This document contains a pricing sheet and definitions for a multiple award task order contract for paving services at military installations in interior Alaska. The contract will be administered by 354th Civil Engineer Squadron at Eielson Air Force Base but Fort Wainwright and Fort Greely will also be able to place task orders against it.
The pricing sheet contains over 150 line items for demolition, site preparation, paving, finishing work, and miscellaneous tasks for both airfield and non-airfield projects. Definitions are provided for each line item. Task orders will include requirements for asphalt and concrete work, signage, fencing, contaminated soil remediation, and installation of electric vehicle charging stations. Responses are due under solicitation FA500420R0001. The Department of the Air Force Pacific Air Forces is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA-4, WD20200007 7FEB20.pdf | ||
| JA-6, Financial Information Request 14FEB20.pdf | ||
| JA-5, Bonding Information Request 14FEB20.pdf | ||
| Solicitation Amendment FA500420R00010001 SF 30.pdf | ||
| JA-6, Financial Information Request.pdf | ||
| JA-2, Specifications 4FEB20.pdf | ||
| JA-2-5, Ft Greely Contractor Access Spec Addendum 3JUN11.pdf | ||
| JA-2-4, Ft Greely MDC Spec Addendum 6AUG15.pdf | ||
| JA-4, WD AK20200006 3JAN20.pdf | ||
| FA500420R0001.pdf | ||
| JA-2-1, Eielson Environmental Spec Addendum 4FEB20.pdf | ||
| JA-2-2, Ft Wainwright Environmental Spec Addendum 7SEP19.pdf | ||
| JA-2-6, Ft Greely MDC Special Requirements Spec Addendum 25SEP19.pdf | ||
| JA-5, Bonding Information Request.pdf | ||
| JA-3, Typical Drawings 2019 Edition.pdf | ||
| JA-2-3, Ft Wainwright ATFP_OPSEC Addendum 23JAN20.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Data Sheet-Airfield
| DEMOLITION OF AIRFIELD PAVEMENTS | CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT PRICE | QUANTITY | TOTAL | |
| A100 | SAWCUT NEW OR EXISTING ASPHALT, | ||||||
| EXCLUDES JOINT CUTTING/ WIDENING | FT - IN | $ - 0 | |||||
| A101 | SAWCUT NEW OR EXISTING PORTLAND | ||||||
| CEMENT CONCRETE | FT - IN | $ - 0 | |||||
| A102 | REMOVE EXISTING ASPHALT TO SPECIFIED | ||||||
| THICKNESS, HAULING OFF BASE | SY - IN | $ - 0 | |||||
| A103 | COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASE | SY - IN | $ - 0 | ||||
| A104 | REMOVE EXISTING CONCRETE SLABS- | ||||||
| UNREINFORCED, ON-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| A105 | REMOVE EXISTING CONCRETE SLABS- | ||||||
| UNREINFORCED, OFF-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| A106 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||||||
| REINFORCED, ON-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| A107 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||||||
| REINFORCED, OFF-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| A108 | REMOVE EXISTING CULVERT AS SPECIFIED, | ||||||
| OFF-BASE DISPOSAL | LF | $ - 0 | |||||
| A109 | REMOVAL OF PAVEMENT MARKINGS | SF | $ - 0 | ||||
| AIRFIELD SITE PREPARATION | A110 | EXCAVATE EXISTING BASE, SUBBASE, | |||||
| STONE OR TOPSOIL; ON-BASE DISPOSAL | CY | $ - 0 | |||||
| A111 | EXCAVATE EXISTING BASE, SUBBASE, | ||||||
| STONE OR TOPSOIL; OFF-BASE DISPOSAL | CY | $ - 0 | |||||
| A112 | REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | ||||
| A113 | SCARIFY, FINISH GRADE & COMPACT | ||||||
| EXISTING BASE COURSE | SY | $ - 0 | |||||
| A114 | NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACT | CY | $ - 0 | ||||
| A115 | NEW SUBBASE, RECLAIMED ASPHALT FROM | ||||||
| BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| A116 | NEW BASE COURSE (D-1), INCLUDES SUPPLY, | ||||||
| PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| A117 | NEW BASE COURSE (RECLAIMED ASPHALT | ||||||
| FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| A118 | PULVERIZE ASPHALT AND BASE COURSE IN | ||||||
| PLACE TO SPECIFIED DEPTH, INCLUDES REGRADE AND COMPACT TO SPEC DENSITY | SY | $ - 0 | |||||
| AIRFIELD PAVING | A119 | NEW ASPHALT PAVEMENT, INCLUDES | |||||
| SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITY | TON | $ - 0 | |||||
| A120 | CONSTRUCT CONCRETE SLABS- | ||||||
| UNREINFORCED | CY | $ - 0 | |||||
| A121 | CONSTRUCT CONCRETE SLABS- | ||||||
| REINFORCED | CY | $ - 0 | |||||
| A122 | INSTALL MISCELLANEOUS CONCRETE, | ||||||
| INCLUDES FORMWORK AND FINISHING, | CY | $ - 0 | |||||
| A123 | ADD STEEL REINFORCEMENT, | ||||||
| #4 TO #8 BARS | TON | $ - 0 | |||||
| A124 | DOWELS SUPPLIED IN FORM EDGES OR | ||||||
| DRILLED INTO EXISTING CONCRETE | EA | $ - 0 | |||||
| AIRFIELD FINISH WORK | A125 | SAWCUT WIDENING OF PORTLAND CEMENT | |||||
| CONCRETE JOINT FOR JOINT SEALANT | LF | $ - 0 | |||||
| A126 | CUT/WIDEN JOINTS IN ASPHALT FOR JOINT | ||||||
| SEALANT | LF | $ - 0 | |||||
| A127 | INSTALL NEW HOT POUR JOINT SEALANT IN | ||||||
| ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER | LF | $ - 0 | |||||
| A128 | INSTALL PREFORMED JOINT SEAL IN | ||||||
| CONCRETE | LF | $ - 0 | |||||
| A129 | INSTALL TOPSOIL TO SPECIFIED DEPTH; INCLUDES | ||||||
| SUPPLY, PLACE AND FINISH GRADE | SY | $ - 0 | |||||
| A130 | INSTALL HYDROSEED MIX | SY | $ - 0 | ||||
| A131 | INSTALL BULL ROCK OR RIP-RAP FOR | ||||||
| EROSION CONTROL | CY | $ - 0 | |||||
| A132 | NEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINES | SF | $ - 0 | ||||
| A133 | PAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINES | SF | $ - 0 | ||||
| A134 | CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSAL | SY | $ - 0 | ||||
| AIRFIELD MISCELLANEOUS | A135 | INSTALL SAND FOR CONDUIT BEDDING | CY | $ - 0 | |||
| A136 | INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPE | LF | $ - 0 | ||||
| A137 | INSTALL GEOTEXTILE FABRIC | SY | $ - 0 | ||||
| A138 | PERFORM PETROLEUM CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| A139 | REMOVE, HAUL & DISPOSE OF PETROLEUM | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| A140 | PERFORM PFOS/PFOA CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| A141 | REMOVE, HAUL & DISPOSE OF PFOS/PFOA | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| A142 | PERFORM VOC/SVOC CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| A143 | REMOVE, HAUL & DISPOSE OF VOC/SVOC | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| A144 | INSTALL PETROLEUM RESISTANT SEAL | ||||||
| COAT | SY | $ - 0 | |||||
| TOTAL PRICE | $ - 0 |
JA-1, PROJECT PRICING DATA SHEET 04FEB20
AIRFIELD
Pricing Data Sheet-Non-airfield
| DEMOLITION OF NON-AIRFIELD PAVEMENTS | CLIN | DESCRIPTION | UNIT OF ISSUE | UNIT PRICE | QUANTITY | TOTAL | |
| B100 | SAWCUT NEW OR EXISTING ASPHALT, | ||||||
| EXCLUDES JOINT CUTTING/ WIDENING | FT - IN | $ - 0 | |||||
| B101 | SAWCUT NEW OR EXISTING PORTLAND | ||||||
| CEMENT CONCRETE | FT - IN | $ - 0 | |||||
| B102 | REMOVE EXISTING ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASE | SY - IN | $ - 0 | ||||
| B103 | COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS & HAULING OFF BASE | SY - IN | $ - 0 | ||||
| B104 | REMOVE EXISTING CONCRETE SLABS- | ||||||
| UNREINFORCED, ON-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| B105 | REMOVE EXISTING CONCRETE SLABS- | ||||||
| UNREINFORCED, OFF-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| B106 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||||||
| REINFORCED, ON-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| B107 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||||||
| REINFORCED, OFF-BASE DISPOSAL | SY - IN | $ - 0 | |||||
| B108 | REMOVE CURB & GUTTER, CURB ONLY, OR | ||||||
