Attachment 13 - JBE057_058_Asbestos_Final.pdf
PDF 7 MB Posted
- Attached to
- FXSB 17-4704 Repair Tank Farm 3 and 4
- Solicitation number
- FA500023B0001
About this file
This solicitation seeks proposals for the repair of Tank Farms 3 and 4 at Joint Base Elmendorf Richardson in Alaska. The scope of work involves demolishing existing 1950s-era underground storage tanks and aviation fuel infrastructure at Tank Farms 3 and 4, and reconstructing a consolidated fuel storage and distribution system at Tank Farm 4. The consolidated system will include six 50,000-gallon double-wall underground storage tanks for JP-8 jet fuel and one 25,000-gallon double-wall tank for ultra-low sulfur diesel. A new filter building, control room, motor control center, truck loading area, and retail fueling station will also be constructed. Questions regarding the specifications and drawings are due by June 1, 2023, and an organized site visit will be held on May 24, 2023. The estimated price range for this opportunity is between $10-25 million. Payment and performance bonds are required.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL MEMORANDUM
of
ASBESTOS and HAZARDOUS MATERIALS SURVEY
Buildings 11567, 11568, 11583 and 11584 JBER, Alaska JBE057 and JBE058
Submitted by:
US Army Corps of Engineers
CEPOA-EC-EE
PO Box 6898
JBER, 99506
i
EXECUTIVE SUMMARY
The United States Army Corps of Engineers (USACE) performed an asbestos and hazardous materials assessment survey for projects JBE057 & 058, Fuel Farms 3 & 4. These buildings are fuel farms and canopies, located at Joint Base Elmendorf Richardson (JBER), Alaska. The existing underground storage tanks were installed in 1942. The survey was conducted April 17, 2019. All quantities contained in this report are estimates, subject to field verification prior to any proposed renovations or demolition projects.
Asbestos
Samples of suspect asbestos-containing building materials (ACBMs) were collected. A summary of the suspect ACBMs encountered are provided in Tables 1 and 2. These ACBMs are further described in Section 4.0 – Findings – Asbestos, of this report. The following suspect materials were found or assumed to be positive for asbestos:
• Assumed foundation waterproofing
• Transite Wall Board in the Pump/Filter Rooms
• Pipe Insulation
• Various Caulks
Building materials with asbestos content under 1% is not classified as an ACBM under EPA.
However, OSHA does require that businesses protect their workers from asbestos at any percentage.
Lead-Based Paint
Lead-based paint (LBP) is defined as paint or other surface coatings that contain lead greater than
1.0 milligrams per square centimeter (mg/cm2), 0.5 percent by weight (% by wt.), or 5,000 parts per million (ppm). Due to the age of the structure and type of construction it is assumed that all painted surfaces may contain lead at some level.
Lead containing paints (LCP) are defined as any paints with detectable levels of lead. Proper work procedures must be followed while working with lead-containing paints to prevent dust or fume generation above the OSHA Action Limit. All painted surfaces will be considered LCP. Activities such as sanding, scraping, manual demolition, abrasive blasting, cutting, torching, or welding of LCP are trigger tasks that can result in significant worker and community exposures. All construction or renovation work disturbing lead-containing paints must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62 or the OSHA General Industry Standard, 29 CFR 1910.102.
Nine paint samples were collected from areas with disturbed or peeling paint. Paint samples had detections of lead ranging from a concentration of 2.49 to 53,800 mg/kg and meet the definition of LBP and LCP. Three paint samples collected from Building 11567 meet the definition for LBP. See Table 3 for a table of paint results and Appendix D for the laboratory report.
Other hazardous materials
Other miscellaneous hazardous materials are present in the buildings and include PCB ballasts, mercury lights (fluorescent and HID), and smoke detectors. These other hazardous materials are further described in Section 6.0, Findings-Other Hazardous Materials, of this report.
Paint was also tested for polychlorinated biphenyls (PCBs). The exterior concrete walls tested positive for PCBs above the TSCA limit of 50ppm, and will need to be disposed out of state as such.
ii
Discussion
Suitable precautions must be taken to prevent worker exposure, emissions to the environment, and to comply with applicable regulations. Friable and non-friable ACBM, materials which contain asbestos greater than 1%, which will become friable during demolition activities should be removed prior to building demolition. Non-friable ACM that is not likely to release asbestos fibers during demolition activities may be left in place and managed in compliance with all applicable regulations and policies. Lead and PCB sources are accessible and could be a health hazard if ingested or the dust is inhaled during demolition.
Worker protection is required by labor standards in 29 CFR and Alaska Administrative Code Title 8 (Chapter 61). Waste management is regulated under 40 CFR. Transportation of asbestos, lead, and PCB waste is regulated under 49 CFR.
