FA520522R0001_Atch2_Drawings_PDF_01of12_General_16Jun20.pdf

PDF 3 MB Posted

Attached to
Project No. QKKA 171042, Repair Dorm Bldg. 542, Misawa Air Base, Japan
Solicitation number
FA520522R0001
Issued by

About this file

This document package includes construction drawings and specifications for the repair of Dormitory Building 542 at Misawa Air Base in Japan. The scope of work involves interior demolition and hazardous material abatement, structural and architectural site improvements, new architectural finishes and windows, renovated electrical and plumbing systems, new telecommunications and energy management control systems, fire alarm/mass notification systems and fire suppression systems, exterior utility improvements, and new heating, ventilation and air conditioning systems. The contractor will be responsible for supervision, management, quality control, labor, equipment, materials and performance of all work depicted in the contract documents, including repairing 1,200 meters of concrete cracks; providing 300 square meters of mold remediation; obtaining and testing 120 bulk samples of suspected asbestos-containing materials; and removing and disposing of asbestos-containing materials at pipe elbows and flanges.

View the file

Other files

File Type Posted
FA520522R00010003_Atch3_As-built Drawings (2of2)_16Mar22.pdf PDF
FA520522R00010003_Atch4_Revised solicitation page 1 and 20.pdf PDF
FA520522R00010003.pdf PDF
FA520522R00010003_Atch2_Revised Specifications_16Mar22.pdf PDF
FA520522R00010003_Atch1_Consol List-of-Govt Response_Dorm542_16Mar22.pdf PDF
FA520522R00010003_Atch3_As-built Drawings (1of2)_16Mar22.pdf PDF
FA520522R00010002.pdf PDF
FA520522R00010002_Atch_Revised solicitation page 1.pdf PDF
FA520522R00010001_Atch2_Revised Other Contract Requirements Page 6.pdf PDF
FA520522R00010001.pdf PDF
FA520522R00010001_Atch1_Revised solicitation pages P1_P20_P31.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_03of12_Civil_16Jun20.pdf PDF
RFP FA520522R0001_Repair Dorm Bldg. 542_20Jan22.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_02of12_Hazmat_16Jun20.pdf PDF
FA520522R0001_Atch8_Past Performance Questionnaire_28Dec21.docx DOCX document
FA520522R0001_Atch2_Drawings_PDF_05of12_Structural_16Jun20.pdf PDF
FA520522R0001_Atch6_ACM-LBP Data_18Dec19.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_10of12_Fire Protection_16Jun20.pdf PDF
FA520522R0001_Atch1_Specifications_3Nov21.pdf PDF
FA520522R0001_Atch5_List of Contractor Furnished U.S. Material_3Nov21.pdf PDF
FA520522R0001_Atch3_Other Contract Requirements_28Dec21.pdf PDF
FA520522R0001_Atch4_Schedule of Material Submittals_3Nov21.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_11of12_Life Safety_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_12of12_Telecommunications_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_04of12_Architectural_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_08of12_Electrical_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_06of12_Mechanical_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_09of12_EMCS_16Jun20.pdf PDF
FA520522R0001_Atch2_Drawings_PDF_07of12_Plumbing_16Jun20.pdf PDF
FA520522R0001_Atch7_Past Performance Questionnaire Cover Letter_20Jan22.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SELFRIDGE STREET

FALCON DRIVE

FISHER STREET

FR

EE

DO

M

DR

IV

E

SWAN DRIVE

FL

EM

IN

G

ST

RE

ET

MAIN GATE

LEVITOW GATE

PROJECT AREA

FALCON DRIVE

APPLE GATE

HAUL ROUTE

FALCON DRIVE

HAUL ROUTE

MISAWA AB

CONTRACTING DATE

CEO DATE

COMMUNICATION DATE

SFS DATE

FW AT/FP DATE

CE ENVIRONMENTAL DATE

SAFETY OFFICER DATE

BIO ENVIRONMENTAL DATE

FIRE DEPARTMENT DATE

REFERENCE NO.

