Attachment 3 - Specifications REV001.pdf
PDF 11 MB Posted
- Attached to
- FXSB 17-4704 Repair Tank Farm 3 and 4
- Solicitation number
- FA500023B0001
About this file
This solicitation seeks proposals to repair two fuel storage tank farms at a Department of the Air Force base in Alaska. The consolidated project will demolish aging underground storage tanks and infrastructure at Tank Farms 3 and 4, and reconstruct a new consolidated storage and distribution system at Tank Farm 4. The new system will include six 50,000-gallon double-wall tanks for JP-8 fuel and one 25,000-gallon double-wall tank for ultra-low sulfur diesel. Additional requirements include constructing a new filter building, control room, motor control center, truck loading area, and return to bulk station. A new retail fuel station with dispensers will also be built to replace Tank Farm 3. Proposals are due by June 1, 2023, and questions regarding the specifications must be submitted by June 1. An optional site visit will be held on May 24, 2023 to inspect the work areas. Payment and performance bonds are required, and the project value is estimated between $10-25 million.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tank Farm #3 and #4 Reconstruction, JBER, Alaska JBE057058
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 73 00.00 29 4/12/2013 SPECIAL CONTRACT REQUIREMENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 19 30.00 29 04/16/12 SPECIAL ITEMS
01 32 01.00 10 02/15 PROJECT SCHEDULE
01 33 00 08/18 SUBMITTAL PROCEDURES
01 33 29 02/17 SUSTAINABILITY REPORTING
01 35 26 11/15 GOVERNMENTAL SAFETY REQUIREMENTS
01 36 00.00 29 10/01/10 RADIOACTIVE MATERIALS PROCEDURES
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/16 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.00 29 2/14/2016 CONTRACTOR QUALITY CONTROL
01 45 35 02/15 SPECIAL INSPECTIONS
01 57 20.01 29 05/12 ENVIRONMENTAL PROTECTION
01 57 34.00 29 04/22/13 STORM WATER POLLUTION PREVENTION
MEASURES
01 58 00 08/19 PROJECT IDENTIFICATION
01 74 19 02/19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 08/11 CLOSEOUT SUBMITTALS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION
02 61 13 02/19 EXCAVATION AND HANDLING OF
CONTAMINATED MATERIAL
02 65 00 02/10 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 11/18 ASBESTOS REMEDIATION
02 83 00 11/18 LEAD REMEDIATION
02 84 16 04/06 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 84 33 04/06 REMOVAL AND DISPOSAL OF
POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 12 00 08/18 STRUCTURAL STEEL
05 50 13 05/17 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17 METAL STAIRS
05 51 33 02/16 METAL LADDERS
05 52 00 02/18 METAL RAILINGS
05 59 10 08/18 ROLLING COVER FOR AVIATION REFUELING
VAULTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1
06 41 16.00 10 08/10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL
CABINETS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 08/11 BITUMINOUS DAMPPROOFING
07 27 10.00 10 08/19 BUILDING AIR BARRIER SYSTEM
07 41 63 11/16 FABRICATED ROOF PANEL ASSEMBLIES
07 42 63 05/11 FABRICATED WALL PANEL ASSEMBLIES
07 60 00 05/17 FLASHING AND SHEET METAL
07 84 00 05/10 FIRESTOPPING
07 92 00 08/16 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 02/10 STEEL DOORS AND FRAMES
08 53 00 08/11 PLASTIC WINDOWS
08 71 00 02/16 DOOR HARDWARE
08 81 00 05/19 GLAZING
DIVISION 09 - FINISHES
09 06 00 05/09 SCHEDULES FOR FINISHES
09 22 00 02/10 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/17 CERAMIC, QUARRY, AND GLASS TILING
09 90 00 05/11 PAINTS AND COATINGS
09 96 00 11/14 HIGH-PERFORMANCE COATINGS
09 97 13.15 02/15 LOW VOC POLYSULFIDE INTERIOR COATING
OF WELDED STEEL PETROLEUM FUEL TANKS
09 97 13.27 10/16 EXTERIOR COATING OF STEEL STRUCTURES
DIVISION 10 - SPECIALTIES
10 14 00.10 08/17 EXTERIOR SIGNAGE
10 28 13 08/17 TOILET ACCESSORIES
10 44 16 05/15 FIRE EXTINGUISHERS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 11/11 METAL BUILDING SYSTEMS
13 48 73 05/20, CHG 1: 08/20 SEISMIC CONTROL FOR MECHANICAL
EQUIPMENT
DIVISION 22 - PLUMBING
22 00 00 11/15 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 08/10 AIR SUPPLY, DISTRIBUTION, VENTILATION,
AND EXHAUST SYSTEMS
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 13 11/15 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 53.00 20 02/10 SPACE TEMPERATURE CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 2
23 09 93 11/15 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 31 13.00 40 05/16 METAL DUCTS