iii
TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................................... i
1.0 INTRODUCTION
2.0 METHODOLOGY - ASBESTOS
2.1 Pre-Inspection Planning
2.2 Inspection for ACBM
2.3 Condition Assessment
3.0 SAMPLING PROTOCOL
4.0 FINDINGS – ASBESTOS
5.0 FINDINGS – LEAD
6.0 FINDINGS – OTHER HAZARDOUS MATERIALS
7.0 DISCUSSION
7.1 Asbestos
7.2 Lead
7.3 Other Hazardous Materials
TABLES
Table 1: JBE057 Tank Farm 3, Buildings 11567 and 11568 Table 2: JBE058 Tank Farm 4, Buildings 11583 and 11584 Table 3: Lead and PCBs Present in Paint Summary Table 4: Other Hazardous Materials Summary
APPENDICES
Appendix A Maps Appendix B Photographs Appendix C Asbestos Laboratory Sample Results Appendix D Lead and PCB Laboratory Sample Results Appendix E Inspector Certifications
1.0 INTRODUCTION
The U.S. Army Corps of Engineers (USACE), Engineering/Construction Division-Environmental Engineering Branch (CEPOA-EC-EE) at the request of the Alaska District Project Management Branch, performed an inspection of JBE057 & 058 at Fuel Tank Farm 3 (Buildings 11567 and 11568) and Fuel Tank Farm 4 (Buildings 11583 and 11584) on Joint Base Elmendorf Richardson (JBER), Alaska, to identify and assess all accessible asbestos containing building materials (ACBMs), lead based paint (LBP), and other hazardous materials at the facility. The survey was conducted on April 17, 2019. Survey and assessment protocols were based on those adopted by the U.S. Environmental Protection Agency (EPA) as detailed in the Asbestos Hazard Emergency Response Act (AHERA; 40 CFR 763, Subpart E). The site visit was part of an overall investigation being performed on the building to facilitate demolition/renovation projects. This report outlines the methodology, findings, and recommendations for the aforementioned project.
2.0 METHODOLOGY - ASBESTOS
The asbestos survey was divided into three distinct phases: pre-inspection planning, inspection for ACBM, and assessment of ACBM conditions/response action recommendation. Each phase consisted of multiple steps that are outlined below.
2.1 Pre-Inspection Planning
Items that were addressed in the pre-inspection planning phase included:
• Reviewed available records, such as:
- building plans,
- building specifications,
- previous asbestos related work.
• Interviewed U.S. Air Force personnel about previous asbestos-related work.
• Planned inspection strategy.
• Informed key personnel of scheduled activities.
2.2 Inspection for ACBM
This phase was conducted on a room-by-room, area-by-area basis as determined in the pre-inspection planning phase. Materials that were considered suspect were identified, and the number of samples to be collected of these suspect materials was determined by the inspector using AHERA protocols. As defined by AHERA policy, suspect materials include the following building material types:
• Surfacing materials - including spray applied or troweled on wall/ceiling coatings;
• Thermal Systems Insulation (TSI) - including pipe insulation, boiler lagging, tank insulation, and duct insulation; and,
• Miscellaneous materials - including ceiling tiles, floor tiles/mastic, gaskets (if accessible), fire doors, wallboard/spackle.
Suspect materials that were homogeneous in nature (i.e., uniform in color and texture) were identified, touched to determine friability, and sampled by removing a small piece, which was then placed in a labeled container. For a given homogeneous area, one or more samples were collected in a randomly distributed manner in accordance with AHERA provisions (40 CFR 763.86). Unless specifically referenced, materials not considered by the AHERA rule as suspect ACBMs were not addressed by USACE personnel in this survey.
Every reasonable attempt was made to locate ACBM present as TSI, surfacing material, or other miscellaneous materials in the areas surveyed. However, areas that were inaccessible could be addressed only through extrapolation of conditions in accessible building space and review of building plans, specifications, or other building documents provided to USACE.
Each room was inspected and samples taken within. Rooms were chosen randomly and were spaced out so that a room was inspected and sampled for each section. Walls were either cinderblock or drywall. Floor tile and cove base were consistent with the rest of the building.
2.3 Condition Assessment
At the time of the survey suspect materials were assessed for condition. Once analytical results were obtained, combined with the condition assessments, approximate quantities of ACBM were calculated.
3.0 SAMPLING PROTOCOL
The building was surveyed to locate, quantify, and assess ACBM and suspect ACBM in accordance with all requirements set forth in 29 CFR 1910.1001 and 29 CFR 1926.1101 using EPA 40 CFR 763 AHERA guidelines.
Extreme care was taken to avoid fiber liberation during the inspection/sampling process.
Before sample collection, a fine mist of water was applied to the sample site. Samples were collected using sharpened core samplers and/or razor knives and immediately placed in labeled containers and sealed.
Collected samples of suspect ACBM were analyzed by AmeriSci Richmond (AmeriSci), a National Voluntary Laboratory Accreditation Program (NVLAP)-accredited laboratory located in Midlothian, Virginia. AmeriSci analyzed the friable samples by EPA 600/R-93/116 and Environmental Laboratory Approval Program (ELAP) method 198.1 which uses stratified point count polarized light microscope (PLM) techniques. Non-friable Organically Bound (NOB) samples were analyzed by EPA 600/R-93/116, EPA 600/R-93/116 and NY ELAP 198.4.
Laboratory data sheets indicating the sample designations, gross descriptions, and analytical results are provided as Appendix C.
Every reasonable attempt was made to locate ACBM present as thermal system insulation (TSI), surfacing material, or other miscellaneous materials in the areas surveyed. However, areas that were inaccessible could be addressed only through extrapolation of conditions in accessible building space and review of building plans, specifications, or other building documents provided to USACE. Such general inaccessible areas might include but are not limited to:
• Within walls
• Within fire doors
• Enclosed pipe/duct chases
• Inside mechanical equipment
• Inside utilidor and underground utilities
Paint was sampled for lead and PCBs by finding a disturbed surface area where the paint was either peeling or chipping. The peels and chips were collected and labeled for each paint type found in disrepair. Collected samples were analyzed by SGS Laboratories in Anchorage, Alaska.
