FA520520R0006_Atch2_Drawings_PDF3of12_Civil.pdf
PDF 9 MB Posted
- Attached to
- Project No. 1058046, Repair Military Family Housing (MFH), Tower 116, Misawa Air Base, Japan
- Solicitation number
- FA520520R0006
About this file
This solicitation is for a military family housing repair project at Misawa Air Base in Japan. The solicitation number is FA520520R0006 and was issued by the Department of the Air Force Pacific Air Forces. The project involves repairs to Tower 116 and includes demolition work, site utilities replacement and repairs, parking lot renovations, and landscaping work. The response due date is not provided in the document. Products and services required include sanitary sewer line replacement, water line replacement, concrete sidewalk and walkway installation, asphalt paving repairs, retaining wall reconstruction, and erosion control measures.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEWEXISTING DESCRIPTION
LEGEND AND SYMBOLSGENERAL CIVIL NOTES
ABBREVIATIONS
1. ALL CONSTRUCTION WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE FEDERAL AND LOCAL LAWS, CODES, ORDINANCES, AND THE STANDARDS OF MISAWA AIR BASE.
2. THE LOCATIONS OF COVERED SLABS, ASPHALT CONCRETE PAVEMENTS, PIPES, UNDERGROUND STRUCTURES, OR OTHER
UTILITIES SHOWN ON THESE PLANS ARE BASED ON VISIBLE FEATURES ON THE GROUND OR AVAILABLE DRAWINGS
PROVIDED BY OTHERS, THEREFORE THEY ARE APPROXIMATE. THE CONTRACTOR SHALL VERIFY THE TYPE OF MATERIALS, EXACT LOCATION, SIZE AND DEPTH OF ALL UTILITIES PRIOR TO THE START OF WORK.
3. EXISTING ASPHALT CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, CONCRETE WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE SWALES, AND OTHER STRUCTURES THAT ARE DISTURBED OR DAMAGED BY THE CONTRACTOR DURING
CONSTRUCTION SHALL BE RESTORED TO ITS ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE
GOVERNMENT.
4. ALL EXISTING UTILITIES, VALVE BOXES, AND MANHOLES, WHETHER SHOWN OR NOT SHOWN ON THE PLANS, THAT ARE
AFFECTED BY TRENCHING WORK SHALL BE PROTECTED AT ALL TIMES DURING CONSTRUCTION. IF DISTURBED THEY SHALL
BE RESTORED TO ORIGINAL OR BETTER CONDITION AND ANY DAMAGE SHALL BE REPAIRED AT NO COST TO THE
GOVERNMENT.
5. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, SIZES, AND MATERIALS OF PROPOSED CONNECTIONS TO EXISTING
UTILITIES. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION DURING EXCAVATION ACTIVITIES IN THESE LOCATIONS.
6. THE CONTRACTOR SHALL CONDUCT HIS/HER CONSTRUCTION OPERATIONS WITH MINIMAL INTERFERENCE TO ROADS, DRIVEWAYS, PARKING AREAS, SIDEWALKS, AND OTHER PEDESTRIAN AND VEHICULAR FACILITIES. THE CONTRACTOR SHALL
USE HIS/HER BEST EFFORTS TO PROVIDE CONTINUOUS TRAFFIC FLOW IN ALL DIRECTIONS AT ALL TIMES.
7. THE CONTRACTOR SHALL REVIEW THE PLANS AND NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY IF
ANY DISCREPANCIES ARE FOUND BEFORE PROCEEDING WITH THE WORK.
8. THE CONTRACTOR SHALL COORDINATE AND OBTAIN CLEARANCES AND PERMITS FROM THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO EXCAVATION ACTIVITIES.
9. ALL EXISTING SURVEY MONUMENTS SHALL BE PROTECTED. IF THE CONTRACTOR DAMAGES A SURVEY MONUMENT, HE/SHE
MUST REPORT IT IMMEDIATELY TO THE CONTRACTING OFFICER'S REPRESENTATIVE. THE CONTRACTOR WILL BE LIABLE FOR
ALL COSTS TO RESTORE AND REPAIR DISTURBED SURVEY MONUMENTS.
10. UNLESS OTHERWISE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE, THE DISRUPTION OF WATER SERVICE
SHALL BE MINIMIZED. THE CONTRACTING OFFICER'S REPRESENTATIVE SHALL APPROVE IN ADVANCE ANY SERVICE
INTERRUPTIONS AND THE REMOVAL OF EXISTING UTILITY LINES. WRITTEN NOTIFICATION SHALL BE PROVIDED TO
AFFECTED RESIDENTS 72 HOURS IN ADVANCE OF INTERRUPTIONS OF SERVICE. INTERRUPTIONS TO FACILITATE
CONNECTIONS SHALL BE SCHEDULED TO TAKE PLACE BETWEEN 0800 AND 1600 HOURS. MAXIMUM UTILITY OUTAGE FOR
ANY ONE (1) INTERRUPTION SHALL NOT EXCEED FOUR (4) HOURS PER DAY.
11. UNPAVED AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED WITH SOD IN ACCORDANCE WITH PROJECT
SPECIFICATIONS.
12. THE CONTRACTOR SHALL PROVIDE TEMPORARY CONNECTION TO EXISTING LINES AS REQUIRED TO MINIMIZE WATER
SERVICE INTERRUPTIONS BEFORE THE REMOVAL OF ANY PORTION OF EXISTING LINES.
13. THE CONTRACTOR SHALL PROVIDE TEMPORARY ACCESS PROTECTION FOR EQUIPMENT, TRUCKS OR OTHER
CONSTRUCTION VEHICLES TO PREVENT ANY DAMAGE TO EXISTING AND/OR NEWLY INSTALLED CONCRETE SIDEWALKS, CURBS, AND PAVING.
14. THE CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AND AVOID PONDING CONDITIONS
ANYWHERE ON SITE. STORM WATER IS TO BE DIRECTED TO STORM WATER CONVEYANCE STRUCTURES.
15. DUE TO VARIATIONS AND CONSTRAINTS, EACH UTILITY TIE IN LAYOUT WILL BE DETERMINED BY ITS ACTUAL FIELD
CONDITIONS. CHANGES TO THE DESIGN CONFIGURATION REQUIRE APPROVAL OF THE CONTRACTING OFFICER'S
REPRESENTATIVE AND SHALL BE DOCUMENTED ON THE AS-BUILT DRAWINGS.
