FA520520R0006_Atch7_Schedule of Material Submittals.pdf
PDF 186 KB Posted
- Attached to
- Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, Misawa Air Base, Japan
- Solicitation number
- FA520520R0006
About this file
This document is a schedule of material submittals for the Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, at Misawa Air Base in Japan. The project involves repair and renovation work for military family housing.
The schedule lists over 100 submittal items required from the contractor organized by specification section. Submittals include shop drawings, product data, samples, test reports, warranties, and closeout documents. Key submittals include a project schedule, safety plan, quality control plan, commissioning plan, ductwork and piping drawings, mechanical and electrical equipment lists, lighting and fire alarm layouts, and as-built drawings. The schedule provides details on the type and number of copies required for each submittal and the required submission dates. It will be reviewed by the project engineer and contracting administrator to ensure materials comply with specifications before approval.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PR
EC
O N
ST
R
U C
TI
O
N
SU
BM
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R E'
S
IN
ST
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
EL
D
R
EP
O R
T O
PE
R
AT
IO
N A
M
AI
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
ER
'S
W
AR
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
01 32 01.00 10 PROJECT SCHEDULE
01 32 01.00 10 Project Schedule 3.4 3
01 33 00 SUBMITTAL PROCEDURES
01 33 00 Schedule of Material Submittals (SMS) 1.4 3
01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS
01 35 29 Accident Prevention Plan (APP) 1.6 3 01 35 29 Activity Hazard Analysis (AHA) 1.7 3 01 35 29 Crane Critical Lift Plan 1.6.1 3 01 35 29 Crane Operators 1.5.1.2 3 01 35 29 Accident Reports 1.11.1 3 01 35 29 Crane Reports 1.11.4 3 01 35 29 Monthly Exposure Reports 1.11.3 3 01 35 29 Reports 1.11 3 01 35 29 Certificate of Compliance 1.11.5 3 01 35 29 Confined Space Entry Permit 1.8 3 01 35 29 Hot work permit 1.8 3 01 35 29 Machinery & Mechanized Equipment Certification Form 3.5.3 3
01 45 00.00 10 QUALITY CONTROL
01 45 00.00 10 Contractor Quality Control (CQC) Plan 3.2 3 01 45 00.00 10 Verification Statement 3.9 3
01 57 19.00 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.00 Dirt and Dust Control Plan 1.3 3 01 57 19.00 Employee Training Records 1.3 3 01 57 19.00 Environmental Manager Qualifications 1.6.3 3 01 57 19.00 Environmental Protection Plan 1.7 3 01 57 19.00 Inspection Reports 1.3 3 01 57 19.00 Solid Waste Management Report 1.3 3 3 01 57 19.00 Certificate of Competency 1.3 3 01 57 19.00 EMS Certificate Of Completion 1.3 3 01 57 19.00 Erosion and Sediment Control 3.3.2 3 01 57 19.00 Inspector Qualifications 1.3 3 01 57 19.00 Contractor Hazardous Material Inventory Log 1.3 3 01 57 19.00 Disposal Documentation for Hazardous and Regulated Waste 1.3 3 01 57 19.00 Hazardous Waste/Debris Management 1.3 3 01 57 19.00 Stormwater Pollution Prevention Plan Compliance Notebook 1.3 3 01 57 19.00 Waste Determination Documentation 1.3 3
01 78 00 CLOSEOUT SUBMITTALS
01 78 00 Spare Parts Data 1.4 3 01 78 00 Instructions 1.6.1 3 01 78 00 Operation and Maintenance Manuals 3.3 3 01 78 00 As-Built Drawings 3.1 3 01 78 00 As-Built Record of Equipment and Materials 3.2 3 01 78 00 Checklist for DD FORM 1354 1.3 3 01 78 00 Construction Contract Specifications 1.3 3 01 78 00 Final Approved Shop Drawings 1.3 3 01 78 00 Final Cleaning 1.3 3 01 78 00 Interim DD FORM 1354 1.3 3 01 78 00 Record Drawings 1.3 3 01 78 00 Warranty Management Plan 1.6.1 3 01 78 00 Warranty Tags 1.6.3 3
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 23 Operation and Maintenance (O&M) Data 1.3 3
02 41 00 DEMOLITION
02 41 00 Demolition Plan 1.2.1 3 02 41 00 Existing Conditions 1.9 3 02 41 00 Notification 1.6 3 02 41 00 Receipts 3.2.2 3
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 82 14.00 10 Asbestos Hazard Abatement Plan (AHAP) 1.6 3 02 82 14.00 10 Detailed Drawings 1.3 3 02 82 14.00 10 Asbestos Management Plan 3.11.3.2 3
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
Attachment 7 to RFP No. FA520520R0006
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
02 82 14.00 10 Asbestos Waste Shipment Records 3.11.3.1 3 02 82 14.00 10 Training Program 1.10 3 02 82 14.00 10 Weight Bills and Delivery Tickets 3.11.3.1 3 02 82 14.00 10 Asbestos Sampling Plan 1.4 3 02 82 14.00 10 Exposure Assessment and Air Monitoring 3.9 3 02 82 14.00 10 Final Clearance Sampling/Analysis Sheets 1.4 3 02 82 14.00 10 Medical Surveillance Requirements 1.8 3 02 82 14.00 10 Hazardous Waste Disposal Record (Copy E) 1.4 3
