JA-1, Project Pricing Data Sheet 04FEB20.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Interior Alaska Paving Multiple Award Task Order Contract Federal contract opportunity
Solicitation number
FA500420R0001
Issued by
Department of the Air Force Pacific Air Forces

About this file

This document contains a pricing sheet and definitions for a multiple award task order contract for paving services at military installations in interior Alaska. The contract will be administered by 354th Civil Engineer Squadron at Eielson Air Force Base but Fort Wainwright and Fort Greely will also be able to place task orders against it.

The pricing sheet contains over 150 line items for demolition, site preparation, paving, finishing work, and miscellaneous tasks for both airfield and non-airfield projects. Definitions are provided for each line item. Task orders will include requirements for asphalt and concrete work, signage, fencing, contaminated soil remediation, and installation of electric vehicle charging stations. Responses are due under solicitation FA500420R0001. The Department of the Air Force Pacific Air Forces is the contracting agency.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing Data Sheet-Airfield

DEMOLITION OF AIRFIELD PAVEMENTSCLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
A100SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGFT - IN$ - 0
A101SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEFT - IN$ - 0
A102REMOVE EXISTING ASPHALT TO SPECIFIED
THICKNESS, HAULING OFF BASESY - IN$ - 0
A103COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASESY - IN$ - 0
A104REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, ON-BASE DISPOSALSY - IN$ - 0
A105REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, OFF-BASE DISPOSALSY - IN$ - 0
A106ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, ON-BASE DISPOSALSY - IN$ - 0
A107ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, OFF-BASE DISPOSALSY - IN$ - 0
A108REMOVE EXISTING CULVERT AS SPECIFIED,
OFF-BASE DISPOSALLF$ - 0
A109REMOVAL OF PAVEMENT MARKINGSSF$ - 0
AIRFIELD SITE PREPARATIONA110EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; ON-BASE DISPOSALCY$ - 0
A111EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; OFF-BASE DISPOSALCY$ - 0
A112REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYCY$ - 0
A113SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSESY$ - 0
A114NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$ - 0
A115NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYCY$ - 0
A116NEW BASE COURSE (D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYCY$ - 0
A117NEW BASE COURSE (RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYCY$ - 0
A118PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO SPECIFIED DEPTH, INCLUDES REGRADE AND COMPACT TO SPEC DENSITYSY$ - 0
AIRFIELD PAVINGA119NEW ASPHALT PAVEMENT, INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITYTON$ - 0
A120CONSTRUCT CONCRETE SLABS-
UNREINFORCEDCY$ - 0
A121CONSTRUCT CONCRETE SLABS-
REINFORCEDCY$ - 0
A122INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING,CY$ - 0
A123ADD STEEL REINFORCEMENT,
#4 TO #8 BARSTON$ - 0
A124DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$ - 0
AIRFIELD FINISH WORKA125SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$ - 0
A126CUT/WIDEN JOINTS IN ASPHALT FOR JOINT
SEALANTLF$ - 0
A127INSTALL NEW HOT POUR JOINT SEALANT IN
ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKERLF$ - 0
A128INSTALL PREFORMED JOINT SEAL IN
CONCRETELF$ - 0
A129INSTALL TOPSOIL TO SPECIFIED DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$ - 0
A130INSTALL HYDROSEED MIXSY$ - 0
A131INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROLCY$ - 0
A132NEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINESSF$ - 0
A133PAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINESSF$ - 0
A134CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALSY$ - 0
AIRFIELD MISCELLANEOUSA135INSTALL SAND FOR CONDUIT BEDDINGCY$ - 0
A136INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPELF$ - 0
A137INSTALL GEOTEXTILE FABRICSY$ - 0
A138PERFORM PETROLEUM CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
A139REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
A140PERFORM PFOS/PFOA CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
A141REMOVE, HAUL & DISPOSE OF PFOS/PFOA
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
A142PERFORM VOC/SVOC CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
A143REMOVE, HAUL & DISPOSE OF VOC/SVOC
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
A144INSTALL PETROLEUM RESISTANT SEAL
COATSY$ - 0
TOTAL PRICE$ - 0