SGS is a Department of Defense Environmental Laboratory Accreditation Program certified laboratory. The samples for lead were analyzed by method EPA SW846 6020A and PCBs were analyzed by method EPA SW8082A.
4.0 FINDINGS – ASBESTOS
Homogeneous materials suspected of potentially containing asbestos were identified and then sampled. These materials were analyzed to confirm if they were ACBM (see Tables 1 and 2).
Table 1: JBE057 Tank Farm 3, Building 11567
Material Code
Description of Material Code Location Friable
(Yes/No) Sample
Numbers ACM Total quantity (Yes/No)
Surfacing Materials None Found
Thermal Systems Insulation I Pipe Insulation Pump Room Yes 11567-I1 No (0.2%) NQ
Miscellaneous Materials
DW Drywall Pump room No 11567-DW2 Yes (50% )
SQFT
C Caulk Pump Room
Exterior, Pipe Protrusion
No 11567-C5 Yes
(2.1% ) 2 LF
CW Window Caulk Pump Room Exterior No 11567-CW3 Yes (5% ) 30 LF
CW Window Caulk Pump Room Exterior No 11567-CW5 Trace NQ
DW Drywall Office No 11567-DW1 No NQ
COE Concrete Expansion Joint Around Vault Yes 11567-COE01 No NQ
FC Fire Caulk, Red Office No 11567-FC1 No NQ
T Tar Tar Pieces on Metal Overhng No 11567-T1 No NQ
VF Vinyl Flooring Office No 11567-VF1 No NQ CB Cove Base, Brown Office No 11567-CB1 No NQ
CW Window Caulk Office and Pump Rooms, Interior &
Exterior No 11567-CW1, CW2 No NQ
C Caulk Office Interior and Canopy No 11567-C1 to
C4, C6 No NQ
CD Door Caulk Office Door No 11567-CD1 No NQ Bold - Tested positive as ACBM SQFT – Square Feet LF – Linear Feet
Italics - Trace amounts under 1% asbestos found, not considered ACBM NQ – Not Quantified
Table 2: JBE058 Tank Farm 4, Building 11583 Material
Code Description of Material Code Location Friable
(Yes/No) Sample Numbers
ACM
(Yes/No)
Total quantity
Surfacing Materials None Found
Thermal Systems Insulation I1 Pipe Insulation Inside Floor Grate Yes 11583-I1 Yes (10%) 25 LF
Miscellaneous Materials
DW Drywall Pump room No 11583-DW01,03 Yes (50%) 1000 SQFT
CW Window Caulk Pump Room Exterior No 11583-CW1 Trace NQ
DW Drywall Pump Room No 11583-DW02 No NQ
JC1 Joint Compound Office No 11583-JC01 No NQ
FC Fire Caulk Pump Room to Office (red), to Exterior (gray)
No 11583-FC01, 02 No NQ
CD Door Caulk Electric Room Exterior No 11583-CD1 No NQ
C Caulk Pump Room Interior and Exterior No 11583-C1, C2, C3, C4 No NQ
G Gasket Exterior Pipe, South and East Walls No 11583-G1 , GH2 No NQ
T Tar Tank Vault Base and Roof No 11583C*-T01 and 11583-T02 No NQ
Bold - Tested positive as ACBM SQFT - Square Feet LF - Linear Feet Italics - Trace amounts under 1% asbestos found, not considered ACBM
* C in sample number for canopy
All identified homogeneous materials considered to be potentially asbestos containing (“suspect”) are listed on the JBE057 & 058 Tank Farms 3 & 4 Asbestos Materials List (Tables 1and 2). These materials are grouped according to class (i.e., surfacing, TSI, or miscellaneous). For each suspect material, the material description, friability, general location in the building, and sample numbers are indicated, as well as whether the material was determined to be ACBM or not. ACBMs were identified during the 2019 sampling event. Drywall samples, pipe insulation, caulk, and caulk window samples tested positive for asbestos. Because drywall can become friable during demolition, it should be considered as friable for abatement purposes. The pump/filter room interiors (Buildings 11567 and 11583) are both assumed to be Transite Wall Board, not drywall, due to the sampling results found. There were also trace amounts of asbestos (under 1%) found in the caulk window samples.
Additional inspection documentation can be found in the appendices. Laboratory bulk sample analysis results and chain of custody forms are located in Appendix C. These laboratory data forms indicate the material composition including asbestos type and percent content.
5.0 FINDINGS – LEAD
Lead-based paint (LBP) is defined as paint or other surface coatings that contain lead greater than
1.0 milligrams per square centimeter (mg/cm2), 0.5 percent by weight (% by wt.), or 5,000 ppm.
Lead containing paints (LCP) are defined as any paints or coatings with detectable levels of lead.
The U.S. Occupational Health and Safety Administration (OSHA) Lead in Construction Standard 29 CFR
1926.62 regulates work practices and exposures to lead in any concentration. Materials containing any amount of lead must be considered a potential risk during construction or renovation work that disturbs the materials. Activities such as sanding, scraping, manual renovation, abrasive blasting, cutting, torching, or welding of LCP are trigger tasks that can result in significant worker and community exposures. All construction or renovation work disturbing LCP must comply with the OSHA Lead in Construction Standard, 29 CFR 1926.62 or the OSHA General Industry Standard, 29 CFR 1910.1025 (where applicable).
