FA520520R0006_Atch7_Schedule of Material Submittals.pdf

PDF 186 KB Posted

Attached to
Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, Misawa Air Base, Japan
Solicitation number
FA520520R0006
Issued by

About this file

This document is a schedule of material submittals for the Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, at Misawa Air Base in Japan. The project involves repair and renovation work for military family housing.

The schedule lists over 100 submittal items required from the contractor organized by specification section. Submittals include shop drawings, product data, samples, test reports, warranties, and closeout documents. Key submittals include a project schedule, safety plan, quality control plan, commissioning plan, ductwork and piping drawings, mechanical and electrical equipment lists, lighting and fire alarm layouts, and as-built drawings. The schedule provides details on the type and number of copies required for each submittal and the required submission dates. It will be reviewed by the project engineer and contracting administrator to ensure materials comply with specifications before approval.

View the file

Other files

File Type Posted
Amendment_0002_30Mar20.zip ZIP file
Amendment_0001_20Mar20.zip ZIP file
FA520520R0006_Pre-Proposal Conf Minutes_Record of Site Visit_28Feb20.pdf PDF
FA520520R0006_Atch2_Drawings_PDF2of12_HAZMAT.pdf PDF
FA520520R0006_Atch2_Drawings_PDF12of12_Telecommunications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF9of12_EMCS.pdf PDF
FA520520R0006_Atch1_Specifications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF7of12_Plumbing.pdf PDF
FA520520R0006_Atch2_Drawings_PDF4of12_Architectural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF1of12_General.PDF PDF
FA520520R0006_Atch2_Drawings_PDF5of12_Structural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF3of12_Civil.pdf PDF
FA520520R0006_Atch4_Past Performance Questionnaire Cover Letter.pdf PDF
RFP_FA520520R0006.pdf PDF
FA520520R0006_Atch9_Manufacturer's Cut Sheet_Catalog Information.pdf PDF
FA520520R0006_Atch2_Drawings_PDF8of12_Electrical.pdf PDF
FA520520R0006_Atch10_Hazardous Material Survey Report.pdf PDF
FA520520R0006_Atch3_Other Contract Requirements.pdf PDF
FA520520R0006_Atch2_Drawings_PDF11of12_Life Safety.pdf PDF
FA520520R0006_Atch6_Construction Timeline.pdf PDF
FA520520R0006_Atch5_PastPresent Performance Questionnaire.pdf PDF
FA520520R0006_Atch2_Drawings_PDF6of12_Mechanical.pdf PDF
FA520520R0006_Atch2_Drawings_PDF10of12_Fire Protection.pdf PDF
FA520520R0006_Atch8_List of Contractor Furnished US Material.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR

EC

O N

ST

R

U C

TI

O

N

SU

BM

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R E'

S

IN

ST

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

EL

D

R

EP

O R

T O

PE

R

AT

IO

N A

M

AI

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

ER

'S

W

AR

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

01 32 01.00 10 PROJECT SCHEDULE

01 32 01.00 10 Project Schedule 3.4 3

01 33 00 SUBMITTAL PROCEDURES

01 33 00 Schedule of Material Submittals (SMS) 1.4 3

01 35 29 SAFETY AND OCCUPATIONAL HEALTH REQUIREMENTS

01 35 29 Accident Prevention Plan (APP) 1.6 3 01 35 29 Activity Hazard Analysis (AHA) 1.7 3 01 35 29 Crane Critical Lift Plan 1.6.1 3 01 35 29 Crane Operators 1.5.1.2 3 01 35 29 Accident Reports 1.11.1 3 01 35 29 Crane Reports 1.11.4 3 01 35 29 Monthly Exposure Reports 1.11.3 3 01 35 29 Reports 1.11 3 01 35 29 Certificate of Compliance 1.11.5 3 01 35 29 Confined Space Entry Permit 1.8 3 01 35 29 Hot work permit 1.8 3 01 35 29 Machinery & Mechanized Equipment Certification Form 3.5.3 3

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10 Contractor Quality Control (CQC) Plan 3.2 3 01 45 00.00 10 Verification Statement 3.9 3

01 57 19.00 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.00 Dirt and Dust Control Plan 1.3 3 01 57 19.00 Employee Training Records 1.3 3 01 57 19.00 Environmental Manager Qualifications 1.6.3 3 01 57 19.00 Environmental Protection Plan 1.7 3 01 57 19.00 Inspection Reports 1.3 3 01 57 19.00 Solid Waste Management Report 1.3 3 3 01 57 19.00 Certificate of Competency 1.3 3 01 57 19.00 EMS Certificate Of Completion 1.3 3 01 57 19.00 Erosion and Sediment Control 3.3.2 3 01 57 19.00 Inspector Qualifications 1.3 3 01 57 19.00 Contractor Hazardous Material Inventory Log 1.3 3 01 57 19.00 Disposal Documentation for Hazardous and Regulated Waste 1.3 3 01 57 19.00 Hazardous Waste/Debris Management 1.3 3 01 57 19.00 Stormwater Pollution Prevention Plan Compliance Notebook 1.3 3 01 57 19.00 Waste Determination Documentation 1.3 3

01 78 00 CLOSEOUT SUBMITTALS

01 78 00 Spare Parts Data 1.4 3 01 78 00 Instructions 1.6.1 3 01 78 00 Operation and Maintenance Manuals 3.3 3 01 78 00 As-Built Drawings 3.1 3 01 78 00 As-Built Record of Equipment and Materials 3.2 3 01 78 00 Checklist for DD FORM 1354 1.3 3 01 78 00 Construction Contract Specifications 1.3 3 01 78 00 Final Approved Shop Drawings 1.3 3 01 78 00 Final Cleaning 1.3 3 01 78 00 Interim DD FORM 1354 1.3 3 01 78 00 Record Drawings 1.3 3 01 78 00 Warranty Management Plan 1.6.1 3 01 78 00 Warranty Tags 1.6.3 3

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 23 Operation and Maintenance (O&M) Data 1.3 3

02 41 00 DEMOLITION

02 41 00 Demolition Plan 1.2.1 3 02 41 00 Existing Conditions 1.9 3 02 41 00 Notification 1.6 3 02 41 00 Receipts 3.2.2 3

02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES

02 82 14.00 10 Asbestos Hazard Abatement Plan (AHAP) 1.6 3 02 82 14.00 10 Detailed Drawings 1.3 3 02 82 14.00 10 Asbestos Management Plan 3.11.3.2 3