| VALLEY GUTTERS,CONTINUOUS | LF | $ - 0 | |||||
| B109 | REMOVE CONCRETE SIDEWALK, OFF-BASE DISPOSAL | ||||||
| SF | $ - 0 | ||||||
| B110 | REMOVE EXISTING CULVERT, OFF-BASE DISPOSAL | LF | $ - 0 | ||||
| B111 | REMOVAL OF PAVEMENT MARKINGS | SF | $ - 0 | ||||
| NON-AIRFIELD SITE PREPARATION | B112 | EXCAVATE EXISTING BASE, SUBBASE, | |||||
| STONE OR TOPSOIL; ON-BASE DISPOSAL | CY | $ - 0 | |||||
| B113 | EXCAVATE EXISTING BASE, SUBBASE, | ||||||
| STONE OR TOPSOIL; OFF-BASE DISPOSAL | CY | $ - 0 | |||||
| B114 | REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | ||||
| B115 | SCARIFY, FINISH GRADE & COMPACT | ||||||
| EXISTING BASE COURSE | SY | $ - 0 | |||||
| B116 | NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACT | CY | $ - 0 | ||||
| B117 | NEW SUBBASE, RECLAIMED ASPHALT FROM | ||||||
| BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| B118 | NEW BASE COURSE (D-1), INCLUDES SUPPLY, | ||||||
| PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| B119 | NEW BASE COURSE (RECLAIMED ASPHALT | ||||||
| FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | CY | $ - 0 | |||||
| B120 | PULVERIZE ASPHALT AND BASE COURSE IN | ||||||
| PLACE TO SPECIFIED DEPTH, INCLUDES REGRADE AND COMPACT TO SPEC DENSITY | SY | $ - 0 | |||||
| NON-AIRFIELD PAVING | B121 | NEW ASPHALT PAVEMENT, INCLUDES | |||||
| SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITY | TON | $ - 0 | |||||
| B122 | CONSTRUCT CONCRETE SLABS- UNREINFORCED | CY | $ - 0 | ||||
| B123 | CONSTRUCT CONCRETE SLABS- REINFORCED | CY | $ - 0 | ||||
| B124 | INSTALL MISCELLANEOUS CONCRETE, | ||||||
| INCLUDES FORMWORK AND FINISHING | CY | $ - 0 | |||||
| B125 | ADD STEEL REINFORCEMENT | ||||||
| #4 TO #8 BARS | TON | $ - 0 | |||||
| B126 | DOWELS SUPPLIED IN FORM EDGES OR | ||||||
| DRILLED INTO EXISTING CONCRETE | EA | $ - 0 | |||||
| B127 | INSTALL CURB & GUTTER, CURB ONLY, OR | ||||||
| VALLEY GUTTERS, CONTINUOUS | LF | $ - 0 | |||||
| B128 | CONSTRUCT NEW FIBER REINFORCED | ||||||
| CONCRETE SIDEWALK | SF | $ - 0 | |||||
| B129 | INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK, REINFORCEMENT AND GRATE | EA | $ - 0 | ||||
| B130 | INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE , INCLUDING FORMWORK | EA | $ - 0 | ||||
| NON-AIRFIELD FINISH WORK | B131 | SAWCUT WIDENING OF PORTLAND CEMENT | |||||
| CONCRETE JOINT FOR JOINT SEALANT | LF | $ - 0 | |||||
| B132 | INSTALL PREFORMED JOINT SEAL IN CONCRETE | LF | $ - 0 | ||||
| B133 | INSTALL TOPSOIL TO SPECIFIED DEPTH; INCLUDES | ||||||
| SUPPLY, PLACE AND FINISH GRADE | SY | $ - 0 | |||||
| B134 | INSTALL HYDROSEED MIX | SY | $ - 0 | ||||
| B135 | INSTALL BULL ROCK OR RIP-RAP FOR | ||||||
| EROSION CONTROL; UP TO 6" PIECES | CY | $ - 0 | |||||
| B136 | INSTALL BULL ROCK OR RIP-RAP FOR | ||||||
| EROSION CONTROL; 12"+ PIECES | CY | $ - 0 | |||||
| B137 | NEW PAVEMENT MARKINGS, METHYL | ||||||
| METHACRYLATE, 4" LINES | LF | $ - 0 | |||||
| B138 | NEW PAVEMENT MARKINGS, LOW VOC | ||||||
| SOLVENT BASED, 4" LINES | LF | $ - 0 | |||||
| B139 | PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC… | SF | $ - 0 | ||||
| B140 | CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSAL | SY | $ - 0 | ||||
| NON-AIRFIELD MISCELLANEOUS | B141 | INSTALL SAND FOR CONDUIT BEDDING | CY | $ - 0 | |||
| B142 | INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPE | LF | $ - 0 | ||||
| B143 | INSTALL GEOTEXTILE FABRIC | SY | $ - 0 | ||||
| B144 | PERFORM PETROLEUM CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| B145 | REMOVE, HAUL & DISPOSE OF PETROLEUM | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| B146 | PERFORM PFOS/PFOA CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| B147 | REMOVE, HAUL & DISPOSE OF PFOS/PFOA | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| A148 | PERFORM VOC/SVOC CONTAMINATED | ||||||