USACE did not perform an exhaustive assessment of lead based paint (LBP) and lead containing paint (LCP). However, due to the age of the structure and type of construction, it is assumed that all painted surfaces may contain lead at some level. Nine paint samples were collected from areas of disturbed or peeling paint. Paint samples had levels of lead ranging from a concentration of 2.49 to 53,800 mg/kg and meet the definition of LCP. Three paint samples from Building 11567 meet the definition for LBP. See Table 3 for a summary of paint results and Appendix D for the laboratory report.
Materials with low levels of lead (i.e., <1.0 mg/cm2) that are torched, welded, sanded, scraped or otherwise aerosolized and converted to fumes or dusts can pose health risks to exposed populations. The U.S. Occupational Health and Safety Administration (OSHA) Lead in Construction Standard 29 CFR
1926.62 regulates work practices and exposures to lead in any concentration. Materials containing any amount of lead must be considered a potential risk during construction or renovation work that disturbs the materials. All of the rooms in the building are of similar construction and have been repainted over the years. The paint is in poor condition overall, with damage found scattered in certain areas.
Table 3: Lead and PCBs Present in Paint Summary
Sample # Location Lead Result
(mg/kg) Total PCBs
(mg/kg) 11583-P01 Exterior wall paint 62.4 2,180
11583C*-P02 Canopy steel paint 2.49 NA 11583-P03 Interior electric room 17.5 ND 11567-P01 Exterior vault concrete 46,600 470 11567-P02 Vault lid 119 NA 11567-P03 Exterior building wall 9,290 376 11567-P04 Interior office concrete wall 1,370 ND 11568-P05 Canopy steel 2.81 NA 11567-P06 Canopy vault concrete 53,800 NA NA - Not Analyzed ND - Non-Detect _____ - Lead Based Paint*
_____ - PCB Containing Paint * C in sample number for canopy
The contractor should assume that all painted surfaces are coated with LCP and plan their activities accordingly. In addition, the contractor should provide appropriate engineering controls, medical surveillance, personal protective equipment in lieu of a negative exposure assessment, air monitoring, and training necessary to work in lead areas. In addition, a TCLP sample should be taken for disposal purposes.
6.0 FINDINGS – OTHER HAZARDOUS MATERIALS
Polychlorinated Biphenyls (PCBs) has been found in the paints of older structures on base. Because of this, most of the paint samples were also analyzed for PCBs. Three of the five paint samples had PCB detections above the Toxic Substances Control Act (TSCA) limit of 50 ppm (Table 3). Only PCB-1254 (Aroclor 1254) was found, all other Aroclors were non-detect.
The following table provides a summary of other hazardous materials that were identified in the building:
Table 4: Other Hazardous Materials Summary
Description
Total Quantity Mercury is found in the fluorescent bulbs throughout the building 4 foot bulbs – 20 each Americium is found in the smoke detectors 4 each Fluorescent light ballasts may contain PCBs 40 each HID Light Bulbs 30 each
7.0 DISCUSSION
7.1 Asbestos
Airborne asbestos is a health hazard. It is regulated under both Alaska State and Federal
OSHA Labor standards. Alaska has adopted, as State regulation, substantially all Federal OSHA standards for general industry, construction and some other industries. The State maintains enforcement authority. The Federal OSHA regulation governing worker exposure to asbestos is 29 CFR 1926.1101. The permissible exposure limit (PEL) for asbestos is 0.1 fibers per cubic centimeter (cc) of air for an 8-hour work period. Presumed asbestos-containing material (PACM) includes thermal insulation and surfacing found in buildings constructed no later than 1980 and directs levels of worker protection when present during some tasks. The analysis must be done by a NVLAP or other accredited laboratory and must demonstrate that the asbestos level present does not exceed 1%.
The presence of asbestos in ACM is not a health hazard unless the asbestos fibers are freed from their matrix and become airborne, i.e. capable of being inhaled or ingested. The term “friable” is a general description for ACM that is likely to release fibers if crumbled by hand pressure. The term “non-friable ACM” refers to ACM where the asbestos fibers are bound in a stiff matrix, such as vinyl, asphalt, or cement, and consequently unlikely to release fibers unless the matrix is damaged.
Friable ACM was found in the thermal system insulation and its associated debris. Suspect items shall be properly removed prior to renovation by properly trained; Alaska and EPA licensed and certified asbestos contractors. Proper work procedures to minimize disturbance and fiber releases shall be implemented to protect workers and residents. Drywall samples, insulation, caulk, and caulk window samples were found to contain asbestos. EPA’s Asbestos NESHAP regulations do apply to this material containing greater than 1% of asbestos. OSHA’s Asbestos Construction Standard (29 CFR 1926.1101) applies regardless of the amount of asbestos present. Any work involving the removal of the tile will need to be abated by a licensed professional.
7.2 Lead
Lead is a human health hazard when exposures are possible through inhalation and ingestion. Lead is regulated by both State and Federal labor regulations. The State has adopted Federal OSHA standards for its regulations. The Federal labor standard for lead in construction is 29 CFR 1926.62 and 1910.1025. The maximum PEL for lead is 50 micrograms per cubic meter (ug/m3) of air over an 8-hour day. The standard establishes reduced PELs for longer work periods and sometimes for some individuals. Medical monitoring, personal protection, and administrative requirements are part of the regulations when lead is present in the work place. The standards also prescribe specific levels of personal protection whenever lead is present and airborne lead concentrations have not been measured for the particular site and tasks.
Lead does not present a health hazard unless disturbed to generate an exposure route.