16. ALL DISTANCES, DIMENSIONS, AND ELEVATIONS ARE INDICATED IN METRIC UNLESS OTHERWISE INDICATED.
17. ALL EXISTING WATER LINES THAT ARE BEING REPLACED SHALL BE REMOVED AND DISPOSED OF OFF-SITE UNLESS
OTHERWISE INDICATED.
18. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AREAS THAT ARE KNOWN TO HAVE UNDERGROUND
UTILITIES. HAND EXCAVATION IS REQUIRED WITHIN 0.90 METERS OF ANY EXISTING UTILITIES. IN CASES WHERE THE DEPTH
OR ELEVATION ARE NOT INDICATED ON THE PLANS, THE CONTRACTOR SHALL PROCEED WITH CAUTION AND SHALL BE
RESPONSIBLE FOR ANY DAMAGES INCURRED DURING EXCAVATION ACTIVITIES.
19. THE CONTRACTOR SHALL NOTIFY THE 35TH COMMUNICATIONS SQUADRON (35CS) PRIOR TO COMMENCING ANY LAND
DISTURBING ACTIVITIES. THE CONTRACTOR SHALL COMPLETE AND SUBMIT AF FORM 103 FOR COORDINATING ALL
AGENCIES AT LEAST TWO (2) FULL WEEKS PRIOR TO DIGGING. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO
RESTORE AND REPAIR DISTURBED COMMUNICATION LINES AND/OR APPURTENANCES DAMAGED AS A RESULT OF THE
CONTRACTOR'S ACTIVITIES.
20. PROVIDE SHORING FOR TRENCH EXCAVATION WORK THAT EXCEEDS 1.50 METERS IN DEPTH.
21. ALL EXISTING TREES AND PLANT MATERIALS NOT IDENTIFIED ON THE PLANS FOR REMOVAL OR RELOCATION ARE TO BE
PRESERVED IN PLACE AND PROTECTED. IF PROPOSED IMPROVEMENTS MAY NEGATIVELY AFFECT THE MAJOR ROOT
SYSTEMS, THEN THE CONTRACTOR SHALL OBTAIN APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE TO
REMOVE OR RELOCATE THE EXISTING TREE OR PLANT MATERIAL.
22. CONTRACTOR SHALL PROVIDE FENCING AND/OR BARRICADES FROM THE UNIT TO THE NEAREST SIDEWALK, STREET OR
OTHER PREDETERMINED DEMARCATION LINE AND BE RESPONSIBLE FOR MAINTAINING THE GROUNDS WITHIN IN
ACCORDANCE WITH THE PROJECT CONSTRUCTION DOCUMENTS THROUGHOUT THE PERIOD OF WORK.
23. NEW TREES PLANTED SHALL NOT HAVE TORN BARK. NEW TREES SHALL NOT BE FRUIT BEARING.
METRIC/IMPERIAL
CONVERSION SCHEDULE
1 mm = 0.03937 INCHES
INCH 25.4 mm mm 0.003281 FEET
FOOT 304.8 mm m 3.2808 FEET
FOOT 0.3048 m m² 10.764 FEET²
FEET² 0.092903 m² m³ 35.315 FEET³
FEET³ 0.028317 m³ m³ 1.308 CUBIC YARD
CUBIC YD 0.76455 m³ m³ 264.17 GALLONS
GALLON 0.003785 m³
WATER GATE VALVE WITH BOX
FIRE HYDRANT
STORM SEWER DRAINAGE MANHOLE
BUILDING/STRUCTURE
D
SANITARY SEWER PIPE
SS
x
W WATER PIPE
E
ELECTRICAL MANHOLE
x
W
SEWER MANHOLE
S
STORM DRAINAGE PIPE
x
SD
DECIDUOUS/CONIFEROUS TREE
TREE LINE
UNDERGROUND ELECTRIC LINE
x
E
XX
CHAIN LINK FENCE
DECIDUOUS/CONIFEROUS BUSH
AC
CO
CON/CONC
CW
DMH
E
GV
HW
INV
N
NTS
SMH
THK
ASPHALTIC CONCRETE, ASBESTOS CEMENT
CLEANOUT
CONCRETE
COLD WATER LINE
DRAINAGE MANHOLE
EASTING, EAST
GATE VALVE
HOT WATER LINE
INVERT
NORTHING, NORTH
NOT TO SCALE
SEWER MANHOLE
THICK
EX. EXISTING
W WATER LINE
REINF. REINFORCE, REINFORCEMENT
EXP. EXPANSION
JT. JOINT
DWG. DRAWING
M METER
MM MILLIMETER
TYP. TYPICAL
MIN. MINIMUM
MAX. MAXIMUM
WWF WELDED WIRE FABRIC
GALV. GALVANIZED
DIA. DIAMETER
O.C. ON CENTER
CLR. CLEAR
DET. DETAIL
PVC POLYVINYL CHLORIDE
C CENTER LINE
L
F FIRE LINE
BC BOTTOM OF CURB
TC TOP OF CURB
POC POINT OF CONNECTION
DI DUCTILE IRON
WSP WET STAND PIPE
FFE FINISHED FLOOR ELEVATION
(NIC) NOT IN CONTRACT
WMB WATER METER BOX
POL PETROLEUM, OIL, & LUBRICANT
H HORIZONTAL
V VERTICAL
TBD TO BE DETERMINED
PRV PRESSURE REDUCING VALVE
ARV AIR RELEASE VALVE
STORM SEWER CATCH BASINCB
ELECTRICAL UTILITY VENT
SANITARY SERVICE CLEANOUT
LIMITS OF ASPHALT PAVEMENT REPAIRS
INLET PROTECTION
SILT FENCE
WALKWAY PAVEMENT
x
SS SS
HPS
BOLLARD
C
CO
AC
AIR CONDITIONING UNIT AND PAD
DEMOLISH
CURB
SQ m SQUARE METER
TREE DRIPLINE
FO
HIGH PRESSURE STEAM PIPES
FIBER OPTIC CABLE
FO
TELECOMMUNICATIONS MANHOLE
TELECOMMUNICATIONS PEDESTAL
ROOF DRAIN CATCH BASIN
SIGN POST
CLOTHES LINE POST
LIGHT POLE
STAIR AND RAMP
XX
W x
W
LANDSCAPING, WALL AND BERM REPAIR
HOSE BIBB
HB HBHB
SF
IP
TREE PROTECTION FENCING
X
X
XX
W
SEGMENTAL RETAINING WALL
x
MAB
MISAWA AIR BASE
SS SANITARY SEWER
CB
SD
x
SD
TEMPORARY ACCESS FOR SHARED PARKING
PAVING SECTION PER DETAIL 10/C-503
R
J O
H N
S T
O N
R L W
J J F
T
C-001
C I V
I L
N
O T
E S
A
N D
I
F O
R M
A T
I O
N
R E
P A
R
F
M
I L
Y
H
O U
S I N
G
B
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
C T
O
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
L
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
H Y
W
N
D
SHEET OF 295
S
T
D
D
S
S
W
D
S
D x
S
D x
S
D
S
D x
S
D x
S
D
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
SS
x
S
S x
S S x
S S x
S S x
S S x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x W x
W x
W x
W x
W x
W x
W x
S
D x
S
D x
S
D x
S
D x
S
D x
SD
x
SD
x
S D x
S D x
S D x
S
D x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
SS
x
SS
x
SS
x
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
SS
x
SS
x
SS
x
S
S x
S
S x
S
S x
H
B
H
B
E x
E x
E x
SS
x
SS
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
E x
E x
E x
E x
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 46.50 SQ m±
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
HOSE BIB AND
ADDITIONAL WATER LINE
DEMOLITION
REMOVE AND
SALVAGE MANHOLE
COVER AND COLLAR
HOSE BIB AND
ADDITIONAL WATER LINE
DEMOLITION
X
X
X
X
X
X
X
X
CD101
B116 CIVIL DEMOLITION PLAN
SCALE: 1:100
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
B116
B117
B178
B179YELLOWSTONE DR
B190 B189B188 B187