| SOIL TESTING IAW ADEC REQUIREMENTS | EA | $ - 0 | |||||
| A149 | REMOVE, HAUL & DISPOSE OF VOC/SVOC | ||||||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | CY | $ - 0 | |||||
| B150 | INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORK | EA | $ - 0 | ||||
| B151 | INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORK | EA | $ - 0 | ||||
| B152 | INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRING | LF | $ - 0 | ||||
| B153 | INSTALL EROSION CONTROL | ||||||
| TOTAL PRICE | $ - 0 |
JA-1 PROJECT PRICING DATA SHEET 4 FEB20
NON-AIRFIELD
Definitions of items
| AIRFIELD | NON-AIRFILED | DESCRIPTION | DEFINITION | |
| A100 | B100 | SAWCUT NEW OR EXISTING ASPHALT, | ||
| EXCLUDES JOINT CUTTING/ WIDENING | Laying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item. | |||
| A101 | B101 | SAWCUT NEW OR EXISTING PORTLAND | ||
| CEMENT CONCRETE | Laying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item. | |||
| A102 | B102 | REMOVE EXISTING ASPHALT TO SPECIFIED | ||
| THICKNESS, HAULING OFF BASE | Complete removal of the existing AC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at a location off base. | |||
| A103 | B103 | COLD-MILLING OF ASPHALT TO SPECIFIED THICKNESS, HAULING OFF BASE | Set up and milling of AC pavement to the limits, grades (slopes) and depths identified in the Task Order. Also included is cleanup, loading, hauling and dumping of the milled material at a location off base. | |
| A104 | B104 | REMOVE EXISTING CONCRETE SLABS- | ||
| UNREINFORCED, ON-BASE DISPOSAL | Complete removal of the existing PCC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |||
| A105 | B105 | REMOVE EXISTING CONCRETE SLABS- | ||
| UNREINFORCED, OFF-BASE DISPOSAL | Complete removal of the existing PCC pavement to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |||
| A106 | B106 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||
| REINFORCED, ON-BASE DISPOSAL | Additional cost for removing reinforcement in the existing PCC pavement within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |||
| A107 | B107 | ADDITIONAL REMOVAL COST IF CONCRETE IS | ||
| REINFORCED, OFF-BASE DISPOSAL | Additional cost for removing reinforcement in the existing PCC pavement within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |||
| N/A | B108 | REMOVE CURB & GUTTER, CURB ONLY, OR VALLEY GUTTERS,CONTINUOUS | Complete removal of the existing PCC gutter, curb and gutter, or gutter to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |
| N/A | B109 | REMOVE CONCRETE SIDEWALK, OFF-BASE DISPOSAL | Complete removal of the existing PCC sidewalk to the base aggregate level, within the limits of area identified by the Task Order. Also included is loading, hauling and dumping at approved location. | |
| A108 | B110 | REMOVE EXISTING CULVERT, 12" TO 24", | ||
| OFF-BASE DISPOSAL | Removal of culvert pipe including connections. This item includes the removal and hauling and dumping at an approved location. This does not include excavation. | |||
| A109 | B111 | REMOVAL OF PAVEMENT MARKINGS | Removal of pavement markings to the limits identified in the Task Order. Also included is the cleaning and disposal of the removed pavement markings. | |
| A110 | B112 | EXCAVATE EXISTING BASE, SUBBASE, | ||
| STONE OR TOPSOIL; ON-BASE DISPOSAL | Excavation of soil, aggregate and other earthen materials to the limits and grades identified in the Task Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Task Order and hauling to approved location. | |||
| A111 | B113 | EXCAVATE EXISTING BASE, SUBBASE, | ||