Removal procedures that generate an airborne source (inhalation) and possible ingestion source will result in a health risk and possible hazardous waste production. Such procedures would require special precautions and compliance with relevant federal, state, and local regulations. The contractor should conduct additional testing (TCLP test) prior to disposal for documentation and hazardous waste characterization. Proper work procedures to minimize disturbance and dust generation should be implemented to protect workers.
7.3 Other Hazardous Materials
1. PCBs and lead may be present in light ballasts, emergency lights, plumbing components, and fluorescent light fixtures.
2. Polychlorinated biphenyls (PCBs) were found in 3 of the 9 paint samples where it was tested for. Six of the samples were below the TSCA limit of 50 ppm or had a ND. Three of the samples were above the unrestricted waste disposal of 1 ppm and above the TSCA limit.
Due to TSCA regulations, PCBs must be disposed of at the concentration they are found at, and not “diluted out” as part of a waste stream.
3. Mercury is assumed to be found in the fluorescent and HID light bulbs.
4. Americium is found in the smoke detectors.
To ensure the protection of personnel and the environment, hazardous materials should be removed and disposed of as a separate waste stream from the general construction debris. However, if abatement of ACM and lead does not present a significant hazard to workers and/or is not expected to be disturbed, some ACM and lead may be left in place during the building’s renovation.
This information shall be identified in the contractor’s Hazardous Materials Abatement Work Plan and submitted specifications. If ACM and lead are to remain in specific building locations during renovation, special renovation disturbance procedures will be required. At the time when the renovation takes place a representative sample of the waste generated should be analyzed by the EPA’s TCLP method in order to properly classify the waste as a regulated waste or C&D waste.
APPENDIX A
MAPS
PROJECT LOCATION/VICINITY MAP REPAIR
FUEL FARMS 3 & 4 (19-056)
ALASKA DISTRICT
CORPS OF ENGINEERS
Environmental Engineering JBER, ALASKA
CORPS OF ENGINEERS
P
R
O
J E
C
T
L
O
C
A
T
I O
N
Appendix A-1
AutoCAD SHX Text
ANCHORAGE
AutoCAD SHX Text
OCEAN
AutoCAD SHX Text
ARCTIC
AutoCAD SHX Text
ALASKA
AutoCAD SHX Text
FAIRBANKS
AutoCAD SHX Text
PACIFIC OCEAN
AutoCAD SHX Text
GULF OF ALASKA
AutoCAD SHX Text
KETCHICAN
AutoCAD SHX Text
JUNEAU
AutoCAD SHX Text
CANADA
AutoCAD SHX Text
HAINES
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
AREA
AutoCAD SHX Text Football
AutoCAD SHX Text Field
AutoCAD SHX Text Field #3
AutoCAD SHX Text Softball
AutoCAD SHX Text Playing
AutoCAD SHX Text Field
AutoCAD SHX Text Playing
AutoCAD SHX Text Field
AutoCAD SHX Text Jr.
AutoCAD SHX Text
CIRCLE
AutoCAD SHX Text
HERITAGE
AutoCAD SHX Text
LUKE AVE
AutoCAD SHX Text
KUTER AVE
AutoCAD SHX Text
22ND ST
AutoCAD SHX Text
20TH ST
AutoCAD SHX Text
18TH ST
AutoCAD SHX Text
RICKENBACKER AVE
AutoCAD SHX Text
24TH ST
AutoCAD SHX Text
LORING AVE
AutoCAD SHX Text
LORING AVE
AutoCAD SHX Text
SLAMMER AVE
AutoCAD SHX Text
SIMPSON HARBOR DR
AutoCAD SHX Text
SIJAN AVE
AutoCAD SHX Text
SAVILLE AVE
AutoCAD SHX Text
22ND ST
AutoCAD SHX Text
HODGES AVE
AutoCAD SHX Text
JERSTAD AVE
AutoCAD SHX Text
17TH ST
AutoCAD SHX Text
18TH ST
AutoCAD SHX Text
KUTER AVE
AutoCAD SHX Text
JERSTAD AVE
AutoCAD SHX Text
SIJAN AVE
AutoCAD SHX Text
LUKE AVE
AutoCAD SHX Text
LUKE AVE
AutoCAD SHX Text
19TH ST
AutoCAD SHX Text
LINDBERGH AVE
