FA520520R0006_Atch2_Drawings_PDF2of12_HAZMAT.pdf

PDF 3 MB Posted

Attached to
Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, Misawa Air Base, Japan
Solicitation number
FA520520R0006
Issued by

About this file

This document package includes hazardous demolition drawings and specifications for the repair of Military Family Housing Tower 116 at Misawa Air Base in Japan. The drawings identify locations of asbestos containing materials including floor tiles, mastic, joint compound, insulation, and coatings that will require abatement. The general notes provide requirements for engineering controls, compliance with regulations, handling of asbestos-containing pipe insulation and coatings, lead-based paint protocols, signage, air monitoring and disposal documentation. The drawings depict the hazardous demolition scope by floor for the building down to the typical unit level. Solicitation FA520520R0006 from the Department of the Air Force Pacific Air Forces is for the project, which involves repair of Military Family Housing at Misawa Air Base in Japan.

The drawings and specifications summarize abatement and hazardous material handling requirements for the repair of a military family housing tower in Japan. The solicitation from the Department of the Air Force Pacific Air Forces is for the project work.

View the file

Other files

File Type Posted
Amendment_0002_30Mar20.zip ZIP file
Amendment_0001_20Mar20.zip ZIP file
FA520520R0006_Pre-Proposal Conf Minutes_Record of Site Visit_28Feb20.pdf PDF
FA520520R0006_Atch2_Drawings_PDF12of12_Telecommunications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF9of12_EMCS.pdf PDF
FA520520R0006_Atch1_Specifications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF7of12_Plumbing.pdf PDF
FA520520R0006_Atch2_Drawings_PDF4of12_Architectural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF1of12_General.PDF PDF
FA520520R0006_Atch2_Drawings_PDF5of12_Structural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF3of12_Civil.pdf PDF
FA520520R0006_Atch4_Past Performance Questionnaire Cover Letter.pdf PDF
RFP_FA520520R0006.pdf PDF
FA520520R0006_Atch9_Manufacturer's Cut Sheet_Catalog Information.pdf PDF
FA520520R0006_Atch2_Drawings_PDF8of12_Electrical.pdf PDF
FA520520R0006_Atch10_Hazardous Material Survey Report.pdf PDF
FA520520R0006_Atch3_Other Contract Requirements.pdf PDF
FA520520R0006_Atch7_Schedule of Material Submittals.pdf PDF
FA520520R0006_Atch2_Drawings_PDF11of12_Life Safety.pdf PDF
FA520520R0006_Atch6_Construction Timeline.pdf PDF
FA520520R0006_Atch5_PastPresent Performance Questionnaire.pdf PDF
FA520520R0006_Atch2_Drawings_PDF6of12_Mechanical.pdf PDF
FA520520R0006_Atch2_Drawings_PDF10of12_Fire Protection.pdf PDF
FA520520R0006_Atch8_List of Contractor Furnished US Material.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HD408

A

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

1F UNIT STO 1

1F ELEC

1F UNIT STO 2

ELEV SHAFT

PIPE SPACE

CART RM

STAIR 2

STAIR 2

MULTIPURPOSE

RM

LOBBY

MP KITCHENETTE

KITCHEN ENTRY

LAUNDRY

LIVING-DINING

BEDROOM 3

HALL

BATH MST BATH

BEDROOM 2 MST BEDROOM

BALCONY

LIVING-DINING

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

BATH

MASTER BATH

HALL

KITCHEN

ENTRY

LAUNDRY

1F HALL

MP STORAGE

ENTRANCE 2

ENTRANCE 1

1F HALL

GARBAGE

MAIN ELEC RM

GENERATOR RM

WING STAIR A

WING STAIR D

WING STAIR C

WING STAIR B

MAIN MECH RM

1F STORAGE

F A

F

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

C T

N

O

S U

B M

I T

T E

D

B

Y

U S

A

I R

F

R

C E

C I V

L

E

G

I N

E E

R

C E

N T

E R

O T

S

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 295

T I M

O T

H Y

W

N

D T

W

R

A N

D A

L L

C Y

O W

R

J A

N U

A R

Y

FINAL DESIGN

R E

P A

A M

I L

Y

H

O U

S I N

G

B

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

D

B

B

B

B

B

B

B

S H

E N

A N

D O

N

SCALE:

HAZARDOUS DEMOLITION PLAN - FIRST FLOOR

1:200

HD101

H A

Z A

R D

O U

S

D

E M

O L

I T

I O

N

P

L A

N

F I R

O

O R

1 3

PLAN

NORTH

8000 16000

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL

REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS

CONTAINING MORE THAN 0.1% ASBESTOS.

3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT

WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE

PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT

WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,

DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.

4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE APPROPRIATE

ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR CONCRETE WALLS .

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT

NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER

PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE

REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE

PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED

WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED

SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO

BECOME AIRBORNE AND RESPIRIABLE.

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS

APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT

DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL..

9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN, AND

OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS, FROM DUST,

WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL WORK.