| STONE OR TOPSOIL; OFF-BASE DISPOSAL | Excavation of soil, aggregate and other earthen materials to the limits and grades identified in the Task Order. Does not include concrete type materials or timber and brush required to be removed before earthen excavation can begin. Also included is all layout and survey work required to excavate to the limits and grades identified in the Task Order and hauling to approved location. | |||
| A112 | B114 | REUSE EXISTING/ STOCKPILED ONSITE MATERIAL AS SUBBASE, STRUCTURAL FILL, INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | Grading and compacting stockpiled soil and/or aggregate to the limits and grades identified in the Task Order. This item does include redistribution of sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Also included is the hauling of the material from the project site stockpile. | |
| A113 | B115 | SCARIFY, FINISH GRADE & COMPACT | ||
| EXISTING BASE COURSE | Grading and compacting in situ soil and/or aggregate to the limits and grades identified in the Task Order. This item does include redistribution of base course/ sub grade material as normally performed by a grader to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. | |||
| A114 | B116 | NEW SUBBASE, STRUCTURAL FILL, INCLUDES SUPPLY, PLACE, GRADE & COMPACT | Obtaining, loading, hauling, dumping, grading and compacting subbase aggregate material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the Contracting Officer. | |
| A115 | B117 | NEW SUBBASE, RECLAIMED ASPHALT FROM | ||
| BASE STOCKPILE; INCLUDES PLACE, GRADE & COMPACT TO SPEC DENSITY | Obtaining, loading, hauling, dumping, grading and compacting subbase course reclaimed asphalt material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile. | |||
| A116 | B118 | NEW BASE COURSE (D-1), INCLUDES SUPPLY, | ||
| PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | Obtaining, loading, hauling, dumping, grading and compacting high fracture D-1 base aggregate material to the limits, depths and grades identified in the Task Order, and maintaining compacted surface clean and ready for paving operations until subsequent operations take place. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. High fracture D-1 Aggregate material shall be obtained by the Contractor, off base, unless otherwise authorized by the Contracting Officer. | |||
| A117 | B119 | NEW BASE COURSE (RECLAIMED ASPHALT | ||
| FROM BASE STOCKPILE, PLACE, FINISH GRADE & COMPACT TO SPEC DENSITY | Obtaining, loading, hauling, dumping, grading and compacting base course reclaimed asphalt material to the limits, depths and grades identified in the Task Order. Also included is the distribution of fill material to meet grades and all layout, survey work and compaction testing required to grade and compact to the limits and grades identified in the Task Order. Reclaimed asphalt material shall be obtained by the Contractor from the on base stockpile. | |||
| A118 | B120 | PULVERIZE ASPHALT AND BASE COURSE IN | ||
| PLACE TO 6", INCLUDES REGRADE AND COMPACT TO SPEC DENSITY | Pulverizing the existing AC (Asphalt Concrete) pavement in place by use of a pulverizing machine or other equipment to break up the pavement to the required size limit, grading and compacting in place for use as road base course to the limits identified in the Task Order. Also included is clean up of pavement debris lost outside of the compacted base area. | |||
| A119 | B121 | NEW ASPHALT PAVEMENT, INCLUDES | ||
