FA520522R0001_Atch4_Schedule of Material Submittals_3Nov21.pdf
PDF 1 MB Posted
- Solicitation number
- FA520522R0001
About this file
This is a schedule of material submittals for Project No. QKKA171042, Repair Dorm Bldg. 542 at Misawa Air Base in Japan. The document outlines over 100 line items specifying required submittals, including shop drawings, product data, samples, test reports, warranties, and closeout submittals. Submittals are grouped by specification section and include items for demolition, hazardous material abatement, concrete, masonry, metals, thermal and moisture protection, doors and windows, mechanical, electrical, communications, fire protection, earthwork and exterior improvements. The schedule includes columns for the number of copies required, submission dates, receipt dates, review periods, follow ups, re-submittals and final approvals. The level of detail provided in the schedule indicates the project involves comprehensive repairs and upgrades to an existing dormitory building.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
EC
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SECTION 01 31 01.00 10 PROJECT SCHEDULE
01 32 01.00 10 Project Schedule 3.4
SECTION 01 33 00 SUBMITTAL PROCEDURES
01 33 00 Schedule of Material Submittals (SMS) 1.4
SECTION 01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 35 29 Accident Prevention Plan (APP) 1.6
01 35 29 Activity Hazard Analysis (AHA) 1.7
01 35 29 Crane Operators 1.5.1.3
01 35 29 Crane Critical Lift Plan 1.6.1
01 35 29 Reports 1.11
01 35 29 Accident Reports 1.11.1
01 35 29 Monthly Exposure Reports 1.11.3
01 35 29 Crane Reports 1.11.4
01 35 29 Confined Space Entry Permit 1.8
01 35 29 Hot work permit 1.8
01 35 29 Certificate of Compliance 1.11.5
01 35 29 Machinery & Mechanized Equipment Certification Form 3.5.3
SECTION 01 45 00.00 10 QUALITY CONTROL
01 45 00.00 10 Contractor Quality Control (CQC) Plan 3.2
01 45 00.00 10 Verification Statement 3.9
SECTION 01 57 19.00 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.00 Dirt and Dust Control Plan 1.3
01 57 19.00 Employee Training Records 1.3
01 57 19.00 Environmental Protection Plan 1.7
01 57 19.00 Environmental Manager Qualifications 1.6.3
01 57 19.00 Inspection Reports 1.3
01 57 19.00 Solid Waste Management Report 1.3
01 57 19.00 EMS Certificate Of Completion 1.3
01 57 19.00 Certificate of Competency 1.3
01 57 19.00 Inspector Qualifications 1.3
01 57 19.00 Erosion and Sediment Control 3.3.2
01 57 19.00 Stormwater Pollution Prevention Plan Compliance Notebook 1.3
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
Attachment 4 to RFP No. FA520522R0001
Date: 3 Nov 2021
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
01 57 19.00 Waste Determination Documentation 1.3
01 57 19.00 Disposal Documentation for Hazardous and Regulated Waste 1.3
01 57 19.00 Contractor Hazardous Material Inventory Log 1.3
01 57 19.00 Hazardous Waste/Debris Management 1.3
01 57 19.00 List of Hazardous Materials 1.2.9.1
SECTION 01 78 00 CLOSEOUT SUBMITTALS
01 78 00 Final Cleaning 1.4
01 78 00 Spare Parts Data 1.5
01 78 00 Warranty Management Plan 1.7.1
01 78 00 Warranty Tags 1.7.4
01 78 00 Instructions 1.7.1
01 78 00 Operation and Maintenance Manuals 3.5
01 78 00 Certification of EPA Designated Items 1.4
01 78 00 Checklist for DD FORM 1354 1.4
01 78 00 High Performance and Sustainable Building (HPSB) 1.4
01 78 00 Interim DD FORM 1354 1.4
01 78 00 Record Drawings 1.4
01 78 00 As-Built Drawings 3.1
01 78 00 Final Approved Shop Drawings 3.2
01 78 00 Construction Contract Specifications 3.3
01 78 00 As-Built Record of Equipment and Materials 3.4
SECTION 01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23 Operation and Maintenance (O&M) Data 1.3
SECTION 02 41 00 DEMOLITION
02 41 00 Existing Conditions 1.9
02 41 00 Demolition Plan 1.2.1
02 41 00 Notification 1.6
02 41 00 Receipts 3.2.2
SECTION 02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 14.00 10 Training Program 1.10
02 82 14.00 10 Asbestos Hazard Abatement Plan (AHAP) 1.6
02 82 14.00 10 Cleanup and Disposal 3.11
02 82 14.00 10 Qualifications 1.5.1
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
02 82 14.00 10 Licenses, Permits and Notifications 1.7.1
02 82 14.00 10 Respiratory Protection Program 1.8.1