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

Attachment 7 to RFP No. FA520520R0006

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

02 82 14.00 10 Asbestos Waste Shipment Records 3.11.3.1 3 02 82 14.00 10 Training Program 1.10 3 02 82 14.00 10 Weight Bills and Delivery Tickets 3.11.3.1 3 02 82 14.00 10 Asbestos Sampling Plan 1.4 3 02 82 14.00 10 Exposure Assessment and Air Monitoring 3.9 3 02 82 14.00 10 Final Clearance Sampling/Analysis Sheets 1.4 3 02 82 14.00 10 Medical Surveillance Requirements 1.8 3 02 82 14.00 10 Hazardous Waste Disposal Record (Copy E) 1.4 3

03 01 00 REHABILITATION OF CONCRETE

03 01 00 Conventional Concrete 2.5 3 3 03 01 00 Miscellaneous Materials And Equipment 2.7 3 3 03 01 00 Polymers 2.6 3 3 03 01 00 Equipment For Concrete Preparation 2.2 3

03 30 00 CAST-IN-PLACE CONCRETE

03 30 00 Reinforcing Steel 1.6.2.1 3 03 30 00 Reinforcement 2.5 3 03 30 00 Air Content 3.11.2.4 3 03 30 00 Compressive Strength Tests 3.11.2.3 3 03 30 00 Concrete Mix Design 1.6.1.1 3 03 30 00 Slump Tests 3.11.2.1 3 03 30 00 Safety Data Sheets 1.6.3.1 3

04 20 00 UNIT MASONRY

04 20 00 Concrete Masonry Units (CMU) 2.2.2.2 3

05 52 00 METAL RAILINGS

05 52 00 Aluminum Guards 2.2.3 3 05 52 00 Stainless Steel Railings and Handrails 2.2.2 3 05 52 00 Installation Instructions 3.2 3

06 20 00 FINISH CARPENTRY

06 20 00 Detail Drawings Indicating All Wood Assemblies 1.3 3 06 20 00 Hardware and Accessories 2.6 3 06 20 00 Treated Wood Products 1.4 3 06 20 00 Trim 2.2 3 06 20 00 Wood Products 2.1 3 06 20 00 Samples 1.5 3 06 20 00 VOC Content for Hardwood Plywood 2.1.6 3 06 20 00 VOC Content for Softwood Plywood 2.1.5 3

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 41 16.00 10 Installation 3.1 3 06 41 16.00 10 Shop Drawings 1.4.2; 2.11 3 06 41 16.00 10 Finish Schedule 2.11.7.3 3 06 41 16.00 10 Wood Finishes 2.9 3 06 41 16.00 10 Wood Materials 2.1 3 06 41 16.00 10 Cabinet Hardware 2.6 3 06 41 16.00 10 Plastic Laminates 2.3 3 06 41 16.00 10 Laminate Clad Casework 2.9; 3.1 3 06 41 16.00 10 Quality Assurance 1.4 3

06 61 16 SOLID SURFACING FABRICATIONS

06 61 16 Detail Drawings 1.4.2 3 06 61 16 Installation 3.1 3 06 61 16 Solid Polymer Material 2.1 3 3 06 61 16 Counter and Vanity Tops 2.3.4 3 06 61 16 Material 2.1 3 06 61 16 Fabrications 2.3 3 06 61 16 Qualifications 1.4.1 3 06 61 16 Clean-up 3.2 3

07 14 00 FLUID-APPLIED WATERPROOFING (NON-ROOF)

07 14 00 Bond Breaker 2.7 3 07 14 00 Elastomeric Sheet 2.8 3 07 14 00 Flexible Foam-Backed Elastomeric Sheet 2.10 3 07 14 00 Fluid-Applied Membrane 2.1 3 07 14 00 Membrane Primer 2.2 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

07 14 00 Moisture Meter 3.4.1 3 07 14 00 Solvent 3.3 3 07 14 00 Safety Data Sheets 1.2 3 07 14 00 Warranty 1.6 3

07 21 13 BOARD AND BLOCK INSULATION

07 21 13 Accessories 2.5 3 07 21 13 Block or Board Insulation 2.1 3 3 3 07 21 13 Manufacturer's Standard Details 1.3 3 07 21 13 Pressure Sensitive Tape 2.3 3 07 21 13 Protection Board or Coatings 1.4 3 3 07 21 13 Vapor Retarder 2.2 3 3 07 21 13 Special Warranties 1.7 3 07 21 13 Adhesive 2.5.1 3

07 31 13 ASPHALT SHINGLES

07 31 13 Shingles 2.1.1 3 3 07 31 13 Application 3.3 3 07 31 13 Contractor's Warranty 1.5.2 3 07 31 13 Manufacturer's Warranty 1.5.1 3

07 57 16 SPRAYED ELASTOMERIC URETHANE OVERLAY ROOFING SYSTEM

07 57 16 Edge Flashing 2.4 3 07 57 16 Urethane Roof Vent Sheet 2.1.2 3 3 3 07 57 16 Manufacturer's Instructions 2.1 3 3 07 57 16 Primer 2.2 3 07 57 16 Sealants 2.3 3 07 57 16 Sprayed Urethane Coat 2.1 3 3 07 57 16 Ventilation Device 2.1.3 3 3

07 60 00 FLASHING AND SHEET METAL

07 60 00 Base Flashing 3.1.10 3 07 60 00 Conductor Heads 3.1.18 3 07 60 00 Copings 3.1.25 3 07 60 00 Counterflashing 3.1.11 3 07 60 00 Downspouts 3.1.15 3 07 60 00 Drip Edges 3.1.13 3 07 60 00 Eave Flashing 3.1.21 3 07 60 00 Expansion Joints 3.1.23 3 07 60 00 Exposed Sheet Metal 2.1.1 3 07 60 00 Flashing for Roof Drains 3.1.16 3 07 60 00 Gravel Stops and Fasciae 2.1.1 3 07 60 00 Gutters 3.1.14 3 07 60 00 Open Valley Flashing 3.1.20 3 07 60 00 Reglets 2.1.5 3 07 60 00 Scuppers 3.1.17 3 07 60 00 Splash Pans 3.1.19 3 07 60 00 Finish Samples 1.4.2 3 07 60 00 Instructions for Installation 1.4.3 3 07 60 00 Cleaning and Maintenance 1.4.3 3

07 84 00 FIRESTOPPING

07 84 00 Firestopping System 2.1 3 07 84 00 Firestopping Materials 2.2 3 3 07 84 00 Inspection 3.3 3 07 84 00 Inspector Qualifications 1.5.2 3 07 84 00 Installer Qualifications 1.5.1 3

07 92 00 JOINT SEALANTS

07 92 00 Backstops 2.4 3 07 92 00 Bond Breakers 2.3 3 07 92 00 Primers 2.2 3 07 92 00 Sealants 2.1 3

08 11 13 STEEL DOORS AND FRAMES

08 11 13 Accessories 2.2 3 3 08 11 13 Doors 2.1 3 3 08 11 13 Frames 2.4 3 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

