FA520520R0006_Atch2_Drawings_PDF6of12_Mechanical.pdf

PDF 5 MB Posted

Attached to
Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, Misawa Air Base, Japan
Solicitation number
FA520520R0006
Issued by

About this file

This document package includes mechanical drawings for the repair of military family housing at Tower 116, Misawa Air Base, Japan. The drawings cover demolition plans, new mechanical system plans, details, schedules, and related information. Key elements include replacing the existing central hot water heating system with new heat pumps for each unit; demolishing old piping, ductwork and equipment; and installing new ventilation systems for lobbies, multipurpose rooms, mechanical rooms, and utility spaces. Duct sizing, equipment schedules, seismic bracing details and other specifications are provided. The project is solicited under Solicitation No. FA520520R0006 for the Department of the Air Force Pacific Air Forces.

View the file

Other files

File Type Posted
Amendment_0002_30Mar20.zip ZIP file
Amendment_0001_20Mar20.zip ZIP file
FA520520R0006_Pre-Proposal Conf Minutes_Record of Site Visit_28Feb20.pdf PDF
FA520520R0006_Atch2_Drawings_PDF2of12_HAZMAT.pdf PDF
FA520520R0006_Atch2_Drawings_PDF12of12_Telecommunications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF9of12_EMCS.pdf PDF
FA520520R0006_Atch1_Specifications.pdf PDF
FA520520R0006_Atch2_Drawings_PDF7of12_Plumbing.pdf PDF
FA520520R0006_Atch2_Drawings_PDF4of12_Architectural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF1of12_General.PDF PDF
FA520520R0006_Atch2_Drawings_PDF5of12_Structural.pdf PDF
FA520520R0006_Atch2_Drawings_PDF3of12_Civil.pdf PDF
FA520520R0006_Atch4_Past Performance Questionnaire Cover Letter.pdf PDF
RFP_FA520520R0006.pdf PDF
FA520520R0006_Atch9_Manufacturer's Cut Sheet_Catalog Information.pdf PDF
FA520520R0006_Atch2_Drawings_PDF8of12_Electrical.pdf PDF
FA520520R0006_Atch10_Hazardous Material Survey Report.pdf PDF
FA520520R0006_Atch3_Other Contract Requirements.pdf PDF
FA520520R0006_Atch7_Schedule of Material Submittals.pdf PDF
FA520520R0006_Atch2_Drawings_PDF11of12_Life Safety.pdf PDF
FA520520R0006_Atch6_Construction Timeline.pdf PDF
FA520520R0006_Atch5_PastPresent Performance Questionnaire.pdf PDF
FA520520R0006_Atch2_Drawings_PDF10of12_Fire Protection.pdf PDF
FA520520R0006_Atch8_List of Contractor Furnished US Material.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUCTWORK SYMBOLS

SUPPLY DUCT (UP & DOWN)

CEILING DIFFUSERS - CONNECT TO AUX SUPPLY

RETURN/EXHAUST DUCT (UP & DOWN)

STANDARD RADIUS ELBOW (LONG RADIUS)

NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)

MANUAL VOLUME DAMPER

FLEXIBLE DUCTWORK (INSULATED)

RETURN, NO SPLITTER (45° TAP)

STANDARD BRANCH SUPPLY OR

B BOILER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BDD GRAVITY OPERATED DAMPER

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CONVECTOR

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CD CEILING DIFFUSER

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CMH CUBIC METER PER HOUR

CI CAST IRON

COP COEFFICIENT OF PERFORMANCE

COMP COMPRESSOR

CP CONDENSATE PUMP

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EH EXHAUST HOOD

ENT ENTERING

EOD ELECTRICALLY OPERATED DAMPER

ERU ENERGY RECOVERY UNIT

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EIH ELECTRIC INFRARED HEATER

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

CONTROLS SYMBOLS

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AHU AIR-HANDLING UNIT

AMP AMPERGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

THERMOSTAT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FSD COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT

FD FLOOR DRAIN

F FIRE DAMPER

FF FINAL FILTER

FG FILTER GRILLE

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSTAT FREEZESTAT

G NATURAL GAS

GA GAUGE

GAL GALLONS

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

HC HEATING COIL

HD HEAD

HGBP REFRIGERANT HOT GAS BYBASS

HP HEAT PUMP

HP HORSEPOWER

HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HSTAT HUMIDISTAT

HW HOT WATER

HWC HOT WATER COIL

HWWF HOT WATER WALLFIN

HWSX EXISTING HOT WATER SUPPLY PIPING

HWRX EXISTING HOT WATER RETURN PIPING

HX HEAT EXCHANGER

HZ HERTZ

D DAMPER - AUTOMATIC

DB DECIBELS

Db DRY-BULB TEMPERATURE

DC DUST COLLECTOR

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DG DOOR GRILLE

DIA DIAMETER

DN DOWN

DP DEW POINT TEMPERATURE

DUC DOOR UNDERCUT

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

OA OUTSIDE AIR

OD OUTSIDE DIAMETER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

MAT MIXED AIR TEMPERATURE

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MD MOTORIZED DAMPER

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOP MAX OVERCURRENT PROTECTION

M.C. MECHANICAL CONTRACTOR

L LOUVER

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LIQ REFRIGERANT LIQUID PIPING

LPR LOW PRESSURE RETURN (STEAM CONDENSATE)

LPS LOW PRESSURE STEAM

LWT LEAVING WATER TEMPERATURE

KG KILOGRAM

kW KILOWATT kWh KILOWATT HOUR

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IH INTAKE HOOD

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTERGRATED PART LOAD VALUE

T TRANSFER GRILLE

TAB TESTING, ADJUSTING, BALANCE

TCP TEMPERATURE CONTROL PANEL

TD TEMPERATURE DIFFERENCE

TG TRANSFER GRILLE

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SD SMOKE DETECTOR

SD SLOT DIFFUSER

SF SUPPLY FAN

SG SUPPLY AIR GRILLE

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SS STAINLESS STEEL

ST STEAM TRAP

SUC REFRIGERANT SUCTION / GAS PIPING

SUH STEAM UNIT HEATER

SWHX STEAM TO WATER HEAT EXCHANGER

(X)R STEAM RADIATOR

R RETURN

R/A REVERSE ACTING THERMOSTAT

RA RETURN AIR

RF RETURN FAN

RG RETURN GRILLE

RH ROOF HOOD

RHC REHEAT COIL

RHG REFRIGERANT HOT GAS

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RP REFRIGERANT PIPING

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PG PRESSURE GAGE

PG PROPYLENE GLYCOL-WATER (SOLUTION)

P.O.C. POINT OF CONNECTION

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH – ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

ABBREVIATIONS

UH UNIT HEATER

UV UNIT VENTILATOR

WWHP WATER TO WATER HEAT PUMP

WWHX WATER TO WATER HEAT EXCHANGER

WF WATER FILTER

(E) EXISTING EQUIPMENT (WHEN FOLLOWED BY

EQUIPMENT ABBREVIATION)

GENERAL PIPING SYMBOLS

SIDE CONNECTION

BOTTOM CONNECTION, 45° OR 90°

TOP CONNECTION, 45° OR 90°

UNION

RISE OR DROP IN PIPE

CAPPED OUTLET

PIPE UP

PIPE DOWN

STARTER/DISCONNECT

PIPING FLEXIBLE CONNECTION

HOT WATER SUPPLY PIPING

HWS

HOT WATER RETURN PIPING

HWR

DUCTWORK TO BE DEMOLISHED

PIPING TO BE DEMOLISHED

VENT PIPING

V

COOLING COIL CONDENSATE PIPING

CD

REFRIGERANT PIPING

RP

EXISTING EQUIPMENT TO BE DEMOLISHED

GENERAL SYMBOLS

AC

X

HEAT PUMP (OUTDOOR UNIT)

CEILING CASSETTE AC UNIT

(4-WAY)

HP

X

CEILING ACCESS PANEL

KNOCKOUT AT CASSETTE UNIT WHERE SHOWN ON PLANS

SINGLE DIRECTIONAL CEILING AC

UNIT

AC

X

NOTES

1. REFER TO ELECTRICAL FLOOR PLANS FOR ELECTRICAL SERVICES LOCATIONS. FIELD VERIFY ALL

EXISTING ELECTRICAL EQUIPMENT LOCATIONS.