03 01 00 REHABILITATION OF CONCRETE
03 01 00 Conventional Concrete 2.5 3 3 03 01 00 Miscellaneous Materials And Equipment 2.7 3 3 03 01 00 Polymers 2.6 3 3 03 01 00 Equipment For Concrete Preparation 2.2 3
03 30 00 CAST-IN-PLACE CONCRETE
03 30 00 Reinforcing Steel 1.6.2.1 3 03 30 00 Reinforcement 2.5 3 03 30 00 Air Content 3.11.2.4 3 03 30 00 Compressive Strength Tests 3.11.2.3 3 03 30 00 Concrete Mix Design 1.6.1.1 3 03 30 00 Slump Tests 3.11.2.1 3 03 30 00 Safety Data Sheets 1.6.3.1 3
04 20 00 UNIT MASONRY
04 20 00 Concrete Masonry Units (CMU) 2.2.2.2 3
05 52 00 METAL RAILINGS
05 52 00 Aluminum Guards 2.2.3 3 05 52 00 Stainless Steel Railings and Handrails 2.2.2 3 05 52 00 Installation Instructions 3.2 3
06 20 00 FINISH CARPENTRY
06 20 00 Detail Drawings Indicating All Wood Assemblies 1.3 3 06 20 00 Hardware and Accessories 2.6 3 06 20 00 Treated Wood Products 1.4 3 06 20 00 Trim 2.2 3 06 20 00 Wood Products 2.1 3 06 20 00 Samples 1.5 3 06 20 00 VOC Content for Hardwood Plywood 2.1.6 3 06 20 00 VOC Content for Softwood Plywood 2.1.5 3
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 41 16.00 10 Installation 3.1 3 06 41 16.00 10 Shop Drawings 1.4.2; 2.11 3 06 41 16.00 10 Finish Schedule 2.11.7.3 3 06 41 16.00 10 Wood Finishes 2.9 3 06 41 16.00 10 Wood Materials 2.1 3 06 41 16.00 10 Cabinet Hardware 2.6 3 06 41 16.00 10 Plastic Laminates 2.3 3 06 41 16.00 10 Laminate Clad Casework 2.9; 3.1 3 06 41 16.00 10 Quality Assurance 1.4 3
06 61 16 SOLID SURFACING FABRICATIONS
06 61 16 Detail Drawings 1.4.2 3 06 61 16 Installation 3.1 3 06 61 16 Solid Polymer Material 2.1 3 3 06 61 16 Counter and Vanity Tops 2.3.4 3 06 61 16 Material 2.1 3 06 61 16 Fabrications 2.3 3 06 61 16 Qualifications 1.4.1 3 06 61 16 Clean-up 3.2 3
07 14 00 FLUID-APPLIED WATERPROOFING (NON-ROOF)
07 14 00 Bond Breaker 2.7 3 07 14 00 Elastomeric Sheet 2.8 3 07 14 00 Flexible Foam-Backed Elastomeric Sheet 2.10 3 07 14 00 Fluid-Applied Membrane 2.1 3 07 14 00 Membrane Primer 2.2 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
07 14 00 Moisture Meter 3.4.1 3 07 14 00 Solvent 3.3 3 07 14 00 Safety Data Sheets 1.2 3 07 14 00 Warranty 1.6 3
07 21 13 BOARD AND BLOCK INSULATION
07 21 13 Accessories 2.5 3 07 21 13 Block or Board Insulation 2.1 3 3 3 07 21 13 Manufacturer's Standard Details 1.3 3 07 21 13 Pressure Sensitive Tape 2.3 3 07 21 13 Protection Board or Coatings 1.4 3 3 07 21 13 Vapor Retarder 2.2 3 3 07 21 13 Special Warranties 1.7 3 07 21 13 Adhesive 2.5.1 3
07 31 13 ASPHALT SHINGLES
07 31 13 Shingles 2.1.1 3 3 07 31 13 Application 3.3 3 07 31 13 Contractor's Warranty 1.5.2 3 07 31 13 Manufacturer's Warranty 1.5.1 3
07 57 16 SPRAYED ELASTOMERIC URETHANE OVERLAY ROOFING SYSTEM
07 57 16 Edge Flashing 2.4 3 07 57 16 Urethane Roof Vent Sheet 2.1.2 3 3 3 07 57 16 Manufacturer's Instructions 2.1 3 3 07 57 16 Primer 2.2 3 07 57 16 Sealants 2.3 3 07 57 16 Sprayed Urethane Coat 2.1 3 3 07 57 16 Ventilation Device 2.1.3 3 3
07 60 00 FLASHING AND SHEET METAL
07 60 00 Base Flashing 3.1.10 3 07 60 00 Conductor Heads 3.1.18 3 07 60 00 Copings 3.1.25 3 07 60 00 Counterflashing 3.1.11 3 07 60 00 Downspouts 3.1.15 3 07 60 00 Drip Edges 3.1.13 3 07 60 00 Eave Flashing 3.1.21 3 07 60 00 Expansion Joints 3.1.23 3 07 60 00 Exposed Sheet Metal 2.1.1 3 07 60 00 Flashing for Roof Drains 3.1.16 3 07 60 00 Gravel Stops and Fasciae 2.1.1 3 07 60 00 Gutters 3.1.14 3 07 60 00 Open Valley Flashing 3.1.20 3 07 60 00 Reglets 2.1.5 3 07 60 00 Scuppers 3.1.17 3 07 60 00 Splash Pans 3.1.19 3 07 60 00 Finish Samples 1.4.2 3 07 60 00 Instructions for Installation 1.4.3 3 07 60 00 Cleaning and Maintenance 1.4.3 3
07 84 00 FIRESTOPPING
07 84 00 Firestopping System 2.1 3 07 84 00 Firestopping Materials 2.2 3 3 07 84 00 Inspection 3.3 3 07 84 00 Inspector Qualifications 1.5.2 3 07 84 00 Installer Qualifications 1.5.1 3
07 92 00 JOINT SEALANTS
07 92 00 Backstops 2.4 3 07 92 00 Bond Breakers 2.3 3 07 92 00 Primers 2.2 3 07 92 00 Sealants 2.1 3
08 11 13 STEEL DOORS AND FRAMES
08 11 13 Accessories 2.2 3 3 08 11 13 Doors 2.1 3 3 08 11 13 Frames 2.4 3 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
08 11 13 Weatherstripping 2.6 3
08 11 16 ALUMINUM DOORS AND FRAMES
08 11 16 Door and Frame Assembly 1.5.1 3 3 3 08 11 16 Air Infiltration 1.2.3 3 08 11 16 Finish Samples 1.5.2 3 08 11 16 NFRC Project Label Certificates for Fenestration 1.2.5 3 3 08 11 16 Water Penetration 1.2.4 3 08 11 16 Adjustments, Cleaning, and Maintenance 1.5.3 3
08 14 00 WOOD DOORS