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLES
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 05 00.00 40 08/16 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 11/16 MEDIUM-VOLTAGE CABLES
26 05 19.10 10 05/16 INSULATED WIRE AND CABLE
26 05 48.00 10 10/07 SEISMIC PROTECTION FOR ELECTRICAL
EQUIPMENT
26 05 71.00 40 02/17 LOW VOLTAGE OVERCURRENT PROTECTIVE
DEVICES
26 08 00 08/08 APPARATUS INSPECTION AND TESTING
26 12 19.00 40 11/14 PAD-MOUNTED, LIQUID-FILLED,
MEDIUM-VOLTAGE TRANSFORMERS
26 20 00 02/14 INTERIOR DISTRIBUTION SYSTEM
26 24 13 05/15, CHG 1: 08/17 SWITCHBOARDS
26 27 14.00 10 02/11 ELECTRICITY METERING
26 27 14.00 20 02/11 ELECTRICITY METERING
26 28 00.00 10 10/07 MOTOR CONTROL CENTERS, SWITCHBOARDS
AND PANELBOARDS
26 28 21.00 40 05/17 AUTOMATIC TRANSFER SWITCHES
26 32 13.00 20 08/18 SINGLE OPERATION GENERATOR SETS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 41 00 11/13 LIGHTNING PROTECTION SYSTEM
26 42 13.00 20 04/06 CATHODIC PROTECTION BY GALVANIC ANODES
26 51 00 05/16 INTERIOR LIGHTING
26 56 00 05/13 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 08/11 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
31 09 20.00 29 09/11/2012 FIELD SCREEN TESTING OF SOILS FOR
CHEMICAL CONTAMINATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 08/08 FIELD MOLDED SEALANTS FOR SEALING
JOINTS IN RIGID PAVEMENTS
32 11 20 08/17 BASE COURSE AND SUBBASE
32 12 13 05/17 BITUMINOUS TACK AND PRIME COATS
32 12 16 08/09 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 14.13 08/19 CONCRETE PAVING FOR AIRFIELDS AND
OTHER HEAVY DUTY PAVEMENTS
32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 08/16 PAVEMENT MARKINGS
DIVISION 33 - UTILITIES
33 01 50.60 11/18 CLEANING OF PETROLEUM STORAGE TANKS
PROJECT TABLE OF CONTENTS Page 3
33 08 55 08/19 FUEL DISTRIBUTION SYSTEM START-UP
(NON-HYDRANT)
33 09 52 11/18 FUEL PUMP CONTROL AND ANNUNCIATION
SYSTEM (NON-HYDRANT)
33 11 00 02/18 WATER UTILITY DISTRIBUTION PIPING
33 30 00 05/18 SANITARY SEWERAGE
33 40 00 02/10 STORM DRAINAGE UTILITIES
33 52 10 11/18 FUEL SYSTEMS PIPING (SERVICE STATION)
33 52 23.15 11/18 POL SERVICE PIPING WELDING
33 52 40 11/18 FUEL SYSTEMS PIPING (NON-HYDRANT)
33 52 43.11 08/18 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.14 08/18 AVIATION FUEL CONTROL VALVES
33 52 43.23 08/18 AVIATION FUEL PUMPS
33 52 43.28 08/18 FILTER SEPARATOR, AVIATION FUELING
SYSTEM
33 52 80 02/10 LIQUID FUELS PIPELINE COATING SYSTEMS
33 56 10 05/19 FACTORY-FABRICATED FUEL STORAGE TANKS
33 57 55 11/18 FUEL SYSTEM COMPONENTS (NON-HYDRANT)
33 58 00 04/08 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 02/15 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 04/06 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 73 00.00 29
SPECIAL CONTRACT REQUIREMENTS
4/12/2013
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL SCR'S
1.2.1 SCR-GE010 Insurance - Work On A Government Installation:
1.2.2 SCR-GE040 Self Performance Of Work By The Contractor:
1.2.3 SCR-GE050 Coordination With Other Contractors:
1.2.4 SCR-GE060 Qualifications Of The Contractor Quality Control
Systems Manager (CQCSM):
1.2.5 SCR-GE070 Requirements For Contractors Performance Evaluation:
1.2.6 SCR-GE102 Contractor Supply and Use of Electronic Software for
Processing DAVIS-BACON ACT Certified Labor Payrolls (April 2011):
1.2.7 SCR-GE103 Contractor Manpower Reporting
1.2.8 SCR-GE104 Veterans Employment Emphasis for USACE Contracts
1.2.9 SCR-GE112 Equipment Ownership and Operating Expense Schedule
(MAR 1995)
1.2.10 SCR-GE117 Variations In Estimated Quantities, Subdivided
Items
1.3 SAFETY/SITE/SECURITY SCR'S
1.3.1 SCR-SS010 Safety And Health Requirements Manual:
1.3.2 SCR-SS030 Communication Security:
1.3.3 SCR-SS060 Preservation Of Historical, Archaeological &
Cultural Resources:
1.3.4 SCR-SS070 Time Extensions For Unusually Severe Weather (ER
415-1-15, 31 OCT 89):
1.3.5 SCR-SS080 Electrical Conformance Inspection
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
DOCUMENT 00 73 00.00 29 Page 1
SECTION 00 73 00.00 29
SPECIAL CONTRACT REQUIREMENTS
4/12/2013
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 GENERAL SCR'S
1.2.1 SCR-GE010 Insurance - Work On A Government Installation:
In accordance with SECTION 00 72 00, 52.228-5, the Contractor shall, at its own expense, provide and maintain during the entire performance of this contract, at least the following kinds and minimum amounts of insurance:
1. Workman's Compensation and Employers' Liability Insurance:
$100,000.00.