POINT BETWEEN EXISTING WORK

TO REMAIN AND DEMO WORK

1. VOLUME OF REFRIGERANT FOR TYPICAL MILITARY FAMILY HOUSING UNIT IS 8.1 KG. VOLUME OF

REFRIGERANT FOR COMMUNITY ROOM IS 9.09 KG. VOLUME OF REFRIGERANT FOR THE

CORE/HALLWAY SYSTEM IS 15.7 KG.

2. CONFORM TO ALL REQUIREMENTS OF THE BUILDING AND MECHANICAL CODES, US AIR FORCE

BASE AGENCIES HAVING JURISDICTION, AND OTHER APPLICABLE REGULATIONS FOR THE

PROJECT.

3. CONTRACTOR SHALL VERIFY ALL FIELD CONDITIONS PRIOR TO BID AND CONSTRUCTION.

4. COORDINATE ALL WORK WITH OTHER TRADES TO AVOID INTERFERENCE AND DELAYS.

5. PROVIDE ACCESS PANELS FOR ALL ITEMS UNDER THIS SECTION REQUIRING SERVICING,

INSPECTION, MAINTENANCE AND ADJUSTMENT.

6. THE PHASING OF WORK SHALL BE COORDINATED WITH UTILITY AGENCY TO IDENTIFY THE

CENTRAL PIPING LOOP TO BE TAKEN OUT OF SERVICE, AND TO MINIMIZE ANY DOWN TIME

TO UNITS NOT ASSOCIATED WITH THIS PROJECT.

7. CONTRACTOR SHALL OBTAIN ALL NECESSARY INFORMATION FROM THE UTILITY AGENCY

TO MAKE ALL FINAL EQUIPMENT CONNECTIONS. FINAL CONNECTIONS SHALL INCLUDE BUT

NOT BE LIMITED TO HOT AND COLD WATER SHUTOFF VALVES, P-TRAPS, VACUUM BREAKERS,

UNIONS, WASTE AND INDIRECT WASTE CONNECTIONS, REGULATORS, ETC.

8. OMISSIONS: IT IS THE INTENT OF THE PLANS AND SPECIFICATIONS TO PROVIDE A COMPLETE

INSTALLATION. SHOULD THERE BE OMISSIONS, THE CONTRACTOR SHALL CALL THE

ATTENTION OF THE ENGINEER TO SUCH OMISSIONS TEN (10) DAYS IN ADVANCE OF THE

DATE OF BID OPENING SO THAT THE NECESSARY CORRECTIONS CAN BE MADE.

9. THE INSTALLATION SHALL CONFORM TO THE LATEST APPLICABLE INDUSTRY STANDARDS

UNLESS SPECIFICALLY NOTED OTHERWISE.

10. ADDITIONAL WORK: THE DESIGN IS BASED ON EQUIPMENT AS DESCRIBED IN THE DRAWINGS.

ANY CHANGE IN ELECTRICAL, WIRING, CONDUIT, CONNECTIONS, PIPING, CONTROLS, AND

OPENINGS REQUIRED BY ALTERNATE EQUIPMENT SPECIFIED AND SUBMITTED AND APPROVED

SHALL BE PAID FOR BY THIS CONTRACTOR.

11. PRODUCT DELIVERY, STORAGE AND HANDLING: FURNISH NEW FIXTURES, MATERIALS AND

ACCESSORIES BEARING THE MANUFACTURER IDENTIFICATION. COORDINATE DELIVERIES

TO AVOID INTERFERENCE OF CONSTRUCTION DELAYS. PROTECT PRODUCTS DURING

DELIVERY, STORAGE, INSTALLATIONS, AND THE REMAINDER OF THE CONSTRUCTION PERIOD

AFTER INSTALLATION.

12. EXISTING EQUIPMENT, DUCTWORK, AND PIPING IS LOCATED ABOVE EXISTING CEILINGS UNLESS

OTHERWISE NOTED.

GENERAL NOTES

INSTALLATION:

1. PREPARATION: VISIT THE WORK SITE AND BECOME FULLY AWARE OF ALL

EXISTING CONDITIONS. INVESTIGATE THE CONTRACT DOCUMENTS AND MAKE

PROPER PROVISIONS TO AVOID INTERFERENCE OR CONSTRUCTION DELAYS.

FURNISH OTHER TRADES WITH INFORMATION TO PROPERLY LOCATE AND SIZE

OPENINGS IN THE STRUCTURE REQUIRED FOR THIS WORK. FURNISH

ANCHOR BOLTS, SLEEVES, INSERTS AND SUPPORT REQUIRED FOR THIS

WORK.

2. INSTALLATION: PERFORM WORK USING PERSONNEL SKILLED IN THE TRADE

INVOLVED. PROVIDE COMPETENT SUPERVISION. FURNISH NEW MATERIALS,

AND ACCESSORIES BEARING THE MANUFACTURER'S IDENTIFICATION, AND

CONFORMING TO THE RECOGNIZED COMMERCIAL STANDARDS.

3. FIELD QUALITY CONTROL: TEST SYSTEMS IN ACCORDANCE WITH APPLICABLE

STANDARDS, CODES AND MANUFACTURER'S RECOMMENDATIONS. PERFORM

TESTS IN THE PRESENCE OF GOVERNMENT REPRESENTATIVE.

4. BALANCING, ADJUSTMENT AND CLEANING: CLEAN UP WORK AREAS AND

FIXTURES. ADJUST SYSTEM FOR PROPER OPERATION, READY FOR USE.

TOUCH UP WITH MATCHING PAINT ALL DAMAGED FACTORY FINISHES.

5. CLEANING AND ADJUSTING: AT THE COMPLETION OF THE WORK, ALL PARTS

OF THE INSTALLATION SHALL BE THOROUGHLY CLEANED. PIPE, VALVES, AND

FITTINGS SHALL BE CLEANSED OF GREASE, METAL CUTTINGS, AND SLUDGE

THAT MAY HAVE ACCUMULATED BY OPERATION OF THE SYSTEM FOR TESTING

ANY STOPPAGE OR DISCOLORATION OR OTHER DAMAGE TO PARTS OF THE

BUILDING, ITS FINISH, OR FURNISHING. FAILURE TO PROPERLY CLEAN THE

PIPING SYSTEM DUE TO THE CONTRACTOR SHALL BE REPAIRED BY THE

CONTRACTOR WITHOUT COST TO THE OWNER.