08 14 00 Doors 2.1 3 3 3 08 14 00 Accessories 2.2 3 08 14 00 Warranty 1.4 3 3 08 14 00 Door Finish Colors 2.3.6.3 3 08 14 00 Cycle-Slam 2.4 3 08 14 00 Hinge Loading Resistance 2.4 3
08 31 00 ACCESS DOORS AND PANELS
08 31 00 Access Doors And Panels 1.3 3 3 08 31 00 Accessories 2.1.9 3 08 31 00 Hardware 1.3.2 3 08 31 00 Finishes 2.4 3
08 32 13 ALUMINUM SLIDING GLASS DOORS
08 32 13 Aluminum sliding glass doors 2.1 3 3 3 08 32 13 Finish 2.1.5 3 3 08 32 13 Glazing 2.1.2 3 08 32 13 Hardware 2.1.1 3 08 32 13 Screens 2.1.4 3 08 32 13 Weatherstripping 2.1.3 3
08 36 13 SECTIONAL OVERHEAD DOORS
08 36 13 Doors 2.2 3 3 3 3
08 51 13 ALUMINUM WINDOWS
08 51 13 Fabrication Drawings 1.9 3 08 51 13 Windows 2.1 3 3 3 08 51 13 Accessories 2.2.8 3 08 51 13 Adhesives 2.2.4 3 08 51 13 Fasteners 2.2.3 3 08 51 13 Hardware 2.2.8.1 3 08 51 13 Mullions 2.4 3 08 51 13 Screens 2.2.10 3 08 51 13 Thermal Performance 1.10.5 3 08 51 13 Thermal-Barrier Windows 2.3 3 08 51 13 Weatherstripping 2.2.2 3 08 51 13 Window Cleaners' Bolts 2.5 3 08 51 13 Window Performance 1.10 3 08 51 13 Finish Sample 1.4.2.1 3 08 51 13 Window Sample 1.4.2.2 3 08 51 13 Structural Calculations for Deflection 2.1 3 08 51 13 Minimum Condensation Resistance Factor 1.4.3 3
08 71 00 DOOR HARDWARE
08 71 00 Hardware Schedule 1.5 3 08 71 00 Keying System 2.3.7 3 08 71 00 Manufacturer's Detail Drawings 1.3 3 08 71 00 Verification of Existing Conditions 1.3 3 08 71 00 Hardware Items 2.3 3 08 71 00 Installation 3.1 3 08 71 00 Hardware Schedule 1.5 3 08 71 00 Key Bitting 1.6.1 3
08 81 00 GLAZING
08 81 00 Installation 3.3.1 3 08 81 00 Glazing Accessories 1.3 3 08 81 00 Insulating Glass 1.6.1 3 3 08 81 00 Sealant 2.3.1.1 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
08 81 00 Tape 2.3.3 3 08 81 00 Glass Setting 3.2 3 08 81 00 Setting and Sealing Materials 2.3 3
08 91 00 METAL WALL LOUVERS
08 91 00 Wall louvers 1.4; 1.5 3 3 08 91 00 Metal Wall Louvers 2.2 3 08 91 00 Door louvers 1.5 3
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 00 Metal support systems 2.1 3
09 29 00 GYPSUM BOARD
09 29 00 Accessories 2.1.6 3 09 29 00 Cementitious Backer Units 2.1.3 3 09 29 00 Gypsum Board 2.1.1 3 09 29 00 Water-Resistant Gypsum Backing Board 2.1.2 3 09 29 00 Asbestos Free Materials 2.1 3
09 30 10 CERAMIC TILING
09 30 10 Detail Drawings 3.2 3 09 30 10 Glazed Ceramic Wall Tile 2.1.2 3 09 30 10 Mortar, Grout, and Adhesive 2.3 3 09 30 10 Porcelain Tile 2.1.1 3 09 30 10 Accessories 2.1 3 09 30 10 Grout 2.3.3 3 09 30 10 Tile 2.1 3 09 30 10 Transition Strips 2.1; 2.5 3 09 30 10 Maintenance Instructions 3.7 3 09 30 10 Installation 3.2 3
09 51 00 ACOUSTICAL CEILINGS
09 51 00 Approved Detail Drawings 2.1 3 09 51 00 Acoustical Units 2.2 3
09 65 00 RESILIENT FLOORING
09 65 00 Resilient Flooring and Accessories 2.8 3 3 3 3 09 65 00 Adhesives 2.4 3 09 65 00 Luxury Vinyl Plank (Lvp) Flooring 2.2 3 09 65 00 Vinyl Composition Tile 2.1 3 09 65 00 Wall Base 2.3 3 09 65 00 Moisture, Alkalinity and Bond Tests 3.3 3 09 65 00 Installation 3.1 3 09 65 00 Surface Preparation 3.2 3
09 90 00 PAINTS AND COATINGS
09 90 00 Piping identification 3.10 3 09 90 00 stencil 1.9 3 09 90 00 Coating 2.1 3 09 90 00 Manufacturer's Technical Data Sheets 2.1 3 09 90 00 Color 1.9 3 09 90 00 Applicator's qualifications 1.3 3 09 90 00 Qualification Testing 1.4.1.2 3 09 90 00 Application instructions 3.2.1 3 09 90 00 Manufacturer's Safety Data Sheets 1.7.2 3 09 90 00 Mixing 3.6.2 3 09 90 00 Coatings 2.1 3
10 14 00.20 INTERIOR SIGNAGE
10 14 00.20 Detail Drawings 1.4.2 3 10 14 00.20 Installation 3.1 3 10 14 00.20 Warranty 1.6 3 10 14 00.20 Interior Signage 1.4.1 3 10 14 00.20 Approved Manufacturer's Instructions 3.1 3 10 14 00.20 Protection and Cleaning 3.1.2 3
10 28 13 TOILET ACCESSORIES
10 28 13 Accessory Items 2.2 3 3 3 10 28 13 Finishes 2.1.2 3 3
11 31 13 ELECTRIC KITCHEN EQUIPMENT
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
11 31 13 Kitchen Equipment 2.1 3 3 3 11 31 13 Contractor's Warranty for Installation 3.4 3 11 31 13 Manufacturer's Warranty 3.3 3
12 21 00 WINDOW BLINDS
12 21 00 Installation 3.2 3 3 12 21 00 Window Blinds 2.1 3 3 3 3 3 12 21 00 Valance 2.1.2.4 3
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00 Bracing 3.1 3 3 13 48 00 Equipment Requirements 2.1 3 3 13 48 00 Resilient Vibration Isolation Devices 3.4 3 13 48 00 Anchor Bolts 3.3 3
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 00 Plumbing System 3.8.1 3 3 3 22 00 00 Backflow Prevention Assemblies 3.8.1.1 3 22 00 00 Countertop Lavatories 2.4.7 3 22 00 00 Drinking-Water Coolers 2.4.10 3 22 00 00 Fixtures 2.4 3 22 00 00 Flush Tank Water Closets 2.4.5; 2.4.3 3 22 00 00 Flush Valve Urinals 2.4.4 3 22 00 00 Kitchen Sinks 2.4.8 3 22 00 00 Plastic Shower Stalls 2.4.13 3 22 00 00 Pumps 2.9 3 22 00 00 Service Sinks 2.4.9 3 22 00 00 Shower Faucets 2.6.2 3 22 00 00 Vibration-Absorbing Features 3.3 3 22 00 00 Wall Hung Lavatories 2.4.6 3 22 00 00 Test of Backflow Prevention Assemblies 3.8.1.1 3 22 00 00 Tests, Flushing and Disinfection 3.8 3 22 00 00 Bolts 2.1.1 3 22 00 00 Materials and Equipment 1.3 3