2. General Liability Insurance: A Bodily Injury, Comprehensive policy which provides $500,000.00 per occurrence.
3. Automobile Liability Insurance: A comprehensive policy which provides $200,000.00 per person and $500,000.00 per occurrence for bodily injury and $20,000.00 per occurrence for property damage, covering the operation of its automobiles used in connection with the performance of the contract.
4. Aircraft Public and Passenger Liability Insurance: Where aircraft are used in connection with the performance of the contract; $200,000.00 per person, $500,000.00 per occurrence for bodily injury, other than passenger liability, and $200,000.00 per occurrence for property damage; $200,000.00 per person for passenger liability bodily injury aggregate equal to the total number of seats or number of passengers, whichever is greater.
5. Vessel Collision Liability and Protection and Indemnity Liability Insurance: Where vessels are used in connection with the performance of the contract.
1.2.2 SCR-GE040 Self Performance Of Work By The Contractor:
A. The following describes the applicable clause or requirement for self-performance of work by the Contractor, depending upon the type of solicitation (e.g., unrestricted or full or partial set-aside) and/or whether or not a price evaluation preference was provided for in the
DOCUMENT 00 73 00.00 29 Page 2 source selection evaluation.
B. Contract clause 52.236-1, PERFORMANCE OF WORK BY THE CONTRACTOR, is applicable to unrestricted procurement contract awards to any business except as explained in paragraphs C. and E., below.
C. In lieu of the above clause, contract clause 52.219-4, NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS is applicable for award to a HUBZone small business concern on an unrestricted solicitation when the awardee is a HUBZone small business concern or joint venture and claimed a price evaluation preference in accordance with the clause. For purposes of this clause, "cost of the contract" includes all direct and indirect costs, excluding profit or fees. "Cost of contract performance incurred for personnel" means direct labor costs and any overhead which has only direct labor as its base, plus the concern's general and administrative overhead rate multiplied by the labor cost.
D. Contract clause 52.219-3 NOTICE OF TOTAL HUBZONE SET-ASIDE is applicable to awards made under a partial or total HubZone set-aside. For purposes of this clause, "cost of the contract" includes all direct and indirect costs, excluding profit or fees. "Cost of contract performance incurred for personnel" means direct labor costs and any overhead which has only direct labor as its base, plus the concern's general and administrative overhead rate multiplied by the labor cost.
E. Contract Clause 52.219-14, LIMITATIONS ON SUBCONTRACTING, is the applicable requirement for awards to small business concerns for solicitations that were fully or partially set-aside for Small Business, 8(a), or award to a small disadvantaged business (SDB) concern on an unrestricted procurement where an SDB concern has claimed a price evaluation preference (but see next paragraph for suspension of the SDB price preference).
1.2.3 SCR-GE050 Coordination With Other Contractors:
Contracts may be executed on sites with multiple contractors. Minimize interference and inconvenience through cooperation with other authorized contractors. See Contract Clause 52.236-8, OTHER CONTRACTS.
1.2.4 SCR-GE060 Qualifications Of The Contractor Quality Control Systems Manager (CQCSM):
(a) The CQC System Manager (CQCSM) described in SECTION 01 45 04.00 29 CONTRACTOR QUALITY CONTROL shall be assigned no other duties.
(b) In lieu of the education and experience requirements for the CQC
System Manager listed in the CQC SECTION 01 45 04.00 29 CONTRACTOR QUALITY CONTROL, a candidate may qualify provided they have a minimum of 7 years experience in construction quality control and are International Code Council (ICC) certified as a Commercial Building Inspector. For Military Family Housing projects, ICC Residential Building Inspector certification is required in lieu of the Commercial Building Inspector certification.
1.2.5 SCR-GE070 Requirements For Contractors Performance Evaluation:
The Government will evaluate the contractor's performance and prepare a performance report using the Contractor Performance Assessment Reporting
DOCUMENT 00 73 00.00 29 Page 3
System (CPARS), a web-based system ( https://www.cpars.gov/ ). After an evaluation (interim or final) is generated by the Government, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. If the Contractor fails to review, and or comment on the evaluation within the 30-day period, the Contracting Officer will take the appropriate steps to finalize the evaluation without the contractor's comments. It is the sole responsibility of the Contractor to purchase any necessary software to access the electronic system, including a Public Key Infrastructure (PKI) certificate.