02 82 14.00 10 Asbestos Management Plan 3.11.3.2
02 82 14.00 10 Detailed Drawings 1.3
02 82 14.00 10 Encapsulants 2.1
02 82 14.00 10 Asbestos Sampling Plan 1.3.2
02 82 14.00 10 Final Clearance Sampling/Analysis Sheets 1.4
02 82 14.00 10 Medical Surveillance Requirements 1.8
02 82 14.00 10 Exposure Assessment and Air Monitoring 3.9
02 82 14.00 10 Asbestos Waste Shipment Records 3.11.3.1
02 82 14.00 10 Weight Bills and Delivery Tickets 3.11.3.1
02 82 14.00 10 Hazardous Waste Disposal Record (Copy E) 1.4
SECTION 03 01 30.71 CONCRETE REHABILITATION
03 01 30.71 Job Mix Formula 1.4.1.1
03 01 30.71 Epoxy Resin Binder 2.1.1.1
03 01 30.71 Epoxy Grout 2.1.1.2
03 01 30.71 Aggregate 2.1.2
03 01 30.71 Epoxy 2.1.1
SECTION 03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 11 13.00 10 Calculations 2.1
03 11 13.00 10 Inspection 3.2
SECTION 03 20 00.00 10 CONCRETE REINFORCING
03 20 00.00 10 Reinforcement 3.1
03 20 00.00 10 Reinforcing Steel 2.2
SECTION 03 30 00 CAST-IN-PLACE CONCRETE
03 30 00 Reinforcing Steel 1.6.2.1
03 30 00 Materials for Forms 2.1
03 30 00 Reinforcement 2.5
03 30 00 Cementitious Materials 2.4.1
03 30 00 Concrete Mix Design 1.6.1.1
03 30 00 Slump Tests 3.11.2.1
03 30 00 Compressive Strength Tests 3.11.2.3
03 30 00 Air Content 3.11.2.4
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SECTION 04 20 00 UNIT MASONRY
04 20 00 Detail Drawings 3.4.1.1
04 20 00 Hot Weather Procedures 1.4.1
04 20 00 Cold Weather Procedures 1.4.2
04 20 00 Cementitious Materials 2.3.1.1
04 20 00 Admixtures for Masonry Mortar 2.3.1.3
04 20 00 Anchors, Ties, and Bar Positioners 2.5.2
04 20 00 Joint Reinforcement 2.5.3
04 20 00 Bracing Calculations 3.2.5
04 20 00 Field Testing of Mortar 3.6.1.1
04 20 00 Field Testing of Grout 3.6.1.2
04 20 00 Admixtures for Masonry Mortar 2.3.1.3
04 20 00 Admixtures for Grout 2.3.2.2
SECTION 05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 50 13 Bollards/Pipe Guards 2.3
05 50 13 Angles and Plates 2.4
SECTION 05 52 00 METAL RAILINGS
05 52 00 Stainless Steel Railings and Handrails 2.2.2
05 52 00 Aluminum Guards 2.2.3
05 52 00 Installation Instructions 3.2
SECTION 05 72 00 DECORATIVE METAL SPECIALTIES
05 72 00 Existing Conditions 1.3.2
05 72 00 Construction Details 2.1
05 72 00 Installation Drawings 2.1
05 72 00 Shop and Field Connections 2.1
05 72 00 Materials 2.2
05 72 00 Fabrication 2.3
05 72 00 Linear Ceiling 2.2.1
05 72 00 Anchorage Devices and Fasteners 2.2
05 72 00 Manufacturer's Standard Color Charts 1.3.1
05 72 00 Aluminum Finishes 2.3.4
05 72 00 Architectural Metal Items 2.3.4
05 72 00 Application Methods 3.3
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
05 72 00 Cleaning Materials 3.3
05 72 00 Preventative Maintenance and Inspection 3.3
05 72 00 Maintenance Instructions 3.4
SECTION 06 20 00 FINISH CARPENTRY
06 20 00 Detail Drawings Indicating All Wood Assemblies 1.3
06 20 00 Treated Wood Products 1.4
06 20 00 Wood Products 2.1
06 20 00 Hardware and Accessories 2.5
06 20 00 Samples 1.5
06 20 00 Certificates of Grade 1.7.1.1
06 20 00 VOC Content for Softwood Plywood 2.1.5
06 20 00 VOC Content for Hardwood Plywood 2.1.6
SECTION 06 61 16 SOLID SURFACING FABRICATIONS
06 61 16 Installation 3.1
06 61 16 Detail Drawings 1.4.2
06 61 16 Solid Polymer Material 2.1
06 61 16 Fabrications 2.3
06 61 16 Qualifications 1.4.1
06 61 16 Material 2.1
06 61 16 Counter and Vanity Tops 2.3.4
06 61 16 Clean-up 3.2
SECTION 07 14 00 FLUID-APPLIED WATERPROOFING
07 14 00 Fluid-Applied Membrane 2.1
07 14 00 Membrane Primer 2.2
07 14 00 Bond Breaker 2.7
07 14 00 Elastomeric Sheet 2.8
07 14 00 Solvent 3.3
07 14 00 Moisture Meter 3.4.1
07 14 00 Warranty 1.6
07 14 00 Instructions To Government Personnel 3.5
07 14 00 Information Card 3.6
SECTION 07 21 13 BOARD AND BLOCK INSULATION
07 21 13 Manufacturer's Standard Details 1.3
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
07 21 13 Protection Board or Coatings 1.4
07 21 13 Block or Board Insulation 2.1
07 21 13 Vapor Retarder 2.2
07 21 13 Pressure Sensitive Tape 2.3
07 21 13 Accessories 2.4
07 21 13 Adhesive 2.4.1
SECTION 07 57 00 URETHANE SPRAYED ELASTOMERIC ROOF COATINGS OVERLAY SYSTEM
07 57 00 Urethane Topcoat 2.2
07 57 00 Ventilation Device 2.3
07 57 00 Ventilation Sheet 2.3
07 57 00 Performance Requirements 2.2
07 57 00 Protective Coating 2.2