08 11 13 Weatherstripping 2.6 3

08 11 16 ALUMINUM DOORS AND FRAMES

08 11 16 Door and Frame Assembly 1.5.1 3 3 3 08 11 16 Air Infiltration 1.2.3 3 08 11 16 Finish Samples 1.5.2 3 08 11 16 NFRC Project Label Certificates for Fenestration 1.2.5 3 3 08 11 16 Water Penetration 1.2.4 3 08 11 16 Adjustments, Cleaning, and Maintenance 1.5.3 3

08 14 00 WOOD DOORS

08 14 00 Doors 2.1 3 3 3 08 14 00 Accessories 2.2 3 08 14 00 Warranty 1.4 3 3 08 14 00 Door Finish Colors 2.3.6.3 3 08 14 00 Cycle-Slam 2.4 3 08 14 00 Hinge Loading Resistance 2.4 3

08 31 00 ACCESS DOORS AND PANELS

08 31 00 Access Doors And Panels 1.3 3 3 08 31 00 Accessories 2.1.9 3 08 31 00 Hardware 1.3.2 3 08 31 00 Finishes 2.4 3

08 32 13 ALUMINUM SLIDING GLASS DOORS

08 32 13 Aluminum sliding glass doors 2.1 3 3 3 08 32 13 Finish 2.1.5 3 3 08 32 13 Glazing 2.1.2 3 08 32 13 Hardware 2.1.1 3 08 32 13 Screens 2.1.4 3 08 32 13 Weatherstripping 2.1.3 3

08 36 13 SECTIONAL OVERHEAD DOORS

08 36 13 Doors 2.2 3 3 3 3

08 51 13 ALUMINUM WINDOWS

08 51 13 Fabrication Drawings 1.9 3 08 51 13 Windows 2.1 3 3 3 08 51 13 Accessories 2.2.8 3 08 51 13 Adhesives 2.2.4 3 08 51 13 Fasteners 2.2.3 3 08 51 13 Hardware 2.2.8.1 3 08 51 13 Mullions 2.4 3 08 51 13 Screens 2.2.10 3 08 51 13 Thermal Performance 1.10.5 3 08 51 13 Thermal-Barrier Windows 2.3 3 08 51 13 Weatherstripping 2.2.2 3 08 51 13 Window Cleaners' Bolts 2.5 3 08 51 13 Window Performance 1.10 3 08 51 13 Finish Sample 1.4.2.1 3 08 51 13 Window Sample 1.4.2.2 3 08 51 13 Structural Calculations for Deflection 2.1 3 08 51 13 Minimum Condensation Resistance Factor 1.4.3 3

08 71 00 DOOR HARDWARE

08 71 00 Hardware Schedule 1.5 3 08 71 00 Keying System 2.3.7 3 08 71 00 Manufacturer's Detail Drawings 1.3 3 08 71 00 Verification of Existing Conditions 1.3 3 08 71 00 Hardware Items 2.3 3 08 71 00 Installation 3.1 3 08 71 00 Hardware Schedule 1.5 3 08 71 00 Key Bitting 1.6.1 3

08 81 00 GLAZING

08 81 00 Installation 3.3.1 3 08 81 00 Glazing Accessories 1.3 3 08 81 00 Insulating Glass 1.6.1 3 3 08 81 00 Sealant 2.3.1.1 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

08 81 00 Tape 2.3.3 3 08 81 00 Glass Setting 3.2 3 08 81 00 Setting and Sealing Materials 2.3 3

08 91 00 METAL WALL LOUVERS

08 91 00 Wall louvers 1.4; 1.5 3 3 08 91 00 Metal Wall Louvers 2.2 3 08 91 00 Door louvers 1.5 3

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 22 00 Metal support systems 2.1 3

09 29 00 GYPSUM BOARD

09 29 00 Accessories 2.1.6 3 09 29 00 Cementitious Backer Units 2.1.3 3 09 29 00 Gypsum Board 2.1.1 3 09 29 00 Water-Resistant Gypsum Backing Board 2.1.2 3 09 29 00 Asbestos Free Materials 2.1 3

09 30 10 CERAMIC TILING

09 30 10 Detail Drawings 3.2 3 09 30 10 Glazed Ceramic Wall Tile 2.1.2 3 09 30 10 Mortar, Grout, and Adhesive 2.3 3 09 30 10 Porcelain Tile 2.1.1 3 09 30 10 Accessories 2.1 3 09 30 10 Grout 2.3.3 3 09 30 10 Tile 2.1 3 09 30 10 Transition Strips 2.1; 2.5 3 09 30 10 Maintenance Instructions 3.7 3 09 30 10 Installation 3.2 3

09 51 00 ACOUSTICAL CEILINGS

09 51 00 Approved Detail Drawings 2.1 3 09 51 00 Acoustical Units 2.2 3

09 65 00 RESILIENT FLOORING

09 65 00 Resilient Flooring and Accessories 2.8 3 3 3 3 09 65 00 Adhesives 2.4 3 09 65 00 Luxury Vinyl Plank (Lvp) Flooring 2.2 3 09 65 00 Vinyl Composition Tile 2.1 3 09 65 00 Wall Base 2.3 3 09 65 00 Moisture, Alkalinity and Bond Tests 3.3 3 09 65 00 Installation 3.1 3 09 65 00 Surface Preparation 3.2 3

09 90 00 PAINTS AND COATINGS

09 90 00 Piping identification 3.10 3 09 90 00 stencil 1.9 3 09 90 00 Coating 2.1 3 09 90 00 Manufacturer's Technical Data Sheets 2.1 3 09 90 00 Color 1.9 3 09 90 00 Applicator's qualifications 1.3 3 09 90 00 Qualification Testing 1.4.1.2 3 09 90 00 Application instructions 3.2.1 3 09 90 00 Manufacturer's Safety Data Sheets 1.7.2 3 09 90 00 Mixing 3.6.2 3 09 90 00 Coatings 2.1 3

10 14 00.20 INTERIOR SIGNAGE

10 14 00.20 Detail Drawings 1.4.2 3 10 14 00.20 Installation 3.1 3 10 14 00.20 Warranty 1.6 3 10 14 00.20 Interior Signage 1.4.1 3 10 14 00.20 Approved Manufacturer's Instructions 3.1 3 10 14 00.20 Protection and Cleaning 3.1.2 3

10 28 13 TOILET ACCESSORIES

10 28 13 Accessory Items 2.2 3 3 3 10 28 13 Finishes 2.1.2 3 3

11 31 13 ELECTRIC KITCHEN EQUIPMENT

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

11 31 13 Kitchen Equipment 2.1 3 3 3 11 31 13 Contractor's Warranty for Installation 3.4 3 11 31 13 Manufacturer's Warranty 3.3 3