DEPARTMENT OF THE AIR FORCE

PACIFIC AIR FORCES

HEADQUARTERS FIFTH AIR FORCE

BASE CIVIL ENGINEER

MISAWA AIR BASE

MISAWA JAPAN

REVISIONS

SYM. DESCRIPTION DATE APPROVAL

PROJECT NO. 1013751 (QKKA171042)

Project Title: REPAIR DORM 542

MISAWA AB, JAPAN.

APPROVED BY: DATE:

BASE CIVIL ENGINEER

APPROVED BY: DATE:

USING AGENCY

SCALE:

DRAWING NUMBER

SHEET

SEQ. NO.

G-001

CONTRACT DRAWINGS

PROJECT

1013751 (QKKA171042)

REPAIR DORM, B542

MISAWA AB, JAPAN

FINAL DESIGN 6/16/2020

Prime Consultant:

Civil:

Structural:

Mechanical & Plumbing:

CONTACT: TIMOTHY WENDT, PE

EMAIL: TWENDT@OTIE.COM

OTIE - ONEIDA TOTAL INTEGRATED ENTERPRISES

CONTACT: JOHN THOUSAND, PE

TEL: 608-243-6473

EMAIL: JTHOUSAND@OTIE.COM

OTIE - ONEIDA TOTAL INTEGRATED ENTERPRISES

2555 PACKERLAND DRIVE

GREEN BAY, WI 54313

CONTACT: CHAD ALLEN, PE

TEL: 920-884-3967

EMAIL: CALLEN@OTIE.COM

Electrical:

OTIE - ONEIDA TOTAL INTEGRATED ENTERPRISES

CONTACT: CARLOS SANTIAGO

TEL: 619-230-1712 EXT 27

EMAIL: CSANTIAGO@OTIE.COM

2247 SAN DIEGO AVENUE, SUITE 238

SAN DIEGO, CA 92110

OTIE - ONEIDA TOTAL INTEGRATED ENTERPRISES

1033 N. MAYFAIR ROAD SUITE 200

MILWAUKEE, WI 53226

TEL: 608-241-6725

5100 EASTPARK BOULEVARD SUITE 300

MADISON, WI 53718

OTIE - RS&H JOINT VENTURE

Architectural:

RIM ARCHITECTS

851 FORT STREET, SUITE 200

HONOLULU, HI 96813

CONTACT: JOHN VANN

TEL: 808-550-0844

EMAIL: JVANN@RIMARCHITECTS.COM

Hazardous Materials Abatement:

HAWAI'I INTERNATIONAL ENVIRONMENTAL SERVICES, INC.

CONTACT: WILLIAM RANDALL

EMAIL: KANKYO123@AOL.COM

70 KIHAPAI STREET

KAILUA, HI 96734TEL: 808-263-4787

DESIGN TEAM:

CONTACT: ANDREW WALTHER, PE

TEL: 414-607-6762

EMAIL: AWALTHER@OTIE.COM

OF 2321

Telecommunications:

RS&H

10748 DEERWOOD PARK BOULEVARD SOUTH

JACKSONVILLE, FL 32256

CONTACT: STEPHEN CONWAY, PE, RCDD

TEL: 904-256-2713

EMAIL: STEPHEN.CONWAY@RSANDH.COM

Fire Protection:

RS&H

CONTACT: SCOTT LEOPOLD, PE

TEL: 904-256-2273

EMAIL: SCOTT.LEOPOLD@RSANDH.COM

10748 DEERWOOD PARK BOULEVARD SOUTH

JACKSONVILLE, FL 32256

1033 N. MAYFAIR ROAD SUITE 200

MILWAUKEE, WI 53226

CENMD DATE: CEN DATE:

FUJIMOTO.MIYA

KO.1288435894

Digitally signed by

FUJIMOTO.MIYAKO.1288435894

Date: 2021.09.13 09:12:39 +09'00'

VALENTINE.TAYLOR.