07 57 00 Urethane Foam 2.2
07 57 00 Installation 2.2
SECTION 07 60 00 FLASHING AND SHEET METAL
07 60 00 Exposed Sheet Metal 2.1.1
07 60 00 Gravel Stops and Fasciae 2.1.1
07 60 00 Reglets 2.1.10
07 60 00 Base Flashing 3.1.10
07 60 00 Counterflashing 3.1.11
07 60 00 Drip Edges 3.1.13
07 60 00 Downspouts 3.1.14
07 60 00 Flashing for Roof Drains 3.1.15
07 60 00 Eave Flashing 3.1.16
07 60 00 Expansion Joints 3.1.17
07 60 00 Finish Samples 1.4.2
07 60 00 Instructions for Installation 1.4.3
07 60 00 Cleaning and Maintenance 1.4.3
SECTION 07 84 00 FIRESTOPPING
07 84 00 Firestopping System 2.1
07 84 00 Firestopping Materials 2.2
07 84 00 Inspection 3.3
07 84 00 Installer Qualifications 1.5.1
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
07 84 00 Inspector Qualifications 1.5.2
SECTION 07 92 00 JOINT SEALANTS
07 92 00 Sealants 2.1
07 92 00 Primers 2.2
07 92 00 Bond Breakers 2.3
07 92 00 Backstops 2.4
07 92 00 Field Adhesion 3.1
SECTION 08 11 13 STEEL DOORS AND FRAMES
08 11 13 Doors 2.1
08 11 13 Accessories 2.3
08 11 13 Frames 2.5
08 11 13 Weatherstripping 2.7
SECTION 08 31 00 ACCESS DOORS AND PANELS
08 31 00 Access Doors And Panels 1.3
08 31 00 Hardware 1.3.2
08 31 00 Accessories 2.1.9
08 31 00 Finishes 2.4
SECTION 08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 41 13 List of Product Installations 1.2.1
08 41 13 Sample Warranty 1.2.1
08 41 13 Fabrication Drawings 2.2
08 41 13 Installation Drawings 3.3
08 41 13 Manufacturer's Catalog Data 1.2.1
08 41 13 Finish 2.2.3
08 41 13 Finish and Color Samples 1.2.1
08 41 13 Certified Test Reports 1.2.1
08 41 13 Air Infiltration 3.4.1
08 41 13 Deflection 3.4.3
08 41 13 Condensation Resistance and Thermal Transmittance 3.4.4
08 41 13 Water Infiltration 3.4.5
08 41 13 Manufacturer's Instructions 3.3
08 41 13 Manufacturer's Product Warranty 3.6
SECTION 08 51 13 ALUMINUM WINDOWS
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
08 51 13 Fabrication Drawings 1.9
08 51 13 Windows 2.1
08 51 13 Window Performance 1.1
08 51 13 Thermal-Barrier Windows 2.3
08 51 13 Mullions 2.4
08 51 13 Window Cleaners' Bolts 2.5
08 51 13 Thermal Performance 1.10.5
08 51 13 Screens 2.2.10
08 51 13 Weatherstripping 2.2.2
08 51 13 Fasteners 2.2.3
08 51 13 Adhesives 2.2.4
08 51 13 Accessories 2.2.8
08 51 13 Hardware 2.2.8.1
08 51 13 Finish Sample 1.4.2.1
08 51 13 Window Sample 1.4.2.2
08 51 13 Structural Calculations for Deflection 2.1
08 51 13 Minimum Condensation Resistance Factor 1.4.3
SECTION 08 71 00 DOOR HARDWARE
08 71 00 Manufacturer's Detail Drawings 1.3
08 71 00 Verification of Existing Conditions 1.3
08 71 00 Hardware Schedule 1.5
08 71 00 Keying System 2.3.8
08 71 00 Hardware Items 2.3
08 71 00 Installation 3.1
08 71 00 Key Bitting 1.6.1
SECTION 08 81 00 GLAZING
08 81 00 Installation 3.3.1
08 81 00 Glazing Accessories 1.3
08 81 00 Insulating Glass 1.6.1
08 81 00 Sealant 2.3.1.1
08 81 00 Tape 2.3.3
08 81 00 Setting and Sealing Materials 2.3
08 81 00 Glass Setting 3.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SECTION 09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 00 Metal support systems 2.1
SECTION 09 29 00 GYPSUM BOARD
09 29 00 Gypsum Board 2.1.1
09 29 00 Water-Resistant Gypsum Backing Board 2.1.2
09 29 00 Cementitious Backer Units 2.1.3
09 29 00 Accessories 2.1.6
09 29 00 Asbestos Free Materials 2.1
SECTION 09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 30 10 Detail Drawings 3.2
09 30 10 Setting-Bed 2.2
09 30 10 Mortar, Grout, and Adhesive 2.4
09 30 10 Porcelain Tile 2.1.1
09 30 10 Glazed Wall Tile 2.1.2
09 30 10 Reinforcing Wire Fabric 2.2.6
09 30 10 Accessories 2.1
09 30 10 Tile 2.1
09 30 10 Transition Strips 2.1; 2.6
09 30 10 Grout 2.4.3
09 30 10 Indoor Air Quality 1.3.1
09 30 10 Maintenance Instructions 3.7
09 30 10 Installation 3.2
09 30 10 Indoor Air Quality for Adhesives 2.4
SECTION 09 65 00 RESILIENT FLOORING
09 65 00 Resilient Flooring and Accessories 2.8
09 65 00 Sheet Vinyl Flooring 2.1
09 65 00 Wall Base 2.2
09 65 00 Adhesives 2.4
09 65 00 Moisture, Alkalinity and Bond Tests 3.3
09 65 00 Installation 3.1
09 65 00 Surface Preparation 3.2
SECTION 09 68 00 CARPETING
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
09 68 00 Installation Drawings 3.4
09 68 00 Carpet 2.1
09 68 00 Moldings 2.4
09 68 00 Moisture and Alkalinity Tests 3.2
