Project No. AJJY 22-1063_Questions & Answers (Q&A)_09MAY22.pdf

PDF 6 MB Posted

Attached to
Replace In-Pavement Approach Lighting System at Andersen AFB, Guam
Solicitation number
FA524022R0008
Issued by

About this file

This document provides details for a federal solicitation to replace an in-pavement approach lighting system at Andersen Air Force Base in Guam. The contractor shall replace 58 existing light fixtures flush mounted in the runway pavement as well as outer rings, adapters, underground cables, ground wires, and other components to provide a fully operational lighting system. The work must be completed within 240 calendar days. This acquisition is set aside for Historically Underutilized Business Zone small businesses with a size standard of $16.5 million. The contract type is firm-fixed price. A site visit was held on April 26, 2022 and requests for information were due by May 3, 2022. Proposals must be submitted electronically by the deadline through the Procurement Integrated Enterprise Environment portal. The Government reserves the right to cancel the solicitation before or after the closing date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9 May 2022

Notice ID: FA52022R0008 – Solicitation

Subject Title: Project No. AJJY 22‐1063 Replace In‐Pavement Approach System

Request for Information

Please see below for a new overall drawing as well as drawings for locations E1 through E10.

1. Since we were not able to visit the site earlier, would we be able to get an extension to submit our RFIs until close of business Monday, May 16?

The RFI deadline has been extended to COB 13 May 2022.

2. At 24R North Runway there are 58 units of threshold lighting fixtures. 42 units are on concrete pavement and 16 units pedestal mounted are on the grass area. Please confirm if those 16 units on the grass area are not to be replaced.

See Scope of Work (SOW) Section 2.4.4.a and Attachment 2‐ 24R North Runway‐Partial Site

Plan.

3. Are there any other circuits affected in shutting down the in‐pavement lightings? Please provide a circuit wiring diagram if possible.

There will be other circuit that will be affected in shutting down the in‐pavement lighting.

Attached are the available as‐built drawing plans.

4. Is the north runway will be totally closed during the removal & installation work?

The runway will be closed during the replacement of the light fixtures.

5. Is it necessary to provide temporary lighting?

The runway will be closed during the replacement of the light fixtures.

new t/w fixt new t/ w fix t

Attachment 11 - E1-E10 Combined.pdf
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10