| SUPPLY, PLACE, GRADE AND COMPACT TO SPEC DENSITY | Placing and compacting new asphalt to the required thickness in no more than 2” lifts, grade, smoothness and compaction specified, within the limits identified in the Task Order. Also includes hauling of asphalt material from the asphalt mixing plant, layout, survey work, density testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Also included is distributing asphalt prime coat and/ or tack coat at the proper rate and distribution coverage, to the limits identified in the Task Order and preparation of the surface by removing any loose or objectionable materials such as uncompacted aggregate, debris or vegetation spilled on the compacted surface after final grading and compaction of the base. This item also includes clean-up of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance and all calibration and test patterns within or outside of the work area required to obtain the specified distribution. Preparation of the base course surface is not a part of this item. | |||
| A120 | B122 | CONSTRUCT CONCRETE SLABS- | ||
| UNREINFORCED | Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item. | |||
| A121 | B123 | CONSTRUCT CONCRETE SLABS- | ||
| REINFORCED | Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item. | |||
| A122 | B124 | INSTALL MISCELLANEOUS CONCRETE, | ||
| INCLUDES FORMWORK AND FINISHING, | Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. Also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing and core sampling, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the base course surface is not a part of this item. | |||
| A123 | B125 | ADD STEEL REINFORCEMENT, | ||
| #4 TO #8 BARS | This includes preparation of PCC for reinforcement or dowels, hauling of material, and placement of material. | |||
| A124 | B126 | DOWELS SUPPLIED IN FORM EDGES OR | ||
| DRILLED INTO EXISTING CONCRETE | This includes preparation of PCC for reinforcement or dowels, hauling of material, and placement of material. | |||
| N/A | B127 | INSTALL CURB & GUTTER, CURB ONLY, OR | ||
| VALLEY GUTTERS, CONTINUOUS | Placing, consolidating, finishing and curing PCC curb, curb and gutter, or gutter to the required configuration, grade, smoothness and finish specified within the limits identified in the Task Order. This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing, required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new curb, curb and gutter, or gutter where old curb, curb and gutter, or gutter has been removed is a part of this item. | |||
| N/A | B128 | CONSTRUCT NEW FIBER REINFORCED | ||
| CONCRETE SIDEWALK | Placing, consolidating, finishing and curing PCC to the required thickness, grade, smoothness and finish specified within the limits identified in the Task Order. This item also includes layout, survey work, forming, transverse expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new sidewalk where old sidewalk has been removed is a part of this item. | |||
| N/A | B129 | INSTALL SIDEWALK SCUPPER WITH 4 FT SPILLWAY INCLUDES FORMWORK, REINFORCEMENT AND GRATE | Placing, consolidating, finishing and curing the PCC sidewalk scupper and spillway including curb and gutter around the scupper This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the sidewalk scupper details and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item. Also included is the placement of the reinforcement and grate as identified in the sidewalk scupper details. | |
| N/A | B130 | INSTALL CURB RAMP WITH CAST IN PLACE DETECTABLE WARNING TILE , INCLUDING FORMWORK | Placing, consolidating, finishing and curing the PCC handicapped ramp including curb and gutter around the ramp, tapering from the base of the ramp to the full height curb and gutter, to the required thickness, grade, smoothness and finish specified within the limits identified in the sidewalk ramp detail. This item also includes layout, survey work, forming, expansion, contraction and construction joints, field and strength testing required to meet the limits and grades identified in the Task Order and as specified for quality control. Preparation of the placement surface including minor excavation, grading and compaction such as is associated with installing new ramp where old ramp or sidewalk has been removed is a part of this item. | |