10. THE FIRST FLOOR MULTI PURPOSE ROOM CEILING WILL BE DEMOLISHED DURING

ANOTHER PROJECT AND NOT REINSTALLED, SO THERE WILL BE NO CEILING THERE.

THE MULTIPURPOSE ROOM GYPSUM WALL BOARD JOINT COMPOUND IS ACM AND

WILL BE REMOVED AND DISPOSED OF (WALLS ONLY) AS ACM.

11. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"

VINYL FLOOR TILE MASTIC AND FLOOR TILES

REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC

REMOVE AND DISPOSE OF ACM ELECTRICAL CAULKING / PUTTY

THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL BOARD IS ACM.

REMOVE AND DISPOSE OF THE GYPSUM WALL BOARD AS ACM. NOTE THAT

ONLY A SMALL AMOUNT OF THE GYPSUM WALL BOARD IS LOCATED BELOW

THE CEILING AND ABOVE THE CERAMIC WALL TILES IN THE UNIT KITCHENS

AND ONE OF THE WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE IS

CERAMIC WALL TILE.

A BLACK ASPHALTIC WATERPROOFING COATING MAY BE PRESENT BETWEEN

THE CONCRETE SLAB AND MORTAR BENEATH THE BATHROOM FLOOR TILES.

CONTRACTOR SHALL ASSUME THE MATERIAL IS PRESENT AND THAT THE

MATERIAL IS ACM, AND THAT ONE (1) SQUARE METER OF THE MATERIAL AT

EACH BATHROOM WILL REQUIRE REMOVAL AND DISPOSAL. THE

CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER WHEN THE SLAB

IS ENCOUNTERED AND REPORT WHETHER THE BLACK ASPHALTIC MATERIAL IS

PRESENT PRIOR TO CONTINUING WORK ON THE BATHROOM FLOORS.

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES

TYPICAL UNIT

HD408

A

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

TYP UNIT STO 1

TYP ELEC RM

TYP UNIT STO 2

ELEV SHAFT

TYP PIPE SPACE

STAIR 1

STAIR 2

STAIR 2

KITCHEN

LIVING-DINING

BEDROOM 3 BEDROOM 2

MASTER

BEDROOM

HALL

BATH

MASTER BATH

ENTRY

LAUNDRY

BALCONY

KITCHEN ENTRY

LAUNDRY

LIVING-DINING

BEDROOM 3

HALL

BATH MST BATH

BEDROOM 2 MST BEDROOM

BALCONY

LIVING-DINING

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

BATH

MASTER BATH

HALL

KITCHEN

ENTRY

LAUNDRY

TYP HALL

TYP HALL

F A

F

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 295

T I M

O T

N

D T

W

R

A N

D A

L L

C Y

O W

R

J A

N U

A R

Y

FINAL DESIGN

R E

P A

M

I L

Y

H

O U

S I N

G

B

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"

VINYL FLOOR TILE MASTIC AND FLOOR TILES

REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC

SCALE:

HAZARDOUS DEMOLITION PLAN - 2ND THRU 9TH FLOORS

1:200

HD102

H A

Z A

R D

O U

S

D

E M

O L

I T

I O

N

P

L A

N

N

D

T

H R

U

O

O R

S

1 3

PLAN

NORTH

8000 16000

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR

ALL REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING

MATERIALS CONTAINING MORE THAN 0.1% ASBESTOS.

3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES

THAT WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY

CUTTING THE PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE

ASSEMBLY INTACT WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS

PRESUMED TO BE ACM, DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS

MATERIAL.

4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE

APPROPRIATE ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR

CONCRETE WALLS.

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING

BUT NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND

OTHER PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED

TO BE REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT

DISTURB THE PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING

SPECIALLY TRAINED WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL

NOT INVOLVE HIGH-SPEED SANDING, GRINDING, OR CUTTING WHICH CAN MAKE

THE PAINT MATERIAL TO BECOME AIRBORNE AND RESPIRIABLE.

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL

CLEARANCE IS APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT

DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES

ENVIRONMENTAL.

9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN,

AND OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS,

FROM DUST, WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL

WORK.

10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES

TYPICAL UNIT

REMOVE AND DISPOSE OF ACM ELECTRICAL CAULKING / PUTTY

THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL

BOARD IS ACM. REMOVE AND DISPOSE OF THE GYPSUM WALL

BOARD AS ACM. NOTE THAT ONLY A SMALL AMOUNT OF THE

GYPSUM WALL BOARD IS LOCATED BELOW THE CEILING AND

ABOVE THE CERAMIC WALL TILES IN THE UNIT KITCHENS AND

ONE OF THE WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE

IS CERAMIC WALL TILE.