12 21 00 WINDOW BLINDS

12 21 00 Installation 3.2 3 3 12 21 00 Window Blinds 2.1 3 3 3 3 3 12 21 00 Valance 2.1.2.4 3

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00 Bracing 3.1 3 3 13 48 00 Equipment Requirements 2.1 3 3 13 48 00 Resilient Vibration Isolation Devices 3.4 3 13 48 00 Anchor Bolts 3.3 3

22 00 00 PLUMBING, GENERAL PURPOSE

22 00 00 Plumbing System 3.8.1 3 3 3 22 00 00 Backflow Prevention Assemblies 3.8.1.1 3 22 00 00 Countertop Lavatories 2.4.7 3 22 00 00 Drinking-Water Coolers 2.4.10 3 22 00 00 Fixtures 2.4 3 22 00 00 Flush Tank Water Closets 2.4.5; 2.4.3 3 22 00 00 Flush Valve Urinals 2.4.4 3 22 00 00 Kitchen Sinks 2.4.8 3 22 00 00 Plastic Shower Stalls 2.4.13 3 22 00 00 Pumps 2.9 3 22 00 00 Service Sinks 2.4.9 3 22 00 00 Shower Faucets 2.6.2 3 22 00 00 Vibration-Absorbing Features 3.3 3 22 00 00 Wall Hung Lavatories 2.4.6 3 22 00 00 Test of Backflow Prevention Assemblies 3.8.1.1 3 22 00 00 Tests, Flushing and Disinfection 3.8 3 22 00 00 Bolts 2.1.1 3 22 00 00 Materials and Equipment 1.3 3

22 07 19.00 40 PLUMBING PIPING INSULATION

22 07 19.00 40 Installation Drawings 3.1 3 22 07 19.00 40 Adhesives 2.3 3 3 22 07 19.00 40 Coatings 2.3 3 3 22 07 19.00 40 Insulating Cement 2.3 3 22 07 19.00 40 Insulation Materials 2.3 3 3 22 07 19.00 40 Jacketing 2.3 3 22 07 19.00 40 Tape 2.3 3 22 07 19.00 40 Installation Manual 3.1 3 22 07 19.00 40 Record Drawings 3.4 3 22 07 19.00 40 Recycled Materials 1.3.1 3

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 00 00 Detail Drawings 1.4.3 3 23 00 00 Air Deflectors 2.9.6 3 23 00 00 Air Filters 2.10.2 3 23 00 00 Air Supply And Exhaust Air Dampers 2.9.5 3 23 00 00 Ceiling Exhaust Fans 2.10.1.3 3 3 23 00 00 Centrifugal Fans 2.10.1.1 3 23 00 00 Centrifugal Type Power Wall Ventilators 2.10.1.2 3 3 23 00 00 Diagrams 1.2.1.2 3 23 00 00 Diffusers 2.9.7.1 3 23 00 00 Duct Access Doors 2.9.2 3 23 00 00 Duct Connectors 2.9.1.1 3 23 00 00 Fire Dampers 2.9.3 3 3 23 00 00 Insulated Nonmetallic Flexible Duct Runouts 2.9.1.1 3 23 00 00 Manual Balancing Dampers 2.9.4 3 3 23 00 00 Registers and Grilles 2.9.7.2 3 23 00 00 Test Procedures 1.4.4 3 23 00 00 Damper Acceptance Test 3.9 3 23 00 00 Performance Tests 3.11 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

23 00 00 Manufacturer's Installation Instructions 3.2 3 23 00 00 Operation and Maintenance Training 3.13.2 3 23 00 00 Operation and Maintenance Manuals 3.13.1 3

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 48.00 40 Installation Drawings 1.2 3 23 05 48.00 40 Equipment and Performance Data 1.2 3 23 05 48.00 40 Isolators 2.2.4 3

23 05 48.19 SEISMIC BRACING FOR HVAC

23 05 48.19 Contractor Designed Bracing 1.2.4 3 3 23 05 48.19 Coupling and Bracing 3.1 3 3 23 05 48.19 Equipment Restraint 2.2 3 3 23 05 48.19 Flexible Couplings or Joints 3.3 3 3 23 05 48.19 Anchor Bolts 3.9 3 3 23 05 48.19 Snubbers 2.6 3 23 05 48.19 Vibration Isolators 2.2.2 3 23 05 48.19 Design Calculations 1.2.4 3

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 05 93 Records of Existing Conditions 1.3 3 23 05 93 TAB Firm 1.5.3.1 3 23 05 93 TAB Specialist 1.5.3.2 3 23 05 93 TAB team assistants 1.2 3 23 05 93 TAB team engineer 1.2 3 23 05 93 TAB team field leader 1.2 3 23 05 93 TAB Report Forms 1.2 3 23 05 93 Calibration 1.5.2 3 23 05 93 Equipment and Performance Data 1.3 3 23 05 93 TAB Execution 1.5.4 3 23 05 93 TAB Procedures 1.5.2 3 23 05 93 Design review report 1.7.3.1; 3.5 3 3 23 05 93 TAB Procedures Summary 3.5 3 23 05 93 TAB Report for Season 1 1.5.5.1; 3.5 3 23 05 93 TAB Report for Season 2 1.5.5.1; 3.5 3 23 05 93 TAB Work Execution Schedule 3.5 3 23 05 93 Advance Notice of TAB Field Work 3.5 3 23 05 93 Completed Season 1 Pre-TAB Work Checklist 3.5 3 23 05 93 Independent TAB agency and personnel qualifications 1.5.1 3 23 05 93 Pre-field TAB engineering report 1.7.3.2 3 23 05 93 TAB Submittal and Work Schedule 1.7.1; 1.7.3 3

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 07 00 Duct Insulation Systems 3.2 3 3 3 23 07 00 Pipe Insulation Systems 2.1.1 3 3 3

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 08 00.00 10 Commissioning Plan 1.5.2.2 3 23 08 00.00 10 Functional Performance Tests 3.2.2 3 23 08 00.00 10 Pre-Functional Performance Test Checklists 3.2.1 3 23 08 00.00 10 Commissioning Report 3.3 3 23 08 00.00 10 Commissioning Firm 1.5.1 3 23 08 00.00 10 Commissioning Specialist 1.5.2 3

23 09 23.13 20 BACnet DIRECT DIGITAL CONTROL SYSTEMS FOR HVAC 23 09 23.13 20 BACnet Communication Architecture Schematic 1.3.1.8 3 23 09 23.13 20 Component Wiring Diagrams 1.3.1.6 3 23 09 23.13 20 Control System Components List 1.3.1.3 3 23 09 23.13 20 Control System Drawings Title Sheet 1.3.1.1 3 23 09 23.13 20 Control System Schematics 1.3.1.4 3 23 09 23.13 20 EMCS Front-End Interface Graphic Screens 2.1.3.3 3 23 09 23.13 20 Energy Dashboard Interface Graphic Screen And Reporting 2.1.3.3 3 23 09 23.13 20 HVAC Equipment Electrical Ladder Diagrams 1.3.1.5 3 23 09 23.13 20 List of I/O Points 1.3.1.2 3 23 09 23.13 20 Terminal Strip Diagrams 1.3.1.7 3 23 09 23.13 20 BACnet Operator Workstation 2.1.3 3 23 09 23.13 20 DDC Software 2.1.2 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