22 07 19.00 40 PLUMBING PIPING INSULATION
22 07 19.00 40 Installation Drawings 3.1 3 22 07 19.00 40 Adhesives 2.3 3 3 22 07 19.00 40 Coatings 2.3 3 3 22 07 19.00 40 Insulating Cement 2.3 3 22 07 19.00 40 Insulation Materials 2.3 3 3 22 07 19.00 40 Jacketing 2.3 3 22 07 19.00 40 Tape 2.3 3 22 07 19.00 40 Installation Manual 3.1 3 22 07 19.00 40 Record Drawings 3.4 3 22 07 19.00 40 Recycled Materials 1.3.1 3
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 00 00 Detail Drawings 1.4.3 3 23 00 00 Air Deflectors 2.9.6 3 23 00 00 Air Filters 2.10.2 3 23 00 00 Air Supply And Exhaust Air Dampers 2.9.5 3 23 00 00 Ceiling Exhaust Fans 2.10.1.3 3 3 23 00 00 Centrifugal Fans 2.10.1.1 3 23 00 00 Centrifugal Type Power Wall Ventilators 2.10.1.2 3 3 23 00 00 Diagrams 1.2.1.2 3 23 00 00 Diffusers 2.9.7.1 3 23 00 00 Duct Access Doors 2.9.2 3 23 00 00 Duct Connectors 2.9.1.1 3 23 00 00 Fire Dampers 2.9.3 3 3 23 00 00 Insulated Nonmetallic Flexible Duct Runouts 2.9.1.1 3 23 00 00 Manual Balancing Dampers 2.9.4 3 3 23 00 00 Registers and Grilles 2.9.7.2 3 23 00 00 Test Procedures 1.4.4 3 23 00 00 Damper Acceptance Test 3.9 3 23 00 00 Performance Tests 3.11 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
23 00 00 Manufacturer's Installation Instructions 3.2 3 23 00 00 Operation and Maintenance Training 3.13.2 3 23 00 00 Operation and Maintenance Manuals 3.13.1 3
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
23 05 48.00 40 Installation Drawings 1.2 3 23 05 48.00 40 Equipment and Performance Data 1.2 3 23 05 48.00 40 Isolators 2.2.4 3
23 05 48.19 SEISMIC BRACING FOR HVAC
23 05 48.19 Contractor Designed Bracing 1.2.4 3 3 23 05 48.19 Coupling and Bracing 3.1 3 3 23 05 48.19 Equipment Restraint 2.2 3 3 23 05 48.19 Flexible Couplings or Joints 3.3 3 3 23 05 48.19 Anchor Bolts 3.9 3 3 23 05 48.19 Snubbers 2.6 3 23 05 48.19 Vibration Isolators 2.2.2 3 23 05 48.19 Design Calculations 1.2.4 3
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 05 93 Records of Existing Conditions 1.3 3 23 05 93 TAB Firm 1.5.3.1 3 23 05 93 TAB Specialist 1.5.3.2 3 23 05 93 TAB team assistants 1.2 3 23 05 93 TAB team engineer 1.2 3 23 05 93 TAB team field leader 1.2 3 23 05 93 TAB Report Forms 1.2 3 23 05 93 Calibration 1.5.2 3 23 05 93 Equipment and Performance Data 1.3 3 23 05 93 TAB Execution 1.5.4 3 23 05 93 TAB Procedures 1.5.2 3 23 05 93 Design review report 1.7.3.1; 3.5 3 3 23 05 93 TAB Procedures Summary 3.5 3 23 05 93 TAB Report for Season 1 1.5.5.1; 3.5 3 23 05 93 TAB Report for Season 2 1.5.5.1; 3.5 3 23 05 93 TAB Work Execution Schedule 3.5 3 23 05 93 Advance Notice of TAB Field Work 3.5 3 23 05 93 Completed Season 1 Pre-TAB Work Checklist 3.5 3 23 05 93 Independent TAB agency and personnel qualifications 1.5.1 3 23 05 93 Pre-field TAB engineering report 1.7.3.2 3 23 05 93 TAB Submittal and Work Schedule 1.7.1; 1.7.3 3
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 07 00 Duct Insulation Systems 3.2 3 3 3 23 07 00 Pipe Insulation Systems 2.1.1 3 3 3
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 08 00.00 10 Commissioning Plan 1.5.2.2 3 23 08 00.00 10 Functional Performance Tests 3.2.2 3 23 08 00.00 10 Pre-Functional Performance Test Checklists 3.2.1 3 23 08 00.00 10 Commissioning Report 3.3 3 23 08 00.00 10 Commissioning Firm 1.5.1 3 23 08 00.00 10 Commissioning Specialist 1.5.2 3
23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC 23 09 23.13 20 BACnet Communication Architecture Schematic 1.3.1.8 3 23 09 23.13 20 Component Wiring Diagrams 1.3.1.6 3 23 09 23.13 20 Control System Components List 1.3.1.3 3 23 09 23.13 20 Control System Drawings Title Sheet 1.3.1.1 3 23 09 23.13 20 Control System Schematics 1.3.1.4 3 23 09 23.13 20 EMCS Front-End Interface Graphic Screens 2.1.3.3 3 23 09 23.13 20 Energy Dashboard Interface Graphic Screen And Reporting 2.1.3.3 3 23 09 23.13 20 HVAC Equipment Electrical Ladder Diagrams 1.3.1.5 3 23 09 23.13 20 List of I/O Points 1.3.1.2 3 23 09 23.13 20 Terminal Strip Diagrams 1.3.1.7 3 23 09 23.13 20 BACnet Operator Workstation 2.1.3 3 23 09 23.13 20 DDC Software 2.1.2 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