JA-1, PROJECT PRICING DATA SHEET 04FEB20

AIRFIELD

Pricing Data Sheet-Non-airfield

DEMOLITION OF NON-AIRFIELD PAVEMENTSCLINDESCRIPTIONUNIT OF ISSUEUNIT PRICEQUANTITYTOTAL
B100SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGFT - IN$ - 0
B101SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETEFT - IN$ - 0
B102REMOVE EXISTING ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASESY - IN$ - 0
B103COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS & HAULING OFF BASESY - IN$ - 0
B104REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, ON-BASE DISPOSALSY - IN$ - 0
B105REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, OFF-BASE DISPOSALSY - IN$ - 0
B106ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, ON-BASE DISPOSALSY - IN$ - 0
B107ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, OFF-BASE DISPOSALSY - IN$ - 0
B108REMOVE CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS,CONTINUOUSLF$ - 0
B109REMOVE CONCRETE SIDEWALK, OFF-BASE DISPOSAL
SF$ - 0
B110REMOVE EXISTING CULVERT, OFF-BASE DISPOSALLF$ - 0
B111REMOVAL OF PAVEMENT MARKINGSSF$ - 0
NON-AIRFIELD SITE PREPARATIONB112EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; ON-BASE DISPOSALCY$ - 0
B113EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; OFF-BASE DISPOSALCY$ - 0
B114REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYCY$ - 0
B115SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSESY$ - 0
B116NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTCY$ - 0
B117NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYCY$ - 0
B118NEW BASE COURSE (D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYCY$ - 0
B119NEW BASE COURSE (RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYCY$ - 0
B120PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO SPECIFIED DEPTH, INCLUDES REGRADE AND COMPACT TO SPEC DENSITYSY$ - 0
NON-AIRFIELD PAVINGB121NEW ASPHALT PAVEMENT, INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITYTON$ - 0
B122CONSTRUCT CONCRETE SLABS- UNREINFORCEDCY$ - 0
B123CONSTRUCT CONCRETE SLABS- REINFORCEDCY$ - 0
B124INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHINGCY$ - 0
B125ADD STEEL REINFORCEMENT
#4 TO #8 BARSTON$ - 0
B126DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEEA$ - 0
B127INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUSLF$ - 0
B128CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALKSF$ - 0
B129INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK, REINFORCEMENT AND GRATEEA$ - 0
B130INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE , INCLUDING FORMWORKEA$ - 0
NON-AIRFIELD FINISH WORKB131SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLF$ - 0
B132INSTALL PREFORMED JOINT SEAL IN CONCRETELF$ - 0
B133INSTALL TOPSOIL TO SPECIFIED DEPTH; INCLUDES
SUPPLY, PLACE AND FINISH GRADESY$ - 0
B134INSTALL HYDROSEED MIXSY$ - 0
B135INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESCY$ - 0
B136INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESCY$ - 0
B137NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLF$ - 0
B138NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLF$ - 0
B139PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC…SF$ - 0
B140CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALSY$ - 0
NON-AIRFIELD MISCELLANEOUSB141INSTALL SAND FOR CONDUIT BEDDINGCY$ - 0
B142INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPELF$ - 0
B143INSTALL GEOTEXTILE FABRICSY$ - 0
B144PERFORM PETROLEUM CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
B145REMOVE, HAUL & DISPOSE OF PETROLEUM
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
B146PERFORM PFOS/PFOA CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
B147REMOVE, HAUL & DISPOSE OF PFOS/PFOA
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
A148PERFORM VOC/SVOC CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSEA$ - 0
A149REMOVE, HAUL & DISPOSE OF VOC/SVOC
CONTAMINATED SOIL IAW ADEC REQUIREMENTSCY$ - 0
B150INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKEA$ - 0
B151INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKEA$ - 0
B152INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRINGLF$ - 0
B153INSTALL EROSION CONTROL
TOTAL PRICE$ - 0