23 09 23.13 20 Direct Digital Controllers 2.1.1 3 23 09 23.13 20 Sensors and Input Hardware 2.2 3 23 09 23.13 20 Performance Verification Testing Plan 3.4.2 3 23 09 23.13 20 Pre-Performance Verification Testing Checklist 3.4.4 3 23 09 23.13 20 Performance Verification Testing Report 3.4.10 3 23 09 23.13 20 Contractor's Qualifications 1.5.6 3 23 09 23.13 20 Pre-PVT Checklist 3.4.1 3 23 09 23.13 20 BACnet Direct Digital Control Systems 1.3 3 23 09 23.13 20 Controls System Operators Manuals 3.3 3 23 09 23.13 20 Training Documentation 3.5.1 3 23 09 23.13 20 Training Video 3.5 3

23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC

23 09 33.00 40 Material, Equipment, and Fixture Lists 2.3 3 23 09 33.00 40 Records of Existing Conditions 1.6 3 23 09 33.00 40 Fabrication Drawings 2.2 3 23 09 33.00 40 Installation Drawings 3.1 3 23 09 33.00 40 Control Components 2.3 3 23 09 33.00 40 Dampers 1.7; 2.3; 2.3.4 3 23 09 33.00 40 Operators 2.3; 2.3.5.1 3 23 09 33.00 40 Pressure Gages 2.3 3 23 09 33.00 40 Room Humidistats 2.4.5 3 3 3 23 09 33.00 40 Thermometers 2.3 3 23 09 33.00 40 Valves 1.7; 2.3 3 23 09 33.00 40 Listing of Product Installations 1.4.1 3 23 09 33.00 40 Manufacturer's Standard Factory Finishing 2.3.6 3 23 09 33.00 40 Qualified Permanent Service Organizations 1.4.4 3 23 09 33.00 40 Set Points and Final Adjustments Of Controls 3.2 3 23 09 33.00 40 Test Reports 3.2 3 23 09 33.00 40 Operating Instructions 1.3 3 23 09 33.00 40 Electric Operators 2.3.5.2 3 23 09 33.00 40 Operation and Maintenance Manuals 3.3.3 3 23 09 33.00 40 Scheduled Instructional Services 3.3.1 3 23 09 33.00 40 Thermostats 2.4.3 3

23 22 26.00 20 STEAM SYSTEM AND TERMINAL UNITS

23 22 26.00 20 Instrumentation 2.1.9 3 23 22 26.00 20 Steam Meters 2.1.10.1 3 23 22 26.00 20 Strainers 2.1.10.4 3 23 22 26.00 20 Traps 2.1.10.3 3 23 22 26.00 20 Valve Operating Mechanism 2.1.7.6 3 23 22 26.00 20 Valves 2.1.7 3 3 23 22 26.00 20 Copper Tubing 2.1.2.1 3 23 22 26.00 20 Instrumentation 2.1.9 3 23 22 26.00 20 Pipe and Pipe System 2.1 3 23 22 26.00 20 Steam Piping 2.1.1 3 23 22 26.00 20 List of Welders and Welder's Symbols 1.4.2 3 23 22 26.00 20 Welder's Performance Qualification Record 1.4.2 3 23 22 26.00 20 Welding Procedure 1.4.1 3

23 23 00 REFRIGERANT PIPING

23 23 00 Refrigerant Piping System 2.3 3 23 23 00 Demonstrations 3.4 3 23 23 00 Qualifications 1.3.1 3 23 23 00 Refrigerant Piping System 2.3 3 23 23 00 Refrigerant Piping Tests 3.5 3 23 23 00 Spare Parts 1.5.2 3 23 23 00 Verification of Dimensions 3.1 3 23 23 00 Refrigerant Piping Tests 3.5 3 23 23 00 Service Organization 2.1 3 23 23 00 Maintenance 1.5 3 23 23 00 Operation and Maintenance Manuals 3.4 3

23 31 13.00 40 METAL DUCTS

23 31 13.00 40 Material, Equipment, and Fixture Lists 1.5 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

23 31 13.00 40 Records of Existing Conditions 1.5 3 23 31 13.00 40 Connection Diagrams 1.6 3 23 31 13.00 40 Record Drawings 1.6 3 23 31 13.00 40 Duct Hangers 2.2.5 3 23 31 13.00 40 Fire Dampers and Wall Collars 2.2.9 3 23 31 13.00 40 Galvanized Steel Ductwork Materials 2.1.1 3 23 31 13.00 40 Gravity Backdraft and Relief Dampers 2.2.7 3 23 31 13.00 40 Manual Volume Dampers 2.2.6 3 23 31 13.00 40 Mill-Rolled Reinforcing and Supporting Materials 2.1.2 3 23 31 13.00 40 Power Operated Dampers 2.2.8 3 23 31 13.00 40 Round Sheet Metal Duct Fittings 2.2.1 3 23 31 13.00 40 Stainless Steel Ductwork Materials 2.1.3 3 23 31 13.00 40 Turning Vanes 2.2.4 3 23 31 13.00 40 Operation and Maintenance Manuals 3.6 3 23 31 13.00 40 Power Operated Dampers 2.2.8 3

23 34 23.00 40 HVAC POWER VENTILATORS

23 34 23.00 40 Installation Drawings 3.1 3 23 34 23.00 40 Final Test Reports 3.2.1 3 23 34 23.00 40 Record Drawings 3.3 3

23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLES

23 37 13.00 40 Material, Equipment, and Fixture Lists 2.2.1 3 23 37 13.00 40 Records of Existing Conditions 2.2.1 3 23 37 13.00 40 Fabrication Drawings 2.2.1 3 23 37 13.00 40 Installation Drawings 3.1 3 23 37 13.00 40 Equipment and Performance Data 2.1 3 23 37 13.00 40 Manufacturer's Standard Color Chart 2.2.1 3

23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT

23 81 00.00 20 Control System Wiring Diagrams 1.4.2 3 23 81 00.00 20 Air Handling Unit (100OA Heat Pump) 2.2 3 3 23 81 00.00 20 Filters 2.3 3 23 81 00.00 20 Refrigerant 1.5 3 23 81 00.00 20 Salt-Spray Tests 2.6.1 3 23 81 00.00 20 Start-Up and Initial Operational Tests 3.3.3 3 23 81 00.00 20 Filters 2.3 3 3 23 81 00.00 20 Ozone Depleting Substances 2.1.1 3 23 81 00.00 20 Posted Operating Instructions 1.4.4 3