Contractors are encouraged to obtain and use the Public Key Infrastructure (PKI) certificate. Details and information to access the system are listed below. The contractor shall provide the Contacting Officer the primary contact name and email address in order to receive the initial email and to access the system. Additional information and training material is available at https://www.cpars.gov/ . This web site will give the contractor an understanding of the system and levels of access, the policies and regulations governing CPARS and the electronic workflow with particular attention to the Contractor comment function. Contractor users are required to obtain a PKI certificate in order to log into CPARS. PKI certificates can be purchased from DoD's industries partners under External Certificate Authorities (ECAs). A list of ECAs vendors is available at http https://www.cpars.gov/main/pki_info.htm .
1.2.6 SCR-GE102 Contractor Supply and Use of Electronic Software for Processing DAVIS-BACON ACT Certified Labor Payrolls (April 2011):
The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Davis-Bacon Act as stated in FAR 52.222-8, PAYROLLS AND BASIC RECORDS and FAR 52.222-13, COMPLIANCE
WITH DAVIS-BACON AND RELATED ACT REGULATIONS.
If the contractor elects to use an electronic Davis-Bacon payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with Davis-Bacon and related Act regulations.
When the contractor uses an electronic Davis-Bacon payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic Davis-Bacon payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Davis-Bacon and related Act regulations over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria: commercially available; compliant with appropriate Davis Bacon Act payroll provisions in the FAR; able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract; capable of producing an Excel spreadsheet-compatible electronic output of weekly
DOCUMENT 00 73 00.00 29 Page 4 payroll records (format at http://www.rmssupport.com/guides.aspx) for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's Resident Management System (RMS); demonstrated security of data and data entry rights; ability to produce contractor-certified electronic versions of weekly payroll data; ability to identify erroneous entries and track the data/time of all versions of the certified Davis Bacon payrolls submitted to the government over the life of the contract; capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic Davis-Bacon payroll processing system shall be provided to the Government during contract closeout.
All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for Davis-Bacon Act compliance using electronic payroll processing services shall not be a separately bid/proposed or reimbursed item under this contract.
1.2.7 SCR-GE103 Contractor Manpower Reporting
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Department of the Army via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/ .
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year of contract/task order performance. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/ to review user manuals and gain an understanding about the data fields that will be included in the reporting structure that is hosted at http://www.ecmra.mil/ .
1.2.8 SCR-GE104 Veterans Employment Emphasis for USACE Contracts
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS
222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/ Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/ Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html U.S. Chamber of Commerce Foundation-Hiring Our Heros
DOCUMENT 00 73 00.00 29 Page 5 http://www.hiringourheroes.org/ Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf
1.2.9 SCR-GE112 Equipment Ownership and Operating Expense Schedule (MAR 1995)
(a) This clause does not apply to terminations. See 52.249-9000, Basis for Settlement of Proposals, and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region IX. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
1.2.10 SCR-GE117 Variations In Estimated Quantities, Subdivided Items
This variation in estimated quantities clause is applicable only to Items Nos.[____].
(a) Variation from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
(b) Where the actual quantity of work performed for Items Nos. [ _] is less than 85% of the quantity of the first sub-item listed under such item, the contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment shall be made in accordance with the clause
DOCUMENT 00 73 00.00 29 Page 6
FAR 52.211-18, Variation in Estimated Quantities.
(c) If the actual quantity of work performed under Items Nos. ____________ exceeds 115% or is less than 85% of the total estimated quantity of the sub-item under that item and/or if the quantity of the work performed under the second sub-item or any subsequent sub-item under Items Nos. [___] exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantities.
1.3 SAFETY/SITE/SECURITY SCR'S
1.3.1 SCR-SS010 Safety And Health Requirements Manual:
EM 385-1-1 and its changes are available at http://www.usace.army.mil/CESO/Pages/Home.aspx . At the HQ homepage, select Safety and Occupational Health.
The Contractor shall be responsible for complying with the current edition and all changes posted on the web (see web address above) as of the effective date of this solicitation and shall comply with the version in effect on the contract award date. This EM 385-1-1 shall remain in effect throughout the life of the contract.
1.3.2 SCR-SS030 Communication Security:
All communications with DOD organizations are subject to COMSEC review.
Contractor personnel shall be aware that telecommunications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from or terminating at DOD organizations. Therefore, civilian Contractor personnel are advised that any time they place a call to or receive a call from Alaska District offices or Resident Engineer offices located on military installations, they are subject to COMSEC procedures. The Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DOD information.
1.3.3 SCR-SS060 Preservation Of Historical, Archaeological & Cultural Resources:
A. Known historical, archeological and cultural resources within the Contractor's work area are designated on the contract drawings. The Contractor shall install protection for these resources as shown on the drawings and shall be responsible for their preservation during the contract.