09 68 00 Warranty 1.5
09 68 00 Surface Preparation 3.1
09 68 00 Cleaning and Protection 3.5
SECTION 09 90 00 PAINTING, GENERAL
09 90 00 Paint 2.1
09 90 00 Moisture-curing Polyurethane 1.1
09 90 00 Mildewcide and Insecticide 2.1.2
09 90 00 Lead 2.1.3
09 90 00 Volatile Organic Compound (VOC) Content 2.1.5
SECTION 10 28 13 TOILET ACCESSORIES
10 28 13 Accessory Items 2.2
10 28 13 Finishes 2.1.2
SECTION 11 31 13 ELECTRIC KITCHEN EQUIPMENT
11 31 13 Kitchen Equipment 2.1
11 31 13 Manufacturer's Warranty 3.3
11 31 13 Contractor's Warranty for Installation 3.4
SECTION 12 32 00 MANUFACTURED WOOD CASEWORK
12 32 00 Fabrication 2.2
12 32 00 Installation Drawings 3.1.2
12 32 00 Adhesives 2.3
12 32 00 Fasteners 2.3
12 32 00 Filler Material 2.3
12 32 00 Hardwood 2.3
12 32 00 Hardwood Plywood 2.3
12 32 00 Plywood 2.3
12 32 00 Softwoods 2.3
12 32 00 Accessories and Hardware 2.4
12 32 00 Cabinets 2.2.1
12 32 00 Manufacturer's Standard Color Charts 1.3
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
12 32 00 Fasteners 2.3
12 32 00 Manufacturer's Instructions Part 3
SECTION 12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 48 13 Detail Drawings 3.2
12 48 13 Installation Drawings 3.2
12 48 13 Entrance Floor Mats and Frames 2.1.1
12 48 13 Adhesives and Concrete Primers 2.1.2
12 48 13 Manufacturer's Instructions 3.2
12 48 13 Protection, Maintenance, and Repair Information 3.2
SECTION 13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00 Equipment Requirements 2.1
13 48 00 Bracing 3.1
13 48 00 Resilient Vibration Isolation Devices 3.4
13 48 00 Anchor Bolts 3.3
SECTION 21 21 00 FIRE EXTINGUISHING SPRINKLER SYSTEMS (RESIDENTIAL)
21 21 00 Sprinkler heads and piping system layout 1.3
21 21 00 Electrical wiring diagrams 1.3.7
21 21 00 Piping 2.1
21 21 00 Mechanical couplings 2.1.1
21 21 00 Fire department connections 2.1.12
21 21 00 Hose Valves 2.1.13
21 21 00 Sprinkler heads 2.1.2
21 21 00 Flow switch 2.1.4
21 21 00 Valve tamper switch 2.1.5
21 21 00 Pipe hangers and supports 2.1.6
21 21 00 Valves 2.1.7
21 21 00 Backflow prevention assemblies 2.1.9
21 21 00 Sprinkler system design 1.3
21 21 00 Preliminary tests 3.3.1
21 21 00 Qualifications of installer 1.5.1
21 21 00 As-built drawings of each system 1.3.8
SECTION 22 00 00 PLUMBING, GENERAL PURPOSE
22 00 00 Plumbing System 3.9.1
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
22 00 00 Welding 1.2
22 00 00 Pumps 2.11
22 00 00 Fixtures 2.4
22 00 00 Water Heaters 2.9
22 00 00 Vibration-Absorbing Features 3.4
22 00 00 Flush Valve Water Closets 2.4.3
22 00 00 Wall Hung Lavatories 2.4.4
22 00 00 Countertop Lavatories 2.4.5
22 00 00 Kitchen Sinks 2.4.6
22 00 00 Service Sinks 2.4.7
22 00 00 Drinking-Water Coolers 2.4.8
22 00 00 Shower Faucets 2.6.2
22 00 00 Backflow Prevention Assemblies 3.9.1.1
22 00 00 Tests, Flushing and Disinfection 3.9
22 00 00 Test of Backflow Prevention Assemblies 3.9.1.1
22 00 00 Materials and Equipment 1.3
22 00 00 Bolts 2.1.1
SECTION 22 07 19.00 40 PLUMBING PIPING INSULATION
22 07 19.00 40 Installation Drawings 3.1
22 07 19.00 40 Adhesives 2.3
22 07 19.00 40 Coatings 2.3
22 07 19.00 40 Insulating Cement 2.3
22 07 19.00 40 Insulation Materials 2.3
22 07 19.00 40 Jacketing 2.3
22 07 19.00 40 Tape 2.3
22 07 19.00 40 Installation Manual 3.1
22 07 19.00 40 Record Drawings 3.4
22 07 19.00 40 Recycled Materials 1.3.1
SECTION 22 14 29.00 40 SUMP PUMPS
22 14 29.00 40 Connection Diagrams 2.1
22 14 29.00 40 Control Diagrams 2.1
22 14 29.00 40 Installation Drawings 2.1
22 14 29.00 40 Manufacturer's Catalog Data 2.1
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
22 14 29.00 40 Pump Performance Curve 2.1
22 14 29.00 40 Spare Parts List 3.3
22 14 29.00 40 Special Tools 3.3
22 14 29.00 40 Wet-Pit Sump Pumps 2.2.1
22 14 29.00 40 Floatless Electrode Level Controls 2.2.1.10
22 14 29.00 40 Accessories 2.2.2
22 14 29.00 40 Submersible Pumps 2.2.2
22 14 29.00 40 Hydrostatic Leak 3.2.2
22 14 29.00 40 Pump Flow Capacity 3.2.2
22 14 29.00 40 Static Heads 3.2.2
22 14 29.00 40 Manufacturer's Certification of Bearing Life 2.2.1.6
22 14 29.00 40 Manufacturer's Installation Instructions 2.1
22 14 29.00 40 Vibration Specifications 2.1
SECTION 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 00 00 Duct Connectors 2.9.1.1
23 00 00 Manual Balancing Dampers 2.9.2