JA-1 PROJECT PRICING DATA SHEET 4 FEB20

NON-AIRFIELD

Definitions of items

AIRFIELDNON-AIRFILEDDESCRIPTIONDEFINITION
A100B100SAWCUT NEW OR EXISTING ASPHALT,
EXCLUDES JOINT CUTTING/ WIDENINGLaying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item.
A101B101SAWCUT NEW OR EXISTING PORTLAND
CEMENT CONCRETELaying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item.
A102B102REMOVE EXISTING ASPHALT TO SPECIFIED
THICKNESS, HAULING OFF BASEComplete removal of the existing AC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at a location off base.
A103B103COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASESet up and milling of AC pavement to the limits, grades (slopes) and depths identified in the Task Order. Also included is cleanup, loading, hauling and dumping of the milled material at a location off base.
A104B104REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, ON-BASE DISPOSALComplete removal of the existing PCC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
A105B105REMOVE EXISTING CONCRETE SLABS-
UNREINFORCED, OFF-BASE DISPOSALComplete removal of the existing PCC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
A106B106ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, ON-BASE DISPOSALAdditional cost for removing reinforcement in the existing PCC pavement within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
A107B107ADDITIONAL REMOVAL COST IF CONCRETE IS
REINFORCED, OFF-BASE DISPOSALAdditional cost for removing reinforcement in the existing PCC pavement within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
N/AB108REMOVE CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS,CONTINUOUSComplete removal of the existing PCC gutter, curb and gutter, or gutter to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
N/AB109REMOVE CONCRETE SIDEWALK, OFF-BASE DISPOSALComplete removal of the existing PCC sidewalk to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location.
A108B110REMOVE EXISTING CULVERT, 12" TO 24",
OFF-BASE DISPOSALRemoval of culvert pipe including connections. This item includes the removal and hauling and dumping at an approved location. This does not include excavation.
A109B111REMOVAL OF PAVEMENT MARKINGSRemoval of pavement markings to the limits identified in the Task Order. Also included is the cleaning and disposal of the removed pavement markings.
A110B112EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; ON-BASE DISPOSALExcavation of soil, aggregate and other earthen materials to the limits and grades identified in the Task Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Task Order and hauling to approved location.
A111B113EXCAVATE EXISTING BASE, SUBBASE,
STONE OR TOPSOIL; OFF-BASE DISPOSALExcavation of soil, aggregate and other earthen materials to the limits and grades identified in the Task Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Task Order and hauling to approved location.
A112B114REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYGrading and compacting stockpiled soil and/or aggregate to the limits and grades identified in the Task Order. This item does include redistribution of sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Also included is the hauling of the material from the project site stockpile.
A113B115SCARIFY, FINISH GRADE & COMPACT
EXISTING BASE COURSEGrading and compacting in situ soil and/or aggregate to the limits and grades identified in the Task Order. This item does include redistribution of base course/ sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order.
A114B116NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACTObtaining, loading, hauling, dumping, grading and compacting subbase aggregate material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the Contracting Officer.
A115B117NEW SUBBASE, RECLAIMED ASPHALT FROM
BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITYObtaining, loading, hauling, dumping, grading and compacting subbase course reclaimed asphalt material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile.
A116B118NEW BASE COURSE (D-1), INCLUDES SUPPLY,
PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYObtaining, loading, hauling, dumping, grading and compacting high fracture D-1 base aggregate material to the limits, depths and grades identified in the Task Order, and maintaining compacted surface clean and ready for paving operations until subsequent operations take place. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. High fracture D-1 Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the Contracting Officer.
A117B119NEW BASE COURSE (RECLAIMED ASPHALT
FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITYObtaining, loading, hauling, dumping, grading and compacting base course reclaimed asphalt material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile.
A118B120PULVERIZE ASPHALT AND BASE COURSE IN