NEW FIRE DAMPER

CONNECT TO EXISTING

NEW FIRE - SMOKE DAMPERS

STEAM FLOW METER

AUTOMATIC CONTROL VALVE

Y-STRAINER

SHUT OFF VALVE

STEAM TRAP

MOTORIZED DAMPER

M

ACCESS PANEL

SG-3

AIR DEVICE TAG

AIR DEVICE TAG

AIRFLOW (CMM)

EXISTING FIRE DAMPER

LOW PRESSURE STEAM

LPS

LOW PRESSURE RETURN

LPR

HIGH PRESSURE STEAM

HPS

HIGH PRESSURE CONDENSATE

HPR

PRESSURE GAUGE AND SNUBBER; LARGE DIAL;

METRIC (kPa) AND ENGLISH (PSIG) UNITS

PG

M E

C H

A N

I C

A L

S

Y M

B O

N D

B B

R E

V I A

T I O

N S

M-001

C T

S

K L

N

C

K E

S

R E

P A

I R

F

M

I L

Y

H

O U

S I N

G

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

C T

O

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

E

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

H

W

N

D T

SHEET OF 295

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text 10X8

AutoCAD SHX Text 45%%d

AutoCAD SHX Text T

AutoCAD SHX Text

SM

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

1F UNIT STO 1

1F ELEC

1F UNIT STO 2

ELEV SHAFT

PIPE SPACE

CART RM

STAIR 2

STAIR 2

MULTIPURPOSE

RM

LOBBY

MP KITCHENETTE

KITCHEN ENTRY

LAUNDRY

LIVING-DINING

BEDROOM 3

HALL

BATH MST BATH

BEDROOM 2 MST BEDROOM

BALCONY

LIVING-DINING

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

BATH

MASTER BATH

HALL

KITCHEN

ENTRY

LAUNDRY

1F HALL

MP STORAGE

ENTRANCE 2

ENTRANCE 1

1F HALL

GARBAGE

MAIN ELEC RM

GENERATOR RM

WING STAIR A

WING STAIR D

WING STAIR C

WING STAIR B

MAIN MECH RM

1F STORAGE

(E)EF(E)EF

AC-1

T

AC-1

T

AC-1

T

AC-4

T

(E)AC

(E)AC

(E)AC

(E)AC

R L

R P

CD

RP

(E)HP

M

E

E

F

E

E

F

A

C

T

A

C

T

A

C

T

A

C

T

E

A

C

E

A

C

E

A

C

E

A

C

RL

RP

C

D

R

P

E

H

P

M

E

E

F E

E

F

A C

T

A C

T

A C

T

A C

T

E

A

C

E

A

C

E

A

C

E

A

C

RL

RP

C D

R P

E

H

P

M

(E)EF(E)EF

AC-1

T

AC-1

T

AC-1

T

AC-4

T

(E)AC

(E)AC

(E)AC

(E)AC

R L

R

P

CD

RP

(E)HP

M

E

Ø

E

Ø

E

Ø

(E)150Ø

(E)150Ø

E

C

D

(E)RP

E

R

P

(E)360/150

FC

FC

E

Ø

MM

FC FC

(E)AC-2T

(E)250Ø

E

Ø

E

Ø

E

C

D

E

R

P

(E)AC-2T

MD408

MD404

MD402

MD403

MD401

MD403

MD408

MD408

MD408

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

N

O

V E

R A

L L

F I R

O

O R

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. REMOVE EXISTING PIPING SERVING EXISTING HOT WATER

FAN-COIL UNITS IN THEIR ENTIRETY, ALONG WITH

ASSOCIATED PIPING, CONTROLS AND ELECTRICAL

CONNECTION.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

MD101

SCALE:

MECHANICAL DEMOLITION PLAN - OVERALL FIRST FLOOR

1:200

8000 16000

PLAN

NORTH

8000 16000

C T

S

K L

N

C

K E

S

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

KEYNOTES

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES.

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

TYP UNIT STO 1

TYP ELEC RM

TYP UNIT STO 2

ELEV SHAFT

TYP PIPE SPACE

STAIR 1

STAIR 2

STAIR 2

KITCHEN

LIVING-DINING

BEDROOM 3 BEDROOM 2

MASTER

BEDROOM

HALL

BATH

MASTER BATH

ENTRY

LAUNDRY

BALCONY

KITCHEN ENTRY

LAUNDRY

LIVING-DINING

BEDROOM 3

HALL

BATH MST BATH

BEDROOM 2 MST BEDROOM

BALCONY

LIVING-DINING

BEDROOM 2

MASTER

BEDROOM

BEDROOM 3

BATH

MASTER BATH

HALL

KITCHEN

ENTRY

LAUNDRY

TYP HALL

TYP HALL

T

T

T

T

R L

M

T

T

T

T

RL

M

T

T

T

T

RL

M

T

T

T

T

R L

M

T

T

T

T

R L

M

T

T

T

T

RL

M

T

T

T

T

RL

M

T

T

T

T

R L

M

MD408

MD405

MD408

MD408

MD408

MD408

MD408

MD408

MD408

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

N

O V

E R

A L

L

T

Y P

I C

O

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. REMOVE EXISTING PIPING SERVING EXISTING HOT WATER

FAN-COIL UNITS IN THIER ENTIRETY, ALONG WITH

ASSOCIATED PIPING, CONTROLS AND ELECTRICAL

CONNECTION.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

MD102

SCALE:

MECHANICAL DEMOLITION PLAN - OVERALL TYPICAL FLOOR (2-9)

1:200

8000 16000

PLAN

NORTH

8000 16000

C T

S

K L

N

C

K E

S

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

KEYNOTES

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES.

00 00

(E)175Ø

E x

(E)300x300 (E)200x200

(E)400X300

(E)100Ø

E

Ø

(E)350Ø

(E)225Ø

(E)125x100

(E)150Ø

(E)EG

(E)EG

(E)EG

(E)EG

(E)EG

(E)100Ø

(E)TG

(E)TG

(E)TG

(E)TG

(E)250x250

(E)TG

(E)EG

1F UNIT STO 1

1F ELEC

1F UNIT STO 2

ELEV SHAFT

PIPE SPACE

CART RM

STAIR 2

STAIR 2

LOBBY

LAUNDRY

1F HALL

(E)TG

D

03 04 05

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

N

F I R

O

B

L

L W

A Y

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

6. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

KEYNOTES

1 EXISTING DUCT AND FIRE DAMPER TO REMAIN.

REMOVE TRANSFER DUCT ALONG WITH ASSOCIATED FIRE

DAMPER, GRILLES, SUPPORTS AND ACCESSORIES. REFER

TO GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

MD401

SCALE:

MECHANICAL DEMOLITION PLAN - FIRST FLOOR LOBBY AND HALLWAY

1:50

2000 4000

PLAN

NORTH

REMOVE EXISTING MAKEUP AIR LOUVER AND DUCT FOR

EXISTING SMOKE CONTROL SYSTEM AS SHOWN. REFER TO

GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

REMOVE EXISTING SMOKE CONTROL SYSTEM AS SHOWN.

REFER TO GENERAL NOTE 5 FOR PATCHING

REQUIREMENTS.

EXISTING HOT WATER HEATING PIPING LOCATED ABOVE

THE CORRIDOR CEILING IS TO BE ABANDONED IN PLACE.