B186B185 B184 SHENANDOAH DRN
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
Xref ..\Common\QKKA184008-Keyplan-T117.dwg
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
PLAN
NORTH
4 8
B116 M
A T
C H
L I N
E
S
E
MATCHLINE SEE SHEET CD104
B
W
W
C B
W
W
C B
T
W
W
C
B
W
S
S
D
S
S
D
S
S
D
D
W
S
S x
S
S x
S
S x
S
S x
S
S x
SS
x
SS
x
S S x
W x W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D
S D x
S D x
S D x
S
D x
S
D x
S
D x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
H
P
S
H
P
S
H
P
S
S S x
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
E x
E x
E x
E x
E x
E x
E x
E x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
H
B
H
B
H
B
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W
RAMP AND RAILING TO BE
REMOVED
11.08 SQ m± SEE
ARCHITECTURAL PLANS
FOR DETAILS
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
SANITARY SEWER PIPE
DEMOLITION (TYP.) .
MANHOLE TO REMAIN
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
WATER VALVE TO REMAIN.
WATER VALVE TO REMAIN.
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
HOSE BIB AND
ADDITIONAL WATER
LINE DEMOLITION
HOSE BIB AND
ADDITIONAL WATER
LINE DEMOLITION
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
REMOVE AND
SALVAGE MANHOLE
COVER AND COLLAR
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 102.08 SQ m±
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 12.75 SQ m±
IP
DEMOLISH DAMAGED
SIDEWALK
24.5 SQ m ±
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
CD102
B116 CIVIL DEMOLITION PLAN
SCALE: 1:100
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
B116
B117
B178
B179YELLOWSTONE DR
B190 B189B188 B187
B186B185 B184 SHENANDOAH DRN
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
Xref ..\Common\QKKA184008-Keyplan-T117.dwg
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
PLAN
NORTH
4 8
B116
MATCHLINE SEE SHEET CD105
M A
T C
H L I N
E
S
E
W
W
W
C B
C
B
C B
C B
C B
D
S
D
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S D x
S D x
S D x
S D x
S D x
S
D x
S
D x
S
D x
S
D x
S D x
S D x
S D x
S D x
S
D x
S
D x
S D x
S D x
S D x
S D x
S D x
S D x
E x
E x
E x
E x
E x
E x
E x
E x
E x
E x
W
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
REMOVE 26.2m± OF EX.
CONCRETE BLOCK WALL
AND BACKFILL MATERIAL
56.6 SQ m±. SALVAGE
BLOCKS FOR REPAIR OF
WALLS.
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 4.77 SQ m±
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 46.9 SQ m±
X
X
X
X
X
X
X
X
X
X
X
X
Xref ..\Common\QKKA184008-Keyplan-T117.dwg
CD103
B116 CIVIL DEMOLITION PLAN
SCALE: 1:100
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
B116
B117
B178
B179YELLOWSTONE DR
B190 B189B188 B187
B186B185 B184 SHENANDOAH DRN
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
PLAN
NORTH
4 8
M A
T C
H L I N
E
S
E
M A
T C
H L I N
E
S
E
REMOVE EX. METER IN EX.
METER VAULT. VALVES TO
REMAIN. SEE DETAIL 4/C-504
W
W
W
D
D
W
C
O
C
B
D
S
D x
S
D x
C
B
S
W
C
B
C
B
D
D D
S
S
D
S
S x
S
S x
S
S x
S
S x
S
S x
S S x
S
S x
S S x
S S x
S
S x
S S x
S S x
S
S x
S S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
SS
xSS xSS xSS x
S S x
S S x
S S x
S S x
S S x
S S x
W x
W x
W x
W x
W x
W x
W x
W x
S D x
S D x
S D x
S
D x
S
D x
S
D x
S
D x
SD
x
SD
x
SD
x
S
D x
S
D x
S
D x
S
D x
S
D x
S D x
S D x
S D x
S D x
S D x
S D x
S
D x
S
D x
H P
S
HPS
HPS
HPS
H P
S
HPS
HPS
HPS
S
D x
H P
S
HPS
HPS
HPS
W
S S x
S S x
S S x
S S x
S S x
S S x
S S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
H
B
H
B
H
B
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W
W
W
W
W
AD410
REMOVE SIDEWALK
12.84SQ m± AND CURB
5.39m±, WITHIN LIMITS
SHOWN
STAIRS, RAMP, ENTRY
AND RAILING REMOVAL,
22.13 SQ m±
SEE ARCHITECTURAL
PLANS
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
REMOVE EX. WATERLINE
3.25m±
REMOVE EX. VALVE
HOSE BIB AND ADDITIONAL WATER
LINE DEMOLITION
DEMOLISH HOSE BIB AND
ADDITIONAL WATER LINE
DEMOLISH HOSE BIB AND
ADDITIONAL WATER LINE
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 102.1 SQ m±
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 44.49 SQ m±
IP
I P
I P
REMOVE LANDSCAPING AND
EXCAVATE AS NECESSARY
TO PREPARE FOR
CONCRETE PAVING
14.5 SQ m±
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
SUMP PUMP DRAIN LINE
DEMOLITION
DEMOLISH EXISTING
SIDEWALK FOR UTILITY
REPLACEMENT AND RAMP
IMPROVEMENTS
75.5 SQ m±
SEE ARCHITECTURAL
PLANS FOR STAIR
DEMOLITION
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
2.77m±
2.62m±
3.40m±
CD104
B116 CIVIL DEMOLITION PLAN
SCALE: 1:100
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
Xref ..\Common\QKKA184008-Keyplan-T117.dwg
B116
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
MATCHLINE SEE SHEET CD102
M A
T C
H L I N
E
S
E
PLAN
NORTH
4 8
SEE SHEET CD106 FOR PARKING LOT DEMOLITION
M A
T C
H L I N
E
S
E
D
W
C
B
C
B
T
C B
D
S
D
S
D
D
CB
D
E
S
S x
S
S x
S
S x
S
S x
S S x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
SD
x
SD
x
SD
x
S
D x
S
D x
S
D x
S
D x
E x
E x
E x
E x
E x
E x
S S x
S S x
S S x
S S x
S S x
S S x
SD
x
H
B
SS
x
SS
x
SS
x
SS
x
SS
x
W x
W x
W x
W x
AD410
STAIRS, RAMP, ENTRY
AND RAILING REMOVAL
2 STEPS, 29.63 SQ m±
SEE ARCHITECTURAL
PLANS
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
SANITARY SEWER PIPE
DEMOLITION (TYP.)