23 09 23.13 20 Direct Digital Controllers 2.1.1 3 23 09 23.13 20 Sensors and Input Hardware 2.2 3 23 09 23.13 20 Performance Verification Testing Plan 3.4.2 3 23 09 23.13 20 Pre-Performance Verification Testing Checklist 3.4.4 3 23 09 23.13 20 Performance Verification Testing Report 3.4.10 3 23 09 23.13 20 Contractor's Qualifications 1.5.6 3 23 09 23.13 20 Pre-PVT Checklist 3.4.1 3 23 09 23.13 20 BACnet Direct Digital Control Systems 1.3 3 23 09 23.13 20 Controls System Operators Manuals 3.3 3 23 09 23.13 20 Training Documentation 3.5.1 3 23 09 23.13 20 Training Video 3.5 3
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 09 33.00 40 Material, Equipment, and Fixture Lists 2.3 3 23 09 33.00 40 Records of Existing Conditions 1.6 3 23 09 33.00 40 Fabrication Drawings 2.2 3 23 09 33.00 40 Installation Drawings 3.1 3 23 09 33.00 40 Control Components 2.3 3 23 09 33.00 40 Dampers 1.7; 2.3; 2.3.4 3 23 09 33.00 40 Operators 2.3; 2.3.5.1 3 23 09 33.00 40 Pressure Gages 2.3 3 23 09 33.00 40 Room Humidistats 2.4.5 3 3 3 23 09 33.00 40 Thermometers 2.3 3 23 09 33.00 40 Valves 1.7; 2.3 3 23 09 33.00 40 Listing of Product Installations 1.4.1 3 23 09 33.00 40 Manufacturer's Standard Factory Finishing 2.3.6 3 23 09 33.00 40 Qualified Permanent Service Organizations 1.4.4 3 23 09 33.00 40 Set Points and Final Adjustments Of Controls 3.2 3 23 09 33.00 40 Test Reports 3.2 3 23 09 33.00 40 Operating Instructions 1.3 3 23 09 33.00 40 Electric Operators 2.3.5.2 3 23 09 33.00 40 Operation and Maintenance Manuals 3.3.3 3 23 09 33.00 40 Scheduled Instructional Services 3.3.1 3 23 09 33.00 40 Thermostats 2.4.3 3
23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS
23 22 26.00 20 Instrumentation 2.1.9 3 23 22 26.00 20 Steam Meters 2.1.10.1 3 23 22 26.00 20 Strainers 2.1.10.4 3 23 22 26.00 20 Traps 2.1.10.3 3 23 22 26.00 20 Valve Operating Mechanism 2.1.7.6 3 23 22 26.00 20 Valves 2.1.7 3 3 23 22 26.00 20 Copper Tubing 2.1.2.1 3 23 22 26.00 20 Instrumentation 2.1.9 3 23 22 26.00 20 Pipe and Pipe System 2.1 3 23 22 26.00 20 Steam Piping 2.1.1 3 23 22 26.00 20 List of Welders and Welder's Symbols 1.4.2 3 23 22 26.00 20 Welder's Performance Qualification Record 1.4.2 3 23 22 26.00 20 Welding Procedure 1.4.1 3
23 23 00 REFRIGERANT PIPING
23 23 00 Refrigerant Piping System 2.3 3 23 23 00 Demonstrations 3.4 3 23 23 00 Qualifications 1.3.1 3 23 23 00 Refrigerant Piping System 2.3 3 23 23 00 Refrigerant Piping Tests 3.5 3 23 23 00 Spare Parts 1.5.2 3 23 23 00 Verification of Dimensions 3.1 3 23 23 00 Refrigerant Piping Tests 3.5 3 23 23 00 Service Organization 2.1 3 23 23 00 Maintenance 1.5 3 23 23 00 Operation and Maintenance Manuals 3.4 3
23 31 13.00 40 METAL DUCTS
23 31 13.00 40 Material, Equipment, and Fixture Lists 1.5 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
23 31 13.00 40 Records of Existing Conditions 1.5 3 23 31 13.00 40 Connection Diagrams 1.6 3 23 31 13.00 40 Record Drawings 1.6 3 23 31 13.00 40 Duct Hangers 2.2.5 3 23 31 13.00 40 Fire Dampers and Wall Collars 2.2.9 3 23 31 13.00 40 Galvanized Steel Ductwork Materials 2.1.1 3 23 31 13.00 40 Gravity Backdraft and Relief Dampers 2.2.7 3 23 31 13.00 40 Manual Volume Dampers 2.2.6 3 23 31 13.00 40 Mill-Rolled Reinforcing and Supporting Materials 2.1.2 3 23 31 13.00 40 Power Operated Dampers 2.2.8 3 23 31 13.00 40 Round Sheet Metal Duct Fittings 2.2.1 3 23 31 13.00 40 Stainless Steel Ductwork Materials 2.1.3 3 23 31 13.00 40 Turning Vanes 2.2.4 3 23 31 13.00 40 Operation and Maintenance Manuals 3.6 3 23 31 13.00 40 Power Operated Dampers 2.2.8 3
23 34 23.00 40 HVAC POWER VENTILATORS
23 34 23.00 40 Installation Drawings 3.1 3 23 34 23.00 40 Final Test Reports 3.2.1 3 23 34 23.00 40 Record Drawings 3.3 3
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES
23 37 13.00 40 Material, Equipment, and Fixture Lists 2.2.1 3 23 37 13.00 40 Records of Existing Conditions 2.2.1 3 23 37 13.00 40 Fabrication Drawings 2.2.1 3 23 37 13.00 40 Installation Drawings 3.1 3 23 37 13.00 40 Equipment and Performance Data 2.1 3 23 37 13.00 40 Manufacturer's Standard Color Chart 2.2.1 3
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 81 00.00 20 Control System Wiring Diagrams 1.4.2 3 23 81 00.00 20 Air Handling Unit (100OA Heat Pump) 2.2 3 3 23 81 00.00 20 Filters 2.3 3 23 81 00.00 20 Refrigerant 1.5 3 23 81 00.00 20 Salt-Spray Tests 2.6.1 3 23 81 00.00 20 Start-Up and Initial Operational Tests 3.3.3 3 23 81 00.00 20 Filters 2.3 3 3 23 81 00.00 20 Ozone Depleting Substances 2.1.1 3 23 81 00.00 20 Posted Operating Instructions 1.4.4 3
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
