Attachment 13 - Project Requirement Price Schedule.pdf
PDF 118 KB Posted
- Solicitation number
- FA524025R0001
About this file
This document is a Project Requirement Price Schedule for a federal contract opportunity to repair infrastructure at Andersen Air Force Base in Guam. The project involves comprehensive upgrades to the Marbo Bulk Pumping Station (BPS), including installation of a dual pump system, rehabilitation of the chlorination control room, tank repairs, well relocations, and site improvements. Specific work includes replacing walls, installing sanitary connections, adding SCADA systems, performing tank leakage inspections, replacing ventilation components, waterproofing, and implementing electrical and surveillance upgrades.
The solicitation (FA524025R0001) is a 100% small business HUBZone set-aside with a Firm Fixed Price contract type, targeting water and sewer infrastructure construction. The project is valued between $20-100 million, with a performance period of 800 calendar days. Key dates include a site visit on 07 May 2025 and a request for information deadline of 16 May 2025. Proposals will be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE), with the contracting agency being the Department of the Air Force Pacific Air Forces.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI FA524025R0001
Attachment 13
CUI
PROJECT REQUIREMENT PRICE SCHEDULE
Project #: AJJW 25-1071M
Project Name: Repair Marbo Bulk Pumping Station (BPS) Tank 2 and Wells 1 and 3 Andersen Air Force Base, GU
Project Description: The Contractor repair the Marbo Booster Pump Station (BPS) 2, Tank 2, and Wells 1 & 3. BPS 2 improvements include installation of a dual pump system, rehabilitation of the chlorination control room, and replacement of wall between chlorination and pump rooms. Sanitary connections will be installed for restroom addition and all instrumentation and control (SCADA) systems for new pump operation. Tank 2 improvements include tank leakage inspection and recommended repairs of the internal and exterior tank walls. Additional Gauges and sensors for leak protection and monitoring. Rehabilitation also includes replacement of ventilation pipes and hatch accesses, roof water proofing treatment, PVC liner and replacement of all associated corroded appurtenances. Well 1 and Well 3 repairs will include the relocation of the well, drilled outside of the building, removal and relocation of the existing pipe, conversion of existing building, and provisions for instrumentation and control (SCADA) equipment.
The site will include electrical upgrades and video surveillance system with intrusion detection capabilities. Work shall be performed in accordance with the Statement of Work and all associated attachments.
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE
TOTAL
EVALUATED
PRICE (TEP)
AJJW 25-1071M, Repair Marbo Bulk Pumping Station (BPS) Tank 2 and Wells 1 and 3 Andersen Air Force Base, GU
1 LOT
CONTRACTOR/OFFEROR NAME ADDRESS
Proposal Valid Through (Date): ____________
SIGNATURE DATE SIGNED