AutoCAD SHX Text
LINDBERGH AVE
AutoCAD SHX Text
21ST ST
AutoCAD SHX Text
20TH ST
AutoCAD SHX Text
JOHNSON AVE
AutoCAD SHX Text
PEASE AVE
AutoCAD SHX Text
FIGHTER DRIVE
AutoCAD SHX Text
FIGHTER DRIVE
AutoCAD SHX Text McGUIRE AVE
AutoCAD SHX Text
MUNDY AVE
AutoCAD SHX Text
NECRASON AVE
AutoCAD SHX Text A-39
AutoCAD SHX Text A-40
AutoCAD SHX Text A-41
AutoCAD SHX Text
EAST/WEST CENTERLINE INSTRUMENT RUNWAY
AutoCAD SHX Text T/W 'N1'
AutoCAD SHX Text T/W 'N2'
AutoCAD SHX Text
TAXIWAY ' M '
AutoCAD SHX Text
TAXIWAY ' Q '
AutoCAD SHX Text
TAXIWAY ' B '
AutoCAD SHX Text T/W ' N3 '
AutoCAD SHX Text N 80%%d 01' 00" E
AutoCAD SHX Text
TAXIWAY ' N '
AutoCAD SHX Text 7500' X 150'
AutoCAD SHX Text
NORTH/SOUTH RUNWAY
AutoCAD SHX Text N 0 00'42" E
AutoCAD SHX Text
TAXIWAY ' D ' SOUTH
AutoCAD SHX Text
SOUTH RAMP
AutoCAD SHX Text T/W ' D2 '
AutoCAD SHX Text
GOLD RAMP
AutoCAD SHX Text T/W ' N4 '
AutoCAD SHX Text
TAXIWAY ' D '
AutoCAD SHX Text
TAXIWAY ' N5 '
AutoCAD SHX Text
TAXIWAY ' N '
AutoCAD SHX Text T/W ' D1 '
AutoCAD SHX Text
BLUE RAMP
AutoCAD SHX Text A-1
AutoCAD SHX Text
TAXIWAY ' M '
AutoCAD SHX Text
TAXIWAY ' N '
AutoCAD SHX Text
TAXIWAY ' P '
AutoCAD SHX Text
BAK-13
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
BAK-13
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
BAK-13
AutoCAD SHX Text
BAK-12
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
FPN-G2
AutoCAD SHX Text
(GCA)
AutoCAD SHX Text Base Exchange
AutoCAD SHX Text Base Gym
AutoCAD SHX Text 100+00
AutoCAD SHX Text Library
AutoCAD SHX Text 80+00
AutoCAD SHX Text 90+00
AutoCAD SHX Text Fire
AutoCAD SHX Text Station 1
AutoCAD SHX Text Mt. Spur
AutoCAD SHX Text School
AutoCAD SHX Text Billboard
AutoCAD SHX Text Billboard
AutoCAD SHX Text Dental
AutoCAD SHX Text Clinic
AutoCAD SHX Text Officers
AutoCAD SHX Text Open
AutoCAD SHX Text Mess
AutoCAD SHX Text Chapel 2
AutoCAD SHX Text Air
AutoCAD SHX Text Passenger
AutoCAD SHX Text Terminal
AutoCAD SHX Text 60+00
AutoCAD SHX Text 70+00
AutoCAD SHX Text Base
AutoCAD SHX Text Operations
AutoCAD SHX Text 50+00
AutoCAD SHX Text Hangar 7
AutoCAD SHX Text Hangar 6
AutoCAD SHX Text 120+00
AutoCAD SHX Text Credit
AutoCAD SHX Text Union
AutoCAD SHX Text Center
AutoCAD SHX Text Support
AutoCAD SHX Text Family
AutoCAD SHX Text Cage
AutoCAD SHX Text Eagle
AutoCAD SHX Text Wing HQ
AutoCAD SHX Text 80+00
AutoCAD SHX Text 90+00
AutoCAD SHX Text 110+00
AutoCAD SHX Text Hangar 2
AutoCAD SHX Text Hangar 3
AutoCAD SHX Text 70+00
AutoCAD SHX Text People Center
AutoCAD SHX Text Hangar 4
AutoCAD SHX Text Bank
AutoCAD SHX Text
TAXIWAY ' N '
AutoCAD SHX Text
TALLEY AVE
AutoCAD SHX Text
TALLEY AVE
AutoCAD SHX Text
FRONTAGE RD
AutoCAD SHX Text
FRONTAGE RD
AutoCAD SHX Text
TAXIWAY 9
AutoCAD SHX Text
ALASKA RAILROAD
AutoCAD SHX Text
ELMENDORF AIR FORCE BASE
AutoCAD SHX Text
ELMENDORF AIR FORCE BASE
AutoCAD SHX Text Riding
AutoCAD SHX Text Stables
AutoCAD SHX Text
37TH ST
AutoCAD SHX Text
TALLEY AVE
AutoCAD SHX Text
AIRLIFTER DRIVE
AutoCAD SHX Text
TAXIWAY ' G '
AutoCAD SHX Text
TAXIWAY ' H '
AutoCAD SHX Text
TANGO ROW
AutoCAD SHX Text T/W ' E '
AutoCAD SHX Text
TAXIWAY ' E '
AutoCAD SHX Text T/W 8
AutoCAD SHX Text
TAXIWAY ' F '
AutoCAD SHX Text T/W 8
AutoCAD SHX Text Hangar 17
AutoCAD SHX Text (Aircraft Weather Shelter)
AutoCAD SHX Text Hangar 16 (Alert)
AutoCAD SHX Text Area
AutoCAD SHX Text Cargo
AutoCAD SHX Text Explosive
AutoCAD SHX Text
STA. 136+00
AutoCAD SHX Text End Runway
AutoCAD SHX Text Pad
AutoCAD SHX Text Blast
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
FISH
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
TRIANGLE
