This document package includes hazardous demolition drawings and specifications for the repair of Military Family Housing Tower 116 at Misawa Air Base in Japan. The drawings identify locations of asbestos containing materials including floor tiles, mastic, joint compound, insulation, and coatings that will require abatement. The general notes provide requirements for engineering controls, compliance with regulations, handling of asbestos-containing pipe insulation and coatings, lead-based paint protocols, signage, air monitoring and disposal documentation. The drawings depict the hazardous demolition scope by floor for the building down to the typical unit level. Solicitation FA520520R0006 from the Department of the Air Force Pacific Air Forces is for the project, which involves repair of Military Family Housing at Misawa Air Base in Japan.
The drawings and specifications summarize abatement and hazardous material handling requirements for the repair of a military family housing tower in Japan. The solicitation from the Department of the Air Force Pacific Air Forces is for the project work.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HD408
A
A.0
B
C
D
E
F
G
G.0
00 02 03 04 05 06 07 08
1F UNIT STO 1
1F ELEC
1F UNIT STO 2
ELEV SHAFT
PIPE SPACE
CART RM
STAIR 2
STAIR 2
MULTIPURPOSE
RM
LOBBY
MP KITCHENETTE
KITCHEN ENTRY
LAUNDRY
LIVING-DINING
BEDROOM 3
HALL
BATH MST BATH
BEDROOM 2 MST BEDROOM
BALCONY
LIVING-DINING
BEDROOM 2
MASTER
BEDROOM
BEDROOM 3
BATH
MASTER BATH
HALL
KITCHEN
ENTRY
LAUNDRY
1F HALL
MP STORAGE
ENTRANCE 2
ENTRANCE 1
1F HALL
GARBAGE
MAIN ELEC RM
GENERATOR RM
WING STAIR A
WING STAIR D
WING STAIR C
WING STAIR B
MAIN MECH RM
1F STORAGE
F A
F
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
C T
N
O
S U
B M
I T
T E
D
B
Y
U S
A
I R
F
R
C E
C I V
L
E
G
I N
E E
R
C E
N T
E R
O T
S
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L W
A U
K E
E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 295
T I M
O T
H Y
W
N
D T
W
R
A N
D A
L L
C Y
O W
R
J A
N U
A R
Y
FINAL DESIGN
R E
P A
A M
I L
Y
H
O U
S I N
G
B
T
O W
E R
M I S
A W
A
A
B
J
A P
A N
Q
K K
A
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
D
B
B
B
B
B
B
B
S H
E N
A N
D O
N
SCALE:
HAZARDOUS DEMOLITION PLAN - FIRST FLOOR
1:200
HD101
H A
Z A
R D
O U
S
D
E M
O L
I T
I O
N
P
L A
N
F I R
O
O R
1 3
PLAN
NORTH
8000 16000
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL
REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS
CONTAINING MORE THAN 0.1% ASBESTOS.
3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT
WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE
PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT
WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM,
DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.
4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE APPROPRIATE
ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR CONCRETE WALLS .
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT
NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER
PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE
REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE
PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED
WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED
SANDING, GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO
BECOME AIRBORNE AND RESPIRIABLE.
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS
APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT
DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL..
9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN, AND
OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS, FROM DUST,
WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL WORK.
10. THE FIRST FLOOR MULTI PURPOSE ROOM CEILING WILL BE DEMOLISHED DURING
ANOTHER PROJECT AND NOT REINSTALLED, SO THERE WILL BE NO CEILING THERE.
THE MULTIPURPOSE ROOM GYPSUM WALL BOARD JOINT COMPOUND IS ACM AND
WILL BE REMOVED AND DISPOSED OF (WALLS ONLY) AS ACM.
11. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"
VINYL FLOOR TILE MASTIC AND FLOOR TILES
REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC
REMOVE AND DISPOSE OF ACM ELECTRICAL CAULKING / PUTTY
THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL BOARD IS ACM.
REMOVE AND DISPOSE OF THE GYPSUM WALL BOARD AS ACM. NOTE THAT
ONLY A SMALL AMOUNT OF THE GYPSUM WALL BOARD IS LOCATED BELOW
THE CEILING AND ABOVE THE CERAMIC WALL TILES IN THE UNIT KITCHENS
AND ONE OF THE WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE IS
CERAMIC WALL TILE.