BLAKE.1257001330

Digitally signed by

VALENTINE.TAYLOR.BLAKE.125

7001330 Date: 2021.08.04 17:08:57 +09'00'

SALAZAR.DOMANIC.

MARTIN.1184234978

Digitally signed by

SALAZAR.DOMANIC.MARTIN.1184

234978 Date: 2021.08.24 09:57:36 +09'00'

EDDENS.DEANDRE.

JAMAR.1469308142

Digitally signed by

EDDENS.DEANDRE.JAMAR.14693

08142 Date: 2021.08.24 12:36:04 +09'00'

BINNIE.SCOTT.

A.1187127390

Digitally signed by

BINNIE.SCOTT.A.1187127390

Date: 2021.08.24 13:49:01 +09'00'

CHAVEZ.CRYSTAL.HA

RRISON.1534446000

Digitally signed by

CHAVEZ.CRYSTAL.HARRISON.153

4446000 Date: 2021.09.13 08:06:26 +09'00'

SHEPHERD-DRIES.R

KELSEY.1374242411

Digitally signed by SHEPHERD-

DRIES.R KELSEY.1374242411

Date: 2021.08.27 15:11:18 +09'00'

NORI.ALLAA.S.1

537004670

Digitally signed by

NORI.ALLAA.S.1537004670

Date: 2021.09.03 09:55:08 +09'00'

KEALE.TRAVIS.

M.1180201374

Digitally signed by

KEALE.TRAVIS.M.1180201374

Date: 2021.09.10 13:14:04

+09'00' BUTLER.BERNADETTE.PA

TRICIA ANN.1285219716

Digitally signed by BUTLER.BERNADETTE.PATRICIA

ANN.1285219716

Date: 2021.09.15 09:47:47 +09'00'

TEMPEL.MICHELE.K.1291058970

Digitally signed by

TEMPEL.MICHELE.K.1291058970

Date: 2021.09.28 12:11:52 +09'00'

MUHS.AJ.C.1028340571

Digitally signed by

MUHS.AJ.C.1028340571

Date: 2021.09.29 11:58:43 +09'00'

CASTRO.WILLIAM.FROILAN.124

1380153

Digitally signed by

CASTRO.WILLIAM.FROILAN.1241380153

Date: 2021.09.15 08:37:44 +09'00'

Attachment 2 to RFP No. FA520522R0001 Drawings – General dated 16 Jun 2020

R E

P A

I

D

O R

M

B

M I S

A W

A

A

B

A S

E

J

A P

A N

Q

K K

A

F A

F

J U

N

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

C T

S U

B M

I T

T E

D

B

Y

U S

A

F

R

C E

C I V

L

G

I N

E E

R

C E

N T

E R

O T

S

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

P A

U

V

N

D E

N B

E R

G

T

W

E N

D T

K L

N T

T W

G-002

I N

D E

X

O

F

D

R A

W I N

G

P A

D

R

M

B

M I S

A W

A

A

B

S

E

J

A P

A N

Q

K K

A

F A

F

J U

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

F

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 232

P A

U

V

N

D E

N B

E R

G

T

W

E N

D T

K L

N T

T W

G-003

G E

N E

R A

L

P

R O

J E

F O

R M

A T

I O

N

1. CONTRACT DOCUMENTS CONSIST OF THE COMBINATION OF DRAWINGS AND SPECIFICATIONS. CONTRACTOR IS

RESPONSIBLE FOR ALL REQUIREMENTS CONTAINED THEREIN. SPECIFICATIONS AND DRAWINGS ARE COMPLEMENTARY, AND WHAT IS REQUIRED BY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL; PERFORMANCE BY THE CONTRACTOR

SHALL BE REQUIRED ONLY TO THE EXTENT CONSISTENT WITH THE CONTRACT DOCUMENTS AND REASONABLY INFERABLE

FROM THEM AS BEING NECESSARY TO PRODUCE THE INTENDED RESULTS. VARYING LEVEL OF DETAIL BETWEEN

DRAWINGS AND SPECIFICATION, OR AMONGST PLANS, ELEVATIONS, SECTIONS, DETAILS AND SCHEDULES, DOES NOT

CONSTITUTE OMISSION OF INFORMATION, NOR DOES IT RELIEVE THE CONTRACTOR FROM OBLIGATION TO CONTRACT

DOCUMENTS.