23 82 02.00 10 Drawings 1.4 3 23 82 02.00 10 Demonstrations 3.4 3 23 82 02.00 10 Materials and Equipment 2.1.1 3 23 82 02.00 10 Posted Instructions 3.4 3 23 82 02.00 10 Spare Parts 1.6 3 23 82 02.00 10 System Performance Tests 3.6 3 3 23 82 02.00 10 Verification of Dimensions 3.1 3 23 82 02.00 10 Refrigerant Tests, Charging, and Start-Up 3.5 3 23 82 02.00 10 Operation and Maintenance Manuals 3.4 3
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 00.00 40 Material, Equipment, and Fixture Lists 2.1 3 26 05 00.00 40 Circuit Breakers 2.1.8 3 26 05 00.00 40 Conduits and Raceways 2.1.1 3 26 05 00.00 40 Dry-Type Distribution Transformers 40940 3 26 05 00.00 40 Lamps and Lighting Fixtures 2.1.9 3 26 05 00.00 40 Outlet Boxes, Pull Boxes and Junction Boxes 2.1.6 3 26 05 00.00 40 Panelboards 2.1.7 3 26 05 00.00 40 Receptacles 2.1.5 3 26 05 00.00 40 Splices and Connectors 3.2.1.8 3 26 05 00.00 40 Switches 2.1.4 3 26 05 00.00 40 Wire and Cable 2.1.3 3 26 05 00.00 40 Continuity Test 3.3 3 26 05 00.00 40 Insulation Resistance Test 3.3 3 26 05 00.00 40 Phase-Rotation Tests 3.3 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
26 05 00.00 40 Manufacturer's Instructions 3.1 3
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 05 48.00 10 Equipment Requirements 1.3 3 3 26 05 48.00 10 Lighting Fixtures in Buildings 3.2 3 3 26 05 48.00 10 Contractor Designed Bracing 1.2.4 3
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 20 00 Cable trays 2.4 3 26 20 00 Marking strips 3.1.10.1 3 26 20 00 Panelboards 2.14 3 26 20 00 Wireways 2.28 3 26 20 00 CATV outlets 2.22.1 3 26 20 00 Circuit breakers 2.14.3; 2.15.2 3 26 20 00 Enclosed circuit breakers 2.16 3 26 20 00 Grounding Busbar 2.23.3 3 26 20 00 Load centers for housing units 2.15 3 26 20 00 Manual motor starters 2.19 3 26 20 00 Metering 2.29 3 3 26 20 00 Motor controllers 2.18 3 26 20 00 Receptacles 2.13 3 26 20 00 Surge protective devices 2.3 3 26 20 00 Switches 2.11 3 26 20 00 600-volt wiring test 3.5.2 3 26 20 00 Ground-fault receptacle test 3.5.4 3 26 20 00 Grounding system test 3.5.5 3 26 20 00 Transformer tests 3.5.3 3 26 20 00 Fuses 2.12 3 26 20 00 Electrical Systems 1.5.1 3
26 27 13.10 30 ELECTRIC METERS
26 27 13.10 30 Communications Module 2.2.2 3 26 27 13.10 30 Current 2.1.3 3 26 27 13.10 30 Data Recorder 1.6.2 3 3 26 27 13.10 30 Potential Transformer 2.1.2 3 26 27 13.10 30 Power Meters 2.1 3 3 26 27 13.10 30 Protocol Modules 1.6.1 3 3 26 27 13.10 30 Acceptance Checks and Tests 3.3.1 3 26 27 13.10 30 Communications Module 2.2.2 3 26 27 13.10 30 System Function Verification 3.3.2 3
26 51 00 INTERIOR LIGHTING
26 51 00 Luminaire Drawings 1.5.1 3 26 51 00 Occupancy/Vacancy Sensor Coverage Layout 1.5.2 3 26 51 00 Dimming Controllers (Dimmers) 2.5.2 3 26 51 00 Drivers, Ballasts and Generators 2.3 3 26 51 00 Exit Signs 2.6.1 3 26 51 00 LED Emergency Drivers 2.6.2 3 26 51 00 LED Luminaire Warranty 1.6.1 3 26 51 00 Light Sources 2.4 3 26 51 00 Luminaire Design Data 1.5.4 3 26 51 00 Luminaires 2.2 3 26 51 00 Occupancy Sensors 2.5.3.1 3 26 51 00 Vacancy Sensors 2.5.3.2 3 26 51 00 Energy Efficiency 1.5.11.3 3 26 51 00 LED Light Source - IES LM-80 Test Report 1.5.6 3 26 51 00 LED Light Source - IES TM-21 Test Report 1.5.7 3 26 51 00 LED Luminaire - IES LM-79 Test Report 1.5.5 3 26 51 00 Occupancy/Vacancy Sensor Verification Tests 1.5.8 3 26 51 00 LED Driver and Dimming Switch Compatibility Certificate 1.5.3 3 26 51 00 Luminaire Useful Life Certificate 1.6.1.1 3
26 52 00.00 40 EMERGENCY LIGHTING
26 52 00.00 40 Central Emergency Lighting Systems 2.2.2 3 3 26 52 00.00 40 Accessories 2.2.2.4 3 26 52 00.00 40 Emergency Lighting Egress Units 2.2.1 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
26 52 00.00 40 Material, Equipment, and Fixture Lists 1.2.1 3 26 52 00.00 40 Sample Warranty 1.2.1 3 26 52 00.00 40 System Operational Tests 3.2 3 26 52 00.00 40 Certificates of Conformance 1.2.1 3 26 52 00.00 40 Warranty 3.3 3
26 53 00.00 40 EXIT SIGNS
26 53 00.00 40 Material, Equipment, and Fixture Lists 1.2.1 3 26 53 00.00 40 Exit Lighting Units 1.2.1 3 3 26 53 00.00 40 Exit Lighting Units Outline Drawings 1.2.1 3 26 53 00.00 40 Accessories 1.2.1 3 26 53 00.00 40 Contemporary Fixtures 1.2.1 3 26 53 00.00 40 Operational Tests 3.2.1 3 26 53 00.00 40 Energy Efficiencies 1.2.1 3
26 56 00 EXTERIOR LIGHTING
26 56 00 LED Luminaire Warranty 1.6.1 3 26 56 00 Luminaire drawings 1.5.1.1 3 26 56 00 LED Luminaires 2.2 3 26 56 00 Luminaire Light Sources 2.2.2 3 26 56 00 Luminaire Power Supply Units (Drivers) 2.2.3 3 26 56 00 Photocell 2.3.1 3 26 56 00 Design Data for luminaires 1.5.2 3 26 56 00 LED Light Source - IES LM-80 Test Report 1.5.4 3 26 56 00 LED Luminaire - IES LM-79 Test Report 1.5.3 3 26 56 00 Operating test 3.2 3 26 56 00 Luminaire Useful Life Certificate 1.6.1 3