A BLACK ASPHALTIC WATERPROOFING COATING MAY BE PRESENT BETWEEN
THE CONCRETE SLAB AND MORTAR BENEATH THE BATHROOM FLOOR TILES.
CONTRACTOR SHALL ASSUME THE MATERIAL IS PRESENT AND THAT THE
MATERIAL IS ACM, AND THAT ONE (1) SQUARE METER OF THE MATERIAL AT
EACH BATHROOM WILL REQUIRE REMOVAL AND DISPOSAL. THE
CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER WHEN THE SLAB
IS ENCOUNTERED AND REPORT WHETHER THE BLACK ASPHALTIC MATERIAL IS
PRESENT PRIOR TO CONTINUING WORK ON THE BATHROOM FLOORS.
SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES
TYPICAL UNIT
HD408
A
A.0
B
C
D
E
F
G
G.0
00 02 03 04 05 06 07 08
TYP UNIT STO 1
TYP ELEC RM
TYP UNIT STO 2
ELEV SHAFT
TYP PIPE SPACE
STAIR 1
STAIR 2
STAIR 2
KITCHEN
LIVING-DINING
BEDROOM 3 BEDROOM 2
MASTER
BEDROOM
HALL
BATH
MASTER BATH
ENTRY
LAUNDRY
BALCONY
KITCHEN ENTRY
LAUNDRY
LIVING-DINING
BEDROOM 3
HALL
BATH MST BATH
BEDROOM 2 MST BEDROOM
BALCONY
LIVING-DINING
BEDROOM 2
MASTER
BEDROOM
BEDROOM 3
BATH
MASTER BATH
HALL
KITCHEN
ENTRY
LAUNDRY
TYP HALL
TYP HALL
F A
F
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L W
A U
K E
E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 295
T I M
O T
N
D T
W
R
A N
D A
L L
C Y
O W
R
J A
N U
A R
Y
FINAL DESIGN
R E
P A
M
I L
Y
H
O U
S I N
G
B
T
O W
E R
M I S
A W
A
A
B
J
A P
A N
Q
K K
A
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"
VINYL FLOOR TILE MASTIC AND FLOOR TILES
REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC
SCALE:
HAZARDOUS DEMOLITION PLAN - 2ND THRU 9TH FLOORS
1:200
HD102
H A
Z A
R D
O U
S
D
E M
O L
I T
I O
N
P
L A
N
N
D
T
H R
U
O
O R
S
1 3
PLAN
NORTH
8000 16000
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR
ALL REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING
MATERIALS CONTAINING MORE THAN 0.1% ASBESTOS.
3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES
THAT WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY
CUTTING THE PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE
ASSEMBLY INTACT WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS
PRESUMED TO BE ACM, DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS
MATERIAL.
4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE
APPROPRIATE ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR
CONCRETE WALLS.
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING
BUT NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND
OTHER PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED
TO BE REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT
DISTURB THE PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING
SPECIALLY TRAINED WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL
NOT INVOLVE HIGH-SPEED SANDING, GRINDING, OR CUTTING WHICH CAN MAKE
THE PAINT MATERIAL TO BECOME AIRBORNE AND RESPIRIABLE.
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL
CLEARANCE IS APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT
DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES
ENVIRONMENTAL.
9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN,
AND OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS,
FROM DUST, WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL
WORK.
10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES
TYPICAL UNIT
REMOVE AND DISPOSE OF ACM ELECTRICAL CAULKING / PUTTY
THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL
BOARD IS ACM. REMOVE AND DISPOSE OF THE GYPSUM WALL
BOARD AS ACM. NOTE THAT ONLY A SMALL AMOUNT OF THE
GYPSUM WALL BOARD IS LOCATED BELOW THE CEILING AND
ABOVE THE CERAMIC WALL TILES IN THE UNIT KITCHENS AND
ONE OF THE WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE
IS CERAMIC WALL TILE.