AutoCAD SHX Text
RABAUL DRIVE
AutoCAD SHX Text
28TH ST
AutoCAD SHX Text
37TH ST
AutoCAD SHX Text
FAIRCHILD AVE
AutoCAD SHX Text
37TH ST
AutoCAD SHX Text
37TH ST
AutoCAD SHX Text
37TH ST
AutoCAD SHX Text
28TH ST
AutoCAD SHX Text
28TH ST
AutoCAD SHX Text
30TH ST
AutoCAD SHX Text
30TH ST
AutoCAD SHX Text
29TH ST
AutoCAD SHX Text
32ND ST
AutoCAD SHX Text
32ND ST
AutoCAD SHX Text
33RD ST
AutoCAD SHX Text
35TH ST
AutoCAD SHX Text
35TH ST
AutoCAD SHX Text
AIRLIFTER DRIVE
AutoCAD SHX Text
AIRLIFTER DRIVE
AutoCAD SHX Text
AIRLIFTER DRIVE
AutoCAD SHX Text
AIRLIFTER DRIVE
AutoCAD SHX Text A-38
AutoCAD SHX Text
TAXIWAY ' J '
AutoCAD SHX Text
TAXIWAY ' K '
AutoCAD SHX Text
TAXIWAY ' J '
AutoCAD SHX Text A-31
AutoCAD SHX Text A-12
AutoCAD SHX Text A-10
AutoCAD SHX Text A-13
AutoCAD SHX Text A-11
AutoCAD SHX Text A-14
AutoCAD SHX Text A-15
AutoCAD SHX Text A-30
AutoCAD SHX Text A-33
AutoCAD SHX Text A-32
AutoCAD SHX Text A-34
AutoCAD SHX Text A-17
AutoCAD SHX Text
NORTH/SOUTH RUNWAY CENTERLINE
AutoCAD SHX Text 7,500' X 150'
AutoCAD SHX Text N 0%%d 00' 42"E
AutoCAD SHX Text
NORTH/SOUTH RUNWAY CENTERLINE EXTENDED
AutoCAD SHX Text N 0%%d 00' 42' E
AutoCAD SHX Text
AutoCAD SHX Text
TAXIWAY ' J '
AutoCAD SHX Text A-19
AutoCAD SHX Text A-21
AutoCAD SHX Text A-35
AutoCAD SHX Text
TAXIWAY ' D '
AutoCAD SHX Text A-24
AutoCAD SHX Text A-23
AutoCAD SHX Text A-22
AutoCAD SHX Text A-20
AutoCAD SHX Text A-18
AutoCAD SHX Text
TAXIWAY ' M '
AutoCAD SHX Text A-37
AutoCAD SHX Text A-29
AutoCAD SHX Text A-8
AutoCAD SHX Text
NORTH RAMP
AutoCAD SHX Text A-3
AutoCAD SHX Text A-7
AutoCAD SHX Text A-2
AutoCAD SHX Text A-5
AutoCAD SHX Text A-36
AutoCAD SHX Text A-28
AutoCAD SHX Text A-27
AutoCAD SHX Text
AutoCAD SHX Text
TAXIWAY ' M '
AutoCAD SHX Text A-25
AutoCAD SHX Text A-26
AutoCAD SHX Text A-26A
AutoCAD SHX Text
TAXIWAY ' J '
AutoCAD SHX Text A-4
AutoCAD SHX Text
TAXIWAY ' B '
AutoCAD SHX Text
BAK-12
AutoCAD SHX Text
BARRIER
AutoCAD SHX Text
ANTENNA
AutoCAD SHX Text
ANTENNA
AutoCAD SHX Text
SURVIVAL TRAINING AREA
AutoCAD SHX Text Hangar 10
AutoCAD SHX Text Hangar 11
AutoCAD SHX Text Reservoir
AutoCAD SHX Text Water
AutoCAD SHX Text Underground
AutoCAD SHX Text Guard Shack
AutoCAD SHX Text Hangar 8
AutoCAD SHX Text P.O.L. Area
AutoCAD SHX Text In Flight
AutoCAD SHX Text Kitchen
AutoCAD SHX Text Blast
AutoCAD SHX Text Deflectors
AutoCAD SHX Text 130+00
AutoCAD SHX Text 133+00
AutoCAD SHX Text End Runway
AutoCAD SHX Text Hangar 14
AutoCAD SHX Text Barrier
AutoCAD SHX Text
BAK - 13
AutoCAD SHX Text 120+00
AutoCAD SHX Text
BAK - 13
AutoCAD SHX Text Barrier
AutoCAD SHX Text Joint Mobility Complex
AutoCAD SHX Text Hangar 12
AutoCAD SHX Text 130+00
AutoCAD SHX Text 110+00
AutoCAD SHX Text Hangar 18
AutoCAD SHX Text
BORAM DRIVE
AutoCAD SHX Text N
AutoCAD SHX Text
GRAPHIC SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text
GRAPHIC SCALE IN FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SY
AutoCAD SHX Text
EMA 3D
AutoCAD SHX Text
FIGURE GFI-1
AutoCAD SHX Text
DATE: APRIL 2019
AutoCAD SHX Text
SCALE: NTS
AutoCAD SHX Text
DRAWN/RVW: MLM/JMM
Appendix A-3:
Fuel Farm 4
Sample Locations
Building 11583 and Canopy 11584 Fuel Farm 4, JBER AK
P02
T01
JC1
DW3
DW1
DW2
T02
C3, CW1
FC01
CD1
C1
C4
FC2C2
G2
G1
P01
P03
I1
Appendix A-2:
Fuel Farm 3
Sample Locations
Building 11567 and Canopy 11568 Fuel Farm 3, JBER AK
I1
DW2
DW1
P06
P05
P02
T1
C6
C3
CD1
CW5
C4 C1
CW1/CW2
FC1
M1, CB1, VF1 CW3
P04
P03
P01
COE01
C2
C5
APPENDIX B
PHOTOGRAPHS
PHOTO 1: FUEL FARM 3, BLDG 11567 EXTERIOR, LOOKING ENE.
PHOTO 2: CONCRETE UTILIDOR VAULT OF FUEL FARM 3, WITH LEAD AND PCB BASED
PAINT.