B. If, during construction activities, the Contractor observes items that might have historical or archeological value, such observations shall be reported immediately to the Contracting Officer so that the appropriate authorities may be notified and a determination can be made as to their significance and what, if any, special disposition of the finds should be made. The Contractor shall cease all activities that may result in the destruction of these resources and shall prevent its employees from trespassing on, removing, or otherwise damaging such resources.
DOCUMENT 00 73 00.00 29 Page 7
1.3.4 SCR-SS070 Time Extensions For Unusually Severe Weather (ER 415-1-15, 31 OCT 89):
A. This provision specifies the procedure for determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled "DEFAULT (FIXED PRICE CONSTRUCTION)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
1. The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.
2. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
B. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.
Monthly Anticipated Adverse Weather Delay Work Days Based on a 5-Day Work Week
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
22 20 21 0 0 1 1 1 0 10 21 22
C. Upon acknowledgement of the Notice to Proceed and continuing throughout the contract, the Contractor shall record on the daily CQC report, the occurrence of adverse weather and the resultant impact to normally scheduled work. Actual adverse weather delays days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled workday. The number of actual adverse weather days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day in each month, and be recorded as full days. If the number of actual adverse weather days exceeds the number of days anticipated in Paragraph B, above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather workdays, and issue a modification in accordance with the Contract Clause entitled "DEFAULT (FIXED-PRICE CONSTRUCTION)".
1.3.5 SCR-SS080 Electrical Conformance Inspection
Provisions shall be made by the contractor for Government inspection of those parts to be energized of all service equipment, transformers, switchboards, panel boards, non-power limited industrial control panels, and motor control centers. Inspections shall be performed after electrical construction is complete, before equipment is energized, and prior to final inspection. However, if special circumstances require parts to be inspected while energized, the contractor shall provide exposure of, and safe and controlled access to, the live parts.
The Government shall be notified not less than 4 work days in advance of the scheduled inspection date. The Government inspector will be an
DOCUMENT 00 73 00.00 29 Page 8 electrician or electrical engineer qualified (as defined in NFPA 70E) to perform this type of work. Deficiencies found during the inspection shall be documented and corrected, and, at the Government's discretion, re-inspected under the provisions of this paragraph.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
-- End of Section --
DOCUMENT 00 73 00.00 29 Page 9
Page Intentionally Left Blank
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 19 30.00 29
SPECIAL ITEMS
04/16/12
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 FIRE SAFETY
1.4.1 Fire Protection
1.4.2 Welding Permit
1.5 WORK CLEARANCE AND UTILITY OUTAGES
1.5.1 Clearance Request
1.5.2 Utility Outages
1.6 PERMANENT UTILITIES
1.7 TEMPORARY UTILITY SERVICES
1.8 DISPOSITION OF MATERIALS
1.8.1 Salvageable Material
1.9 TESTS
1.10 WARRANTY OF CONSTRUCTION
1.10.1 Failures
1.11 CAMP FACILITIES
1.12 TEMPORARY HEATING
1.13 NON-GOVERNMENT BORROW SOURCES
1.14 WEEKLY COORDINATION MEETINGS
1.15 RED ZONE MEETING
1.16 PROHIBITION OF DRY WELLS ON SITE
1.17 ACCESS REQUEST
1.18 ATTACHMENTS
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
ATTACHMENTS:
a. AF Form 592 - USAF Welding, Cutting & Brazing Permit
b. 3WG Form 3 - Base CE Work Clearance Request and Instructions and AK Digline/Locates Request
c. Sample Letter - Warranty Provisions
d. JBER Access Request and Instructions
-- End of Section Table of Contents --
SECTION 01 19 30.00 29 Page 1
SECTION 01 19 30.00 29
SPECIAL ITEMS
04/16/12
PART 1 GENERAL
1.1 SCOPE
Items included in this section cover special features and/or requirements which are not otherwise specified or indicated.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
ASTM INTERNATIONAL (ASTM)
ASTM E 1527 (1993) Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910 Occupational Safety and Health Standards
29 CFR 1926 Safety and Health Regulations for Construction
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 51B (2014) Standard for Fire Prevention During Welding, Cutting, and Other Hot Work
NFPA 241 (2019) Standard for Safeguarding Construction, Alteration, and Demolition Operations
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-05 Design Data
SECTION 01 19 30.00 29 Page 2
Temporary Site Electrical Plan; G
Doyon Utilities' Service Application Form
1.4 FIRE SAFETY
1.4.1 Fire Protection
The Contractor shall comply with local Air Force fire protection requirements and NFPA 241 .
1.4.2 Welding Permit
Prior to using any flame devices or welding equipment, or performing other similar operations, Contractor personnel shall be certified to issue AF Form 592 "USAF Welding, Cutting, and Brazing Permit" (copy attached to this section). Certification training is provided by appointment and can be scheduled by contacting the Base Technical Services Office, through the Contracting Officer. If permits are required for hot work prior to attendance in the certification class, permits may be obtained from Technical Services. Work shall comply with NFPA 241 , NFPA 51B, and applicable portions of 29 CFR 1910 and 29 CFR 1926 .