C T

S

K L

N

C

K E

S

EXISTING DUCTWORK IN UTILIDOR TO REMAIN.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

REMOVE EXISTING DUCT THRU WALL AND ABANDON IN

PLACE. REFER TO GENERAL NOTE 5 FOR PATCHING

REQUIREMENTS.

REMOVE TRANSFER DUCT ALONG WITH ASSOCIATED FIRE

DAMPER, GRILLES, SUPPORTS AND ACCESSORIES. REFER

TO GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

(E)150X150

(E)TG (E)TG

(E)EF

E

Ø

(E)EF

E

Ø

(E)EF

MULTIPURPOSE

RM

LOBBY

MP KITCHENETTE

1F STORAGE

ENTRANCE 2

ENTRANCE 1

WOMEN

MEN

MP STORAGE

E

Ø

E

Ø

E

Ø

(E)150Ø

(E)150Ø

E

C

D

(E)RP

E

R

P

(E)360/150

FC

FC

E

Ø

MM

FC FC

(E)AC-2T

(E)250Ø

E

Ø

E

Ø

E

C

D

E

R

P

(E)EWH

(E)EWH

(E)EWH

(E)ECH

(E)ECH

(E)EF

(E)AC-2

(E)AC-2

(E)AC-2

(E)AC-2

(E)ERV

(E)HP-2

(E)EF

(E)150Ø

(E)AC-2T

C

D

E

C

D

E

05 06 0705 06 07

SCALE:

MECHANICAL DEMOLITION PLAN - FIRST FLOOR MULTIPURPOSE ROOM

1:50

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

N

F I R

O

M

U L

T I P

U R

P O

O

M

A

B

A C

K E

S

K L

N C

T S

PLAN

NORTH

2000 4000

MD402

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS WITH

AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE SHALL BE

SHUT-OFF, AND SYSTEM TO BE COMPLETELY DRAINED PRIOR TO

DEMOLITION. PIPING SHALL BE CAPPED WATER-TIGHT WHERE

PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON DRAWINGS

IS APPROXIMATE - FIELD VERIFY ALL PIPING AND EQUIPMENT PRIOR

TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT WITH

BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT PLAN

SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT FROM

DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS OPENING IS

TO BE REUSED. PATCHING OF OPENINGS OR OTHER DAMAGE IS TO

MATCH ADJACENT SURFACES, MATERIALS AND CONDITIONS. REFER

TO GENERAL NOTES ON SHEET G-003 FOR MORE INFORMATION.

6. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

KEYNOTES

REMOVE FAN ALONG WITH ASSOCIATED SUPPORTS,

VALVES, ACCESSORIES AND CONTROLS FOR

REPLACEMENT. EXISTING DISCHARGE HOOD AND

DUCTWORK AS SHOWN TO REMAIN.

EXISTING WALL OPENINGS TO BE REUSED. REFER TO

MH402.

EXISTING WALL OPENINGS TO BE INFILLED. REFER TO

GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

REMOVE TRANSFER DUCT ALONG WITH ASSOCIATED FIRE

DAMPER, GRILLES, SUPPORTS AND ACCESSORIES. REFER

TO GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

EXISTING ENERGY RECOVERY CONTROLLER.

E

H

W S

E

H

W S

E

L P

S

E

L P

S

(E)LPR

(E)HPR

(E)LPS

E

L P

R

(E)HWP

(E)HWP

(E)DWH

(E)HX

E

H

W S

E

H

W S

E

H

W S

E

H

W R

E

H

W R

E

H

W R

E

H

W R

E

H

W S

E

E

X P

12520

(E)HWR

(E)HWS

(E)LPS

TYP

(E)DWH

LAUNDRY

MST BEDROOM

MST BATH

1F STORAGE

MECHANICAL ROOM

ENTRANCE 2

04 05

A

B

C

ENTRANCE 2

MAIN MECH RM

1F STORAGE

E

X

E

X

E

X

E

X

E

X

(E)250X250

(E)EF

(E)EF

(E)TG

04 05

A

B

C

SCALE:

MECHANICAL DEMOLITION PLAN - MECHANICAL ROOM PIPING

1:50

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

E

C H

A N

I C

O

M

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. REMOVE ALL STEAM AND CONDENSATE PIPING ASSOCIATED

WITH DOMESTIC WATER HEATER AND SPACE HEATING HEAT

EXCHANGER. EXITING DOMESTIC WATER HEATER TO REMAIN.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR OTHER

DAMAGE IS TO MATCH ADJACENT SURFACES, MATERIALS AND

CONDITIONS. REFER TO GENERAL NOTES ON SHEET G-003 FOR

MORE INFORMATION.

6. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

KEYNOTES

REMOVE HOT WATER PUMP ALONG WITH ASSOCIATED

SUPPORTS, CONCRETE PAD, INERTIA BASE, PIPING,

VALVES, ACCESSORIES AND CONTROLS.

REMOVE EXISTING PIPE MAIN HEADER ALONG WITH

ASSOCIATED STEEL SUPPORTS, CONCRETE PAD, PIPING,

VALVES, ACCESSORIES AND CONTROLS FOR

REPLACEMENT. STEEL AND CONCRETE BASE CAN BE

RE-USED WHERE MANIFOLD IS TO REPLACED.

2000 4000

REMOVE SHELL AND TUBE HEAT EXCHANGER ALONG WITH

ASSOCIATED SUPPORTS, PIPING, VALVES, ACCESSORIES

AND CONTROLS.

MD403

REMOVE ALL VERTICAL PIPES UP TO FLOOR LEVEL. CAP

PIPING WATER TIGHT AT FLOOR LEVEL. PIPING IN UTILIDOR

TO BE ABANDONED IN PLACE.

SCALE:

PLAN

NORTH

2000 4000

REMOVE FAN ALONG WITH ASSOCIATED SUPPORTS,

VALVES, ACCESSORIES AND CONTROLS FOR

REPLACEMENT. EXISTING DISCHARGE HOOD AND

DUCTWORK TO REMAIN AS SHOWN.

EXISTING LOUVER TO BE REMOVED AND REPLACED. REFER

TO GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

TAKE BASELINE TRAVERSE AIRFLOW READING AT THIS

LOCATION. NEW FAN SHALL BE BALANCED TO EXISTING

AIRFLOW.

REMOVE TRANSFER DUCT ALONG WITH ASSOCIATED FIRE

DAMPER, GRILLES, SUPPORTS AND ACCESSORIES. REFER

TO GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

C T

S

K L

N

C

K E

S

MECHANICAL ROOM DUCTWORK

1:50

MECHANICAL DEMOLITION PLAN -

EXISTING STEAM TO WATER HEAT EXCHANGER TO REMAIN.

REFER TO MH403 FOR NEW PIPING.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

TOWER 116 KEY PLAN

X

E

X

E

X

(E)400X300

(E)200X350

EXISTING

GENERATOR

(E)TG

(E)400X400

(E)EF

(E)SF(E)SF

(E)700X700

(ETR)

E

H

W R

(E)EF

(E)EG

(E)EG

(E)EG

(E)790X950

(E)1400X1350

(E)1200X1000

(E)EH

(E)IH(E)IH

(E)EH

(E)EH

(E)EG

(E)EG

(E)EG

(E)EF

LAUNDRY

MST BATH

ENTRANCE 1

GARBAGE

MAIN ELECTRICAL RM

GENERATOR RM

(E)ECH

(E)400X350

E

F

G

G.0

E

F

G

G.0

04 0504 05

SCALE:

MECHANICAL DEMOLITION PLAN - ELECTRICAL AND GARBAGE ROOMS

1:50

M E

C H

A N

I C

A L

D

E M

O L

I T

I O

N

P

L A

N

E

L E

C T

R I C

A L

A N

D

G

A R

B A

O

M S

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. EXISTING ELECTRICAL GENERATOR TO REMAIN.

3. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

4. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

5. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

6. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

7. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

KEYNOTES

PLAN

NORTH

2000 4000

MD404

EXISTING LOUVER TO BE REMOVED. REFER TO MH404 FOR

NEW WORK.

C T

S

K L

N

C

K E

S

REMOVE FAN ALONG WITH ASSOCIATED SUPPORTS,

ACCESSORIES AND CONTROLS.

TAKE BASELINE TRAVERSE AIRFLOW READING AT THIS

LOCATION. NEW FAN SHALL BE BALANCED TO EXISTING

AIRFLOW.

NO DEMOLITION WORK IS REQUIRED ON GENERATOR,

GENERATOR VENT, OR GENERATOR EXHAUST.

EXISTING DUCTWORK IN UTILIDOR TO REMAIN.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

REMOVE FAN ALONG WITH ASSOCIATED SUPPORTS,

VALVES, ACCESSORIES AND CONTROLS FOR

REPLACEMENT. EXISTING DISCHARGE HOOD AND

DUCTWORK AS SHOWN TO REMAIN.

EXISTING DOOR GRILLES FOR VENTILATION AIR INTAKE.

REFER TO DRAWING AE602.

x

(E)100Ø

E

Ø

(E)350Ø

(E)225Ø

(E)EG

(E)EG

(E)EG

(E)EG

(E)100Ø

(E)TG

(E)TG

(E)TG

(E)TG

(E)250x250

(E)TG

(E)EG

UNIT STO 1

ELEC RM

UNIT STO 2

ELEV SHAFT

PIPE SPACE

STAIR 1

STAIR 2

STAIR 2

KITCHEN

LAUNDRY

LAUNDRY

TYP HALL

TYP HALL

LAUNDRY

KITCHEN

LAUNDRY

(E)300x300 (E)200x200

(E)175Ø

D

03 04 05

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

N

T

Y P

I C

A L

C O

L

L W

L O

O R

S

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

6. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

7. EXISTING GENERAL EXHAUST SYSTEM IN CORE AREA SHALL

REMAIN.

KEYNOTES

MD405

SCALE:

MECHANICAL DEMOLITION PLAN - TYPICAL CORE AND HALLWAY (FLOORS 2-9)

1:50

2000 4000

PLAN

NORTH

REMOVE EXISTING MAKEUP AIR FOR EXISTING SMOKE

CONTROL SYSTEM. REFER TO GENERAL NOTE 5 FOR

PATCHING REQUIREMENTS.

REMOVE EXISTING SMOKE CONTROL SYSTEM AS SHOWN.

REFER TO GENERAL NOTE 5 FOR PATCHING

REQUIREMENTS.

C T

S

K L

N

C

K E

S

REMOVE TRANSFER DUCT ALONG WITH ASSOCIATED FIRE

DAMPER, GRILLE, SUPPORTS AND ACCESSORIES. REFER TO

GENERAL NOTE 5 FOR PATCHING REQUIREMENTS.

REMOVE EXISTING DUCT THRU WALL AND ABANDON IN

PLACE. REFER TO GENERAL NOTE 5 FOR PATCHING

REQUIREMENTS.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

EXISTING HOT WATER HEATING PIPING LOCATED ABOVE

THE CORRIDOR CEILING IS TO BE ABANDONED IN PLACE.

E

03 04 05 06 07 08

(E)EF

(E)EF

(E)EF

(E)EF

(E)EF

(E)EF

(E)EF3

ROOF MECH 2

PH1

FAN 1

PH1 MECH

ELEV SHAFT

PH1 LOBBY

ROOF MECH 1

PH1-PIPE ROOM

STAIR 1

PH1 STORAGE

PH1 FAN 2

ROOF MECH A

(E)EF

(E)EF

D

(E)EF

ELEV MACH RM

MECH TANK RM

STAIR 1

04 05

SCALE:

MECHANICAL DEMOLITION PLAN - PENTHOUSE DUCTWORK

1:100

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

P E

N T

H O

U S

E

D

U C

T W

O R

K

MD406

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

KEYNOTES

SCALE:

MECHANICAL DEMOLITION PLAN - PENTHOUSE 2 DUCTWORK

1:100

4000 8000

4000 8000

PLAN

NORTH

PLAN

NORTH

C T

S

K L

N

C

K E

S

REMOVE FAN ALONG WITH ASSOCIATED SUPPORTS, PIPING,

VALVES, ACCESSORIES AND CONTROLS FOR

REPLACEMENT. EXISTING DISCHARGE HOOD AND

DUCTWORK TO REMAIN AS SHOWN.

EXISTING MAKEUP AIR SYSTEM FOR EXISTING SMOKE

CONTROL SYSTEM SHALL BE REMOVED.

REMOVE EXISTING SMOKE CONTROL SYSTEM EQUIPMENT,

CONTROLS, DUCTWORK, PIPING, HOODS, ETC.

REMOVE EXISTING DUCTWORK ALONG WITH ASSOCIATED

FIRE DAMPER, GRILLES, SUPPORTS AND ACCESSORIES.

REFER TO GENERAL NOTE 5 FOR PATCHING

REQUIREMENTS.

EXISTING LOUVER TO REMAIN.

EXISTING WALL FAN TO BE REMOVED FOR REPLACEMENT.

EXISTING DISCHARGE HOOD TO REMAIN.

TYPICAL OF 4 EXHAUST FAN PENTHOUSES.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

EXISTING LOUVERS TO BE REMOVED. REFER TO MH406 FOR

NEW WORK.

E

03 04 05 06 07 08

HWR

H W

R

H W

R

H W

R

H W

R

HWR

HWR

ROOF

MECH 2

PH1

FAN 1

PH1 MECH

ELEV

SHAFT

PH1 LOBBY

ROOF

MECH 1

PH1-PIPE

ROOM

STAIR 1

PH1 STORAGE

PH1

FAN 2

ROOF MECH A

D32

ELEV MACH RM

MECH TANK RM

STAIR 1

04 05

SCALE:

MECHANICAL DEMOLITION PLAN - PENTHOUSE PIPING

1:50

M E

C H

A N

I C

M

O L

I T

I O

N

P

L A

E

N T

H O

U S

E

P

I P

I N

G

MD407

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

KEYNOTES

1 REMOVE EXISTING HORIZONTAL HWR PIPING INDICATED.

CAP PIPING AT VERTICAL PIPING RISERS. VERTICAL PIPING

TO BE ABANDONED IN PLACE.

2 REMOVE EXISTING HOT WATER COIL AND ASSOCIATED

VALVES AND ACCESSORIES.