MANHOLE TO REMAIN
HOSE BIB AND
ADDITIONAL WATER
LINE DEMOLITION
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 81.21 SQ m±
EX. CONCRETE BLOCK WALL
TO REMAIN, REMOVE 100mm
OF TOPSOIL FOR BERM
RESTORATION 16.74 SQ m±
IP
REMOVE LANDSCAPING AND
EXCAVATE AS NECESSARY
TO PREPARE FOR
CONCRETE PAVING
26.37 SQ m±
EXISTING
MANHOLE TO
REMAIN
IP
REMOVE SIDEWALK 9.37
SQ m± AND CURB 4.52m±, WITHIN LIMITS SHOWN
REMOVE AND SALVAGE SIGN
FOR RE-INSTALLATION AFTER
BERM STABILIZATION (TYP.)
DEMOLISH SIDEWALK
FOR UTILITY, STAIR
AND RAMP
CONSTRUCTION
46.0 SQ m ±
4.53m±
3.10m±
CD105
B116 CIVIL DEMOLITION PLAN
SCALE: 1:100
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
Xref ..\Common\QKKA184008-Keyplan-T117.dwg
B116
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
M A
T C
H L I N
E
S
E
PLAN
NORTH
4 8
MATCHLINE SEE SHEET CD103
SEE SHEET CD106 FOR PARKING LOT DEMOLITION
C
B
C
B
T
C B
D
CB
C
B
C
B
S
W
C
B
C
B
S
D
D D
S
D
C B
S
D
S
S x
S
S x
S
S x
S
S x
S S x
S S x
S
S x
S
S x
SS
xSS x
S
S x
S
S x
S S x
S S x
S S x
W x
W x
W x
W x
W x
W x
W x W x
W x
S D x
S D x
S D x
S D x
S
D x
SD
x
S
D x
S
D x
S
D x
S
Dx
SD
x
S
D x
S D x
E x
E x
E x
E x
E x
SMOKE
HUT
H
B
C B
C B
C B
C B
C B
C B
E x
W x
W x
W x
W x
W x
W x
W x
W
S D x
S D x
CB
CB
LIMITS OF PAVEMENT
REPAIRS, SAW CUT AT
EXISTING PAVMENT LINE
PRIOR TO REMOVAL.
LIMITS OF PAVEMENT
REPAIRS - SAW CUT
AT EXISTING
PAVEMENT SEAM
PRIOR TO REMOVAL
REMOVE ASPHALT AND
BASE COURSE TO A
DEPTH OF 75 mm WITHIN
LIMITS SHOWN.
MAINTAIN EXISTING
GRADE AND DRAINAGE
PATTERNS.
REMOVE SIDEWALK
24.8 SQ m±, CURB 11.2
m±, AND ADA RAMPS
WITHIN LIMITS
SHOWN
CONTRACTOR TO TEMPORARILY
RELOCATE SMOKE HUT TO AN
OWNER APPROVED LOCATION
PRIOR TO PARKING LOT
CONSTRUCTION. SEE SHEET C-106
FOR FINAL LOCATION AFTER
PARKING LOT CONSTRUCTION
LOCATION
EX. INLET TO
REMAIN (TYP)
EX. INLETS TO REMAIN
(TYP)
IP
IP
IP
IP
IP
IP
IP
EX. INLETS TO REMAIN
(TYP)
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
TREE PROTECTION
FENCING (TYP) SEE
DETAIL 3/C-501
DEMOLISH EX. TREES, CURB AND
LANDSCAPING. REMOVE TOPSOIL
FOR PLACEMENT OF PAVING BASE
COURSE. SITE LIGHTING TO BE
REMOVED FOR RELOCATION.
DEMOLISH EX. TREES, CURB AND
LANDSCAPING. REMOVE TOPSOIL FOR
PLACEMENT OF PAVING BASE COURSE.
DEMOLISH EX. TREES, CURB AND
LANDSCAPING. REMOVE TOPSOIL
FOR PLACEMENT OF PAVING BASE
COURSE. SITE LIGHTING TO BE
REMOVED FOR RELOCATION.
CURB AND
LANDSCAPING. REMOVE
TOPSOIL FOR
PLACEMENT OF PAVING
BASE COURSE.
IP
EX. INLET TO BE
REMOVED
8.32m± STORM DRAIN
REMOVAL
5.53m± STORM DRAIN
REMOVAL
IP
IP
PAVEMENT REMOVAL FOR NEW LIGHTING AND ELECTRICAL
LINE, SAWCUT AT EXISTING PAVEMENT LINE PRIOR TO
REMOVAL. EXCAVATE AS REQUIRED FOR LIGHT AND BOLLARD
CONSTRUCTION.