1.5 WORK CLEARANCE AND UTILITY OUTAGES
1.5.1 Clearance Request
The Contractor shall have a properly executed , Base Civil Engineering Work Clearance Request (copy attached to this section), coordinated through the Contracting Officer and signed by the Base Civil Engineer prior to any work at the project site.
1.5.2 Utility Outages
Utility outages shall be coordinated with the Base Civil Engineer through the Contracting Officer at least 7 days prior to the planned utility interruption. Outage periods shall exclude Saturdays, Sundays and holidays.
1.6 PERMANENT UTILITIES
The utility system infrastructure for water, sewer, natural gas and electricity on Fort Richardson has been privatized and is owned by Doyon Utilities, LLC (DU). Permanent utility systems (water, sewer, electricity) will be installed by DU up to the demarcation point. The Contractor shall coordinate directly with DU on all aspects of contract work that will interface with DU's installation of permanent utilities to facility including, but not limited to, schedule, access, safety, SWPPP, and areas/details of the interface. The Contractor shall also coordinate directly with DU for removal and relocation of any existing permanent utilities on the project site, which conflicts with or prevents new construction in accordance with project plans. The Government will not serve as an intermediary or coordinator between the Contractor and DU.
The Contractor shall remain responsible for meeting all contract requirements and for providing a complete and operable facility for use no later than the contract completion date required by FAR 52.211-10 of the contract. Also, reference FAR 52.236-8, Other Contracts, regarding the requirement to fully cooperate with other Contractors on the site and not
SECTION 01 19 30.00 29 Page 3 interfere with the performance of their work.
1.7 TEMPORARY UTILITY SERVICES
The Government will make all reasonably required utilities available to the Contractor from existing power, and water outlets, for the Contractor's temporary use during construction at a charge to the Contractor. The Contractor shall carefully conserve any utilities furnished without charge. The Contractor is responsible for coordinating with Doyon Utilities to extend temporary lines and for any fees and expenses associated with providing and maintaining necessary temporary connections, meters, and distribution lines. For Utility see attachment at end of this section, and verify current rates with:
Sonny Turpin griffith.turpin@elmendorf.af.mil JBER - Utilities Engineer
673 CES/CEAO
907-384-2763
The Contractor is responsible for submitting all work plans for permanent or temporary utilities to Doyon Utilities for approval, a minimum of 30 working days prior to when requested services are needed.
a. The Contractor should not assume that permanent utilities will be installed to the facility at a time most convenient for the Contractor, and may want to consider obtaining access to temporary utility services. DU will extend temporary service to contractors performing work on the Installation when requested by the Government and the Contractor. The Contractor shall provide written notification to DU, copy furnish the Government, a minimum of 30 working days prior to when requested services are needed. Written notification shall be provided using Doyon Utilities' Service Application Form. As a minimum, the request will include requested date of temporary service installation, expected duration of the connection, a description of requested connection, and the name, title, and phone number of Contractor Point of Contact responsible for coordinating the temporary service connection with DU. The Contractor shall be responsible for any fees charged by DU to extend/provide temporary utility lines to project site and making any required connections to Contractor provided equipment.
b. The Contractor shall submit a Temporary Site Electrical Plan for Government and Doyon Utilities approval. The Contractor shall comply with all applicable rules and regulations. The temporary site electrical plan shall identify safety procedures to include lock-out/tag-out procedures, NEC and NESC safety requirements.
c. Doyon Utilities must review and approve plans for disinfecting and preventing contamination/cross-connection from any temporary water supply connection; and DU must operate the valve that charges/opens any temporary connection. The Contractor shall provide the documentation and coordination to facilitate these actions as applicable.
d. DU will install meters on the temporary utility lines it extends to the project site. The Contractor shall reimburse the Government for use of temporary utility services. The Contractor shall carefully conserve any utilities furnished without charge.
SECTION 01 19 30.00 29 Page 4
e. Before completion of the work and final acceptance of the work by the Government, the Contractor shall notify the Contracting Officer and Doyon Utilities, in writing, 5 working days before termination is desired. Doyon Utilities will take a final meter reading and disconnect service. DU and the Contractor shall then remove their respective temporary distribution lines and associated paraphernalia.
The Contractor shall be responsible for any costs or fees charged by Doyon Utilities for disconnecting, and shall pay all outstanding utility bills before final acceptance of the work by the Government.
1.8 DISPOSITION OF MATERIALS
Combustible and noncombustible waste material, except asbestos, shall be disposed of off-site at an authorized solid waste disposal facility. No burning will be permitted. Asbestos containing materials shall be disposed of at the Base Landfill where shown. The Contractor shall comply with applicable waste hauling requirements of the State of Alaska and the Municipality of Anchorage.