PLACE TO 6", INCLUDES REGRADE AND COMPACT TO SPEC DENSITYPulverizing the existing AC (Asphalt Concrete) pavement in place by use of a pulverizing machine or other equipment to break up the pavement to the required size limit, grading and compacting in place for use as road base course to the limits identified in the Task Order. Also included is clean up of pavement debris lost outside of the compacted base area.
A119B121NEW ASPHALT PAVEMENT, INCLUDES
SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITYPlacing and compacting new asphalt to the required thickness in no more than 2” lifts, grade, smoothness and compaction specified, within the limits identified in the Task Order. Also includes hauling of asphalt material from the asphalt mixing plant, layout, survey work, density testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Also included is distributing asphalt prime coat and/ or tack coat at the proper rate and distribution coverage, to the limits identified in the Task Order and preparation of the surface by removing any loose or objectionable materials such as uncompacted aggregate, debris or vegetation spilled on the compacted surface after final grading and compaction of the base. This item also includes clean-up of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance and all calibration and test patterns within or outside of the work area required to obtain the specified distribution. Preparation of the base course surface is not a part of this item.
A120B122CONSTRUCT CONCRETE SLABS-
UNREINFORCEDPlacing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item.
A121B123CONSTRUCT CONCRETE SLABS-
REINFORCEDPlacing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item.
A122B124INSTALL MISCELLANEOUS CONCRETE,
INCLUDES FORMWORK AND FINISHING,Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item.
A123B125ADD STEEL REINFORCEMENT,
#4 TO #8 BARSThis includes preparation of PCC for reinforcement or dowels, hauling of material, and placement of material.
A124B126DOWELS SUPPLIED IN FORM EDGES OR
DRILLED INTO EXISTING CONCRETEThis includes preparation of PCC for reinforcement or dowels, hauling of material, and placement of material.
N/AB127INSTALL CURB & GUTTER, CURB ONLY, OR
VALLEY GUTTERS, CONTINUOUSPlacing, consolidating, finishing and curing PCC curb, curb and gutter, or gutter to the required configuration, grade, smoothness and finish specified within the limits identified in the Task Order. This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new curb, curb and gutter, or gutter where old curb, curb and gutter, or gutter has been removed is a part of this item.
N/AB128CONSTRUCT NEW FIBER REINFORCED
CONCRETE SIDEWALKPlacing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. This item also includes layout, survey work, forming, transverse expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new sidewalk where old sidewalk has been removed is a part of this item.
N/AB129INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK, REINFORCEMENT AND GRATEPlacing, consolidating, finishing and curing the PCC sidewalk scupper and spillway including curb and gutter around the scupper This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the sidewalk scupper details and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item. Also included is the placement of the reinforcement and grate as identified in the sidewalk scupper details.
N/AB130INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE , INCLUDING FORMWORKPlacing, consolidating, finishing and curing the PCC handicapped ramp including curb and gutter around the ramp, tapering from the base of the ramp to the full height curb and gutter, to the required thickness, grade, smoothness and finish specified within the limits identified in the sidewalk ramp detail. This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item.
A125B131SAWCUT WIDENING OF PORTLAND CEMENT
CONCRETE JOINT FOR JOINT SEALANTLaying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item.
A126N/ACUT/WIDEN JOINTS IN ASPHALT FOR JOINT SEALANTLaying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item.
A127N/AINSTALL NEW HOT POUR JOINT SEALANT IN ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKERRemoving foreign material from cracks by blowing with high pressure air, high pressure water and/or mechanical means, drying crack and filling joint with specified sealant.
A128B132INSTALL PREFORMED JOINT SEAL IN
CONCRETERemoving foreign material from cracks by blowing with high pressure air, high pressure water and/or mechanical means, drying crack and filling joint with specified sealant.
A129B133INSTALL TOPSOIL TO 6" DEPTH; INCLUDES SUPPLY, PLACE AND FINISH GRADEObtaining, loading, hauling, dumping, grading and compacting topsoil material to the limits, depths and grades identified in the Task Order, and maintaining the surface ready for planting. This item includes scarification of sub grade prior to placing topsoil, and layout and survey work required to grade the topsoil to the limits, thickness and grades identified in the Task Order.