| A125 | B131 | SAWCUT WIDENING OF PORTLAND CEMENT | ||
| CONCRETE JOINT FOR JOINT SEALANT | Laying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item. | |||
| A126 | N/A | CUT/WIDEN JOINTS IN ASPHALT FOR JOINT SEALANT | Laying out cut location and accurately sawing pavement to the limits and depth identified in the Task Order. Cleanup of cutting residue is a part of this item. | |
| A127 | N/A | INSTALL NEW HOT POUR JOINT SEALANT IN ASPHALTIC CEMENT CONCRETE INCLUDES BACKERROD/BOND BREAKER | Removing foreign material from cracks by blowing with high pressure air, high pressure water and/or mechanical means, drying crack and filling joint with specified sealant. | |
| A128 | B132 | INSTALL PREFORMED JOINT SEAL IN | ||
| CONCRETE | Removing foreign material from cracks by blowing with high pressure air, high pressure water and/or mechanical means, drying crack and filling joint with specified sealant. | |||
| A129 | B133 | INSTALL TOPSOIL TO 6" DEPTH; INCLUDES SUPPLY, PLACE AND FINISH GRADE | Obtaining, loading, hauling, dumping, grading and compacting topsoil material to the limits, depths and grades identified in the Task Order, and maintaining the surface ready for planting. This item includes scarification of sub grade prior to placing topsoil, and layout and survey work required to grade the topsoil to the limits, thickness and grades identified in the Task Order. | |
| A130 | B134 | INSTALL HYDROSEED MIX | Scarifying soil for planting, applying fertilizer, grass seed and cover mix, and maintaining seeded area through the establishment period. | |
| A131 | B135 | INSTALL BULL ROCK OR RIP-RAP FOR | ||
| EROSION CONTROL; UP TO 6" PIECES | Obtaining, loading, hauling, and dumping material at the location specified in the Task Order. | |||
| N/A | B136 | INSTALL BULL ROCK OR RIP-RAP FOR | ||
| EROSION CONTROL; 12"+ PIECES | Obtaining, loading, hauling, and dumping material at the location specified in the Task Order. | |||
| A132 | N/A | NEW PAVEMENT MARKINGS, WATERBORNE PAINT, 6" LINES | Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item. | |
| A133 | N/A | PAINT AIRFIELD MARKINGS, WATERBORNE, OTHER THAN 6" LINES | Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item. | |
| N/A | B137 | NEW PAVEMENT MARKINGS, METHYL | ||
| METHACRYLATE, 4" LINES | Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item. | |||
| N/A | B138 | NEW PAVEMENT MARKINGS, LOW VOC | ||
| SOLVENT BASED, 4" LINES | Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item. | |||
| N/A | B139 | PAINT PAVEMENT, LOW VOC SOLVENT BASED, MARKINGS, ARROWS, ETC… | Laying out and striping pavement to the configuration and limits identified in the Task Order. Cleaning and preparation of the surface for paint is a part of this item. | |
| A134 | B140 | CLEARING AND GRUBBING, INCLUDES HAULING & DISPOSAL | Removal of trees, shrubs, stumps and rubbish from the areas specified in the Task Order. This also includes hauling and disposing of the material at approved location identified in the Task Order. | |
| A135 | B141 | INSTALL SAND FOR CONDUIT BEDDING | Includes only the placement of sand for conduit bedding at the depth outlined in the Task Order. This item does not include any excavation or any other work associated with placing conduit. | |
| A136 | B142 | INSTALL NEW CMP CULVERT IAW SPEC SIZE AND SHAPE | Installation of Corrugated Metal Pipe (CMP) culvert pipe with connections to grade with bedding and compaction to 12" over top of pipe. Also install a culvert thaw pipe including all supports, anchors and standpipes. This item also includes layout and survey work required to meet drainage as identified in the Task Order. Excavation and backfill above the bedding is not a part of this item. | |