23 00 00 Grilles 2.9.4.1
23 00 00 Performance Tests 3.8
23 00 00 Manufacturer's Installation Instructions 3.2
23 00 00 Operation and Maintenance Training 3.10.2
SECTION 23 05 15 COMMON PIPING FOR HVAC
23 05 15 Material Lists 1.2
23 05 15 Record Drawings 1.2
23 05 15 Installation Drawings 3.1
23 05 15 Pipe and Fittings 2.1
23 05 15 Piping Specialties 2.2
23 05 15 Miscellaneous Materials 2.3
23 05 15 Supporting Elements 2.4
23 05 15 Air Tests 3.1
23 05 15 Drainage Tests 3.1
23 05 15 Hydrostatic Tests 3.1
SECTION 23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT 23 05 48.00 40 Installation Drawings 1.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
23 05 48.00 40 Equipment and Performance Data 1.2
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 05 93 TAB team assistants 1.2
23 05 93 TAB team engineer 1.2
23 05 93 TAB team field leader 1.2
23 05 93 Records of Existing Conditions 1.3
23 05 93 TAB Firm 1.5.3.1
23 05 93 TAB Specialist 1.5.3.2
23 05 93 TAB Report Forms 1.2
23 05 93 Equipment and Performance Data 1.3
23 05 93 Calibration 1.5.2
23 05 93 TAB Procedures 1.5.2
23 05 93 TAB Execution 1.5.4
23 05 93 Design review report 1.7.3.1; 3.5
23 05 93 TAB Procedures Summary 3.5
23 05 93 TAB Report for Season 1 1.5.5.1; 3.5
23 05 93 TAB Report for Season 2 1.5.5.1; 3.5
23 05 93 TAB Work Execution Schedule 3.5
23 05 93 Advance Notice of TAB Field Work 3.5
23 05 93 Completed Season 1 Pre-TAB Work Checklist 3.5
23 05 93 Independent TAB agency and personnel qualifications 1.5.1
23 05 93 TAB Submittal and Work Schedule 1.7.1; 1.7.3
23 05 93 Pre-field TAB engineering report 1.7.3.2
SECTION 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 07 00 Pipe Insulation Systems 2.3; 3.2
23 07 00 Duct Insulation Systems 3.3
SECTION 23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 08 00.00 10 Commissioning Plan 1.5.2.2
23 08 00.00 10 Pre-Functional Performance Test Checklists 3.2.1
23 08 00.00 10 Functional Performance Tests 3.2.2
23 08 00.00 10 Commissioning Report 3.3
23 08 00.00 10 Commissioning Firm 1.5.1
23 08 00.00 10 Commissioning Specialist 1.5.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SECTION 23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC 23 09 23.13 20 Control System Drawings Title Sheet 1.3.1.1
23 09 23.13 20 List of I/O Points 1.3.1.2
23 09 23.13 20 Control System Components List 1.3.1.3
23 09 23.13 20 Control System Schematics 1.3.1.4
23 09 23.13 20 HVAC Equipment Electrical Ladder Diagrams 1.3.1.5
23 09 23.13 20 Component Wiring Diagrams 1.3.1.6
23 09 23.13 20 Terminal Strip Diagrams 1.3.1.7
23 09 23.13 20 BACnet Communication Architecture Schematic 1.3.1.8
23 09 23.13 20 EMCS Front-End Interface Graphic Screens 2.1.3.3
23 09 23.13 20 Energy Dashboard Interface Graphic Screen And Reporting 2.1.3.3
23 09 23.13 20 Sensors and Input Hardware 2.2
23 09 23.13 20 Direct Digital Controllers 2.1.1
23 09 23.13 20 DDC Software 2.1.2
23 09 23.13 20 Notebook Computer 2.1.4
23 09 23.13 20 BACnet Operator Workstation 2.1.3
23 09 23.13 20 Performance Verification Testing Plan 3.4.2
23 09 23.13 20 Pre-Performance Verification Testing Checklist 3.4.4
23 09 23.13 20 Performance Verification Testing Report 3.4.10
23 09 23.13 20 Contractor's Qualifications 1.5.6
23 09 23.13 20 Pre-PVT Checklist 3.4.1
23 09 23.13 20 BACnet Direct Digital Control Systems 1.3
23 09 23.13 20 Controls System Operators Manuals 3.3
23 09 23.13 20 Training Video 3.5
23 09 23.13 20 Training Documentation 3.5.1
SECTION 23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 09 33.00 40 Material, Equipment, and Fixture Lists 1.2.1
23 09 33.00 40 Records of Existing Conditions 1.2.1
23 09 33.00 40 Installation Drawings 3.1
23 09 33.00 40 Fabrication Drawings 1.2.2
23 09 33.00 40 Control Components 2.1
23 09 33.00 40 Stand-Alone Controller 2.2
23 09 33.00 40 Sensors 2.3
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
23 09 33.00 40 Dampers 2.4
23 09 33.00 40 Thermostats 2.1.2
23 09 33.00 40 Operators 2.5.1
23 09 33.00 40 Operating Instructions 1.2.2
23 09 33.00 40 Outside Air Sensors 2.3
SECTION 23 23 00 REFRIGERANT PIPING
23 23 00 Refrigerant Piping System 2.2
23 23 00 Verification of Dimensions 3.1
23 23 00 Demonstrations 3.4
23 23 00 Refrigerant Piping Tests 3.5
23 23 00 Qualifications 1.3.1