SCALE:

MECHANICAL DEMOLITION PLAN - PENTHOUSE 2 PIPING

1:50

4000 8000

4000 8000

PLAN

NORTH

PLAN

NORTH

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

C T

S

K L

N

C

K

KITCHEN

ENTRY

LAUNDRY

LIVING-DINING

BEDROOM 3

HALL

BATH

BEDROOM 2

MST BEDROOM

BALCONY

E

H

W R

E

H

W S

E

H

W S

E

H

W R

E

H

W R

(E)HWS

(E)HWR

(E)EF(E)EF

E

H

W R

AC-1

T

AC-1

T

AC-1

T

AC-4

T

(E)AC

(E)AC

(E)AC

(E)AC

R L

R P

CD

RP

(E)HP

M

E

Ø

100Ø

E

Ø

(E)200Ø

E

Ø

Ø

ETR

ETR

Ø

03 04

E

F

G

MD408

SCALE:

MECHANICAL DEMOLITION PLAN - TYPICAL UNIT

1:50

M E

C H

A N

I C

M

O L I T

I O

N

P

L A

N

T

Y P

I C

A L

U N

I

TPLAN

NORTH

GENERAL NOTES:

1. COORDINATE SHUT DOWN OF EXISTING CENTRAL HOT WATER

HEATING SYSTEM, ALONG WITH POWER TO DWELLING UNITS

WITH AF BASE PRIOR TO DEMOLITION. HWS/HWR MAIN VALVE

SHALL BE SHUT-OFF, AND SYSTEM TO BE COMPLETELY

DRAINED PRIOR TO DEMOLITION. PIPING SHALL BE CAPPED

WATER-TIGHT WHERE PIPING DEMOLITION OCCURS.

2. LOCATION OF EQUIPMENT TO BE REMOVED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL PIPING AND

EQUIPMENT PRIOR TO REMOVAL.

3. COORDINATE REMOVAL AND RETENTION OF ALL EQUIPMENT

WITH BASE HOUSING.

4. COORDINATE REMOVAL AND ABATEMENT OF ASBESTOS

CONTAINING MATERIALS FOR ALL UNITS. REFER TO HAZMAT

PLAN SHEETS FOR ADDITIONAL DEMOLITION NOTES.

5. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

6. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

KEYNOTES

REMOVE TOILET EXHAUST SYSTEM INSIDE ROOM. REMOVE

EXHAUST FAN, ALONG WITH ASSOCIATED DUCTWORK,

DAMPERS, FAN SUPPORT, CONTROLS, AND ACCESSORIES.

REMOVE EXISTING OUTDOOR AIR INTAKE VENT

TERMINATION FOR REPLACEMENT.

REMOVE EXISTING FRESH AIR VENTILATION SYSTEM IN ITS

ENTIRETY FOR REPLACEMENT. REMOVE FILTER GRILLES,

DUCTWORK, DAMPERS, DUCT SUPPORTS, AND

ACCESSORIES. WALL OPENINGS TO REMAIN.

EXISTING AC UNIT AND THERMOSTAT TO REMAIN IN PLACE.

REMOVE EXISTING DRYER EXHAUST DUCTWORK AND FIRE

DAMPER UP TO VERTICAL RISER. REFER TO GENERAL NOTE

5 FOR PATCHING REQUIREMENTS.

REMOVE EXISTING RANGE EXHAUST HOOD AND

ASSOCIATED DUCTWORK. WALL OPENING TO BE REUSED.

2000 4000

DISCONNECT PIPE AT THIS LOCATION AND CAP.

DISCONNECT DUCT AT THIS WALL AND CAP. ABANDON

DUCT IN CHASE. REFER TO GENERAL NOTE 5 FOR

PATCHING REQUIREMENTS.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

A A

A A

B C

B C

C T

S

K L

N

C

K E

S

MOTORIZED DAMPER TO BE REUSED.

1F UNIT STO 1

1F ELEC

1F UNIT STO 2

ELEV

ELEV SHAFT

PIPE SPACE

CART RM

ST-2

STAIR 2

MULTIPURPOSE

RM

LOBBY

MP KITCHENETTE

UA03

KITCHEN

UA01

ENTRY

UA05

LAUNDRY

UA06

LIVING-DINING

UA17

BEDROOM 3

UA07

HALL

UA09

BATH

UA13

MST BATH

UA14

BEDROOM 2

UA10

MST BEDROOM

BALCONY

UA06

LIVING-DINING

UA14

BEDROOM 2

UA10

MASTER

BEDROOM

UA17

BEDROOM 3

UA09

BATH

UA13

MASTER BATH

UA07

HALL

UA03

KITCHEN

UA01

ENTRY

UA05

LAUNDRY

1F HALL

ENTRANCE 2

ENTRANCE 1

GARBAGE

MAIN ELEC RM

GENERATOR RM

WS-A

WING STAIR A

WS-D

WING STAIR D

WS-C

WING STAIR C

WS-B

WING STAIR B

1F STORAGE

MAIN MECH RM

1F STO

A

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

M

M

M

M

(E)AC-2T

(E)AC-2T

MH408

MH404

MH402

MH403

MH401

MH403

MH408

MH408

MH408

M E

C H

A N

I C

A

N

O V

E R

A L

L

F

I R

O

O R

MH101

SCALE:

MECHANICAL PLAN - OVERALL FIRST FLOOR

1:200

8000 16000

PLAN

NORTH

8000 16000

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

3. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

C T

S

K L

N

C

K E

S

KEYNOTES

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES.

A.0

B

C

D

E

F

G

G.0

00 02 03 04 05 06 07 08

M

M

M

M

M

M

M

M

MH408

MH405

MH408

MH408

MH408

MH408

MH408

MH408

MH408

MH407

MH407

MH407

(FLOORS

2,5,8)

(FLOORS

3,6,9)

(FLOORS

4,7)

M E

C H

A N

I C

A

N

O

V E

R A

L L

T Y

P I C

O

MH102

SCALE:

MECHANICAL PLAN - OVERALL TYPICAL FLOOR (2-9)

1:200

8000 16000

PLAN

NORTH

8000 16000

GENERAL NOTES:

1. LOCATION OF NEW EQUIPMENT TO BE INSTALLED SHOWN ON

DRAWINGS IS APPROXIMATE - FIELD VERIFY ALL EXISTING

CONDITIONS PRIOR TO INSTALLATION OF NEW EQUIPMENT.

2. GENERAL CONTRACTOR IS RESPONSIBLE FOR PATCHING ALL

OPENINGS IN CEILINGS, WALLS AND FLOORS THAT RESULT

FROM DEMOLITION WORK OR REMOVED EQUIPMENT, UNLESS

OPENING IS TO BE REUSED. PATCHING OF OPENINGS OR

OTHER DAMAGE IS TO MATCH ADJACENT SURFACES,

MATERIALS AND CONDITIONS. REFER TO GENERAL NOTES ON

SHEET G-003 FOR MORE INFORMATION.

3. EXISTING INTAKE AND EXHAUST HOODS TO REMAIN, UNLESS

OTHERWISE NOTED.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

C T

S

K L

N

C

K E

S

KEYNOTES

SEE ENLARGED VIEW FOR ADDITIONAL KEYNOTES.