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 14.00 10 Cable TV Premises Distribution System 1.2 3 27 05 14.00 10 Installation 3.1 3 27 05 14.00 10 Qualifications 1.4 3 27 05 14.00 10 Spare Parts 1.7 3 27 05 14.00 10 Test Plan 3.4 3 27 05 14.00 10 Testing 3.4 3 27 05 14.00 10 Materials and Equipment 2.1 3 27 05 14.00 10 Manufacturer's Recommendations 3.1.2 3 27 05 14.00 10 Operation and Maintenance Manuals 3.5 3
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 10 00 Telecommunications drawings 1.6.1.1 3 27 10 00 Telecommunications Space Drawings 1.6.1.2 3 27 10 00 Connector blocks 2.4.3 3 27 10 00 Equipment support frame 2.4.2 3 27 10 00 Patch panels 2.4.5 3 27 10 00 Spare Parts 1.10.3 3 27 10 00 Telecommunications cabling 2.3 3 27 10 00 Telecommunications outlet/connector assemblies 2.5 3 27 10 00 Telecommunications cabling testing 3.5.1 3 27 10 00 Key Personnel 1.6.2.2 3 27 10 00 Manufacturer Qualifications 1.6.2.3 3 27 10 00 Telecommunications Contractor 1.6.2.1 3 27 10 00 Test plan 1.6.3 3 27 10 00 Factory reel tests 2.10.1 3 27 10 00 Telecommunications cabling and pathway system 1.10.1 3 27 10 00 Record Documentation 1.10.2 3
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
28 31 76 Amplifiers 2.14 3 3 28 31 76 Instructions 2.13.10 3 28 31 76 Nameplates 2.1.2 3 28 31 76 Notification Appliances 2.16 3 3 28 31 76 System Layout 1.2.1 3 28 31 76 System Operation 2.3 3 3 28 31 76 Wiring Diagrams 3.2.1 3 28 31 76 Addressable Interface Devices 2.7 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
28 31 76 Batteries 2.12.1 3 28 31 76 Battery Chargers 2.12.2 3 3 28 31 76 Digitalized Voice Generators 2.14 3 28 31 76 Fire Alarm Control Unit and Mass Notification Control Unit (FMCP) 2.13 3 28 31 76 Local Operating Console (LOC) 1.4.3 3 28 31 76 Manual Stations 2.15 3 28 31 76 Radio Transmitter and Interface Panels 2.19.1 3 28 31 76 Smoke Sensors 2.10 3 28 31 76 Technical Data And Computer Software 1.6 3 28 31 76 Terminal Cabinets 3.2.2 3 28 31 76 Text Displays 2.5.3 3 28 31 76 Tone Generators 2.14 3 28 31 76 Transmitters 2.19 3 28 31 76 Battery Power 2.12.1.2 3 28 31 76 Field Quality Control 3.7 3 28 31 76 Smoke Sensor Testing 2.10.2 3 28 31 76 Testing Procedures 3.7.1 3 28 31 76 Final Testing 3.7.2.3 3 28 31 76 Formal Inspection and Tests 3.7.2.2 3 28 31 76 Qualified Engineer 1.7.1.1 3 28 31 76 Supervisor 1.7.1.2 3 28 31 76 Fire Alarm/Mass Notification System 1.7.2.2 3 28 31 76 Instruction of Government Employees 3.8 3 28 31 76 Operation and Maintenance (O&M) Instructions 3.10 3 28 31 76 As-Built Drawings 3.7.2.4 3
31 23 00.00 20 EXCAVATION AND FILL
31 23 00.00 20 Dewatering work plan 1.7.2 3 31 23 00.00 20 Shoring and Sheeting Plan 1.7.1 3 31 23 00.00 20 Buried Warning And Identification Tape 2.7 3 31 23 00.00 20 Filter Fabric 2.5 3 31 23 00.00 20 Flowable Fill 2.3 3 31 23 00.00 20 Bedding Material 2.2 3 31 23 00.00 20 Borrow Site Testing 1.6 3 31 23 00.00 20 Density tests 3.11.2.3 3 31 23 00.00 20 Fill and backfill 3.11.2.1 3 31 23 00.00 20 Select material 3.11.2.2 3 31 23 00.00 20 Filter Fabric 2.5 3
31 32 11 SOIL SURFACE EROSION CONTROL
31 32 11 Geotextile Fabrics for Inlet Protection 2.1 3 3 31 32 11 Maintenance Records 3.4 3 31 32 11 Warranty 1.6 3
32 01 17.61 SEALING CRACKS IN ASPHALT PAVING
32 01 17.61 Installation of Sealant 3.3 3 32 01 17.61 Materials 1.3 3 32 01 17.61 Laboratory Tests 1.3 3
32 05 33 LANDSCAPE ESTABLISHMENT
32 05 33 Integrated Pest Management Plan 2.4 3 32 05 33 Fertilizer 2.1 3 32 05 33 Mulches Topdressing 2.3 3 32 05 33 Maintenance Inspection Report 3.4.1 3 32 05 33 Tree Staking and Guying Removal 3.4.2 3
32 11 20 BASE COURSE FOR RIGID PAVING
32 11 20 Plant, Equipment, and Tools 1.3 3 32 11 20 Density Tests 1.4.2.4 3 32 11 20 Initial Tests 2.2.1 3 32 11 20 In-Place Tests 3.11.1 3 32 11 20 Liquid Limit 1.4.2.2 3 32 11 20 Plasticity Index 1.4.2.2 3 32 11 20 Sieve Analysis 1.4.2.1 3 32 11 20 Wear Test 1.4.2.5 3
32 12 13 BITUMINOUS PRIME COATS
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
32 12 13 Sampling and Testing 3.7 3
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 12 17 Asphalt Cement Binder 2.2 3 32 12 17 Job-mix formula 1.3.2 3 32 12 17 Mix Design 2.3 3 32 12 17 Aggregates tests 3.5.2.1 3 32 12 17 Bituminous mix tests 3.5.2.2 3 32 12 17 Bituminous mixture tests 2.4.1 3 32 12 17 Coarse aggregate tests 2.4.1 3 32 12 17 Fine aggregate tests 2.4.1 3 32 12 17 Percent of crushed pieces in gravel 2.4.1 3 32 12 17 Specific gravity of mineral filler 2.4.1 3 32 12 17 Specific gravity test of asphalt 2.4.1 3 32 12 17 Weight of slag test 2.4.1 3
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 16 19 Concrete 2.1 3 32 16 19 Field Quality Control 3.8 3