2. INFORMATION INDICATED ON THESE DRAWINGS HAS BEEN OBTAINED FROM A LIMITED AMOUNT OF FIELD INVESTIGATION

AND AVAILABLE SOURCES AT THE TIME THE DRAWINGS WERE PREPARED. GENERAL CONTRACTOR SHALL VERIFY ALL

EXISTING CONDITIONS AND DIMENSIONS AT THE JOB SITE. CONTRACTOR SHALL NOTIFY THE ARCHITECT & TECHNICAL

REPRESENTATIVE OF THE CONTRACTING OFFICER OF ANY DISCREPANCIES, OMISSIONS, AND CONFLICTS BEFORE

COMMENCING WORK.

3. THESE DRAWINGS ARE SUPPLIED TO THE GENERAL CONTRACTOR AND OTHERS FOR THEIR USE ON THIS SPECIFIC

PROJECT. ALL COPIES OF THESE DRAWINGS SHALL REMAIN THE PROPERTY OF THE GOVERNMENT & SHALL NOT BE

REUSED OR REPRODUCED WITHOUT PERMISSION OF THE CONTRACTING OFFICER.

4. THE ORGANIZATION OF THESE DRAWINGS IS NOT INTENDED TO CONTROL THE DIVISION OF WORK AMONG THE

SUB-CONTRACTORS. THE DIVISION OF WORK SHALL BE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR.

5. GENERAL CONTRACTOR SHALL MAINTAIN OR PROVIDE ACCESS TO CONCEALED SPACES WITHIN THE EXISTING BUILDING

PER INTERNATIONAL BUILDING CODE (IBC) 2015 EDITION.

6. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING ALL DAMAGES TO EXISTING AREAS CAUSED BY THIS

PROJECT TO ORIGINAL CONDITION AS DIRECTED BY THE CONTRACTING OFFICER / REPRESENTATIVE.

7. SAVE ALL EXISTING TREES WITHIN AREA TO RECEIVE NEW WORK, UNLESS OTHERWISE INDICATED. COORDINATE WITH

CONTRACTING OFFICER IF THERE IS A CONFLICT. “WHERE TREE REMOVAL IS UNAVOIDABLE, NEW TREES OF A SIMILAR

TYPE MUST BE PLANTED NEAR THE LOCATION WHERE THE TREE WAS REMOVED. TREE REPLACEMENT SHALL BE ONE NEW

TREE FOR EACH TREE THAT WAS REMOVED.”

8. IN THE MILITARY FAMILY HOUSING NEIGHBORHOODS WHERE THERE ARE UNITS WHICH ARE OUTSIDE OF THE SCOPE OF

WORK THE CONTRACTOR SHALL COORDINATE ANY DISRUPTION OF SERVICES CAUSED BY WORK IN THIS PROJECT. THIS

WOULD INCLUDE, BUT NOT BE LIMITED TO, DISRUPTION IN THE UTILITY LOOP FOR UNITS NOT BEING RENOVATED.

9. REFER TO HAZMAT DRAWINGS AND ASBESTOS HAZARD CONTROL ACTIVITIES SPEC SECTION FOR TESTING, REMOVAL, AND

DISPOSAL PROCEDURES REGARDING ABATEMENT WORK

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY HEAT IN ALL MFH UNITS WHERE WORK IS TO BE

DONE DURING THE HEATING SEASON. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY HEATING EQUIPMENT AND

UTILITY CONNECTIONS (BUT NOT LIMITED TO) TO MAINTAIN INTERIOR SPACE TEMPERATURES IN THE MFH UNITS AT 20°C

(68°F) DURING CONSTRUCTION AND INTERRUPTION OF EXISTING HEATING EQUIPMENT.