E
03 04 05 06 07 08
ROOF MECH 2
PH1 FAN 1
PH1 MECH
ELEV SHAFT PH1 LOBBY
ROOF MECH 1PH1-PIPE ROOM
STAIR 1
PH1 STORAGE
PH1 FAN 2
ROOF MECH A
D
MECH TANK RM
ELEV MACH RM
STAIR 1
04 05
SCALE:
HAZARDOUS DEMOLITION PLAN - PENTHOUSE
1:100
F A
F
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L W
A U
K E
E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 295
T I M
O T
N
D T
W
R
A N
D A
L L
C Y
O W
R
J A
N U
A R
Y
FINAL DESIGN
R E
P A
M
I L
Y
H
O U
S I N
G
B
T
O W
E R
M I S
A W
A
A
B
J
A P
A N
Q
K K
A
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
HD406
SCALE:
HAZARDOUS DEMOLITION PLAN - PENTHOUSE 2
1:100
4000 8000
4000 8000
TOWER 116 KEY PLAN
PLAN
NORTH
PLAN
NORTH
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"
VINYL FLOOR TILE MASTIC AND FLOOR TILES
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR
ALL REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING
MATERIALS CONTAINING MORE THAN 0.1% ASBESTOS.
3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES
THAT WILL BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY
CUTTING THE PIPING ON BOTH SIDES OF THE FLANGE, REMOVING FLANGE
ASSEMBLY INTACT WITHOUT DISTURBING THE GASKET MATERIAL WHICH IS
PRESUMED TO BE ACM, DISPOSE OF FLANGE ASSEMBLY AS HAZARDOUS
MATERIAL.
4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE
APPROPRIATE ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR
CONCRETE WALLS .
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING
BUT NOT LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND
OTHER PAINTED STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED
TO BE REMOVED, THE WORK SHALL BE DONE IN A MANNER THAT DOES NOT
DISTURB THE PAINT TO A POINT WHERE ABATEMENT ACTIVITIES INVOLVING
SPECIALLY TRAINED WORKERS IS REQUIRED. DEMOLITION ACTIVITIES SHALL
NOT INVOLVE HIGH-SPEED SANDING, GRINDING, OR CUTTING WHICH CAN MAKE
THE PAINT MATERIAL TO BECOME AIRBORNE AND RESPIRIABLE.
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL
CLEARANCE IS APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT
DRAWINGS SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES
ENVIRONMENTAL.
9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN,
AND OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS,
FROM DUST, WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL
WORK.
10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
H A
Z A
R D
O U
S
D
E M
O L
I T
I O
N
P
L A
N
P E
N T
H O
U S
E
REMOVE AND DISPOSE OF VINYL COVE BASE WITH ACM MASTIC
nelkar Snapshot nelkar Snapshot
UA03
KITCHEN
UA01
ENTRY
UA05
LAUNDRY
UA06
LIVING-DINING
UA17
BEDROOM 3
UA07
HALL
UA09
BATH
UA13
MST BATH
UA14
BEDROOM 2
UA10
MST BEDROOM
BALCONY
03 04
E
F
G
F A
F
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L W
A U
K E
E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
SHEET OF 295
T I M
O T
N
D T
W
R
A N
D A
L L
C Y
O W
R
J A
N U
A R
Y
FINAL DESIGN
R E
P A
M
I L
Y
H
O U
S I N
G
B
T
O W
E R
M I S
A W
A
A
B
J
A P
A N
Q
K K
A
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
KEYNOTES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING 12" X 12"
VINYL FLOOR TILE MASTIC AND FLOOR TILES
REMOVE AND DISPOSE OF ASBESTOS CONTAINING UNDER-SINK
SOUNDPROOFING INSULATION
HD408
H A
Z A
R D
O U
S
D
E M
O L
I T
I O
N
P
L A
N
T Y
P I C
U
I T
1 2
SCALE:
HAZARDOUS DEMOLITION PLAN - TYPICAL UNIT
1:50
2000 4000
TOWER 116 KEY PLAN
A A
A A
B C
B C
GENERAL NOTES:
1. USE APPROPRIATE ENGINEERING CONTROLS AND WORKER PROTECTION FOR ALL
REMOVAL WORK AFFECTED BY CONSTRUCTION.
2. COMPLY WITH THE JEGS AND ALL JAPANESE REGULATIONS REGARDING MATERIALS
CONTAINING MORE THAN 0.1% ASBESTOS.