1F UNIT STO 1

1F ELEC

1F UNIT STO 2

ELEV

ELEV SHAFT

PIPE SPACE

CART RM

ST-2

STAIR 2

LOBBY

UA03

KITCHEN

UA01

ENTRY

UA05

LAUNDRY

1F HALL

ENTRANCE 2

1F STO

E

X

(E)400X300

(E)EG

0.75

(E)EG

3.83

(E)EG

0.75

(E)EG

EF

SG-3

2.48

EF

ENTRY

UA01

LAUNDRY

UA05

KITCHEN

UA03

(E)AP

E F

E N

T R

Y

U A

K I T

C H

E N

U A

E

F

E

N

T

R

Y

U

A

K

I

T

C

H

E

N

U

A

SG-1

10.33

460x125

UP THRU

FLOOR

460x125

25 CONDENSATE

DRAIN FROM

2ND FLOOR

(E)175Ø

(E)350Ø(E)225Ø

(E)EG

2.83

(E)100Ø

(E)200Ø

(E)EG

2.17

(E)150Ø

S

03 04 05

D

M E

C H

A N

I C

A

N

F

I R

O

O R

L O

B B

Y

A

L

L W

A Y

GENERAL NOTES:

KEYNOTES

SCALE:

MECHANICAL PLAN - FIRST FLOOR LOBBY AND HALLWAY

1:50

2000 4000

PLAN

NORTH

MH401

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. REFER TO STRUCTURAL AND ARCHITECTURAL DRAWINGS FOR

WALL AND FLOOR PENETRATIONS - COORDINATE EXACT SIZE

AND LOCATION PRIOR TO CONSTRUCTION.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

5. REFER TO MH504 FOR EXHAUST AND MAKEUP AIR FLOW

DIAGRAMS.

6. ALL DUCTWORK INSTALLED BETWEEN EXTERIOR AND

BACKDRAFT DAMPER SHALL BE INSULATED IN ITS ENTIRETY.

7. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.

COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT

ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.

REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.

CONCEALED VERTICAL DUCT - ABANDON IN PLACE. REFER

TO MD401.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

2 AHU SHUT DOWN SWITCH. SEE ELECTRICAL DRAWINGS

FOR DETAILS.

C T

S

K L

N

C

K E

S

3 CONDENSATE DRAIN DOWN INTO CRAWLSPACE. REFER TO

PLUMBING FOR FINAL CONNECTION LOCATION.

Ø

Ø

Ø

250Ø

250Ø

EG-2

2.15

EG-2

2.15

EG-2

2.15

(E)HP

E

Ø

E

Ø

E

Ø

(E)150Ø

(E)150Ø

E

C

D

(E)RP

E

R

P

(E)360/150

FC

FC

E

Ø

MM

FC FC

(E)250Ø

E

Ø

E

C

D

E

R

P

(E)AC

(E)AC

(E)AC

(E)AC

(E)EWH

(E)EWH

(E)EWH

(E)ECH

(E)ECH

(E)EF-1

(E)150Ø

(E)AC-2T

(E)AC-2T

(E)ERV

AP

AP

AP

AP

AP

AP

EF

MULTIPURPOSE

RM

MP KITCHENETTE

ENTRANCE 2

ENTRANCE 1

C

D

E

06 07

SCALE:

MECHANICAL PLAN - MULTIPURPOSE ROOM

1:50

M E

C H

A N

I C

A

N

M

U L

T I P

U R

P O

O

M

2000 4000

PLAN

NORTH

MH402

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

KEYNOTES

BALANCE VENTILATION AIR BRANCH DUCT TO 2.13 CUBIC

METERS PER MINUTE AIRFLOW.

C T

S

K L

N

C

K E

S

GENERAL NOTES:

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. REFER TO STRUCTURAL AND ARCHITECTURAL DRAWINGS FOR

WALL AND FLOOR PENETRATIONS - COORDINATE EXACT SIZE

AND LOCATION PRIOR TO CONSTRUCTION.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

5. REFER TO MH504 FOR EXHAUST AND MAKEUP AIR FLOW

DIAGRAMS.

6. ALL DUCTWORK INSTALLED BETWEEN EXTERIOR AND

BACKDRAFT DAMPER SHALL BE INSULATED IN ITS ENTIRETY.

7. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.

COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT

ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.

REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.

EXISTING ENERGY RECOVERY CONTROLLER.

P

S

LPR

HPR

LPS

L P

R

(E)DWH

12520

(E)DWH

HPS

ST

ST

ST

ST

M501

M501

M501

M501

ENTRANCE 2

WS-B

WING STAIR B

1F STORAGE

MAIN MECH RM

04 0504 05

A

B

C

A

B

C

E

X

E

X

E

X

E

X

E

X

EF

EF

(E)EG

(E)EG

(E)EG

(E)EG

(E)EG

M502

ENTRANCE 2

WS-B

WING STAIR B

1F STORAGE

MAIN MECH RM

04 0504 05

A

B

C

A

B

C

SCALE:

MECHANICAL PLAN - MECHANICAL ROOM DUCTWORK

1:50

M E

C H

A N

I C

A

E C

H A

N I C

O

M

KEYNOTES

150mm STEAM PIPE HEADER - RE-USE EXISTING FLOOR

PIPE SUPPORT. PROVIDE LOW POINT END-OF-MAIN STEAM

TRAP AND DRAIN.

2000 4000

PLAN

NORTH

MH403

SCALE:

MECHANICAL PLAN - MECHANICAL ROOM PIPING

1:50

2000 4000

PLAN

NORTH

EXISTING STEAM TO WATER TANK HEAT EXCHANGER TO

REMAIN. SIZE NEW CONTROL VALVE FOR 207 kPa STEAM @

590 kg/hr STEAM FLOW.

FURNISH AND INSTALL NEW FAN, SUPPORTS, AND

CONTROLS. CONNECT TO EXISTING DUCTWORK AS

INDICATED. PROVIDE NEW FLEXIBLE DUCT CONNECTORS.

NEW LOUVER (L-3) REFER TO ARCHITECTURAL DRAWINGS

(940X1450, 4200 CMH).

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

C T

S

K L

N

C

K E

S

457x304mm TRANSFER SLEEVE WITH FIRE DAMPER.

INSTALL FRAMED REMOVABLE GALVANIZED SCREEN ON

BOTH SIDES.

GENERAL NOTES:

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. REFER TO STRUCTURAL AND ARCHITECTURAL DRAWINGS FOR

WALL AND FLOOR PENETRATIONS - COORDINATE EXACT SIZE

AND LOCATION PRIOR TO CONSTRUCTION.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

5. REFER TO MH504 FOR EXHAUST AND MAKEUP AIR FLOW

DIAGRAMS.

6. ALL DUCTWORK INSTALLED BETWEEN EXTERIOR AND

BACKDRAFT DAMPER SHALL BE INSULATED IN ITS ENTIRETY.

7. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.

COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT

ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.

REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.

X

E

X

(E)200X350

EXISTING

GENERATOR

(E)EF

EF

SF

3B

SF

3A

E

X

EF

(E)EG

(E)EG

(E)EG

(E)EG

(E)EG

(E)EG

17.67

17.67

17.67

19.67

19.67

19.67

ECUH

M

E

X

M502

S

UA13

MST BATH

MST BEDROOM

ENTRANCE 1

GARBAGE

MAIN ELEC RM

GENERATOR RM

WS-D

WING STAIR D

E

F

G

E

F

G

04 0504 05

M E

C H

A N

I C

A

N

E

L E

C T

R I C

A L

A N

D

G

A R

B A

O

M S

GENERAL NOTES:

KEYNOTES

1 INSTALL NEW FAN, REQUIRED SUPPORTS, AND CONTROLS.

CONNECT TO EXISTING DUCTWORK.