A130B134INSTALL HYDROSEED MIXScarifying soil for planting, applying fertilizer, grass seed and cover mix, and maintaining seeded area through the establishment period.
A131B135INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; UP TO 6" PIECESObtaining, loading, hauling, and dumping material at the location specified in the Task Order.
N/AB136INSTALL BULL ROCK OR RIP-RAP FOR
EROSION CONTROL; 12"+ PIECESObtaining, loading, hauling, and dumping material at the location specified in the Task Order.
A132N/ANEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINESLaying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item.
A133N/APAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINESLaying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item.
N/AB137NEW PAVEMENT MARKINGS, METHYL
METHACRYLATE, 4" LINESLaying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item.
N/AB138NEW PAVEMENT MARKINGS, LOW VOC
SOLVENT BASED, 4" LINESLaying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item.
N/AB139PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC…Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item.
A134B140CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSALRemoval of trees, shrubs, stumps and rubbish from the areas specified in the Task Order. This also includes hauling and disposing of the material at approved location identified in the Task Order.
A135B141INSTALL SAND FOR CONDUIT BEDDINGIncludes only the placement of sand for conduit bedding at the depth outlined in the Task Order. This item does not include any excavation or any other work associated with placing conduit.
A136B142INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPEInstallation of Corrugated Metal Pipe (CMP) culvert pipe with connections to grade with bedding and compaction to 12" over top of pipe. Also install a culvert thaw pipe including all supports, anchors and standpipes. This item also includes layout and survey work required to meet drainage as identified in the Task Order. Excavation and backfill above the bedding is not a part of this item.
A137B143INSTALL GEOTEXTILE FABRICInstallation of stabilization fabric on a prepared surface to the limits identified in the Task Order including smoothing the fabric with proper seams and overlaps, and retaining the fabric in place until suitably covered by subsequent construction. Also included is clean up and disposal of all trash and debris created from this work. Preparing of the surface for fabric is not a part of this item.
A138B144PERFORM PETROLEUM CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSPerform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies.
A139B145REMOVE, HAUL & DISPOSE OF PETROLEUM CONTAMINATED SOIL IAW ADEC REQUIREMENTSIncludes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation.
A140B146PERFORM PFOS/PFOA CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSPerform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies.
A141B147REMOVE, HAUL & DISPOSE OF PFOS/PFOA
CONTAMINATED SOIL IAW ADEC REQUIREMENTSIncludes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation.
A142B148PERFORM VOC/SVOC CONTAMINATED
SOIL TESTING IAW ADEC REQUIREMENTSPerform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies.
A143B149REMOVE, HAUL & DISPOSE OF VOC/SVOC
CONTAMINATED SOIL IAW ADEC REQUIREMENTSIncludes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation.
A144N/AINSTALL PETROLEUM RESISTANT SEAL
COATPreparation of the placement surface by cleaning and sweeping and application to the limits identified in the Task Order. This includes cleanup of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance. This item also includes all calibration and test placements within or outside of the work area required to obtain the specified distribution.
N/AB150INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKExcavating, placing support post, conduit and concrete, placing and compacting fill material, placing and compacting base aggregate material, installing and connecting receptacle assembly and connection of the wiring to the existing power transformer. This item includes layout, concrete forming, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place post.
N/AB151INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORKExcavating, placing support post, conduit and concrete, placing and compacting fill material, placing and compacting base aggregate material, installing and connecting receptacle assembly and connection of the wiring to the existing power transformer. This item includes layout, concrete forming, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place post.
N/AB152INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRINGExcavating, placing conduit with wiring, placing and compacting fill material, placing and compacting base aggregate material. This item includes layout, and removal, hauling and disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place conduit.
N/AB153INSTALL EROSION CONTROLObtaining and placing material at the location specified in the Task Order.