32 17 23 PAVEMENT MARKINGS
32 17 23 Application Equipment List 2.1.2 3 32 17 23 Exterior Surface Preparation 3.2 3 32 17 23 Safety Data Sheets 1.3 3 32 17 23 Solventborne Paint 2.2.2 3 3 3 32 17 23 Surface Preparation Equipment List 2.1.1 3 32 17 23 Waterborne Paint 2.2.1 3 32 17 23 High Build Acrylic Coating (HBAC) 2.2.4 3 32 17 23 Test Reports 3.4.1 3 32 17 23 Waterborne Paint 2.2.1 3 3 3 32 17 23 Qualifications 1.3.1 3 32 17 23 Volatile Organic Compound 2.2.4 3 32 32 23 Shop Drawings 2.1.1 3 32 32 23 Components and Equipment 1.4.1 3 32 32 23 Soil Testing 3.7 3 32 32 23 Supplier Qualifications 1.4.2 3 32 32 23 Reinforcement 2.3 3 32 32 23 Segmental Concrete Units 2.2 3
32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL
32 92 23 Fertilizer 2.3 3 32 92 23 Topsoil composition tests 2.2.3 3 32 92 23 sods 2.1 3
32 93 00 EXTERIOR PLANTS
32 93 00 Time Restrictions and Planting Conditions 1.6 3 32 93 00 Antidesiccants 2.9 3 32 93 00 Composted Derivatives 2.3.7 3 32 93 00 Erosion Control Materials 2.10 3 32 93 00 Fertilizer 2.5 3 32 93 00 Ground Stakes 2.8.1.2 3 32 93 00 Gypsum 2.3.8 3 32 93 00 Metal Anchors 2.8.7 3 32 93 00 Mulch 2.7 3 3 32 93 00 Photographs 1.4.3 3 32 93 00 Root Control Barrier 2.11 3 32 93 00 Staking Material 2.8.1 3 32 93 00 Weed Control Fabric 2.6 3 32 93 00 Percolation Test 1.4.4 3 32 93 00 Topsoil Composition Tests 2.2.4 3 32 93 00 Nursery Certifications 2.1.1 3
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 00 Temporary Water Supply Plan 1.5.1 3 33 11 00 Corporation Stops 2.2.4.1 3 33 11 00 Disinfection Procedures 3.2.2 3 33 11 00 Pipe Restraint 2.2.1 3
O N
ST
R
U C
TI
IT
TA
LS
SH
O P
D R
AW
IN
G S
PR
O
D U
C
TS
D
AT
A
SA
M
PL
ES
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
T
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S M
AN
U
FA
C
TU
R
E' S
FI
O R
T O
PE
R
AT
IO
N A
N
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
M
AN
U
FA
C
TU
R
R
AN
TY
O
TH
ER
S U
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
SD
-1
APPROV
ED
DISAPP
R OVED
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
SP
EC
N
U M
BE
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF COPIES REQUIRED
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
FO
LL
O W
-U P
DATE
CONTRACTOR
NOTIFIED
C O
N
TR
AC
TO
R R
E-
SU
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
R
EM
AR
KS
SP
EC
P
AR
A
SCHEDULE OF MATERIAL SUBMITTALS
CONTRACT NO. FA520520R0006
PROJECT NO. 1058046
PROJECT TITLE Repair Military Family Housing (MFH) Tower 116
33 11 00 Pipe, Fittings, Joints and Couplings 2.1.1 3 3 33 11 00 Precast Concrete Thrust Blocks 2.2.1.2 3 33 11 00 Valve Boxes 2.1.2.4 3 33 11 00 Valves 2.1.2 3 3 33 11 00 Bacteriological Samples 3.3.1.3 3 33 11 00 Hydrostatic Sewer Test 3.2.1.1.6 3 33 11 00 Hydrostatic Test 3.3.1.1 3 33 11 00 Leakage Test 3.3.1.2 3 33 11 00 Delivery, storage, and handling 1.6 3 33 11 00 Ductile Iron Piping 2.1.1.1 3 33 11 00 Installation procedures for water piping 3.2.1 3
33 30 00 SANITARY SEWERAGE
33 30 00 Contractor's License 1.3.1 3 33 30 00 Installation Drawings 3.1.1 3 33 30 00 Frames, Covers, and Gratings 2.1.8 3 33 30 00 Gravity Pipe 2.1.1 3 33 30 00 Precast Concrete Manholes 2.1.5 3 33 30 00 Deflection Testing 3.3.1.2 3 33 30 00 Gaskets 2.1.6 3 33 30 00 Portland Cement 2.1.3 3
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 71 02 Precast underground structures 1.4.1 3 33 71 02 Cable supports 2.7 3 33 71 02 Composite/fiberglass handholes 2.6.5 3 33 71 02 Handhole frames and covers 2.6.4 3 33 71 02 Manhole frames and covers 2.6.3 3 33 71 02 Precast concrete structures 2.6.2.1 3 33 71 02 Pulling-In Irons 3.4.3 3 33 71 02 Sealing Materia 2.6.2.4 3 33 71 02 Cable Installation Plan and Procedure 3.3 3 33 71 02 Field Acceptance Checks and Tests 3.15.1 3 33 71 02 Cable Installer Qualifications 1.4.2 3
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
33 82 00 Telecommunications Entrance Facility Drawing 1.6.1.2 3 33 82 00 Telecommunications Outside Plan 1.6.1.1 3 33 82 00 Cable splices, and connectors 2.4 3 33 82 00 Closures 2.3 3 33 82 00 Spare Parts 1.8.2 3 33 82 00 Wire and cable 2.7 3 33 82 00 Acceptance tests 3.5.2 3 33 82 00 Outside Plant Test Plan 1.6.3 3 33 82 00 Pre-installation tests 3.5.1 3 33 82 00 Key Personnel 1.6.2.2 3 33 82 00 Manufacturer's Qualifications 1.6.2.3 3 33 82 00 Telecommunications Contractor 1.6.2.1 3 33 82 00 Cable tensions 3.1.8.1 3 33 82 00 Fiber Optic Splices 3.1.9.2 3 33 82 00 Factory Reel Test Data 2.13.1 3 33 82 00 Telecommunications outside plant (OSP 1.6.1.1 3 33 82 00 Record Documentation 1.8.1 3
File details come from the government source that posted it. Updated .