11. THE CONTRACTOR SHALL SURVEY EXISTING CONDITIONS AT EXTERIOR WALLS PRIOR TO INSTALLATION OF MECHANICAL, ELECTRICAL, AND EMCS EQUIPMENT PRIOR TO INSTALLATION SHOP DRAWING SUBMITTAL. COORDINATE WITH BASE SUCH

THAT COR IS PRESENT FOR SURVEY OF ALL UNITS.

12. THE CONTRACTOR SHALL HAVE AN ENGLISH-SPEAKING REPRESENTATIVE AT ALL SITES AT ALL TIMES - REFER TO

SUMMARY OF WORK SPEC SECTION.

13. INTENT IS TO TO RESTRICT OUTDOOR WORK DURING WINTER (I.E. PAINT, CONCRETE, ROOF WORK, ETC). HOWEVER, THERE

IS NO WINTER EXCLUSION PERIOD. CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS FOR WINTER WORK AT NO

ADDITIONAL COST TO GOVERNMENT.

14. HVAC CONTROL SYSTEM (EMCS) SHALL BE THE PROPERTY OF THE USAF AT THE END OF THE PROJECT, IN ITS ENTIRETY.

THIS SHALL INCLUDE (BUT NOT BE LIMITED TO) ALL PROGRAMMING AND SOFTWARE LICENSES. CONTROLS CONTRACTOR

SHALL PROVIDE THE GOVERNMENT FULL AND UNRESTRICTED ACCESS TO ALL ASPECTS OF EMCS HEAD-END AND

BACK-END. THERE SHALL NOT BE ANY ASPECT OF EMCS THAT IS INACCESSIBLE TO THE GOVERNMENT.

1. UNIFIED FACILITIES CRITERIA (UFC)

2. AIR FORCE FAMILY HOUSING GUIDE, AUGUST 2004

3. INTERNATIONAL BUILDING CODE (IBC) 2015

4. NATIONAL ELECTRICAL CODE (NEC) 2017

5. INTERNATIONAL PLUMBING CODE 2015

6. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 101-LIFE

SAFETY CODE 2015

7. INTERNATIONAL MECHANICAL CODE 2015

8. UNIFORM FEDERAL ACCESSIBILITY STANDARDS (UFAS) 1992

9. UNIFORM FIRE CODE 2003

10. INTERNATIONAL FIRE CODE 2015

11. DEPARTMENT OF DEFENSE JAPAN ENVIRONMENTAL GOVERNING

STANDARDS OCTOBER 2001

12. JAPANESE INDUSTRIAL STANDARDS (JIS) 2010

13. INSTALLATION DEVELOPMENT & DESIGN STANDARD, MISAWA

AIR BASE

14. ARCHITECTURAL AND BASE APPEARANCE STANDARDS, MISAWA

AIR BASE JAPAN

15. IEEE C2 NATIONAL ELECTRICAL SAFETY CODE 2007

16. JAPAN ENVIRONMENTAL GOVERNING STANDARDS (JEGS) 2012

17. JAPANESE ARCHITECTURAL STANDARD SPECIFICATION FOR

REINFORCED CONCRETE WORK JASS 5 (2009)

18. JAPANESE ARCHITECTURAL STANDARD SPECIFICATION JASS 6

(2007) STRUCTURAL STEELWORK SPECIFICATION FOR BUILDING

CONSTRUCTION

PROJECT DESIGN

GUIDES, CODES AND

STANDARDS

THE CONSTRUCTION DRAWINGS ARE ORGANIZED BASED ON THE UNIT TYPES DESCRIBED ABOVE. THE BEGINNING NUMBER IN A

TYPICAL SHEET REFERENCE NO. IDENTIFIES THE UNIT TYPE. FOR EXAMPLE, SHEET "AA2-MD101" IS A MECHANICAL DEMOLITION

SHEET FOR UNIT TYPE AA2. SAME LOGIC APPLIES TO SHEETS FOR ALL OTHER DISCIPLINES. SHEETS NUMBERS. THAT DO NOT

BEGIN WITH A NUMBER ARE EITHER SITE RELATED SHEETS OR SHEETS CONTAINING COMMON DETAILS OR OTHER INFORMATION.