1.8.1 Salvageable Material
Salvageable material, if not otherwise indicated, shall become the property of the Contractor. The value of such salvage shall be reflected in the contract price.
1.9 TESTS
The Contractor shall provide testing, except where specifically noted to be performed by the Government, in accordance with SECTION 01 45 04.00 29
CONTRACTOR QUALITY CONTROL.
1.10 WARRANTY OF CONSTRUCTION
Reference 00 72 00, contract clause 52.246-21 "Warranty of Construction" for additional requirements.
1.10.1 Failures
Upon receipt of notice from the Government of failure of any part of warranted items during the warranty period, the affected part or parts shall be promptly replaced. Such replacement shall include furnishing and installing the necessary new part or parts, making all necessary repairs, restoring the affected item to the operating condition specified in this contract and making all such tests as are necessary to ensure that there are no remaining defects. Such tests shall be performed in the presence of representatives of the Using Agency indicated below. Upon final acceptance of the work or transfer of responsibility to the Government for operation and maintenance of the items covered, whichever is earlier, the Contractor shall be responsible to the Using Agency for the warranty provisions of this contract. A letter stating the applicable warranty provisions shall be furnished to the Contracting Officer in duplicate, in the format and text shown in the sample letter attached to this section.
1.11 CAMP FACILITIES
There are no Government owned camp facilities at the jobsite for the Contractor's use.
SECTION 01 19 30.00 29 Page 5
1.12 TEMPORARY HEATING
EM 385-1-1 , Section 09.D.02.c, requires "close surveillance" of temporary heating devices. The Contractor shall interpret this to mean "continuous monitoring during operation of the temporary heater" to ensure the proper operation of the heater and that appropriate fire prevention/response measures are taken. Continuous monitoring may be accomplished by on-site personnel, or through the use of a wired, a wireless, or in the case of steam or hydronic heating systems where combustion is taking place external to the construction, an internal monitoring system located at the source of combustion. Submit Temporary Heating Monitoring Plan for approval with Accident Prevention Plan (APP) or prior to commencement of applicable definable feature of work.
With regard to fuel combustion heaters, the following also applies: When fuel combustion heaters are used in enclosed structures, carbon monoxide (CO) shall be continuously monitored.
1.13 NON-GOVERNMENT BORROW SOURCES
The Contractor shall check any non-Government, proposed borrow sources for the presence of hazardous substances and petroleum products as defined in ASTM E 1527 . The publication includes guidance on previously examined sites. A Phase I Environmental Site Assessment, also as defined therein, shall be submitted for each proposed borrow site as a supplement to the Environmental Protection Plan specified in SECTION 01 57 20.01 29 ENVIRONMENTAL PROTECTION. The report shall identify any previous or current presence of hazardous substances at the site, regardless of whether they have been, or can be, released to the environment. The Assessment shall be performed under the direct supervision of an independent, registered professional engineer, currently licensed by the State in which the borrow source is located, and within such time frame as will ensure reports are valid when submitted. The engineer shall have a minimum of 3 years experience in performing satisfactory Environmental Site Assessments. All reports shall be certified in writing by the engineer and submitted in the standard format specified in the referenced publication, through the Contracting Officer, to the Base Environmental Office for review. Reports shall be submitted at least 30 days prior to needing borrow materials in the work. The qualifications of the engineer performing the Assessment shall be included with the report. Where hazardous materials are indicated, use of the source will not be allowed.
No borrow materials shall be brought onto Government property without approval of the Contracting Officer. The Government reserves the right to sample and test any borrow materials delivered to the project for conformance with this specification.
1.14 WEEKLY COORDINATION MEETINGS
The Contractor shall participate in weekly coordination meetings with the Contracting Officer and other Government representatives-as applicable.
The Contractor shall be responsible for preparing the agenda in coordination with the Contracting Officer, distributing the agenda, conducting the meeting, preparing the meeting minutes, distributing the minutes, and tracking action items. The Contractor's superintendent and QC System Manager shall attend each meeting. Typical topics shall consist of but not limited to the following: review of the previous week's activities and progress; forecast of the following two week's activities and progress; upcoming utility outage or street closure; status of shop
SECTION 01 19 30.00 29 Page 6 drawing submittals and reviews; status of outstanding requests-for-information (RFI); status of pending modifications;
anticipated modifications; proposed schedule changes; other concerns/and or issues.
1.15 RED ZONE MEETING
Red Zone Meeting (RZM) At approximately 75% completion, but not less than 60 days from anticipated completion, the Contractor shall participate in the RED ZONE Meeting (RZM). The Contractor shall be responsible for contributing to the agenda in support of the Administrative Contracting Officer (ACO) and the Alaska District Project Manager. The Government is responsible for distributing the agenda, conducting the meeting, preparing the minutes, distributing the minutes, and assigning action items. The purpose of the RZM is to coordinate all of the activities leading up to project acceptance by the customer as well as completing contract and project closeout.