E

03 04 05 06 07 08

ROOF MECH 2

PH1 FAN 1

PH1 MECH

ELEV SHAFT PH1 LOBBY

ROOF MECH 1PH1-PIPE ROOM

STAIR 1

PH1 STORAGE

PH1 FAN 2

ROOF MECH A

D

MECH TANK RM

ELEV MACH RM

STAIR 1

04 05

SCALE:

HAZARDOUS DEMOLITION PLAN - PENTHOUSE

1:100

F A

F

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 295

T I M

O T

N

D T

W

R

A N

D A

L L

C Y

O W

R

J A

N U

A R

Y

FINAL DESIGN

R E

P A

M

I L

Y

H

O U

S I N

G

B

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

HD406

SCALE:

HAZARDOUS DEMOLITION PLAN - PENTHOUSE 2

1:100

4000 8000

4000 8000

TOWER 116 KEY PLAN

PLAN

NORTH

PLAN

NORTH

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"

VINYL FLOOR TILE MASTIC AND FLOOR TILES

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR

ALL REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING

MATERIALS CONTAINING MORE THAN 0.1% ASBESTOS.

3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES

THAT WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY

CUTTING THE PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE

ASSEMBLY INTACT WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS

PRESUMED TO BE ACM, DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS

MATERIAL.

4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE

APPROPRIATE ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR

CONCRETE WALLS .

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING

BUT NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND

OTHER PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED

TO BE REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT

DISTURB THE PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING

SPECIALLY TRAINED WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL

NOT INVOLVE HIGH-SPEED SANDING, GRINDING, OR CUTTING WHICH CAN MAKE

THE PAINT MATERIAL TO BECOME AIRBORNE AND RESPIRIABLE.

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL

CLEARANCE IS APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT

DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES

ENVIRONMENTAL.

9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN,

AND OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS,

FROM DUST, WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL

WORK.

10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

H A

Z A

R D

O U

S

D

E M

O L

I T

I O

N

P

L A

N

P E

N T

H O

U S

E

REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC

nelkar Snapshot nelkar Snapshot

UA03

KITCHEN

UA01

ENTRY

UA05

LAUNDRY

UA06

LIVING-DINING

UA17

BEDROOM 3

UA07

HALL

UA09

BATH

UA13

MST BATH

UA14

BEDROOM 2

UA10

MST BEDROOM

BALCONY

03 04

E

F

G

F A

F

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

SHEET OF 295

T I M

O T

N

D T

W

R

A N

D A

L L

C Y

O W

R

J A

N U

A R

Y

FINAL DESIGN

R E

P A

M

I L

Y

H

O U

S I N

G

B

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

KEYNOTES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"

VINYL FLOOR TILE MASTIC AND FLOOR TILES

REMOVE AND DISPOSE OF ASBESTOS CONTAINING UNDER-SINK

SOUNDPROOFING INSULATION

HD408

H A

Z A

R D

O U

S

D

E M

O L

I T

I O

N

P

L A

N

T Y

P I C

U

I T

1 2

SCALE:

HAZARDOUS DEMOLITION PLAN - TYPICAL UNIT

1:50

2000 4000

TOWER 116 KEY PLAN

A A

A A

B C

B C

GENERAL NOTES:

1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL

REMOVAL WORK AFFECTED BY CONSTRUCTION.

2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS

CONTAINING MORE THAN 0.1% ASBESTOS.

3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT WILL

BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE PIPING ON

BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT WITHOUT

DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM, DISPOSE OF

FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.

4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE APPROPRIATE

ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR CONCRETE WALLS.

5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT NOT

LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER PAINTED

STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE REMOVED, THE

WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE PAINT TO A POINT

WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED WORKERS IS

REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED SANDING,

GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO BECOME AIRBORNE

AND RESPIRIABLE.

6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.

7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS

APPROVED BY THE CONTRACTING OFFICER.

8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT DRAWINGS

SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.

9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN, AND

OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS, FROM DUST,

WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL WORK.

10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /

CONSTRUCTION WORK WILL DISTURB ACM.

6 6

A BLACK ASPHALTIC WATERPROOFING COATING MAY BE

PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR

BENEATH THE BATHROOM FLOOR TILES. CONTRACTOR SHALL

ASSUME THE MATERIAL IS PRESENT AND THAT THE MATERIAL IS

ACM, AND THAT ONE (1) SQUARE METER OF THE MATERIAL AT

EACH BATHROOM WILL REQUIRE REMOVAL AND DISPOSAL. THE

CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER

WHEN THE SLAB IS ENCOUNTERED AND REPORT WHETHER THE

BLACK ASPHALTIC MATERIAL IS PRESENT PRIOR TO

CONTINUING WORK ON THE BATHROOM FLOORS.

JOINT COMPOUND ASSOCIATED WITH GYPSUM BOARD IS ACM.

REMOVE AND DISPOSE OF CEILING BOARD AS ACM.

THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL BOARD

IS ACM. REMOVE AND DISPOSE OF THE GYPSUM WALL BOARD

AS ACM. NOTE THAT ONLY A SMALL AMOUNT OF THE GYPSUM

WALL BOARD IS LOCATED BELOW THE CEILING AND ABOVE THE

CERAMIC WALL TILES IN THE UNIT KITCHENS AND ONE OF THE

WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE IS CERAMIC

WALL TILE.

1 74

1 4 7

1 4 7

1 4 7

1 74

Project No. 1058046_Repair Tower 116_HAZMAT Drawings
HD101
HD102
HD406
HD406

File details come from the government source that posted it. Updated .