X
X
X
X
X
X
X
X
CD106
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
B116 CIVIL DEMOLITION PLAN
SCALE: 1:200
REPAIR FAMILY HO
USING, B116 (TOW
ER)
MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEETIDENTIFICATION
DESIGNED BY:DWN BY:CKD BY:
SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MYSUPERVISION
TIMOTHY WENDT
SHEET OF295
B116
B117
B178
B179YELLOWSTONE DR
B190 B189B188 B187B186
B185 B184 SHENANDOAH DRN
R
J O
H N
S T
O N
R L W
J J F
T
B
C
I V
I L
D
E M
O L I T
I O
N
P
L A
N
DEMOLITION PLAN NOTES
1. SEE CIVIL SITE PLANS FOR THE LOCATION OF RELOCATED
SANITARY SEWER LATERALS AND WATER LINE REPLACEMENT.
2. PROVIDE SHORING DURING TRENCHING WORK FOR
EXCAVATIONS EXCEEDING 1.50 METERS IN DEPTH.
3. REMOVE AND REPLACE EXISTING ASPHALT CONCRETE
PAVEMENTS, CONCRETE CURBS AND GUTTERS, CONCRETE
WALKS, WALLS, FENCES, TREES, NATURAL DRAINAGE
SWALES, AND OTHER STRUCTURES DISTURBED OR DAMAGED
BY UTILITIES TRENCHING OR REMOVAL WORK.
4. REMOVE SIDEWALK AND WALKWAYS TO NEAREST JOINT.
5. THE EXISTING INFORMATION SHOWN ON THIS SHEET IS BASED
ON A FIELD SURVEY PERFORMED OCTOBER 2017. ANY
CONSTRUCTION PERFORMED AFTER THAT TIME HAS NOT
BEEN FIELD LOCATED. THE CONTRACTOR SHOULD BE AWARE
THAT THERE MAY BE ADDITIONAL UNDERGROUND OR
OVERHEAD UTILITIES, STRUCTURES, AND PAVING IN THE FIELD
THAT IS NOT SHOWN ON THESE PLANS.
6. CONTRACTOR SHALL SCHEDULE WORK TO ENSURE A
MINIMUM OF ONE LANE OF TRAFFIC IS OPEN THROUGHOUT
DURATION OF CONSTRUCTION. CONTRACTOR SHALL
SCHEDULE WORK TO ENSURE THE FIRE LANES SHALL REMAIN
OPEN THROUGHOUT THE DURATION OF CONSTRUCTION.
7. TREES WITH OR WITHOUT TREE PROTECTION AND WITHIN
THIRTY (30) METERS OF THE BUILDING SHALL BE TRIMMED TO
ELIMINATE ANY BRANCHES WITHIN ONE (1) METER OF THE
GROUND LEVEL AS SHOWN.
8. TOPSOIL REMOVED SHALL BE STOCKPILED ON SITE AND
COVERED TO PREVENT EROSION.
9. THE EXISTING CONCRETE BLOCK WALL SHALL BE CLEARED OF
ALL VEGETATION AT THE BASE, ON THE FACE OF THE WALL,
BETWEEN THE BLOCKS AND ON THE TOP AS PART OF THE
TOSOIL REMOVAL AND WALL REPAIR. BLOCKS SHALL BE
SALVAGED FROM THE WALL REMOVAL AND UTILIZED TO
REPAIR THE WALL IN AREAS SHOWN.
10. CONTRACTOR SHALL REMOVE DAMAGED CONCRETE CURB
ON SITE AS SHOWN AND ANY ADDITIONAL CURBS THAT MAY
HAVE BEEN DAMAGED AFTER THE ISSUANCE OF THESE
PLANS. ESTIMATE 10m± OF DAMAGED CURB.
11.ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-504 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT
IN BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS
PANEL REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED
TO PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
12.ALL DEMOLISHED MATERIAL SHALL BE DISPOSED OF AT THE
CONTRACTORS EXPENSE. DEMOLISHED MATERIAL SHALL NOT
BE STORED OR ABANDONED ON SITE.
C
D
C
D
C
D
C
D
C
D
C
D
PLAN
NORTH
B116
0 1462
S
T
D
D
S
W
D
S
D
S
D
S
S x
S
S x
S
S x
S
S x
S S x
S S x
W x
W x
W x
W x
W x
W x
S
D x
S
D x
SD
x
S D x
S
S x
S
S x
S
S x
S
S x
S
S x
X
X
X
X
X
X
X
X
X
X
X
X
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H
P
S
H P
S
S S
S
S
S S
2.94m± 100mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
CONNECT TO EXISTING
MANHOLE (TYP.)
W
WW
W
W
W W
W
W
W W
W
HB
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
2.66m± 125mm SS
2.55m± 100mm SS
COMBINED INTO
0.75m± 125mm SS
MATCH EX LINE ELEVATION
AND ALIGNMENT
8.62m± 20mm WATER
MATCH EX LINE ELEVATION AND
ALIGNMENT SEE P-101 FOR
WATERLINE CONTINUATION
NEW MH CASTING RIM
ELEVATION SHALL MATCH
EXISTING SURROUNDING
GRADE
0.62m± 100mm SS
0.62m± 125mm SS
MATCH EX LINE ELEVATION
AND ALIGNMENT
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
W
W
W
W
7.96m± 20mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT SEE P-101
FOR WATER LINE
CONTINUATION
W
W
W
W
W
W
W
W
W
W
W
W
HB
NEW HOSE BIBB (TYP.)
ADD CAP BLOCK TO EX.18.5 m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
E
X
I
S
T
I
C
Y
C
E
L
T
E
R
APROXIMATE LIMIT OF
BERM SLOPE
2.66m± 125mm SS
MATCH EX LINE
ELEVATION AND
ALIGNMENT
S
D
3.33m± 40mm SD MATCH EX LINE
ELEVATION AND ALIGNMENT . SEE
P-101 FOR CONTINUATION AT
BUILDING
1.76± 75mm CONDENSATE LINE. CONNECT
TO EXISTING MANHOLE (TYP.)
SEE SHEET MH-401 FOR CONTINUATION
C-101
B116 CIVIL SITE PLAN
PLAN
NORTH
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
B116
B
C
I V
I L
S
I T
E
P
L A
N
R
J O
H N
S T
O N
R L W
J J F
T
CIVIL SITE NOTES:
1. WHERE FEASIBLE WALKWAYS SHOULD BE INSTALLED IN THE
SAME ALIGNMENT AND ELEVATION AS THOSE EXISTING.