| A137 | B143 | INSTALL GEOTEXTILE FABRIC | Installation of stabilization fabric on a prepared surface to the limits identified in the Task Order including smoothing the fabric with proper seams and overlaps, and retaining the fabric in place until suitably covered by subsequent construction. Also included is clean up and disposal of all trash and debris created from this work. Preparing of the surface for fabric is not a part of this item. | |
| A138 | B144 | PERFORM PETROLEUM CONTAMINATED | ||
| SOIL TESTING IAW ADEC REQUIREMENTS | Perform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies. | |||
| A139 | B145 | REMOVE, HAUL & DISPOSE OF PETROLEUM CONTAMINATED SOIL IAW ADEC REQUIREMENTS | Includes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation. | |
| A140 | B146 | PERFORM PFOS/PFOA CONTAMINATED | ||
| SOIL TESTING IAW ADEC REQUIREMENTS | Perform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies. | |||
| A141 | B147 | REMOVE, HAUL & DISPOSE OF PFOS/PFOA | ||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | Includes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation. | |||
| A142 | B148 | PERFORM VOC/SVOC CONTAMINATED | ||
| SOIL TESTING IAW ADEC REQUIREMENTS | Perform contaminated soil testing as outlined in the specifications. Includes preparing a Sampling and Analysis plan and field screening as approved by the installation and approriate agencies. | |||
| A143 | B149 | REMOVE, HAUL & DISPOSE OF VOC/SVOC | ||
| CONTAMINATED SOIL IAW ADEC REQUIREMENTS | Includes any temporary means of storing contaminated material until hauling and disposal is done. This item does not include excavation. | |||
| A144 | N/A | INSTALL PETROLEUM RESISTANT SEAL | ||
| COAT | Preparation of the placement surface by cleaning and sweeping and application to the limits identified in the Task Order. This includes cleanup of spills or inaccurate placements onto surfaces outside of the area identified, to eliminate any environmental concerns and correct misplacements that are unsightly or a nuisance. This item also includes all calibration and test placements within or outside of the work area required to obtain the specified distribution. | |||
| N/A | B150 | INSTALL 2 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORK | Excavating, placing support post, conduit and concrete, placing and compacting fill material, placing and compacting base aggregate material, installing and connecting receptacle assembly and connection of the wiring to the existing power transformer. This item includes layout, concrete forming, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place post. | |
| N/A | B151 | INSTALL 4 OUTLET HEAD BOLT OUTLET TO INCLUDE VANTERA, INC INTELLIGENT PARKING LOT CONTROLLER (IPLC), JUNCTION BOX(S), PANELBOARD, AND ASSOCIATED WORK | Excavating, placing support post, conduit and concrete, placing and compacting fill material, placing and compacting base aggregate material, installing and connecting receptacle assembly and connection of the wiring to the existing power transformer. This item includes layout, concrete forming, and removal, hauling and on base disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place post. | |
| N/A | B152 | INSTALL 2" PVC ELECTRICAL CONDUIT AND ASSOCIATED HBO WIRING | Excavating, placing conduit with wiring, placing and compacting fill material, placing and compacting base aggregate material. This item includes layout, and removal, hauling and disposal of excavated soil. This item does not include removal and replacement of pavement surfaces to place conduit. | |
| N/A | B153 | INSTALL EROSION CONTROL | Obtaining and placing material at the location specified in the Task Order. |