This document is a past performance questionnaire for a firm bidding on Project No. QKKA 171042, Repair Dorm Bldg. 542, Misawa Air Base, Japan. The solicitation is being conducted by the Department of the Air Force Pacific Air Forces under number FA520522R0001. The project involves repair work for Dormitory Building 542 at Misawa Air Base in Japan. Responses to the past performance questionnaire are due to Contracting Squadron personnel no later than 28 December 2021 and will be used to evaluate bidders' experience and performance on previous relevant contracts. The questionnaire requires information on a reference contract, including dollar value, work description, award method, and ratings for quality, management, timeliness, compliance, and overall performance. General comments are also solicited.

View the file

Other files

File Type Posted
FA520522R00010003_Atch3_As-built Drawings (2of2)_16Mar22.pdf PDF
FA520522R00010003_Atch4_Revised solicitation page 1 and 20.pdf PDF
FA520522R00010003.pdf PDF
FA520522R00010003_Atch2_Revised Specifications_16Mar22.pdf PDF
FA520522R00010003_Atch1_Consol List-of-Govt Response_Dorm542_16Mar22.pdf PDF
FA520522R00010003_Atch3_As-built Drawings (1of2)_16Mar22.pdf PDF
FA520522R00010002.pdf PDF
FA520522R00010002_Atch_Revised solicitation page 1.pdf PDF
FA520522R00010001_Atch2_Revised Other Contract Requirements Page 6.pdf PDF
FA520522R00010001.pdf PDF
FA520522R00010001_Atch1_Revised solicitation pages P1_P20_P31.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_03of12_Civil_16Jun20.pdf PDF
RFP FA520522R0001_Repair Dorm Bldg. 542_20Jan22.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_02of12_Hazmat_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_05of12_Structural_16Jun20.pdf PDF
FA520522R0001_Atch6_ACM-LBP Data_18Dec19.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_10of12_Fire Protection_16Jun20.pdf PDF
FA520522R0001_Atch1_Specifications_3Nov21.pdf PDF
FA520522R0001_Atch5_List of Contractor Furnished U.S. Material_3Nov21.pdf PDF
FA520522R0001_Atch3_Other Contract Requirements_28Dec21.pdf PDF
FA520522R0001_Atch4_Schedule of Material Submittals_3Nov21.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_11of12_Life Safety_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_12of12_Telecommunications_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_04of12_Architectural_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_01of12_General_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_08of12_Electrical_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_06of12_Mechanical_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_09of12_EMCS_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_07of12_Plumbing_16Jun20.pdf PDF
FA520522R0001_Atch7_Past Performance Questionnaire Cover Letter_20Jan22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled Unclassified Information When completed, this document is Source Selection Information IAW FAR 2.101 and 3.104.

Section 1: Contract Identification

A. Contractor (Company/Division):

B. Contractor Cage Code:

C. Contract Number:

D. Contract Type (e.g., Firm-Fixed-Price (FFP), Fixed-Price-Incentive-Fee (FPIF), Cost-Plus-Incentive-Fee (CPIF), Cost-Plus-Fixed-Fee (CPFF), etc.):

E. Contract Title:

F. Period of Performance

1. Original Schedule (assuming all options exercised):

Beginning Date _________ through ____________

2. Current Schedule (assuming all options exercised):

Beginning Date _________ through ____________

3. Reason for difference (if applicable):

G. Contract Dollar Value (use FY22 budget rate of ¥106.4531 to $1.00 if conversion is necessary)

1. Original maximum contract dollar value (assuming all options exercised): $

2. Current maximum contract dollar value (assuming all options exercised): $

3. Reasons for difference (if applicable):

H. Description of work performed:

I. Was this a competitively awarded contract? ☐ Yes ☐ No

J. Contractor’s Role: ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel

Section 2: Customer or Agency Identification

A. Customer or agency name:

B. Customer or agency description (if applicable):

C. Geographic description of services under this contract (i.e., local, nationwide, worldwide, other Commands):

Section 3: Respondent Identification

A. Respondent’s name:

B. Respondent’s title:

C. Respondent’s phone number / fax number / e-mail address:

D. Respondent’s position (e.g., Program Manager, PCO/ACO, etc.):

E. Length of time (number of years/months) respondent worked on subject contract and description of responsibility/position/role:

F. Other suggested points of contact:

Section 4: Performance Information

In the tables below, indicate your rating for the contractor’s performance by placing an “X” in the appropriate block to the right of each question. Provide supporting information for each response in the space provided. Attach additional pages if more space is needed. The performance rating scale is defined as follows:

Code Performance Rating

E EXCEPTIONAL – Performance meets contractual requirements and exceeds many requirements to the Government’s benefit. The contractual performance being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

V VERY GOOD – Performance meets contractual requirements and exceeds some requirements to the Government’s benefit. The contractual performance being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

S SATISFACTORY – Performance meets contractual requirements. The contractual performance being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

M MARGINAL – Performance does not meet some contractual requirements. The contractual performance being assessed reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.

U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

N/A NOT APPLICABLE – Unable to provide a rating. Contract did not include performance for this aspect, performance was not observed, or information was not available. Do not know.

Quality Control
E
VG
S
M
U
N/A

Q1. Workmanship and quality control.

Q2. Adequacy / Implementation of CQC plan.

Q3. Adequacy of materials.

Q4. Adequacy of submittals, including as-builts.

Q5. Identification / Correction of deficient work in timely manner.

Effectiveness of Management
E
VG
S
M
U
N/A

E1. Cooperation and responsiveness.

E2. Management of resources / Personnel.

E3. Coordination and control of subcontractors.

E4. Effectiveness of job-site supervision.

Timely Performance
E
VG
S
M
U
N/A

T1. Adequacy of initial progress schedule.

T2. Adherence to approved schedule.

T3. Resolution of Delays.

T4. Submission of required documentation.

Compliance with Labor/Safety Standards
E
VG
S
M
U
N/A

C1. Compliance with labor laws and regulations.

C2. Adequacy of Safety Plan.

C3. Implementation of Safety Plan.

Overall Rating
E
VG
S
M
U
N/A

O1. Based on the above, what is your overall assessment of the present/past performance for this contractor?

Government Contracts Only: Was this contract partially or completely terminated for default or convenience, or are there any pending terminations?

☐ Yes ☐ Default ☐ Convenience ☐ Pending Terminations ☐ No

If yes, please explain (e.g., inability to meet cost, performance, or delivery schedules).

SECTION 5: GENERAL COMMENT

Given what I know today about the contractor’s ability to execute what he promised in his proposal, I [ definitely would, probably would, might or might not, probably would not, definitely would not ] award to him today given that I had a choice.

REMARKS:

Please provide any additional comments concerning this contractor’s performance, as desired.

Respondent’s Signature Date

Thank you for your prompt response and assistance!

Please return this completed questionnaire to:

E-Mail:Ms. Miyako Fujimoto (miyako.fujimoto.jp@us.af.mil)
Mr. Akito Miura (akito.miura.jp@us.af.mil)

Mailing Address:

35th Contracting Squadron Attn: Mr. Akito Miura Bldg. 656, Misawa Air Base, Hirahata, Misawa-shi, Aomori-ken, Japan 033-0012

FAX: 0176-52-4793 (Attn: Mr. Akito Miura) Attachment 8 to RFP No. FA520522R0001 Date: 28 Dec 2021

File details come from the government source that posted it. Updated .