DRAWINGS PRESENT ALL KNOWN INTERFERENCES. IN THE
EVENT OF AN UNKNOWN INTERFERENCE, ALIGNMENTS AND
ELEVATIONS MAY BE CHANGED (E.G., AVOIDING
CURB-AND-GUTTER OR LANDSCAPE TREE ALIGNMENTS). ALL
PROPOSED ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY
THE CONTRACTING OFFICER'S REPRESENTATIVE. ALL
VARIANCES FROM DESIGN ALIGNMENT SHALL BE DOCUMENTED
ON THE AS-BUILT DRAWINGS.
2. MINIMUM PERMISSIBLE SLOPES FOR SANITARY SERVICES:
80 mm DIA: 1.0%
100 mm DIA: 1.0%
125 mm DIA: 1.0%
3. WHERE FEASIBLE, SANITARY LATERAL PIPE, STRUCTURE, AND
APPURTENANCE RELAYS SHOULD BE INSTALLED IN THE SAME
ALIGNMENT AND ELEVATION AS THOSE EXISTING. DRAWINGS
PRESENT ALL KNOWN INTERFERENCES. IN THE EVENT OF AN
UNKNOWN INTERFERENCE, ALIGNMENTS AND ELEVATIONS MAY
BE CHANGED (E.G., AVOIDING CURB-AND-GUTTER OR
LANDSCAPE TREE ALIGNMENTS). ALL PROPOSED
ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY THE
CONTRACTING OFFICER'S REPRESENTATIVE. BENDS IN PIPES
SHALL CONFORM TO PIPE MANUFACTURERS
RECOMMENDATIONS. ALL VARIANCES FROM DESIGN
ALIGNMENT SHALL BE DOCUMENTED ON THE AS-BUILT
DRAWINGS.
4. PROVIDE ALL FITTINGS AS REQUIRED TO CONNECT THE NEW
SANITARY LATERALS TO THE EXISTING SANITARY SEWERS.
5. CONNECT NEW SANITARY LATERALS TO EXISTING MANHOLES IN
ACCORDANCE WITH SPEC SECTION 33 30 00.
6. CONNECT NEW SANITARY LATERALS TO BUILDING SEWER PIPE.
SEE SHEET P-101 FOR CONNECTION.
7. CONNECT NEW WATER SERVICE TO BUILDING WATER PIPE. SEE
SHEET P-101 FOR CONNECTION.
8. CONTRACTOR SHALL REPAIR CURB ON SITE AS SHOWN AND
ANY ADDITIONAL CURB THAT MAY HAVE BEEN DAMAGED AFTER
THE ISSUANCE OF THESE PLANS. ESTIMATE 10 m OF
ADDITIONAL CURB.
11. ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-505 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT IN
BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS PANEL
REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
C
C
C
C
C
C
MATCHLINE SEE SHEET C-104
M A
T C
H L I N
E
S
E
WATER UTILITY NOTE:
SCALE: 1:100 0
4 8
1. WATER LINES TO THE HOSE BIBBS SHALL BE INSTALLED BY
THE PLUMBING CONTRACTOR IN TRENCHES PROVIDED BY AND
BACKFILLED BY THE CIVIL CONTRACTOR. THIS WORK SHALL BE
COORDINATED SUCH THAT TRENCHES ARE FILLED WITHIN 4
HOURS OF COMPLETION OF PIPING INSTALLATION.
2. THE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL
ALL FITTINGS AS REQUIRED FOR THE HOSE BIBBS.
B
W
W
C B
W
W
C B
T
W
W
C
B
W
S
S
D
S
S
D
S
S
D
D
W
S
S x
SS
x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S D x
S
D x
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
H
P
S
H
P
S
H
P
S
H
P
S
E x
E x
E x
E x
W
W
S
S
S
S
6.07m± 100mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
NEW MH RIM AND
COLLAR. RIM SHALL
MATCH EX.
SURROUNDING GRADE
1.03m± 100mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
W
W
W
W
W
W
7.31m± 20mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT
20.79m± 20mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT
1.78m± 125mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
W
W
W
W
W
W
W
W
W
W
W
W
HB
W
W
W
W
W
W
W
W
W
W
W
W
HB
0.62m± 100mm SS
0.62m± 125mm SS
MATCH EX LINE
ELEVATION AND
ALIGNMENT
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
ADD CAP BLOCK TO EX. 44.0m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
ADD CAP BLOCK TO EX. 10.5m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
ADD CAP BLOCK TO EX. 4.8m± OF
BLOCK WALL, TIE SLOPE INTO WALL
SEE DETAIL 5/c-504 FOR CAP
NEW CONCRETE SIDEWALK 24.5 SQ m± SEE
DETAIL 1/C-502 MATCH EXISTING SIDEWALK
GRADE AND MATCH PROPOSED RAMP
GRADE.
CONTRACTOR SHALL BACKFILL WITH
TOPSOIL TO FINISHED SURFACE ELEVATION
AND RESTORE ANY LANDSCAPING
DISTURBED DUE TO CONSTRUCTION
ACTIVITY.
NEW RAMP AND RAILING
SEE ARCHITECTURAL
PLANS
GRADE BERM TO
MEET EX. VALVE RIM
ELEVATION.
GRADE BERM TO
MEET EX. VALVE RIM
ELEVATION.
APROXIMATE LIMIT OF
BERM SLOPE
APROXIMATE LIMIT OF
BERM SLOPE
C-102
B116 CIVIL SITE PLAN
PLAN
NORTH
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
B116
B
C
I V
I L
S
I T
E
P
L A
N
R
J O
H N
S T
O N
R L W
J J F
T
CIVIL SITE NOTES:
1. WHERE FEASIBLE WALKWAYS SHOULD BE INSTALLED IN THE
SAME ALIGNMENT AND ELEVATION AS THOSE EXISTING.
DRAWINGS PRESENT ALL KNOWN INTERFERENCES. IN THE
EVENT OF AN UNKNOWN INTERFERENCE, ALIGNMENTS AND
ELEVATIONS MAY BE CHANGED (E.G., AVOIDING
CURB-AND-GUTTER OR LANDSCAPE TREE ALIGNMENTS). ALL
PROPOSED ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY
THE CONTRACTING OFFICER'S REPRESENTATIVE. ALL
VARIANCES FROM DESIGN ALIGNMENT SHALL BE DOCUMENTED
ON THE AS-BUILT DRAWINGS.