ORGANIZATION OF CONSTRUCTION DRAWINGS

1x-AE201

UNIT TYPE (MATRIX)

DISCIPLINE NAME

SHEET NUMBER

SCOPE OF WORK

THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, MANAGEMENT, QUALITY CONTROL, LABOR, TOOLS, EQUIPMENT, MATERIALS, AND PERFORMANCE OF ALL WORK NECESSARY TO CONSTRUCT IMPROVEMENTS FOR THE RENOVATION OF

DORMITORY B542 AS DEPICTED IN THE CONTRACT DOCUMENTS TO INCLUDE:

INTERIOR DEMOLITION AND HAZARDOUS MATERIAL ABATEMENT; STRUCTURAL AND ARCHITECTURAL SITE IMPROVEMENTS TO

SUPPORT NEW BUILDING SYSTEMS; CIVIL SITE IMPROVEMENTS TO INTEGRATE WITH EXISTING SIDEWALKS, AMENITIES AND

UTILITIES; NEW ARCHITECTURAL FINISHES, NEW WINDOWS, AND EXTERIOR WALL INFILL; NEW INSULATION ASSEMBLIES;

RENOVATE ELECTRICAL AND PLUMBING SYSTEMS; NEW TELECOMMUNICATION SYSTEMS AND ENERGY MANAGEMENT CONTROL

SYSTEMS; NEW FIRE ALARM/MASS NOTIFICATION SYSTEMS AND FIRE SUPPRESSION SYSTEMS; CONSTRUCT FIRE VEHICLE

ACCESS LANE; EXTERIOR UTILITY SERVICES IMPROVEMENTS, NEW HEATING, VENTILATION, AND AIR CONDITIONING SYSTEMS.

REPAIR 1,200M OF CONCRETE CRACKS PER THE CONTRACT DOCUMENTS.

PROVIDE MOLD REMEDIATION FOR 300 SM PER THE CONTRACT DOCUMENTS.

OBTAIN AND TEST 120 BULK SAMPLES OF MATERIALS SUSPECTED TO BE ASBESTOS CONTAINING MATERIAL, NOT PREVIOUSLY

SAMPLED.

REMOVE 30 EXISTING 65MM PIPE FLANGES BY CUTTING THE PIPE ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE

ASSEMBLY INTACT WITHOUT DISTURBING THE GASKET MATERIAL, WHICH IS PRESUMED TO BE ASBESTOS CONTAINING

MATERIAL, AND DISPOSE AS HAZARDOUS MATERIAL.

REMOVE ASBESTOS CONTAINING MATERIAL AT 60 EXISTING 65 MM PIPE ELBOWS AND DISPOSE AS HAZARDOUS MATERIAL.

REMOVE ASBESTOS CONTAINING MATERIAL AT 30 EXISTING 100 MM PIPE ELBOWS AND DISPOSE AS HAZARDOUS MATERIAL.

REMOVE ASBESTOS CONTAINING MATERIAL AT 30 EXISTING 150 MM PIPE ELBOWS AND DISPOSE AS HAZARDOUS MATERIAL.

REPLACE 10 DOOR PANELS TO BE DETERMINED DURING CONSTRUCTION BY CO.

01_QKKA171042_General (G-002&003).pdf
G-001-G-001
Sheets and Views
G-001-G-001
G-002-G-002
Sheets and Views
G-002-G-002
G-003-G-003
Sheets and Views
G-003-G-003