23 23 00 Operation and Maintenance Manuals 3.4
SECTION 23 31 13.00 40 METAL DUCTS
23 31 13.00 40 Material, Equipment, and Fixture Lists 1.5
23 31 13.00 40 Records of Existing Conditions 1.5
23 31 13.00 40 Connection Diagrams 1.6
23 31 13.00 40 Record Drawings 1.6
23 31 13.00 40 Galvanized Steel Ductwork Materials 2.1.1
23 31 13.00 40 Round Sheet Metal Duct Fittings 2.2.1
23 31 13.00 40 Flexible Connectors 2.2.4
23 31 13.00 40 Manual Volume Dampers 2.2.6
23 31 13.00 40 Gravity Backdraft and Relief Dampers 2.2.7
SECTION 23 34 23.00 40 HVAC POWER VENTILATORS
23 34 23.00 40 Installation Drawings 3.1
23 34 23.00 40 Final Test Reports 3.2.1
23 34 23.00 40 Record Drawings 3.3
SECTION 23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 37 13.00 40 Material, Equipment, and Fixture Lists 2.2.1
23 37 13.00 40 Equipment and Performance Data 2.1
SECTION 23 82 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
23 82 00.00 20 Unit heaters 2.1
SECTION 23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
23 82 02.00 10 Drawings 1.4
23 82 02.00 10 Spare Parts 1.6
23 82 02.00 10 Verification of Dimensions 3.1
23 82 02.00 10 Demonstrations 3.4
23 82 02.00 10 Posted Instructions 3.4
23 82 02.00 10 System Performance Tests 3.6
23 82 02.00 10 Materials and Equipment 2.1.1
23 82 02.00 10 Refrigerant Tests, Charging, and Start-Up 3.5
23 82 02.00 10 Operation and Maintenance Manuals 3.4
SECTION 26 05 19.10 10 INSULATED WIRE AND CABLE
26 05 19.10 10 Cable Manufacturing Data 3.1
26 05 19.10 10 Wire and Cable 2.1.1
26 05 19.10 10 Conductors 2.1.3.1
26 05 19.10 10 Test Report(s), Inspection Report(s), and Verification 3.2
SECTION 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 48.00 10 Equipment Requirements 1.3
26 05 48.00 10 Lighting Fixtures in Buildings 3.2
26 05 48.00 10 Contractor Designed Bracing 1.2.3
SECTION 26 11 13.00 20 PRIMARY UNIT SUBSTATION
26 11 13.00 20 Unit substation drawings 1.4.3
26 11 13.00 20 Transformer drawings 1.4.4
26 11 13.00 20 Primary unit substations 2.2
26 11 13.00 20 transformer 2.2.3
26 11 13.00 20 Capacity calculations for battery charger and batteries 1.4.1
26 11 13.00 20 Calibration test reports 1.4.7
26 11 13.00 20 acceptance checks and tests 3.5.1
26 11 13.00 20 Switchgear design tests 2.3.3
26 11 13.00 20 Switchgear production tests 2.3.4
26 11 13.00 20 Load interrupter switch design tests 2.3.5
26 11 13.00 20 Load interrupter switch production tests 2.3.6
26 11 13.00 20 Transformer design tests 2.3.7
26 11 13.00 20 routine and other tests 2.3.8
26 11 13.00 20 Calibration schedule 1.4.5
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
26 11 13.00 20 Formal request for settings 1.4.6
26 11 13.00 20 Equipment test schedule 2.3.1
SECTION 26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 20 00 Panelboards 2.1
26 20 00 Wireways 2.22
26 20 00 Marking strips 3.1.8.1
26 20 00 Enclosed circuit breakers 2.11
26 20 00 Motor controllers 2.13
26 20 00 Surge protective devices 2.23
26 20 00 Switches 2.7
26 20 00 Receptacles 2.9
26 20 00 Circuit breakers 2.10.3
26 20 00 CATV outlets 2.16.1
26 20 00 Grounding Busbar 2.17.2
26 20 00 600-volt wiring test 3.5.2
26 20 00 Transformer tests 3.5.3
26 20 00 Ground-fault receptacle test 3.5.4
26 20 00 Grounding system test 3.5.5
26 20 00 Fuses 2.8
26 20 00 Transformer factory tests 2.25.1
26 20 00 Electrical Systems 1.5.1
SECTION 26 24 13 SWITCHBOARDS
26 24 13 Switchboard Drawings 1.4.2
26 24 13 Switchboard 2.2
26 24 13 Switchboard Design Tests 2.5.2
26 24 13 Switchboard Production Tests 2.5.3
26 24 13 Acceptance Checks and Tests 3.5.1
26 24 13 Cybersecurity Equipment Certification 2.5.4
26 24 13 Cybersecurity Installation Certification 3.5.1.5
26 24 13 Switchboard Operation and Maintenance 1.5.1
26 24 13 Service Entrance Available Fault Current Label 2.7
26 24 13 Request for Settings 3.5
26 24 13 Assembled Operation and Maintenance Manuals 1.5.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
26 24 13 Equipment Test Schedule 2.5.1
SECTION 26 51 00 INTERIOR LIGHTING
26 51 00 Luminaire Drawings 1.5.1
26 51 00 Occupancy/Vacancy Sensor Coverage Layout 1.5.2
26 51 00 Luminaires 2.2
26 51 00 Drivers, Ballasts and Generators 2.3
26 51 00 Light Sources 2.4
26 51 00 Luminaire Design Data 1.5.4
26 51 00 LED Luminaire Warranty 1.6.1