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

23 82 02.00 10 Drawings 1.4 3 23 82 02.00 10 Demonstrations 3.4 3 23 82 02.00 10 Materials and Equipment 2.1.1 3 23 82 02.00 10 Posted Instructions 3.4 3 23 82 02.00 10 Spare Parts 1.6 3 23 82 02.00 10 System Performance Tests 3.6 3 3 23 82 02.00 10 Verification of Dimensions 3.1 3 23 82 02.00 10 Refrigerant Tests, Charging, and Start-Up 3.5 3 23 82 02.00 10 Operation and Maintenance Manuals 3.4 3

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 00.00 40 Material, Equipment, and Fixture Lists 2.1 3 26 05 00.00 40 Circuit Breakers 2.1.8 3 26 05 00.00 40 Conduits and Raceways 2.1.1 3 26 05 00.00 40 Dry-Type Distribution Transformers 40940 3 26 05 00.00 40 Lamps and Lighting Fixtures 2.1.9 3 26 05 00.00 40 Outlet Boxes, Pull Boxes and Junction Boxes 2.1.6 3 26 05 00.00 40 Panelboards 2.1.7 3 26 05 00.00 40 Receptacles 2.1.5 3 26 05 00.00 40 Splices and Connectors 3.2.1.8 3 26 05 00.00 40 Switches 2.1.4 3 26 05 00.00 40 Wire and Cable 2.1.3 3 26 05 00.00 40 Continuity Test 3.3 3 26 05 00.00 40 Insulation Resistance Test 3.3 3 26 05 00.00 40 Phase-Rotation Tests 3.3 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

26 05 00.00 40 Manufacturer's Instructions 3.1 3

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 05 48.00 10 Equipment Requirements 1.3 3 3 26 05 48.00 10 Lighting Fixtures in Buildings 3.2 3 3 26 05 48.00 10 Contractor Designed Bracing 1.2.4 3

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 20 00 Cable trays 2.4 3 26 20 00 Marking strips 3.1.10.1 3 26 20 00 Panelboards 2.14 3 26 20 00 Wireways 2.28 3 26 20 00 CATV outlets 2.22.1 3 26 20 00 Circuit breakers 2.14.3; 2.15.2 3 26 20 00 Enclosed circuit breakers 2.16 3 26 20 00 Grounding Busbar 2.23.3 3 26 20 00 Load centers for housing units 2.15 3 26 20 00 Manual motor starters 2.19 3 26 20 00 Metering 2.29 3 3 26 20 00 Motor controllers 2.18 3 26 20 00 Receptacles 2.13 3 26 20 00 Surge protective devices 2.3 3 26 20 00 Switches 2.11 3 26 20 00 600-volt wiring test 3.5.2 3 26 20 00 Ground-fault receptacle test 3.5.4 3 26 20 00 Grounding system test 3.5.5 3 26 20 00 Transformer tests 3.5.3 3 26 20 00 Fuses 2.12 3 26 20 00 Electrical Systems 1.5.1 3

26 27 13.10 30 ELECTRIC METERS

26 27 13.10 30 Communications Module 2.2.2 3 26 27 13.10 30 Current 2.1.3 3 26 27 13.10 30 Data Recorder 1.6.2 3 3 26 27 13.10 30 Potential Transformer 2.1.2 3 26 27 13.10 30 Power Meters 2.1 3 3 26 27 13.10 30 Protocol Modules 1.6.1 3 3 26 27 13.10 30 Acceptance Checks and Tests 3.3.1 3 26 27 13.10 30 Communications Module 2.2.2 3 26 27 13.10 30 System Function Verification 3.3.2 3

26 51 00 INTERIOR LIGHTING

26 51 00 Luminaire Drawings 1.5.1 3 26 51 00 Occupancy/Vacancy Sensor Coverage Layout 1.5.2 3 26 51 00 Dimming Controllers (Dimmers) 2.5.2 3 26 51 00 Drivers, Ballasts and Generators 2.3 3 26 51 00 Exit Signs 2.6.1 3 26 51 00 LED Emergency Drivers 2.6.2 3 26 51 00 LED Luminaire Warranty 1.6.1 3 26 51 00 Light Sources 2.4 3 26 51 00 Luminaire Design Data 1.5.4 3 26 51 00 Luminaires 2.2 3 26 51 00 Occupancy Sensors 2.5.3.1 3 26 51 00 Vacancy Sensors 2.5.3.2 3 26 51 00 Energy Efficiency 1.5.11.3 3 26 51 00 LED Light Source - IES LM-80 Test Report 1.5.6 3 26 51 00 LED Light Source - IES TM-21 Test Report 1.5.7 3 26 51 00 LED Luminaire - IES LM-79 Test Report 1.5.5 3 26 51 00 Occupancy/Vacancy Sensor Verification Tests 1.5.8 3 26 51 00 LED Driver and Dimming Switch Compatibility Certificate 1.5.3 3 26 51 00 Luminaire Useful Life Certificate 1.6.1.1 3

26 52 00.00 40 EMERGENCY LIGHTING

26 52 00.00 40 Central Emergency Lighting Systems 2.2.2 3 3 26 52 00.00 40 Accessories 2.2.2.4 3 26 52 00.00 40 Emergency Lighting Egress Units 2.2.1 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

26 52 00.00 40 Material, Equipment, and Fixture Lists 1.2.1 3 26 52 00.00 40 Sample Warranty 1.2.1 3 26 52 00.00 40 System Operational Tests 3.2 3 26 52 00.00 40 Certificates of Conformance 1.2.1 3 26 52 00.00 40 Warranty 3.3 3

26 53 00.00 40 EXIT SIGNS

26 53 00.00 40 Material, Equipment, and Fixture Lists 1.2.1 3 26 53 00.00 40 Exit Lighting Units 1.2.1 3 3 26 53 00.00 40 Exit Lighting Units Outline Drawings 1.2.1 3 26 53 00.00 40 Accessories 1.2.1 3 26 53 00.00 40 Contemporary Fixtures 1.2.1 3 26 53 00.00 40 Operational Tests 3.2.1 3 26 53 00.00 40 Energy Efficiencies 1.2.1 3