Items to be discussed include, but are not limited to, the following:
verify O&M manual requirements and submittal dates; review status of all outstanding submittals; verify spare parts, keys, etc.; turnover requirements and turnover dates; acceptance inspection and final acceptance; LEED documentation; identify and schedule all tests to be witnessed by Government personnel; mechanical system tests and balances;
commissioning; training sessions; preliminary as-built submittals; final as-built submittals; warranty conference; building interior inspections;
separate building exterior inspections, if necessary before snowfall;
final utility readings; erosion control and turf requirements;
installation of specialized equipment and communications infrastructure;
permanent keys for building, whose responsibility and when needed; site demobilization.
Additionally the project team will discuss the processes for completing the Contractor's Release of Claims (RoC) and Contractor Performance Assessment Reporting System (CPARS). The Contractor is explicitly responsible for presenting five (5) copies of the following documents to the ACO at the RZM:
1. Current progress schedule.
2. Current punch list.
3. Schedule of all tests to be witnessed by Government.
4. In-season HVAC Testing and Balancing schedule.
The Contractor is explicitly responsible for presenting one (1) copy of the following documents to the ACO at the RZM:
1. Up-to-date Redline drawings and/or draft-final Computer Aided Design & Drafting (CADD) as-built drawings.
2. Draft of O&M manual.
3. Draft of Warranty Plan.
The RZM is also the forum for the Government Team and the Contractor to discuss any requirements for potential Final Contract Modifications to minimize the impact on the BOD and other key project milestones. The
SECTION 01 19 30.00 29 Page 7
Government Team and the Contractor are jointly responsible for tracking all action items through resolution and addressing open issues in regularly scheduled management meetings following the RZM.
1.16 PROHIBITION OF DRY WELLS ON SITE
In order to comply with the Safe Drinking Water Act and ensure that any surface fluids entering the ground meet water quality standards, and to reduce potential impacts to contaminated sites managed under the RCRA/CERCLA cleanup program, JBER has established a prohibition on the construction or installation of any new Class V Underground Injection Control(UIC) wells (i.e., "dry wells"). Although JBER-Richardson recognizes that EPA is authorized to permit the installation of Class V UIC wells under certain circumstances, the installation of such wells are contrary to JBER's long-term environmental management plan. The Corps of Engineers and the JBER-Richardson jointly consider and grant exceptions to this prohibition on a case-by-case basis for those projects for which it is determined that avoidance of Class V UIC well use is technologically impracticable. Absent such an exception, no UIC well or wells may be constructed or installed under this contract.
1.17 ACCESS REQUEST
Complete the access request form attached to the end of this specification. Instructions are included.
1.18 ATTACHMENTS
a. AF Form 592 - USAF Welding, Cutting & Brazing Permit
b. 3WG Form 3 - Base CE Work Clearance Request and Instructions and AK Digline/Locates Request
c. Sample Letter - Warranty Provisions
d. JBER Access Request and Instructions
1. JBER Forms
2. Sample Letter
3. Base Access Program
4. Construction Phase Joint Risk Management
5. 2020 Utility Rates
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
SECTION 01 19 30.00 29 Page 8
FAX-A-LOCATE REQUEST
VOICE: 811 or 278.3121 FAX: 907.278.0696 or 907.726.5028
CONTRACTOR ID# _____ COMPANY NAME
COMPANY ADDRESS __________________________ CITY ______________________ ZIP _______
YOUR NAME ___________________PHONE _______________ EMAIL _________________________
SITE CONTACT ____________________________ PHONE _______________FAX _______________
*** DO NOT FAX AN EMERGENCY, STOP NOW AND CALL IT IN ***
BOROUGH WORK ORDER #
DIG LOCATION CITY CLIENT NAME
SUBDIVISION (Use for Single Addresses or Multiple Addresses in the SAME Subdivision)
STREET ADDRESS LOT BLK STREET ADDRESS LOT BLK
1.) _______________________ _____ _____
2.) _______________________ _____ _____
3.) _______________________ _____ _____
4.) _______________________ _____ _____
5.) _______________________ _____ _____
6.) _______________________ _____ _____
7.) _______________________ _____ _____
8.) _______________________ _____ _____
NEAREST X STREETS 1.) ____________________________ 2.) ____________________________
GRID PAGE __________ TWN _____ RNG _____ SEC _____ ¼ _____
(SPECIFIC DESCRIPTION: Fence, Septic Repair, Electric Service Line, New Foundation etc.)
TYPE OF WORK
YOU WILL BE DIGGING: Check the appropriate boxes that apply – unchecked boxes indicate a “no” response In/Near a Road Rights of Way In/Near a Railroad Right of Way In/Near an Easement
Dig 4 feet or more deep Dig 10 feet or more deep Dig Area is Premarked
Front of Lot Back of Lot Open Access to Property
EXCAVATION AREA: (excavation Scope of Work –…