26 51 00 Dimming Controllers (Dimmers) 2.5.2
26 51 00 Occupancy Sensors 2.5.3.1
26 51 00 Vacancy Sensors 2.5.3.2
26 51 00 Exit Signs 2.6.1
26 51 00 Emergency Lighting Unit (EBU) 2.6.2
26 51 00 Energy Efficiency 1.5.11.3
26 51 00 LED Luminaire - IES LM-79 Test Report 1.5.5
26 51 00 LED Light Source - IES LM-80 Test Report 1.5.6
26 51 00 LED Light Source - IES TM-21 Test Report 1.5.7
26 51 00 Occupancy/Vacancy Sensor Verification Tests 1.5.8
26 51 00 LED Driver and Dimming Switch Compatibility Certificate 1.5.3
26 51 00 Luminaire Useful Life Certificate 1.6.1.1
SECTION 26 56 00 EXTERIOR LIGHTING
26 56 00 Photometric Plan 1.5.2
26 56 00 LED Luminaire Warranty 1.6.1
26 56 00 Luminaire drawings 1.5.1.1
26 56 00 Poles 1.5.1.2
26 56 00 LED Luminaires 2.2
26 56 00 Luminaire Light Sources 2.2.2
26 56 00 Luminaire Power Supply Units (Drivers) 2.2.3
26 56 00 Design Data for luminaires 1.5.3
26 56 00 Operating test 3.2
26 56 00 LED Luminaire - IES LM-79 Test Report 1.5.4
26 56 00 LED Light Source - IES LM-80 Test Report 1.5.5
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
26 56 00 Luminaire Useful Life Certificate 1.6.1
26 56 00 Operational Service 1.7
SECTION 27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 14.00 10 Cable TV Premises Distribution System 1.2
27 05 14.00 10 Installation 3.1
27 05 14.00 10 Qualifications 1.4
27 05 14.00 10 Spare Parts 1.7
27 05 14.00 10 Test Plan 3.4
27 05 14.00 10 Testing 3.4
27 05 14.00 10 Materials and Equipment 2.1
27 05 14.00 10 Manufacturer's Recommendations 3.1.2
27 05 14.00 10 Operation and Maintenance Manuals 3.5
SECTION 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 10 00 Telecommunications drawings 1.6.1.1
27 10 00 Telecommunications Space Drawings 1.6.1.2
27 10 00 Telecommunications cabling 2.3
27 10 00 Telecommunications outlet/connector assemblies 2.5
27 10 00 Equipment support frame 2.4.1
27 10 00 Patch panels 2.4.3
27 10 00 Telecommunications cabling testing 3.5.1
27 10 00 Telecommunications Contractor 1.6.2.1
27 10 00 Key Personnel 1.6.2.2
27 10 00 Manufacturer Qualifications 1.6.2.3
27 10 00 Test plan 1.6.3
27 10 00 Factory reel tests 2.10.1
27 10 00 Telecommunications cabling and pathway system 1.10.1
27 10 00 Record Documentation 1.10.2
SECTION 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
28 31 76 Amplifiers 2.14
28 31 76 Notification Appliances 2.17
28 31 76 System Operation 2.3
28 31 76 System Layout 1.2.1
28 31 76 Nameplates 2.1.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
28 31 76 Wiring Diagrams 3.2.1
28 31 76 Technical Data And Computer Software 1.5
28 31 76 Smoke Sensors 2.1
28 31 76 Fire Alarm Control Unit and Mass Notification Control Unit (FMCP) 2.13
28 31 76 Digitalized Voice Generators 2.14
28 31 76 Tone Generators 2.14
28 31 76 Manual Stations 2.16
28 31 76 Transmitters 2.2
28 31 76 Addressable Interface Devices 2.7
28 31 76 Local Operating Console (LOC) 1.3.3
28 31 76 Batteries 2.12.1
28 31 76 Battery Chargers 2.12.2
28 31 76 Radio Transmitter and Interface Panels 2.20.1
28 31 76 Scrolling LED Text Signs 2.5.3
28 31 76 Terminal Cabinets 3.2.2
28 31 76 Battery Power 2.12.1.2
28 31 76 Field Quality Control 3.7
28 31 76 Smoke Sensor Testing 2.10.2
28 31 76 Testing Procedures 3.7.1
28 31 76 Installer 1.6.1.4
28 31 76 Formal Inspection and Tests 3.7.2.2
28 31 76 Final Testing 3.7.2.3
28 31 76 Fire Alarm/Mass Notification System 1.6.2.2
28 31 76 Operation and Maintenance (O&M) Instructions 3.1
28 31 76 Instruction of Government Employees 3.8
28 31 76 As-Built Drawings 3.7.2.4
SECTION 31 11 00 CLEARING AND GRUBBING
31 11 00 Herbicide Application Plan 3.1.1
31 11 00 Herbicides 1.3.2
31 11 00 Nonsaleable Materials 3.4.1
31 11 00 Tree Wound Paint 2.1.1
31 11 00 Qualifications 1.3.2
31 11 00 Pest Management Report 3.5.1
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SECTION 31 23 00.00 20 EXCAVATION AND FILL
31 23 00.00 20 Dewatering work plan 1.6.1
31 23 00.00 20 Borrow Site Testing 1.5
31 23 00.00 20 Fill and backfill 3.12.2.1
31 23 00.00 20 Select material 3.12.2.2
31 23 00.00 20 Porous fill 3.12.2.3
31 23 00.00 20 Density tests 3.12.2.4
SECTION 32 05 33 LANDSCAPE ESTABLISHMENT
32 05 33 Integrated Pest Management Plan 2.4
32 05 33 Fertilizer 2.1
32 05 33 Mulches Topdressing 2.3
32 05 33 Maintenance Inspection Report 3.4.1