3. ALL PIPE FLANGE GASKETS ARE PRESUMED TO BE ACM. ALL PIPE FLANGES THAT WILL
BE REMOVED DURING THIS PROJECT SHOULD BE REMOVED BY CUTTING THE PIPING ON
BOTH SIDES OF THE FLANGE, REMOVING FLANGE ASSEMBLY INTACT WITHOUT
DISTURBING THE GASKET MATERIAL WHICH IS PRESUMED TO BE ACM, DISPOSE OF
FLANGE ASSEMBLY AS HAZARDOUS MATERIAL.
4. THE SMOOTH COAT ON CONCRETE WALLS IN THE TOWER IS ACM. USE APPROPRIATE
ENGINEERING CONTROLS IF DISTURBING ANY INTERIOR CONCRETE WALLS.
5. LEAD-BASED PAINT IS PRESENT IN THE BUILDING ON COMPONENTS INCLUDING BUT NOT
LIMITED TO, STEEL DOORS AND FRAMES, HAND RAILS, PIPING AND OTHER PAINTED
STEEL COMPONENTS. IF THE COMPONENTS ARE SCHEDULED TO BE REMOVED, THE
WORK SHALL BE DONE IN A MANNER THAT DOES NOT DISTURB THE PAINT TO A POINT
WHERE ABATEMENT ACTIVITIES INVOLVING SPECIALLY TRAINED WORKERS IS
REQUIRED. DEMOLITION ACTIVITIES SHALL NOT INVOLVE HIGH-SPEED SANDING,
GRINDING, OR CUTTING WHICH CAN MAKE THE PAINT MATERIAL TO BECOME AIRBORNE
AND RESPIRIABLE.
6. THE CONTRACTOR MUST PROVIDE THEIR OWN BILINGUAL WARNING SIGNS.
7. MANOMETERS SHOULD RUN 24 HOURS A DAY, EVERY DAY UNTIL FINAL CLEARANCE IS
APPROVED BY THE CONTRACTING OFFICER.
8. UPON COMPLETION OF ALL WORK CONTRACTORS SHALL PROVIDE ASBUILT DRAWINGS
SHOWING WHERE ALL ACM WAS REMOVED TO 35 CES ENVIRONMENTAL.
9. CONTRACTOR SHALL PROTECT STATIONARY (ATTACHED) OBJECTS TO REMAIN, AND
OTHER STATIONARY OBJECTS THAT WILL BE DEMOLISHED BY OTHERS, FROM DUST,
WATER DAMAGE, AND PHYSICAL DAMAGE DURING ACM REMOVAL WORK.
10. SEE ARCHITECTURAL DRAWINGS FOR THE LOCATIONS WHERE DEMOLITION /
CONSTRUCTION WORK WILL DISTURB ACM.
6 6
A BLACK ASPHALTIC WATERPROOFING COATING MAY BE
PRESENT BETWEEN THE CONCRETE SLAB AND MORTAR
BENEATH THE BATHROOM FLOOR TILES. CONTRACTOR SHALL
ASSUME THE MATERIAL IS PRESENT AND THAT THE MATERIAL IS
ACM, AND THAT ONE (1) SQUARE METER OF THE MATERIAL AT
EACH BATHROOM WILL REQUIRE REMOVAL AND DISPOSAL. THE
CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER
WHEN THE SLAB IS ENCOUNTERED AND REPORT WHETHER THE
BLACK ASPHALTIC MATERIAL IS PRESENT PRIOR TO
CONTINUING WORK ON THE BATHROOM FLOORS.
JOINT COMPOUND ASSOCIATED WITH GYPSUM BOARD IS ACM.
REMOVE AND DISPOSE OF CEILING BOARD AS ACM.
THE JOINT COMPOUND ASSOCIATED WITH GYPSUM WALL BOARD
IS ACM. REMOVE AND DISPOSE OF THE GYPSUM WALL BOARD
AS ACM. NOTE THAT ONLY A SMALL AMOUNT OF THE GYPSUM
WALL BOARD IS LOCATED BELOW THE CEILING AND ABOVE THE
CERAMIC WALL TILES IN THE UNIT KITCHENS AND ONE OF THE
WALLS IN THE MULTIPURPOSE ROOM KITCHENETTE IS CERAMIC
WALL TILE.
1 74
1 4 7
1 4 7
1 4 7
1 74
| Project No. 1058046_Repair Tower 116_HAZMAT Drawings |
| HD101 |
| HD102 |
| HD406 |
| HD406 |