26 56 00 EXTERIOR LIGHTING

26 56 00 LED Luminaire Warranty 1.6.1 3 26 56 00 Luminaire drawings 1.5.1.1 3 26 56 00 LED Luminaires 2.2 3 26 56 00 Luminaire Light Sources 2.2.2 3 26 56 00 Luminaire Power Supply Units (Drivers) 2.2.3 3 26 56 00 Photocell 2.3.1 3 26 56 00 Design Data for luminaires 1.5.2 3 26 56 00 LED Light Source - IES LM-80 Test Report 1.5.4 3 26 56 00 LED Luminaire - IES LM-79 Test Report 1.5.3 3 26 56 00 Operating test 3.2 3 26 56 00 Luminaire Useful Life Certificate 1.6.1 3

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

27 05 14.00 10 Cable TV Premises Distribution System 1.2 3 27 05 14.00 10 Installation 3.1 3 27 05 14.00 10 Qualifications 1.4 3 27 05 14.00 10 Spare Parts 1.7 3 27 05 14.00 10 Test Plan 3.4 3 27 05 14.00 10 Testing 3.4 3 27 05 14.00 10 Materials and Equipment 2.1 3 27 05 14.00 10 Manufacturer's Recommendations 3.1.2 3 27 05 14.00 10 Operation and Maintenance Manuals 3.5 3

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 10 00 Telecommunications drawings 1.6.1.1 3 27 10 00 Telecommunications Space Drawings 1.6.1.2 3 27 10 00 Connector blocks 2.4.3 3 27 10 00 Equipment support frame 2.4.2 3 27 10 00 Patch panels 2.4.5 3 27 10 00 Spare Parts 1.10.3 3 27 10 00 Telecommunications cabling 2.3 3 27 10 00 Telecommunications outlet/connector assemblies 2.5 3 27 10 00 Telecommunications cabling testing 3.5.1 3 27 10 00 Key Personnel 1.6.2.2 3 27 10 00 Manufacturer Qualifications 1.6.2.3 3 27 10 00 Telecommunications Contractor 1.6.2.1 3 27 10 00 Test plan 1.6.3 3 27 10 00 Factory reel tests 2.10.1 3 27 10 00 Telecommunications cabling and pathway system 1.10.1 3 27 10 00 Record Documentation 1.10.2 3

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

28 31 76 Amplifiers 2.14 3 3 28 31 76 Instructions 2.13.10 3 28 31 76 Nameplates 2.1.2 3 28 31 76 Notification Appliances 2.16 3 3 28 31 76 System Layout 1.2.1 3 28 31 76 System Operation 2.3 3 3 28 31 76 Wiring Diagrams 3.2.1 3 28 31 76 Addressable Interface Devices 2.7 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

28 31 76 Batteries 2.12.1 3 28 31 76 Battery Chargers 2.12.2 3 3 28 31 76 Digitalized Voice Generators 2.14 3 28 31 76 Fire Alarm Control Unit and Mass Notification Control Unit (FMCP) 2.13 3 28 31 76 Local Operating Console (LOC) 1.4.3 3 28 31 76 Manual Stations 2.15 3 28 31 76 Radio Transmitter and Interface Panels 2.19.1 3 28 31 76 Smoke Sensors 2.10 3 28 31 76 Technical Data And Computer Software 1.6 3 28 31 76 Terminal Cabinets 3.2.2 3 28 31 76 Text Displays 2.5.3 3 28 31 76 Tone Generators 2.14 3 28 31 76 Transmitters 2.19 3 28 31 76 Battery Power 2.12.1.2 3 28 31 76 Field Quality Control 3.7 3 28 31 76 Smoke Sensor Testing 2.10.2 3 28 31 76 Testing Procedures 3.7.1 3 28 31 76 Final Testing 3.7.2.3 3 28 31 76 Formal Inspection and Tests 3.7.2.2 3 28 31 76 Qualified Engineer 1.7.1.1 3 28 31 76 Supervisor 1.7.1.2 3 28 31 76 Fire Alarm/Mass Notification System 1.7.2.2 3 28 31 76 Instruction of Government Employees 3.8 3 28 31 76 Operation and Maintenance (O&M) Instructions 3.10 3 28 31 76 As-Built Drawings 3.7.2.4 3

31 23 00.00 20 EXCAVATION AND FILL

31 23 00.00 20 Dewatering work plan 1.7.2 3 31 23 00.00 20 Shoring and Sheeting Plan 1.7.1 3 31 23 00.00 20 Buried Warning And Identification Tape 2.7 3 31 23 00.00 20 Filter Fabric 2.5 3 31 23 00.00 20 Flowable Fill 2.3 3 31 23 00.00 20 Bedding Material 2.2 3 31 23 00.00 20 Borrow Site Testing 1.6 3 31 23 00.00 20 Density tests 3.11.2.3 3 31 23 00.00 20 Fill and backfill 3.11.2.1 3 31 23 00.00 20 Select material 3.11.2.2 3 31 23 00.00 20 Filter Fabric 2.5 3

31 32 11 SOIL SURFACE EROSION CONTROL

31 32 11 Geotextile Fabrics for Inlet Protection 2.1 3 3 31 32 11 Maintenance Records 3.4 3 31 32 11 Warranty 1.6 3

32 01 17.61 SEALING CRACKS IN ASPHALT PAVING

32 01 17.61 Installation of Sealant 3.3 3 32 01 17.61 Materials 1.3 3 32 01 17.61 Laboratory Tests 1.3 3

32 05 33 LANDSCAPE ESTABLISHMENT

32 05 33 Integrated Pest Management Plan 2.4 3 32 05 33 Fertilizer 2.1 3 32 05 33 Mulches Topdressing 2.3 3 32 05 33 Maintenance Inspection Report 3.4.1 3 32 05 33 Tree Staking and Guying Removal 3.4.2 3

32 11 20 BASE COURSE FOR RIGID PAVING

32 11 20 Plant, Equipment, and Tools 1.3 3 32 11 20 Density Tests 1.4.2.4 3 32 11 20 Initial Tests 2.2.1 3 32 11 20 In-Place Tests 3.11.1 3 32 11 20 Liquid Limit 1.4.2.2 3 32 11 20 Plasticity Index 1.4.2.2 3 32 11 20 Sieve Analysis 1.4.2.1 3 32 11 20 Wear Test 1.4.2.5 3

32 12 13 BITUMINOUS PRIME COATS

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

32 12 13 Sampling and Testing 3.7 3

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 12 17 Asphalt Cement Binder 2.2 3 32 12 17 Job-mix formula 1.3.2 3 32 12 17 Mix Design 2.3 3 32 12 17 Aggregates tests 3.5.2.1 3 32 12 17 Bituminous mix tests 3.5.2.2 3 32 12 17 Bituminous mixture tests 2.4.1 3 32 12 17 Coarse aggregate tests 2.4.1 3 32 12 17 Fine aggregate tests 2.4.1 3 32 12 17 Percent of crushed pieces in gravel 2.4.1 3 32 12 17 Specific gravity of mineral filler 2.4.1 3 32 12 17 Specific gravity test of asphalt 2.4.1 3 32 12 17 Weight of slag test 2.4.1 3