MH404

SCALE:

MECHANICAL PLAN - ELECTRICAL AND GARBAGE ROOMS

1:50

PLAN

NORTH

2000 4000

2 NEW LOUVER L2, TWO SECTIONS, REFER TO

ARCHITECTURAL DRAWING AE404. (850/1150, 3540 CMH)

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. COORDINATE ALL NEW WALL OPENINGS WITH STRUCTURAL.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

3 PROVIDE MOTORIZED DAMPER - HARD-WIRE INTERLOCK

WITH EF-5.

4 INSTALL UNIT HEATER CENTERED ON WALL SLEEVE AND

600MM FROM FACE OF SLEEVE.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

C T

S

K L

N

C

K E

S

5 NEW LOUVER (L-6). REFER TO ARCHITECTURAL DRAWING

AE404. (1300/1000, 3180 CMH)

ELEV

ELEV SHAFT

T16

TYP UNIT STO 1

T14

TYP ELEC RM

T17

TYP UNIT STO 2

T11

TYP PIPE SPACE

ST-1

STAIR 1

ST-2

STAIR 2

ST-2

STAIR 2

KITCHEN

ENTRY

UA05

LAUNDRY

LAUNDRY

T13

TYP HALL

T13

TYP HALL

(E)350Ø(E)225Ø

(E)EG

(E)EG

(E)EG

(E)EG

3.83

2.83

2.17 0.75

AHU-1

T

(E)175Ø

(E)100Ø

(E)200Ø

D

03 04 05

M E

C H

A N

I C

A

N

T

Y P

I C

R

E

A

N D

H A

L L

W A

Y

F

L O

O R

S

GENERAL NOTES:

KEYNOTES

1 BALANCE EXISTING GRILLE TO NEW AIRFLOW INDICATED.

SCALE:

MECHANICAL PLAN - TYPICAL CORE AND HALLWAY (FLOORS 2-9)

1:50

2000 4000

PLAN

NORTH

MH405

2 THERMOSTAT ONLY ON FLOORS 2, 5 AND 8 TO SERVE AIR

HANDLING UNITS LOCATED ON THOSE FLOORS.

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. COORDINATE ALL NEW WALL OPENINGS WITH STRUCTURAL.

CONCEALED VERTICAL DUCT - ABANDON IN PLACE.3

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

C T

S

K L

N

C

K

E

03 04 05 06 07 08

R02

ROOF MECH 2

PH1-4

PH1 FAN 1

PH1-3

PH1 MECH

ELEV

ELEV SHAFT

PH1-1

PH1 LOBBY

R01

ROOF MECH 1

PH1-2

PH1-PIPE ROOM

_ST-1

STAIR 1

PH1-5

PH1 STORAGE

PH1-6

PH1 FAN 2

R03

ROOF MECH A

TEF-11

EF

EF

HP

R P

R P

ON ROOF

M502

M502

D

PH2-1

ELEV MACH RM

PH2-2

MECH TANK RM

_ST-1

STAIR 1

M

T EF-12

EF

25.25

04 05

SCALE:

MECHANICAL PLAN - PENTHOUSE

1:100

M E

C H

A N

I C

A

E N

T H

O U

S E

MH406

GENERAL NOTES:

KEYNOTES

SCALE:

MECHANICAL PLAN - PENTHOUSE 2

1:100

4000 8000

4000 8000

PLAN

NORTH

PLAN

NORTH

INSTALL NEW EXHAUST FAN WITH ALL NECESSARY

SUPPORTS, CONTROLS, VIBRATION ISOLATION AND SAFETY

GUARDS. CONNECT TO EXISTING DUCTWORK.

INSTALL NEW EXHAUST FAN WITH ALL NECESSARY

SUPPORTS, CONTROLS, VIBRATION ISOLATION AND SAFETY

GUARDS. CONNECT TO EXISTING DUCTWORK. REFER TO

DETAIL 2/M-502.

NEW LOUVER (L-1). INSTALL MOTORIZED DAMPER

CONTROLLED BY REVERSE ACTING THERMOSTAT ON

LOUVER. MOUNTED DAMPER SIZE SHALL MATCH EXISTING

LOUVER (800X1150, 1250 CMH).

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. COORDINATE ALL NEW WALL OPENINGS WITH STRUCTURAL.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

5. ACCESS PANELS SHOWN ON THIS PLAN FOR REFERENCE.

COORDINATE EXACT LOCATION WITH ACTUAL EQUIPMENT

ACCESS, ALONG WITH ADJACENT CEILING-MOUNTED DEVICES.

REFER TO ARCHITECTURAL PLANS FOR SCOPE OF WORK.

ROOF PIPE SUPPORT.

R E

P A

M

I L

Y

H

O U

S I N

T

O W

E R

M I S

A W

A

A

B

J

A P

A N

Q

K K

A

F A

F

J A

N U

A R

Y

SHEET

IDENTIFICATION

D E

S I G

N E

D

B

Y

D W

N

B

Y

C K

D

B

Y

S O

L I C

I T

A T

I O

N

N

O

D A

T E

C O

N T

R A

S U

B M

I T

T E

D

B

Y

U S

A

R

C E

C I V

G

I N

E E

R

C E

N T

E R

O T

H

J O

I N

T

V

E N

T U

R E

N

M

A Y

F A

A

D

S

U I T

E

M I L W

A U

K E

E

W

I

A

B

C

D

1 2 3 4 5

M A

R K

D E

S C

R I P

T I O

N D

A T

E

FINAL DESIGN

SIGNED

THIS WORK WAS PREPARED

BY ME OR UNDER MY

SUPERVISION

T I M

O T

N

D T

SHEET OF 295

B116

B117

B

B

Y

E

L

L

O

W

S

T

O

B

B

B

B

B

B

B

S H

E N

A N

D O

N

TOWER 116 KEY PLAN

NEW REVERSE ACTING THERMOSTAT SET AT 27°C.

C T

S

K L

N

C

K E

S

(2) NEW LOUVERS (L-4) REFER TO ARCHITECTURAL

DRAWINGS.

SG-1

9.58

460x125

SOFFIT

UA03

KITCHEN

T13

TYP HALL

T19

MECH

590x1250

460x250

INSULATED

508x508

AHU

SG-1

9.58

UA03

KITCHEN

T13

TYP HALL

SOFFITSG-1

9.58

460x125

M E

C H

A N

I C

A

N

C

O R

E

M

E C

H A

N I C

A L

R O

O M

S

GENERAL NOTES:

KEYNOTES

MH407

1. COORDINATE ROUTING OF NEW DUCTWORK WITH EXISTING

UTILITIES. DUCTWORK, PIPING, ELECTRICAL CONDUIT, ETC.

2. PROVIDE ALL NECESSARY SUPPORTS AND ACCESS PANELS

FOR NEW DUCTWORK, EQUIPMENT AND ACCESSORIES.

3. COORDINATE ALL NEW WALL OPENINGS WITH STRUCTURAL.

4. BALANCE ALL EXISTING AND NEW DIFFUSERS TO AIRFLOWS

INDICATED.

NEW LOUVER (L-5, 640X300, 1785 CMH). SEE

ARCHITECTURAL DRAWINGS.

4 RATED DUCT ENCLOSURE REQUIRED ON FLOORS 2, 5 AND 8

ONLY.

5 BOTTOM RETURN (FOR OUTDOOR AIR). UNIT ON STAND.

SCALE:

MECHANICAL PLAN - (FLOORS 3, 6, 9)

1:30

1200 2400

PLAN

NORTH

SCALE:

MECHANICAL PLAN - (FLOORS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .