This document contains questions and answers regarding solicitation number FA524023R0030 for repair of Booster Pump Station #3 at Andersen Air Force Base in Guam. The solicitation involves mechanical demolition and removal of the existing booster pump, accessories, components, pipes, fittings, supports, and valves. It also includes demolition and removal of existing bypass piping, water meters, accessories, components, supports, fittings, and valves in the bypass pit. All existing pipes, fittings, valves, and supports in the bypass pit will be removed, with new bypass piping installed above ground. The point of connection for the new aboveground waterline and as-built documents for buildings and underground waterline connections can be found in the solicitation attachments.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question # Reference Question/Comment Government Response

1 FA524023R0030

Mechanical demolition and removal states that, “Remove and dispose of existing booster pump, accessories, components, pipes, fittings, support, and valve”. Kindly confirm if this includes the exterior valves and fittings located adjacent to the buildings.

Yes, all fittings, valves and supports that will be affected during the replacement of booster pump.

2 FA524023R0030

Section 2.3 Demolition and Removal, page 7 of 33, By- Pass Pit, East of B682 Mechanical item b states that, “Remove and dispose of existing by-pass piping, water meters, accessories, components, supports, fittings, and valves”. Kindly confirm that the underground piping connected to the by-pass piping will not be removed and shall be abandoned in place since the bypass pit will be backfilled and the new by-pass piping will be installed above ground.

All existing pipes, fittings, valves, supports in by-pass pit will be removed. New by-pass piping will be above ground and connected to existing underground pipe.

3 FA524023R0030

Can you confirm that no exterior underground piping shall be removed, and all new piping shall be installed aboveground aside from the new underground piping for the inter-tie vault, west of B685?

All exposed piping will be elevated above ground level located west of Bldg-686.

4 FA524023R0030

Can you provide a point of connection (POC) for the new aboveground waterline?

See Section J, Attachment 8 in Solicitation.

5 FA524023R0030

May we request a copy of the civil, mechanical, and electrical as built for all the buildings as well as the as built of the existing underground waterline connections of the of the booster pump?

See Section J, Attachment 9 in Solicitation .