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 16 19 Concrete 2.1 3 32 16 19 Field Quality Control 3.8 3

32 17 23 PAVEMENT MARKINGS

32 17 23 Application Equipment List 2.1.2 3 32 17 23 Exterior Surface Preparation 3.2 3 32 17 23 Safety Data Sheets 1.3 3 32 17 23 Solventborne Paint 2.2.2 3 3 3 32 17 23 Surface Preparation Equipment List 2.1.1 3 32 17 23 Waterborne Paint 2.2.1 3 32 17 23 High Build Acrylic Coating (HBAC) 2.2.4 3 32 17 23 Test Reports 3.4.1 3 32 17 23 Waterborne Paint 2.2.1 3 3 3 32 17 23 Qualifications 1.3.1 3 32 17 23 Volatile Organic Compound 2.2.4 3 32 32 23 Shop Drawings 2.1.1 3 32 32 23 Components and Equipment 1.4.1 3 32 32 23 Soil Testing 3.7 3 32 32 23 Supplier Qualifications 1.4.2 3 32 32 23 Reinforcement 2.3 3 32 32 23 Segmental Concrete Units 2.2 3

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

32 92 23 Fertilizer 2.3 3 32 92 23 Topsoil composition tests 2.2.3 3 32 92 23 sods 2.1 3

32 93 00 EXTERIOR PLANTS

32 93 00 Time Restrictions and Planting Conditions 1.6 3 32 93 00 Antidesiccants 2.9 3 32 93 00 Composted Derivatives 2.3.7 3 32 93 00 Erosion Control Materials 2.10 3 32 93 00 Fertilizer 2.5 3 32 93 00 Ground Stakes 2.8.1.2 3 32 93 00 Gypsum 2.3.8 3 32 93 00 Metal Anchors 2.8.7 3 32 93 00 Mulch 2.7 3 3 32 93 00 Photographs 1.4.3 3 32 93 00 Root Control Barrier 2.11 3 32 93 00 Staking Material 2.8.1 3 32 93 00 Weed Control Fabric 2.6 3 32 93 00 Percolation Test 1.4.4 3 32 93 00 Topsoil Composition Tests 2.2.4 3 32 93 00 Nursery Certifications 2.1.1 3

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 00 Temporary Water Supply Plan 1.5.1 3 33 11 00 Corporation Stops 2.2.4.1 3 33 11 00 Disinfection Procedures 3.2.2 3 33 11 00 Pipe Restraint 2.2.1 3

O N

ST

R

U C

TI

IT

TA

LS

SH

O P

D R

AW

IN

G S

PR

O

D U

C

TS

D

AT

A

SA

M

PL

ES

D

ES

IG

N

D

AT

A

TE

ST

R

EP

O R

T

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

R U

C

TI

O N

S M

AN

U

FA

C

TU

R

E' S

FI

O R

T O

PE

R

AT

IO

N A

N

TE

N

AN

C

E D

AT

A

C

LO

SE

O

U T

SU

BM

IT

TA

LS

M

AN

U

FA

C

TU

R

R

AN

TY

O

TH

ER

S U

BM

IT

TA

LS

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-0

SD

-1

SD

-1

SD

-1

APPROV

ED

DISAPP

R OVED

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

SP

EC

N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF COPIES REQUIRED

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

FO

LL

O W

-U P

DATE

CONTRACTOR

NOTIFIED

C O

N

TR

AC

TO

R R

E-

SU

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

R

EM

AR

KS

SP

EC

P

AR

A

SCHEDULE OF MATERIAL SUBMITTALS

CONTRACT NO. FA520520R0006

PROJECT NO. 1058046

PROJECT TITLE Repair Military Family Housing (MFH) Tower 116

33 11 00 Pipe, Fittings, Joints and Couplings 2.1.1 3 3 33 11 00 Precast Concrete Thrust Blocks 2.2.1.2 3 33 11 00 Valve Boxes 2.1.2.4 3 33 11 00 Valves 2.1.2 3 3 33 11 00 Bacteriological Samples 3.3.1.3 3 33 11 00 Hydrostatic Sewer Test 3.2.1.1.6 3 33 11 00 Hydrostatic Test 3.3.1.1 3 33 11 00 Leakage Test 3.3.1.2 3 33 11 00 Delivery, storage, and handling 1.6 3 33 11 00 Ductile Iron Piping 2.1.1.1 3 33 11 00 Installation procedures for water piping 3.2.1 3

33 30 00 SANITARY SEWERAGE

33 30 00 Contractor's License 1.3.1 3 33 30 00 Installation Drawings 3.1.1 3 33 30 00 Frames, Covers, and Gratings 2.1.8 3 33 30 00 Gravity Pipe 2.1.1 3 33 30 00 Precast Concrete Manholes 2.1.5 3 33 30 00 Deflection Testing 3.3.1.2 3 33 30 00 Gaskets 2.1.6 3 33 30 00 Portland Cement 2.1.3 3

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 71 02 Precast underground structures 1.4.1 3 33 71 02 Cable supports 2.7 3 33 71 02 Composite/fiberglass handholes 2.6.5 3 33 71 02 Handhole frames and covers 2.6.4 3 33 71 02 Manhole frames and covers 2.6.3 3 33 71 02 Precast concrete structures 2.6.2.1 3 33 71 02 Pulling-In Irons 3.4.3 3 33 71 02 Sealing Materia 2.6.2.4 3 33 71 02 Cable Installation Plan and Procedure 3.3 3 33 71 02 Field Acceptance Checks and Tests 3.15.1 3 33 71 02 Cable Installer Qualifications 1.4.2 3

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

33 82 00 Telecommunications Entrance Facility Drawing 1.6.1.2 3 33 82 00 Telecommunications Outside Plan 1.6.1.1 3 33 82 00 Cable splices, and connectors 2.4 3 33 82 00 Closures 2.3 3 33 82 00 Spare Parts 1.8.2 3 33 82 00 Wire and cable 2.7 3 33 82 00 Acceptance tests 3.5.2 3 33 82 00 Outside Plant Test Plan 1.6.3 3 33 82 00 Pre-installation tests 3.5.1 3 33 82 00 Key Personnel 1.6.2.2 3 33 82 00 Manufacturer's Qualifications 1.6.2.3 3 33 82 00 Telecommunications Contractor 1.6.2.1 3 33 82 00 Cable tensions 3.1.8.1 3 33 82 00 Fiber Optic Splices 3.1.9.2 3 33 82 00 Factory Reel Test Data 2.13.1 3 33 82 00 Telecommunications outside plant (OSP 1.6.1.1 3 33 82 00 Record Documentation 1.8.1 3

File details come from the government source that posted it. Updated .