32 05 33 Plant Quantities 3.4.2
32 05 33 Tree Staking and Guying Removal 3.4.3
SECTION 32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE PAVING
32 11 16.16 Materials 2.1
32 11 16.16 Bearing ratio 2.1
32 11 16.16 Dry weight 2.1
32 11 16.16 Liquid limit 2.1
32 11 16.16 Percentage of wear 2.1
32 11 16.16 Plasticity index 2.1
32 11 16.16 Gradation tests 3.4.2.1
32 11 16.16 Density tests 3.4.2.3
32 11 16.16 Source 2.2
SECTION 32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR FLEXIBLE PAVING
32 11 24 Aggregates 2.1.1
32 11 24 Bearing ratio 2.1.1
32 11 24 Dry weight 2.1.1
32 11 24 Liquid limit 2.1.1
32 11 24 Percentage of wear 2.1.1
32 11 24 Plasticity index 2.1.1
32 11 24 Gradation 3.5.2.1
32 11 24 Smoothness 3.5.2.2
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
32 11 24 Density 3.5.2.3
32 11 24 Thickness 3.5.2.5
SECTION 32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 13 Sampling and Testing 3.7
SECTION 32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 12 17 ASPHALT CEMENT BINDER 2.2
32 12 17 MIX DESIGN 2.3
32 12 17 Job-mix formula 1.3.2
32 12 17 Bituminous mixture tests 2.4.1
32 12 17 Coarse aggregate tests 2.4.1
32 12 17 Fine aggregate tests 2.4.1
32 12 17 Percent of crushed pieces in gravel 2.4.1
32 12 17 Specific gravity of mineral filler 2.4.1
32 12 17 Specific gravity test of asphalt 2.4.1
32 12 17 Weight of slag test 2.4.1
32 12 17 Aggregates tests 3.5.2.1
32 12 17 Bituminous mix tests 3.5.2.2
32 12 17 Pavement courses 3.5.2.3
SECTION 32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 16 13 Concrete 2.1
32 16 13 Field Quality Control 3.8
SECTION 32 17 23 PAVEMENT MARKINGS
32 17 23 Exterior Surface Preparation 3.2
32 17 23 Safety Data Sheets 1.3.1
32 17 23 Surface Preparation Equipment List 2.1.1
32 17 23 Application Equipment List 2.1.2
32 17 23 Waterborne Paint 2.2.1
SECTION 32 92 23 SODDING
32 92 23 Fertilizer 2.4
32 92 23 Topsoil composition tests 2.2.3
32 92 23 sods 2.1
SECTION 32 93 00 EXTERIOR PLANTS
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
32 93 00 Time Restrictions and Planting Conditions 1.6
32 93 00 Root Control Barrier 2.1
32 93 00 Fertilizer 2.5
32 93 00 Mulch 2.6
32 93 00 Photographs 1.4.3
32 93 00 Gypsum 2.3.8
32 93 00 Staking Material 2.7.1
32 93 00 Ground Stakes 2.7.1.2
32 93 00 Metal Anchors 2.7.7
32 93 00 Recycled Plastic Edging 2.8.1
32 93 00 Percolation Test 1.4.4
32 93 00 Topsoil Composition Tests 2.2.4
32 93 00 Nursery Certifications 2.1.1
32 93 00 Plastic Identification 1.8
SECTION 33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 00 Connections 3.1.1
33 11 00 Pipe, Fittings, Joints and Couplings 2.1.1
33 11 00 Valves 2.1.2
33 11 00 Valve Boxes 2.1.2.2
33 11 00 Pipe Restraint 2.2.1
33 11 00 Tapping Sleeves 2.2.2
33 11 00 Disinfection Procedures 3.2.2
33 11 00 Hydrostatic Sewer Test 3.2.1.1.6
33 11 00 Hydrostatic Test 3.3.1.1
33 11 00 Leakage Test 3.3.1.2
33 11 00 Bacteriological Samples 3.3.1.3
33 11 00 Ductile Iron Piping 2.1.1.1
SECTION 33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 71 02 Precast underground structures 1.4.1
33 71 02 Cable supports 2.14
33 71 02 Medium voltage cable 2.5
33 71 02 Medium voltage cable terminations 2.6
33 71 02 Medium voltage cable joints 2.7
O N
ST
R
U C
TI
O
N S
U
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R
U C
TI
O
N S
M
AN
U
FA
C
TU
R E'
S
FI
EL
D
R
EP
O R
T
O
PE
R
AT
IO
N
A N
D M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
O
TH
ER
S
U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPPR
OVED
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA8903-15-D-0012
PROJECT NO. 1013751 (QKKA171042)
PROJECT TITLE Repair Dorm, B 542
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
LI
N
E N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
33 71 02 Live end caps 2.8
33 71 02 Precast concrete structures 2.13.2.1
33 71 02 Sealing Material 2.13.2.4
33 71 02 Pulling-In Irons 3.5.3
33 71 02 Cable Installation Plan and Procedure 3.3
33 71 02 Arc-proofing test 2.17.1
33 71 02 Medium voltage cable qualification and production tests 2.17.2
33 71 02 Field Acceptance Checks and Tests 3.19.1
33 71 02 Cable splicer/terminator 1.4.2
33 71 02 Cable Installer Qualifications 1.4.3
File details come from the government source that posted it. Updated .