This document is a Project Requirement Price Schedule for a federal contract opportunity to repair infrastructure at Andersen Air Force Base in Guam. The project involves comprehensive upgrades to the Marbo Bulk Pumping Station (BPS), including installation of a dual pump system, rehabilitation of the chlorination control room, tank repairs, well relocations, and site improvements. Specific work includes replacing walls, installing sanitary connections, adding SCADA systems, performing tank leakage inspections, replacing ventilation components, waterproofing, and implementing electrical and surveillance upgrades.

The solicitation (FA524025R0001) is a 100% small business HUBZone set-aside with a Firm Fixed Price contract type, targeting water and sewer infrastructure construction. The project is valued between $20-100 million, with a performance period of 800 calendar days. Key dates include a site visit on 07 May 2025 and a request for information deadline of 16 May 2025. Proposals will be submitted electronically through the Procurement Integrated Enterprise Environment (PIEE), with the contracting agency being the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
RFI - QA FA524025R0001_23 May 2025.pdf PDF
RFI - QA FA524025R0001_19 May 2025.pdf PDF
RFI - QA FA524025R0001_14 May 2025.pdf PDF
RFI - QA FA524025R0001_9 May 2025.pdf PDF
RFI - QA FA524025R0001_1 May 2025.pdf PDF
RFI - QA FA524025R0001_29 April 2025.pdf PDF
Solicitation Amendment FA524025R00010002 SF 30.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ)_Rev 24Apr25.docx DOCX document
Solicitation Amendment - FA524025R00010002.pdf PDF
Solicitation Amendment - FA524025R00010001.pdf PDF
Solicitation Amendment FA524025R00010001 SF 30.pdf PDF
Attachment 04 - Site Location Map.pdf PDF
Attachment 07 - Past Performance Fact Sheet.docx DOCX document
Attachment 05 - Attach A - 36 CES Contractors BUILDER Inventory Sheet Template.xlsx XLSX spreadsheet
Attachment 09 - AAFB Installation Facilities Standards (IFS).pdf PDF
Attachment 10 - Wage Determination (GU20250001).pdf PDF
Attachment 01 - Statement of Work (SOW) dated 03 February 2025.pdf PDF
Attachment 12 - PIEE Proposal Manager Guide.pdf PDF
Attachment 02 - AJJW 25-1071M 35 Percent Concept Design dated 12 July 2024.pdf PDF
Solicitation - FA524025R0001.pdf PDF
Attachment 08 - Past Performance Questionnaire (PPQ).docx DOCX document
Attachment 03 - AJJW 25-1071M 35 Percent Design Submittal dated 12 July 2024.pdf PDF
Attachment 06 - Attach B - AADB Contractor Antiterroism Awareness.pdf PDF
Attachment 11 - Common Construction Prevailing Wage Rates for Guam.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI FA524025R0001

Attachment 13

CUI

PROJECT REQUIREMENT PRICE SCHEDULE

Project #: AJJW 25-1071M

Project Name: Repair Marbo Bulk Pumping Station (BPS) Tank 2 and Wells 1 and 3 Andersen Air Force Base, GU

Project Description: The Contractor repair the Marbo Booster Pump Station (BPS) 2, Tank 2, and Wells 1 & 3. BPS 2 improvements include installation of a dual pump system, rehabilitation of the chlorination control room, and replacement of wall between chlorination and pump rooms. Sanitary connections will be installed for restroom addition and all instrumentation and control (SCADA) systems for new pump operation. Tank 2 improvements include tank leakage inspection and recommended repairs of the internal and exterior tank walls. Additional Gauges and sensors for leak protection and monitoring. Rehabilitation also includes replacement of ventilation pipes and hatch accesses, roof water proofing treatment, PVC liner and replacement of all associated corroded appurtenances. Well 1 and Well 3 repairs will include the relocation of the well, drilled outside of the building, removal and relocation of the existing pipe, conversion of existing building, and provisions for instrumentation and control (SCADA) equipment.

The site will include electrical upgrades and video surveillance system with intrusion detection capabilities. Work shall be performed in accordance with the Statement of Work and all associated attachments.

ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE

TOTAL

EVALUATED

PRICE (TEP)

AJJW 25-1071M, Repair Marbo Bulk Pumping Station (BPS) Tank 2 and Wells 1 and 3 Andersen Air Force Base, GU

1 LOT

CONTRACTOR/OFFEROR NAME ADDRESS

Proposal Valid Through (Date): ____________

SIGNATURE DATE SIGNED