2. MINIMUM PERMISSIBLE SLOPES FOR SANITARY SERVICES:
80 mm DIA: 1.0%
100 mm DIA: 1.0%
125 mm DIA: 1.0%
3. WHERE FEASIBLE, SANITARY LATERAL PIPE, STRUCTURE, AND
APPURTENANCE RELAYS SHOULD BE INSTALLED IN THE SAME
ALIGNMENT AND ELEVATION AS THOSE EXISTING. DRAWINGS
PRESENT ALL KNOWN INTERFERENCES. IN THE EVENT OF AN
UNKNOWN INTERFERENCE, ALIGNMENTS AND ELEVATIONS MAY
BE CHANGED (E.G., AVOIDING CURB-AND-GUTTER OR
LANDSCAPE TREE ALIGNMENTS). ALL PROPOSED
ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY THE
CONTRACTING OFFICER'S REPRESENTATIVE. BENDS IN PIPES
SHALL CONFORM TO PIPE MANUFACTURERS
RECOMMENDATIONS. ALL VARIANCES FROM DESIGN
ALIGNMENT SHALL BE DOCUMENTED ON THE AS-BUILT
DRAWINGS.
4. PROVIDE ALL FITTINGS AS REQUIRED TO CONNECT THE NEW
SANITARY LATERALS TO THE EXISTING SANITARY SEWERS.
5. CONNECT NEW SANITARY LATERALS TO EXISTING MANHOLES IN
ACCORDANCE WITH SPEC SECTION 33 30 00.
6. CONNECT NEW SANITARY LATERALS TO BUILDING SEWER PIPE.
SEE SHEET P-101 FOR CONNECTION.
7. CONNECT NEW WATER SERVICE TO BUILDING WATER PIPE. SEE
SHEET P-101 FOR CONNECTION.
8. CONTRACTOR SHALL REPAIR CURB ON SITE AS SHOWN AND
ANY ADDITIONAL CURB THAT MAY HAVE BEEN DAMAGED AFTER
THE ISSUANCE OF THESE PLANS. ESTIMATE 10 m OF
ADDITIONAL CURB.
11. ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-505 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT IN
BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS PANEL
REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
C
C
C
C
C
C
MATCHLINE SEE SHEET C-105
M A
T C
H L I N
E
S
E
WATER UTILITY NOTE:
1. WATER LINES TO THE HOSE BIBBS SHALL BE INSTALLED BY
THE PLUMBING CONTRACTOR IN TRENCHES PROVIDED BY AND
BACKFILLED BY THE CIVIL CONTRACTOR. THIS WORK SHALL BE
COORDINATED SUCH THAT TRENCHES ARE FILLED WITHIN 4
HOURS OF COMPLETION OF PIPING INSTALLATION.
2. THE PLUMBING CONTRACTOR SHALL PROVIDE AND INSTALL
ALL FITTINGS AS REQUIRED FOR THE HOSE BIBBS.
SCALE: 1:100 0
4 8
D
C
B
W
W
W
C B
C
B
C B
C B
C B
D
S
D
S
S x
S
S x
S
S x
S
S x
S
S x
S
S x
W x
W x
W x
W x
W x
W x
W x
W x
W x
S D x
S D x
S
D x
S
D x
S D x
S
D x
S D x
S D x
W
RECONSTRUCT 30 m± OF CONCRETE
BLOCK WALL WITH CAP.
RECONSTRUCT BERM AS SHOWN ON
DETAIL 1/ C-504
APROXIMATE LIMIT OF
BERM SLOPE
ADD CAP BLOCK TO EX. 3.9m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
ADD CAP BLOCK TO EX. 23.2m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
LIMIT OF WALL RECONSTRUCTION, TIE
INTO EXISTING WALL
E
X
I
S
T
I
N
G
B
I
C
Y
C
L
E
S
H
E
L
T
E
R
APROXIMATE LIMIT OF
BERM SLOPE
Y E
L L O
W S
T O
C-103
B116 CIVIL SITE PLAN
SCALE: 1:100
PLAN
NORTH
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
1 2 3 4 5
MARK
DESCRIPTION
DATE
FINAL DESIGN
SIGNEDTHIS WORK WAS PREPAREDBY ME OR UNDER MY
SUPERVISION
TIMOTHY WENDT
SHEET OF295
R E
P A
M
I L
Y
H
O U
S I N
T
O W
E R
M I S
A W
A
A
B
J A
P A
N
Q
K K
A
F A
F
J A
N U
A R
Y
SHEET
IDENTIFICATION
D E
S I G
N E
D
B
Y
D W
N
B
Y
C K
D
B
Y
S O
L I C
I T
A T
I O
N
N
O
D A
T E
C O
N T
R A
S U
B M
I T
T E
D
B
Y
U S
A
R
C E
C I V
G
I N
E E
R
C E
N T
E R
O T
H
J O
I N
T
V
E N
T U
R E
N
M
A Y
F A
A
D
S
U I T
E
M I L
W A
U K
E E
W
I
A
B
C
D
1 2 3 4 5
M A
R K
D E
S C
R I P
T I O
N D
A T
E
FINAL DESIGN
SIGNED
THIS WORK WAS PREPARED
BY ME OR UNDER MY
SUPERVISION
T I M
O T
N
D T
SHEET OF 295
B116
B117
B
B
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Y
E
L
L
O
W
S
T
O
B
B
B
B
B
B
B
S H
E N
A N
D O
N
B
C
I V
I L
S
I T
E
P
L A
N
R
J O
H N
S T
O N
R L W
J J F
T
CIVIL SITE NOTES:
1. WHERE FEASIBLE WALKWAYS SHOULD BE INSTALLED IN THE
SAME ALIGNMENT AND ELEVATION AS THOSE EXISTING.
DRAWINGS PRESENT ALL KNOWN INTERFERENCES. IN THE
EVENT OF AN UNKNOWN INTERFERENCE, ALIGNMENTS AND
ELEVATIONS MAY BE CHANGED (E.G., AVOIDING
CURB-AND-GUTTER OR LANDSCAPE TREE ALIGNMENTS). ALL
PROPOSED ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY
THE CONTRACTING OFFICER'S REPRESENTATIVE. ALL
VARIANCES FROM DESIGN ALIGNMENT SHALL BE DOCUMENTED
ON THE AS-BUILT DRAWINGS.