PHOTO 3: EXTERIOR OF FUEL FARM 3 WITH LEAD AND PCB BASED PAINT.
PHOTO 4: TANK VAULT UNDER CANOPY 11568 WITH LBP.
PHOTO 5: FUEL FARM 3 WINDOW CAULK WITH ASBESTOS, PUMP ROOM EXTERIOR.
PHOTO 6: FUEL FARM 3 PIPE PROTRUSION WITH ASBESTOS CAULKING, CIRCLED IN RED.
PHOTO 7: FUEL FARM 4 WITH PCB PAINT ON THE UTILIDOR VAULT.
PHOTO 8: FUEL FARM 4 WITH TRANSITE WALL BOARD IN THE PUMP ROOM.
PHOTO 9: TRENCH IN FUEL FARM 4 WITH ASBESTOS PIPE INSULATION
PHOTO 10: FUEL FARM 4 EXTERIOR, LOOKING NE.
PHOTO 11: PANORAMIC OF FUEL FARM 4 FILTER ROOM INTERIOR.
PHOTO 12: FUEL FARM 4 CANOPY, LOOKING SE.
APPENDIX C
ASBESTOS LABORATORY SAMPLE RESULTS
APPENDIX D
LEAD AND PCB LABORATORY SAMPLE RESULTS
Jillian Janssen 2019.05.02 10:18:16 -08'00' y y o f 2 e-Sample Receipt Form
Chain of Custody / Temperature Requirements
Yes
N/A
Temperature blank compliant* (i.e., 0-6 °C after CF)?
SGS Workorder #: 1191863 1191863 Exemption permitted if sampler hand carries/delivers.Yes
DOD: Were samples received in COC corresponding coolers?
Were Custody Seals intact? Note # & location
Review Criteria
HD
Exceptions Noted belowCondition (Yes, No, N/A)
COC accompanied samples? Yes
**Exemption permitted if chilled & collected <8 hours ago, or for samples where chilling is not required
N/A
Cooler ID: Therm. ID:
Were samples received within holding time?
Note: Refer to form F-083 "Sample Guide" for specific holding times.
Yes
***Exemption permitted for metals (e.g,200.8/6020A).
***Note: If sample information on containers differs from COC, SGS will default to COC informatio
If samples received without a temperature blank, the "cooler temperature" will be documented instead & "COOLER TEMP" will be noted to the right. "ambient" or "chilled" will be noted if neither is available.
Sample Id # for sample 9 indicate "11567-P06" on COC and "11568- P06" on bag. Proceeding per COC ( location ID is matching)
N/A
°C °C
Therm. ID:@
Ambient
Therm. ID:
NA @Cooler ID: Therm. ID:
°C
**Note: If times differ <1hr, record details & login per COC.
Cooler ID:
Do samples match COC** (i.e.,sample IDs,dates/times collected)?
°C
N/A
N/A
Were all soil VOAs field extracted with MeOH+BFB?
Yes
N/A
Cooler ID:
Were all water VOA vials free of headspace (i.e., bubbles ≤ 6mm)?
No
Were analytical requests clear? (i.e., method is specified for analyses with multiple option for analysis (Ex: BTEX, Metals)
Holding Time / Documentation / Sample Condition Requirements
Were proper containers (type/mass/volume/preservative***)used?
Additional notes (if applicable):
Note to Client: Any "No", answer above indicates non-compliance with standard procedures and may impact data quality.
Yes
Volatile / LL-Hg Requirements N/AWere Trip Blanks (i.e., VOAs, LL-Hg) in cooler with samples?
Chilling not required
*If >6°C, were samples collected <8 hours ago?
Note: Identify containers received at non-compliant temperature . Use form FS-0029 if more space is needed.
N/AIf <0°C, were sample containers ice free?
F102b_SRFpm_2019032528 of 29
APPENDIX E
INSPECTOR CERTIFICATIONS
| JBE057_058_Asbestos_Final.pdf |
| JBE057 & 58 HTRW Report Final.pdf |
| EXECUTIVE SUMMARY |
| 1.0 INTRODUCTION |
| 2.0 METHODOLOGY - ASBESTOS |
| 2.1 Pre-Inspection Planning |
| 2.2 Inspection for ACBM |
| 2.3 Condition Assessment |
| 3.0 SAMPLING PROTOCOL |
| 4.0 FINDINGS – ASBESTOS |
| Table 1: JBE057 Tank Farm 3, Building 11567 |
| 5.0 FINDINGS – LEAD |
| Table 3: Lead and PCBs Present in Paint Summary |
| 6.0 FINDINGS – Other Hazardous Materials |
| Table 4: Other Hazardous Materials Summary |
| 7.0 DISCUSSION |
| 7.1 Asbestos |
| 7.2 Lead |
| 7.3 Other Hazardous Materials |
| App_A1_sit_vic.pdf |
| JBE057_058_Asbestos_Final |
| App_A3_FF4_Sample.pdf |
| Slide Number 1 |
| App_A2_FF3_Sample.pdf |
| Slide Number 1 |
| JBE057 & 58 HTRW Report Final |
| 119042042.pdf |
| 119042041.pdf |
| JBE057 & 58 HTRW Report Final |
| App_D_SGS.pdf |
| JBE057 & 58 HTRW Report Final |
| App_E_Sean.pdf |
| App_E_Rebecca.pdf |
File details come from the government source that posted it. Updated .