/15, CHG 1: 08/22 HEALTH, SAFETY, AND EMERGENCY RESPONSE

PROCEDURES FOR CONTAMINATED SITES

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 42 15 02/24 METRIC MEASUREMENTS

01 45 00 08/23, CHG 1: 05/24 QUALITY CONTROL

01 45 35 05/24 SPECIAL INSPECTIONS

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 08/19, CHG 5: 08/22 PROJECT IDENTIFICATION

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS

01 78 24.00 20 05/23, CHG 1: 11/23 FACILITY DATA WORKBOOK (FDW)

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 [DEMOLITION][ AND ][DECONSTRUCTION]

02 61 13 02/10, CHG 1: 02/21 EXCAVATION AND HANDLING OF

CONTAMINATED MATERIAL

02 82 00 11/18, CHG 1: 11/19 ASBESTOS REMEDIATION

02 83 00 11/18 LEAD REMEDIATION

DIVISION 03 - CONCRETE

03 01 00 02/18 REHABILITATION OF CONCRETE

03 30 00 02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 08/23 METAL STAIRS

05 52 00 08/23 METAL RAILINGS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/23 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

DIVISION 10 - SPECIALTIES

10 28 13 08/20 TOILET ACCESSORIES

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 22 - PLUMBING

22 00 00 05/24 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 19.00 10 11/22 INSULATED WIRE AND CABLE

26 05 48 11/23 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT

26 05 73 08/23 POWER SYSTEM STUDIES

26 12 19 05/24 PAD-MOUNTED, LIQUID-FILLED,

MEDIUM-VOLTAGE TRANSFORMERS

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 27 14.00 20 02/21, CHG 1: 05/21 ELECTRICITY METERING

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15 05/24 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 42 15 05/21 CATHODIC PROTECTION SYSTEM FOR THE

INTERIOR OF STEEL WATER TANKS

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 55 53 11/23 SECURITY LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 08/23 ELECTRONIC SECURITY SYSTEM ACCEPTANCE

TESTING

28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS)

DIVISION 31 - EARTHWORK

31 00 00 08/23 EARTHWORK

31 10 00 02/21 SITE CLEARING

31 11 00 11/18 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 05/22 [AGGREGATE BASE COURSE]

[AND/OR][GRADED CRUSHED AGGREGATE BASE

COURSE] FOR FLEXIBLE PAVING

32 31 13 11/21 CHAIN LINK FENCES AND GATES

32 92 19 08/17, CHG 1: 08/21 SEEDING

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 11 13 08/17 POTABLE WATER SUPPLY WELLS

33 30 00 05/18 SANITARY SEWERAGE

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 45 04.00 10 11/20 SUBMERSIBLE PUMP, CENTRIFUGAL TYPE

35 45 04 HORIZONTAL SPLIT CASE PUMP

-- End of Master Table of Contents --