2. MINIMUM PERMISSIBLE SLOPES FOR SANITARY SERVICES:
80 mm DIA: 1.0%
100 mm DIA: 1.0%
125 mm DIA: 1.0%
3. WHERE FEASIBLE, SANITARY LATERAL PIPE, STRUCTURE, AND
APPURTENANCE RELAYS SHOULD BE INSTALLED IN THE SAME
ALIGNMENT AND ELEVATION AS THOSE EXISTING. DRAWINGS
PRESENT ALL KNOWN INTERFERENCES. IN THE EVENT OF AN
UNKNOWN INTERFERENCE, ALIGNMENTS AND ELEVATIONS MAY
BE CHANGED (E.G., AVOIDING CURB-AND-GUTTER OR
LANDSCAPE TREE ALIGNMENTS). ALL PROPOSED
ADJUSTMENTS SHALL BE APPROVED IN ADVANCE BY THE
CONTRACTING OFFICER'S REPRESENTATIVE. BENDS IN PIPES
SHALL CONFORM TO PIPE MANUFACTURERS
RECOMMENDATIONS. ALL VARIANCES FROM DESIGN
ALIGNMENT SHALL BE DOCUMENTED ON THE AS-BUILT
DRAWINGS.
4. PROVIDE ALL FITTINGS AS REQUIRED TO CONNECT THE NEW
SANITARY LATERALS TO THE EXISTING SANITARY SEWERS.
5. CONNECT NEW SANITARY LATERALS TO EXISTING MANHOLES IN
ACCORDANCE WITH SPEC SECTION 33 30 00.
6. CONNECT NEW SANITARY LATERALS TO BUILDING SEWER PIPE.
SEE SHEET P-101 FOR CONNECTION.
7. CONNECT NEW WATER SERVICE TO BUILDING WATER PIPE. SEE
SHEET P-101 FOR CONNECTION.
8. CONTRACTOR SHALL REPAIR CURB ON SITE AS SHOWN AND
ANY ADDITIONAL CURB THAT MAY HAVE BEEN DAMAGED AFTER
THE ISSUANCE OF THESE PLANS. ESTIMATE 10 m OF
ADDITIONAL CURB.
11. ANY AND ALL EARTHWORK DISTURBANCE OR STORAGE OF
MATERIALS SHALL BE FULLY FENCED PER DETAIL 3/C-505 TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL BUILDING DISTURBANCE THAT WILL RESULT IN
BUILDING ACCESS (WINDOW/DOOR REMOVAL, ACCESS PANEL
REPLACEMENT AND OTHERS) SHALL ALSO BE FENCED TO
PREVENT ACCESS BY CHILDREN AND UNAUTHORIZED
PERSONNEL. ALL GATES SHALL HAVE A FIRE DEPARTMENT
APPROVED LOCK.
C
C
C
C
C
C
M A
T C
H L I N
E
S
E
M A
T C
H L I N
E
S
E
WATER UTILITY NOTE:
4 8
1. WATER LINES TO THE HOSE BIBBS SHALL BE INSTALLED BY
THE PLUMBING CONTRACTOR IN TRENCHES PROVIDED BY AND
BACKFILLED BY THE CIVIL CONTRACTOR. THIS WORK SHALL BE
COORDINATED SUCH THAT TRENCHES ARE FILLED WITHIN 4
HOURS OF COMPLETION OF PIPING INSTALLATION.
W
D
D
CO
C
B
D
C
B
S
W
C
B
C
B
D
D
S
S
D
S
S x
S
S x
S
S x
S
S x
S
S x
SS
xSS x
S S x
S S x
S S x
W x x
W x
W x
S D x
S
D x
S
D x
SD
x
S
D x
S
Dx
S D x
S D x
B
H P
S
HPS
H P
S
HPS
H P
S
HPS
W
W
W
W
S S
S S
S S
S S
S S
S
S
NEW WATER PIPE IN EX.
METER PIT CONNECT
NEW PIPE TO 2-
EXISTING FLANGES. SEE
DETAIL 4/C-504
100 mm WATER VALVE
CONNECT TO EX
100mm WATERLINE
3.43m± 100 mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
AE416
NEW STAIRS AND
RAILING SEE
ARCHITECTURAL PLANS
NEW RAMP AND RAILING
SEE ARCHITECTURAL
PLANS
W
W
W
W
W
W
W
W
W
W
W W
W W W
W W W
W W W
W W W
W W
2.0m± 25 mm WATER MATCH EX LINE
ELEVATION AND ALIGNMENT
SEE P-101 FOR WATERLINE
CONTINUATION
W
W
W
W
W
W
W
W
W
W
W
W
HB
28.49m± 20mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT
W
12.00m± 20mm WATER
MATCH EX LINE
ELEVATION AND
ALIGNMENT
W
W
W
W
W
W
W
W
W
W
W
W
HB
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
W
W
W
W
W
W
W
W
W
W
W
W
HB
NEW HOSE BIBB (TYP.)
SEE DETAIL 4/C-501
6.70m± 100mm SS
MATCH EX LINE
ELEVATION AND
ALIGNMENT
2.94m± 100mm
2.87m± 80mm COMBINED INTO
0.5m± 125mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
2.87m± 100mm
2.94m± 125mm COMBINED INTO
0.5m± 125mm SS MATCH EX LINE
ELEVATION AND ALIGNMENT
W
W W
W
W W
W
W W
W
W
ADD CAP BLOCK TO EX. 41.7m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
ADD CAP BLOCK TO EX. 16.5m± OF
BLOCK WALL, RECONSTRUCT BERM
AS SHOWN ON DETAIL 5/ C-504
S
H
E
L
T
E
R
NEW CONCRETE SIDEWALK
90.1 SQ m± SEE DETAIL 1/C-502
MATCH EXISTING TOP OF CURB
AND SIDEWALK GRADE
BACK OF CURB IS
APROXIMATE LIMIT OF
BERM SLOPE
SEE DETAIL 2/C-505 FOR
RAMP IMPROVEMENTS
3.42m± 40mm CLEAR WATER DRAIN
S
D
8.70m± 40mm SUMP PUMP
DRAIN MATCH EX ELEVATION
AND ALIGNMENT
S
D
S
D
S
D
SEE ARCHITECTURAL
PLANS FOR STAIR
IMPROVEMENTS
C-104
B116 CIVIL SITE PLAN
SCALE: 1:100
PLAN
NORTH
REPAIR FAMILY HO
USING, B116 (TOW
ER)MISAWA AB, JAPAN1058046 (QKKA1840
18)
FA8903-18-F-0022JANUARY 24, 2020
SHEET
IDENTIFICATION
DESIGNED BY:DWN BY:
CKD BY:SOLICITATION NO.:DATE: CONTRACT NO.:
SUBMITTED BY:
U.S. AIR FOR
CE
CIVIL ENGIN
EER
CENTER OTIE RS&H JOIN
T VENTURE
1033N. MAYFAIR
ROAD SUITE 20
MILWAUKEE, WI
53226
A
B
C
D
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .