Attachment 2 - Drawings 1.pdf

PDF 39 MB Posted

Attached to
FXSB 17-4704 Repair Tank Farm 3 and 4
Solicitation number
FA500023B0001
Issued by

About this file

This document provides details for a federal solicitation seeking repair services for two fuel storage tank farms at a Department of the Air Force base in Alaska. The solicitation requests contractors provide all labor, materials, equipment, and services necessary to consolidate the bulk jet fuel and ultra-low sulfur diesel storage capabilities of Tank Farms 3 and 4. Key aspects of the project include demolishing existing underground storage tanks and infrastructure from 1950s at Farms 3 and 4; reconstructing a consolidated storage system at Farm 4 with six 50,000-gallon double-wall tanks for jet fuel and one 25,000-gallon double-wall tank for diesel; building a new filter building and motor control center; and constructing new truck loading areas. An organized site visit for interested parties is scheduled for May 24, 2023, with questions regarding specifications and drawings due by June 1, 2023. The estimated price range for the contract is between $10-25 million.

View the file

Other files

File Type Posted
Abstract of Offerors - FXSB 17-4704 Repair Tank Farm 3 and 4.pdf PDF
Solicitation Amendment FA500023B00010004 SF 30.pdf PDF
Attachment 1 - AK20230001 Wage Determination 21 July 2023.pdf PDF
Attachment 21 - Clarification to Specifications.pdf PDF
Solicitation Amendment FA500023B00010003 SF 30.pdf PDF
Solicitation Amendment FA500023B00010002 SF 30.pdf PDF
Attachment 18 - Attachments for A33.pdf PDF
Attachment 19 - JBER 2022 Atlas Map Book.pdf PDF
Attachment 17 - RTA ED151.pdf PDF
Attachment 20 - Round 2 of Questions and Answers - Tank Farm.pdf PDF
Attachment 1 - Wage Determination AK20230001 06_23_2023.pdf PDF
Attachment 16 - Class JA ALC.pdf PDF
Attachment 1 - Wage Determination AK200300001 05_19_2023.pdf PDF
Attachment 10 - Site Specific Spill Plan.pdf PDF
Attachment 15 - Tank Farms 3 and 4 Questions and Answers.pdf PDF
Attachment 11 - JBER Spill Reporting Poster.pdf PDF
Attachment 3 - Specifications REV001.pdf PDF
Solicitation Amendment FA500023B00010001 SF 30.pdf PDF
Attachment 13 - JBE057_058_Asbestos_Final.pdf PDF
Attachment 14 - Sign-in Sheet.pdf PDF
Attachment 12 - 2019 JBER Environmental Handbook.pdf PDF
Attachment 8 - JA Fuel Tank Monitoring System - Veeder Root System.pdf PDF
Solicitation - FA500023B0001.pdf PDF
Attachment 9 - Project Price Breakdown.pdf PDF
Attachment 3 - Specifications.pdf PDF
Attachment 4 - Wage Determination AK20230001.pdf PDF
Attachment 7 - JA Fuel Tank Gauge System ENRAF.pdf PDF
Attachment 5 - AF 66 Submittal Register.pdf PDF
Attachment 1 - SOW.pdf PDF
Attachment 6 - Class JA ALC.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

/0

AL

AS

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: C:\Users\bransonm\AppData\Local\Temp\AcPublish_1604\JBE057_058-G-001.dwg MODIFIED BY: bransonm PLOT DATE: May 24, 2021 - 12:35pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-G

-0

.d w g

W

1-

KB

-2 0-

R -X

XX

X

G-001

C O

VE

R

S H

EE

T

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

FUEL FARM #3 AND #4 RECONSTRUCTION

JBER-ELMENDORF, ANCHORAGE, ALASKA

JBE057/058

W911-KB-20-R-XXXX

MAY 2021

400 US ROUTE 1

NORTH SUITE B

FALMOUTH, MAINE 04105

(207) 869-8006

2525 GAMBELL STREET

SUITE 200

ANCHORAGE, AK 99503

(907) 563-3835

PROJECT MANAGER

AARON LEWIS, PE

ENTERPRISE ENGINEERING, INC.

MECHANICAL ENGINEER

BRADLEY RICHARDSON, PE

ENTERPRISE ENGINEERING, INC.

CIVIL ENGINEER

RYAN PARPAN, PE

ENTERPRISE ENGINEERING, INC.

ARCHITECT

DAVID MOORE, AIA, ALEP

ARCHITECTS ALASKA

STRUCTURAL ENGINEER

JAMES WIITA, PE, SE

ENTERPRISE ENGINEERING, INC.

ELECTRICAL ENGINEER

CHANNING LILLO, PE

RSA ENGINEERING, INC.

HVAC/PLUMBING ENGINEER

AJ SCHIRACK, PE

RSA ENGINEERING, INC

FIRE PROTECTION ENGINEER

JASON ANDERSON, PE

COFFMAN ENGINEERS

CATHODIC PROTECTION

ENGINEER

ERIC SHADLE, PE

NORTON CORROSION LIMITED

HAZMAT ENGINEER

ROBERT FRENCH, PE

EHS-ALASKA, INC.

®US Army Corps of Engineers Alaska District

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001 Attachment 2 - Drawings

DRAWING INDEX

SHEET ID SHEET TITLE

GENERAL

G-001 COVER SHEET

G-002 DRAWING INDEX

G-003 GENERAL NOTES, LEGEND AND

ABBREVIATIONS

G-101 LOCATION MAPS

G-102 WORK RESTRICTIONS PLAN

SURVEY

V-111 TOPOGRAPHIC SURVEY AND

BORING LOCATIONS 1 OF 2

V-151 TOPOGRAPHIC SURVEY AND

BORING LOCATIONS 2 OF 2

GEOTECHNICAL

B-601 BORING LOGS 1

B-602 BORING LOGS 2

B-603 BORING LOGS 3

DEMOLITION

D-101 OVERALL EXISTING CONDITIONS

AND DEMOLITION PLAN

D-111 FUEL FARM #4 DEMOLITION PLAN

D-611 FUEL FARM #4 DEMOLITION

PHOTOS

AD111

FUEL FARM #4 FILTER BUILDING

AND CANOPY DEMOLITION FLOOR

PLAN

AD112

FUEL FARM #4 FILTER BUILDING

AND CANOPY DEMOLITION PHOTO

EXHIBIT

ED111 FUEL FARM #4 ELECTRICAL

DEMOLITION PLAN

D-151 FUEL FARM #3 DEMOLITION PLAN

D-651 FUEL FARM #3 DEMOLITION

PHOTOS

AD151

FUEL FARM #3 FILTER BUILDING

AND CANOPY DEMOLITION FLOOR

PLAN

AD152

FUEL FARM #3 FILTER BUILDING

AND CANOPY DEMOLITION PHOTO

EXHIBIT

ED151 FUEL FARM #3 ELECTRICAL

DEMOLITION PLAN

H-001

FUEL FARM #3 AND #4 FILTER

BUILDING HAZARDS ABATEMENT

GENERAL NOTES AND QUANTITIES

H-111

FUEL FARM #4 FILTER BUILDING

HAZARDS ABATEMENT FLOOR

PLAN

H-151

FUEL FARM #3 FILTER BUILDING

HAZARDS ABATEMENT FLOOR

PLAN

CIVIL

C-111 FUEL FARM #4 OVERALL SITE PLAN

C-112 FUEL FARM #4 SITE, GRADING AND

DRAINAGE PLAN

C-113 FUEL FARM #4 ULSD TRUCK RACK

PLAN

C-114 FUEL FARM #4 FILTER BUILDING

AREA PLAN

C-115 FUEL FARM #4 TANK AREA PLAN

C-116 FUEL FARM #4 PLAN AND PROFILE

C-117 FUEL FARM #4 RETURN-TO-BULK

FUEL PIPING PLAN

C-151 FUEL FARM #3 OVERALL SITE PLAN

C-152 FUEL FARM #3 SITE, GRADING AND

DRAINAGE PLAN

C-153 FUEL FARM #3 OFFLOAD AND

RETAIL STATION PLAN

C-154 FUEL FARM #3 DISPENSER AREA

PLAN

C-155 FUEL FARM #3 WATER PLAN AND

PROFILE

C-156 FUEL FARM #3 SEWER PLAN AND

PROFILE

C-157 FUEL FARM #3 FUEL PIPING PLAN

AND PROFILE

C-411 FUEL FARM #4 REINFORCING AND

JOINT PLANS

C-451 FUEL FARM #3 REINFORCING AND

JOINT PLAN

DRAWING INDEX

SHEET ID SHEET TITLE

C-501 CIVIL DETAILS 1

C-502 CIVIL DETAILS 2

MECHANICAL-POL

M-001 MECHANICAL ABBREVIATIONS,

LEGEND, AND SYMBOLS

M-002 MECHANICAL NOTES 1

M-003 MECHANICAL NOTES 2

M-004 MECHANICAL NOTES 3

M-011 FUEL FARM #4 OVERALL JP-8 FLOW

DIAGRAM

M-012 FUEL FARM #4 JP-8 UNDERGROUND

STORAGE TANKS P&ID

M-013 FUEL FARM #4 JP-8 FILTER

BUILDING P&ID

M-014 FUEL FARM #4 JP-8 TRUCK

FILLSTAND AND RTB P&ID

M-015 FUEL FARM #4 JP-8 PRODUCT

RECOVERY SYSTEM P&ID

M-016 FUEL FARM #4 ULSD SYSTEM P&ID

M-051 FUEL FARM #3 AGE REFUELING

STATION TANKS P&ID

M-052 FUEL FARM #3 AGE REFUELING

STATION DISPENSER P&ID

MS111 FUEL FARM #4 OVERALL

MECHANICAL POL SITE PLAN

M-111 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 1

M-112 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 2

M-113 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 3

M-114 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 4

M-115 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 5

M-116 FUEL FARM #4 MECHANICAL POL

PIPING PLAN 6

M-151 FUEL FARM #3 OVERALL

MECHANICAL POL SITE PLAN

M-212 FUEL FARM #4 YARD PIPING

ELEVATIONS

M-214 FUEL FARM #4 FILTER SEPARATOR

ROOM PIPING ELEVATIONS 1

M-215 FUEL FARM #4 FILTER SEPARATOR

ROOM PIPING ELEVATIONS 2

M-216 FUEL FARM #4 YARD PIPING

ELEVATIONS

M-414 FUEL FARM #4 MECHANICAL POL

FILTER BUILDING PIPING PLAN

M-501 FUEL FARM #4 50,000 GALLON JP-8

UST

M-502 FUEL FARM #4 4,000 GALLON

PRODUCT RECOVERY TANK T-407

M-503

FUEL FARM #4 25,000 GALLON ULSD

FUEL STORAGE TANK (T-408)

M-504 FUEL FARM #4 MECHANICAL

DETAILS 1

M-505 FUEL FARM #4 MECHANICAL

DETAILS 2

M-506 FUEL FARM #4 MECHANICAL PIPING

SUPPORT DETAILS 1

M-507 FUEL FARM #4 MECHANICAL PIPING

SUPPORT DETAILS 2

M-508 FUEL FARM #4 MECHANICAL

DETAILS 3

M-509 FUEL FARM #3 FUEL DISPENSER

DETAILS

M-510 FUEL FARM #3 DISPENSER

SIGNAGE DETAILS

M-511 FUEL FARM #4 FILTER SEPARATOR

DETAILS

M-512 FUEL FARM #3 AND #4 SUMP

DETAILS

M-601 EQUIPMENT SCHEDULES

STRUCTURAL

S-001 STRUCTURAL NOTES AND LEGEND

S-002 STRUCTURAL ABBREVIATIONS AND

SPECIAL INSPECTIONS

DRAWING INDEX

SHEET ID SHEET TITLE

S-101 FILTER BUILDING FOUNDATION

PLAN

S-102 FILTER BUILDING SLAB PLAN

S-103

FILTER BUILDING PRIMARY

FRAMING AND ENTRY CANOPY

FRAMING PLAN

S-104

RETAIL STATION BUILDING

FOUNDATION, SLAB AND PRIMARY

FRAMING PLANS

S-105 REMOTE CONTAINMENT BASIN AND

STEEL VAULT PLANS

S-106 UST AND PRT VAULT ROLLING

COVER PLANS AND ELEVATIONS

S-201 FILTER BUILDING FRAMING

ELEVATIONS

S-202 FILTER BUILDING ENTRY CANOPY

FRAMING ELEVATIONS

S-203 RETAIL BUILDING FRAMING

ELEVATIONS

S-301 REMOTE CONTAINMENT BASIN AND

STEEL VAULT SECTION

S-501 FILTER BUILDING AND CANOPY

FOUNDATION DETAILS

S-502

FILTER AND RETAIL STATION

BUILDING CONCRETE SLAB ON

GRADE DETAILS

S-503 PIPE SUPPORT FOUNDATION

DETAILS

S-504 EXTERIOR PIPE SUPPORT

FOUNDATION DETAILS

S-505 REMOTE CONTAINMENT AND

STEEL VAULT DETAILS

S-506

TANK VAULT ACCESS STAIR /

PLATFORM AND CANOPY FRAMING

DETIALS

S-507 VAULT ROLLING COVER DETAILS -

SHEET 1 OF 3

S-508 VAULT ROLLING COVER DETAILS -

SHEET 2 OF 3

S-509 VAULT ROLLING COVER DETAILS -

SHEET 3 OF 3

ARCHITECTURAL

A-001

FUEL FARM #3 AND #4

ARCHITECTURAL GENERAL NOTES,

ABBREVIATIONS, AND SYMBOLS

A-111 FUEL FARM #4 FILTER BUILDING

FLOOR PLAN

A-112 FUEL FARM #4 FILTER BUILDING

REFLECTED CEILING

A-113 FUEL FARM #4 FILTER BUILDING

ROOF PLAN

A-151 FUEL FARM #4 FILTER BUILDING

INTERIOR ELEVATION

A-152 FUEL FARM #3 RETAIL STATION

ROOF PLAN

A-211 FUEL FARM #4 FILTER BUILDING

EXTERIOR ELEVATIONS

A-251 FUEL FARM #3 RETAIL STATION

EXTERIOR ELEVATIONS

A-311 FUEL FARM #4 FILTER BUILDING

BUILDIGN SECTIONS

A-312 FUEL FARM #4 FILTER BUILDING

BUILDING SECTIONS

A-313 FUEL FARM #4 FILTER BUILDING

BUILDING SECTIONS

A-351 FUEL FARM #3 RETAIL STATION

BUILDING SECTIONS

A-352 FUEL FARM #3 RETAIL STATION

BUILDING SECTIONS

A-353 FUEL FARM #3 RETAIL STATION

BUILDING SECTIONS

A-451

FUEL FARM #3 RETAIL STATION

FLOOR PLAN & REFLECTED

CEILING PLAN

A-501 FUEL FARM #3 BUILDING DETAILS

A-502 FUEL FARM #3 DOOR, WINDOW,

AND LOUVER DETAILS

A-601 FUEL FARM #3 AND #4 DOOR

SCHEDULE AND DETAILS

A-602 FUEL FARM #3 AND #4 FINISH

SCHEDULE

MECHANICAL - HVAC

DRAWING INDEX

SHEET ID SHEET TITLE

MH001 MECHANICAL HVAC LEGEND

MH111 FUEL FARM #4 FILTER BUILDING

MECHANICAL HVAC PLAN

MH151 FUEL FARM #3 RETAIL STATION

MECHANICAL HVAC PLAN

MH301 TANK FARM #3 AND #4

MECHANICAL HVAC SECTIONS

MH501 FUEL FARM #3 AND #4 MECHANICAL

HVAC DETAILS

MH601 FUEL FARM #3 AND #4 MECHANICAL

HVAC SCHEDULES

MH901 FUEL FARM #3 AND #4 MECHANICAL

CONTROL SCHEMATICS

PLUMBING

P-001 FUEL FARM #3 AND #4 PLUMBING

LEGEND

P-111 FUEL FARM #4 FILTER BUILDING

BELOW GRADE PLUMBING PLAN

P-112 FUEL FARM #4 FILTER BUILDING

ABOVE GRADE PLUMBING PLAN

P-151 FUEL FARM #3 RETAIL STATION

PLUMBING PLANS

P-501 FUEL FARM #3 AND #4 PLUMBING

DETAILS

P-601 FUEL FARM #3 AND #4 PLUMBING

SCHEDULES

P-901 FUEL FARM #3 PLUMBING

ISOMETRICS

ELECTRICAL

E-001

ELECTRICAL LEGEND,

ABBREVIATIONS, GENERAL NOTES,

AND FIXTURE SCHEDULE

E-111 FUEL FARM #4 ELECTRICAL SITE

PLAN

E-112 FUEL FARM #4 FILTER BUILDING

ELECTRICAL PLAN

E-151 FUEL FARM #3 ELECTRICAL SITE

PLANS

E-152 FUEL FARM #3 RETAIL STATION

ELECTRICAL PLAN

E-411 FUEL FARM #4 ENLARGED PLANS

E-412 ENLARGED INSTRUMENTATION

AND ELECTRICAL PLANS

E-413 ENLARGED GROUNDING PLANS

E-501 ELECTRICAL DETAILS 1

E-502 ELECTRICAL DETAILS 2

E-503 LIGHTNING PROTECTION AND EFSO

DETAILS

E-511 FUEL FARM #4 FILTER BUILDING

ONE-LINE DIAGRAM

E-512 FUEL FARM #4 FILTER BUILDING

ONE-LINE DIAGRAM

E-551

FUEL FARM #3 RETAIL BUILDING

ONE-LINE DIAGRAM GROUNDING

DETAIL

E-601 PANEL SCHEDULES

E-701 HAZARDOUS LOCATION

ELEVATIONS

E-711 FUEL FARM #4 HAZARDOUS

BOUNDARY PLAN

E-712 FILTER BUILDING HAZARDOUS

BOUNDARY PLAN

E-751 FUEL FARM #3 HAZARDOUS

BOUNDARY PLAN

E-801 ELECTRICAL CONTROL SEQUENCE

E-811

FUEL FARM #4 PLC BLOCK

DIAGRAM, CONTROL LEGEND AND

INSTRUMENTATION WIRING

SCHEDULE

E-812 FUEL FARM #4 CONTROL PANEL

BLOCK DIAGRAMS

E-813 FUEL FARM #4 CONTROL PANEL

BLOCK DIAGRAMS

E-814 FUEL FARM #4 CONTROL PANEL

ELEVATIONS

CATHODIC PROTECTION

EC111 FUEL FARM #4 CATHODIC

PROTECTION PLAN

EC501 CATHODIC PROTECTION DETAILS 1

DRAWING INDEX

SHEET ID SHEET TITLE

EC502

FUEL FARM #4 JP-8 UNDERGROUND

STORAGE TANKS CATHODIC

PROTECTION PLAN

EC503

FUEL FARM #4 JP-8 UNDERGROUND

STORAGE TANKS CATHODIC

PROTECTION PLAN

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

/0

AL

AS

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-G-002.dwg MODIFIED BY: bransonm PLOT DATE: May 24, 2021 - 12:35pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-G

-0

.d w g

W

1-

KB

-2 0-

R -X

XX

X

G-002

D R

AW

IN

G

IN

D

EX

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

G-002

D R

AW

IN

G

IN

D

EX

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-G-003.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:02pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-G

-0

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

G-003

G

EN

ER

AL

N O

TE

S, LE

G

EN

D

A N

D A

BB

R

EV

IA

TI

O

N S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

GENERAL NOTES .

1. LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE

FROM GIS DRAWINGS AND ARE APPROXIMATE ONLY.

VERIFY SIZE, DEPTH, HORIZONTAL AND VERTICAL

LOCATIONS OF UTILITIES ENCOUNTERED DURING

CONSTRUCTION. NOTIFY CONTRACTING OFFICER OF ANY

DISCREPANCIES. RECORD LOCATIONS AND CHANGES TO

UTILITIES IN SURVEY NOTES AND ON AS-BUILT

DRAWINGS. PROTECT UTILITIES/STRUCTURES TO

REMAIN. IN THE EVENT OF DAMAGE TO EXISTING

UTILITIES OR STRUCTURES, IMMEDIATELY NOTIFY THE

CONTRACTING OFFICER AND REPAIR DAMAGE AT NO

ADDITIONAL COST TO THE GOVERNMENT.

2. LOCATION OF CONTRACTOR LAYDOWN AREA, DISPOSAL

SITE, AND BORROW SITE ARE SHOWN ON SHEET G-101

AND G-102. COORDINATE LAYDOWN AREA WITH

CONTRACTING OFFICER A MINIMUM OF 14 DAYS PRIOR

TO START OF WORK.

3. PROVIDE AND IMPLEMENT SWPPP IN ACCORDANCE WITH

JBER STORMWATER MANAGEMENT PLAN AND

SPECIFICATION 01 57 34.00 29.

4. PROVIDE EROSION AND SEDIMENTATION CONTROL FOR

SOIL STOCKPILES. DIRECT SURFACE WATER AWAY FROM

STOCKPILE SITES.

5. SMOKING IS PROHIBITED WITHIN THE AIRFIELD AREA

(SECURED SIDE OF FENCE).

6. NOTIFY CONTRACTING OFFICER AND BASE FIRE CHIEF IN

WRITING 24 HOURS PRIOR TO PERFORMING HOT WORK.

OBTAIN HOT WORK PERMIT PRIOR TO BEGINNING WORK.

7. PROVIDE FIRE EXTINGUISHER AT EACH LOCATION OF

HOT WORK. KEEP ONE SPARE EXTINGUISHER AT EACH

FIRE WATCH AT ALL TIMES.

8. TAKE PRECAUTIONS TO MINIMIZE STATIC IGNITION

HAZARD.

9. FACILITY ROADWAYS MUST BE KEPT CLEAR AND

ACCESSIBLE AT ALL TIMES DURING CONSTRUCTION. IF

ROAD BLOCKAGE IS REQUIRED, NOTIFY FIRE

DEPARTMENT 24 HOURS PRIOR TO WORK.

10. COORDINATE OFF-SITE CLOSURES WITH THE

CONTRACTING OFFICER. PROVIDE NOTIFICATION OF

ROAD CLOSURE TO THE CONTRACTING OFFICER A

MINIMUM OF 7 DAYS IN ADVANCE. TRAVELWAYS MUST

NOT BE CLOSED MORE THAN 24 HOURS. PROVIDE

NECESSARY TRAFFIC BARRIERS, SIGNAGE AND WARNING

LIGHTS AS REQUIRED.

11. EXISTING GROUND CONTOURS SHOWN ARE FROM

TOPOGRAPHIC SURVEY PERFORMED BY USACE ALASKA

DISTRICT IN APRIL 2019. CONTRACTOR MUST FIELD

VERIFY SITE CONDITIONS.

12. GEOTECHNICAL BORINGS WERE PERFORMED BY USACE

ALASKA DISTRICT IN JULY 2019.

ABBREVIATIONS

ADEC ALASKA DEPARTMENT OF ENVIRONMENTAL

CONSERAVATION

AGE AIRCRAFT GROUND EQUIPMENT

BOP BOTTOM OF PIPE

CENTERLINE

C/M CIVIL/MECHACICAL

COORD COORDINATION

CP CATHODIC PROTECTION

DEMO DEMOLITION

DIA, Ø DIAMETER

DIP DUCTILE IRON PIPE

E EAST, ELECTRICAL, EASTING

EFSO EMERGENCY FUEL SHUTOFF

ELEV ELEVATION

EW EACH WAY

FF FINISH FLOOR

FF3 FUEL FARM #3

FF4 FUEL FARM #4

FG FINISH GRADE

FT FEET

FOD FOREIGN OBJECT DEBRIS

GB GRADE BREAK

HDPE HIGH DENSITY POLYETHYLENE

HMA HOT-MIX ASPHALT

HP HIGH POINT

INV INVERT

JBER JOINT BASE ELMENDORF RICHARDSON

L LENGTH

LF LINEAR FEET

LPD LOW POINT DRAIN

MAX MAXIMUM

ME MATCH EXISTING

MIN MINIMUM

MCC MOTOR CONTROL CENTER

N NORTH, NORTHING

NO, # NUMBER

NTS NOT TO SCALE

OC ON CENTER

PCS PETROLEUM CONTAMINATED SOILS

PI POINT OF INTERSECTION

POL PETROLEUM OIL LUBRICANT

PRT PRODUCT RECOVERY TANK

R RADIUS

S SOUTH

SD STORM DRAIN

SF SQUARE FEET

SS STAINLESS STEEL

STA STATION

SWPPP STORM WATER POLLUTION PREVENTION PLAN

T/ TOP OF

T&B TOP AND BOTTOM

TYP TYPICAL

ULSD ULTRA LOW SULFUR DIESEL

USACE UNITED STATES ARMY CORPS OF ENGINEERS

UST UNDERGROUND STORAGE TANK

VIL VEHICLE IDENTIFICATION LINK

W WEST

W/ WITH

& AND

@ AT

± PLUS OR MINUS

% PERCENT

° DEGREE

LC

LEGEND

EXISTING NEW DESCRIPTION

GRADE BREAK

DRAINAGE SWALE

PETROLEUM OIL LUBRICANT PIPE ABOVE GROUND

PETROLEUM OIL LUBRICANT PIPE BELOW GROUND

UNDERGROUND COMMUNICATIONS

UNDERGROUND ELECTRIC

STEAM LINE

SANITARY SEWER

STORM DRAIN

VENT

WATER LINE

FENCE

ELEVATION CONTOUR

EDGE OF ASPHALT

EDGE OF GRAVEL

BUILDING

CONCRETE

SPOT ELEVATION

VALVE

CLEANOUT

MONITORING WELL

LIGHT TOWER

MANHOLE

SIGN

LIGHT POLE

FIRE HYDRANT

ELECTRICAL PEDESTAL

ELECTRICAL TRANSFORMER

TEST BORING

STORM DRAIN INLET

BOLLARD

JUNCTION BOX

EMERGENCY FUEL SHUT-OFF

LIMITS OF REMOVAL (REMOVE ON SHADED SIDE)

CATHODIC PROTECTION TEST STATION

GB

POL x POL

POL x POL

C x C

ES x

STEAM x

SS x SS

SD x SD

V x V

W x W

X

204 204

124.77

C.O.

MW

U.E.

T T

AP 4789

J

S

CP

ARROW INDICATES DIRECTION OF CUTTING PLANE

GRID REFERENCE

INDICATES SHEET ID WHERE SECTION IS DRAWN

GRID REFERENCE

INDICATES SHEET ID WHERE DETAIL IS DRAWN

ARROW INDICATES DIRECTION PHOTO IS FACING

GRID REFERENCE

INDICATES SHEET ID WHERE PHOTO IS SHOWN

DRAWING SCALE

GRID REFERENCE

TITLE

SCALE: 1" = 1'-0"

N

0' 1' 2'A3

PLAN NORTH NORTH

GENERAL EXCAVATION NOTES .

1. OBTAIN A DIG PERMIT PRIOR TO EXCAVATION.

2. OPEN EXCAVATIONS, BRACING , AND UNDERPINNING

MUST CONFORM TO EM 385-1-1. WHERE MORE

STRINGENT SAFETY AND HEALTH STANDARDS ARE

SET FORTH BY FEDERAL, STATE OR LOCAL

REGULATIONS, THE MORE STRINGENT STANDARDS

APPLY.

3. PRIOR TO WORK, THE CONTRACTOR MUST HAVE

UTILITY LOCATES PERFORMED. ALL UTILITIES NOT

INDICATED ON THE PLANS OR MISLABLED MUST BE

BROUGHT TO THE ATTENTION OF THE CONTRACTING

OFFICER FOR DIRECTION, PRIOR TO EXCAVATION.

PREVIOUSLY UNKNOWN UTILITIES ENCOUNTERED

DURING DEMOLITION MUST ALSO BE BROUGHT TO

THE ATTENTION OF THE CONTRACTING OFFICER,

PRIOR TO BACKFILLING.

4. EXCAVATED SOIL MUST BE SCREENED AND

CONTAMINATED MATERIAL MUST BE STOCKPILED,

AND DISPOSED PER SPECIFICATION 31 09 20.00 29.

5. RESTORE DISTURBED PROPERTY OUTSIDE OF WORK

LIMITS TO ORIGINAL CONDITIONS.

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

JUNEAU

Nome Fairbanks

Anchorage

ALASKA

JBER

VA

N

D

EN

B

ER

G A

VE

N

U E

TA

LL

EY

WARRIOR DRIVE

POST ROAD GATE

GOVERNMENT

HILL GATE

BONIFACE GATE

AVE

CLEAN SOIL

DISPOSAL SITE

BORROW SITE

HAUL ROUTE

FA

IR

C

H

IL

D A

VE

ARCTIC

HAUL ROUTE

CONCRETE

DISPOSAL

SITEPROJECT

LOCATION

FUEL FARM

#4 GATE

SI

JA

N A

VE

N

U E

LAYDOWN

AREA

FIGHTER DRIVE

PROJECT

LOCATION

B O

N

IF

A C

E

PA

R K

W A

Y

GLENN HIGHWAY

M U

LD

O

O N

R O

A D

POST ROAD

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-G-101.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:02pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-G

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

G-101

LO

C

AT

IO

N M

AP

S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

LOCATION MAP

SCALE: NTS

N

F1

ANCHORAGE MAP

SCALE: NTS

N

A1 JBER MAP

SCALE: 1" = 1000'

N

A4 0' 1000' 2000'

KN

IK

A

RM

NOTES

1. CONTACT BOB MCELROY (673 CES/CENM 907-384-3081) 30

DAYS PRIOR TO MOBILIZATION TO COORDINATE USE OF

BORROW PIT AND DISPOSAL SITES.

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X

T

T

T T

TTT T

T

POLx

E E

E

E

POL x

POLx

POLx

POL x

POLx POLx

POLx POLx

POLx

PO

Lx

POLx POLx

POLx

TV

TV

TV

S

TV

POL

x

POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx

C

PO

L x

TV

GOLD RAMP

POLx POLx

PO

L x

POLx POLx

H O

LL

AN

D

IA

D R

IV

E

AIRFIELD VEHICLE ACCESS ROAD

SLAMMER AVENUE

BI

SM

AR

K

SE

A

D R

IV

E

ES

x

ES x

ES

x

SLAMMER AVENUE

HAUL ROUTE

FUEL FARM #4 FUEL FARM #3

FUEL FARM #4 GATE

(OVERALL NOTE 2)

OVERALL

NOTE 1

ISOLATE FUEL FARM #4 FROM

TRANSFER PIPELINE (OVERALL NOTE 4)

TRANSFER PIPELINE

(OVERALL NOTE 4)

0'

125'

LAYDOWN AREA

(OVERALL NOTE 5)

ISOLATE FUEL

FARM #3 FROM

TRANSFER

PIPELINE

(OVERALL

NOTE 4)

AIRFIELD

PRIMARY

SURFACE

(SOUTH LIMITS)

TANK 325

TANK 337

TANK 45

TANK 44

TANK 43

TANK 42

BUILDING 11567

(OVERALL

NOTE 6)

LOW PROFILE

BARRICADES

LOW PROFILE

BARRICADES

LOW PROFILE

BARRICADES

BUILDING 11583

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-G-102.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:02pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-G

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

G-102

W O

R K

R

ES

TR

IC

TI

O

N S

PL

AN

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

WORK RESTRICTIONS PLAN

SCALE: 1" = 50'

N

0' 50' 100'A1

OVERALL SCHEDULING AND PHASING

NOTES

1. MAINTAIN AT LEAST ONE LANE IN BISMARK SEA DRIVE FOR

ACCESS TO GOLD RAMP. PROPER TRAFFIC CONTROL MUST

BE PROVIDED WHEN WORKING IN BISMARK SEA DRIVE.

2. CONSTRUCTION TRAFFIC MUST USE HAUL ROUTE, UNLESS

OTHERWISE APPROVED INCLUDING ACCESSING SITE

THROUGH FUEL FARM #4 GATE.

3. PREPARE A PHASING PLAN AS PART OF THE

PRE-CONSTRUCTION SUBMITTALS TO BE APPROVED BY THE

CONTRACTING OFFICER.

4. THE TRANSFER PIPELINE MUST REMAIN IN SERVICE

THROUGH THE DURATION OF CONSTRUCTION, EXCEPT AS

NOTED FOR FUEL FARM #3 DEMOLITION.

5. LAYDOWN AREA IS NORTHWEST OF BISMARK SEA

DRIVE/SIJAN AVENUE INTERSECTION. CONTRACTOR MAY

UTILIZE ENTIRE OPEN AREA PROVIDED TREES (TO WEST)

ARE NOT DISTURBED.

6. GOLD RAMP MAY NOT BE USED, UNLESS COORDINATED

WITH AIRFIELD MANAGER.

7. WORK WHICH AFFECTS BASE NORMAL DAY TO DAY

OPERATIONS MUST BE COORDINATED WITH CONTRACTING

OFFICER.

8. COORDINATE WITH CONTRACTING OFFICER FOR ANY

ADJACENT CONSTRUCTION PROJECTS.

FUEL FARM #4 NOTES

1. FUEL FARM #4 MAY BE TAKEN OUT OF OPERATION DURING

CONSTRUCTION. R-11 REFUELING AT FUEL FARM #4 WILL NOT

BE OPERATIONAL FOR THE DURATION OF CONSTRUCTION.

2. TRANSFER PIPING AND ISOLATION VALVE MUST BE

PROTECTED THROUGH THE DURATION OF CONSTRUCTION.

SEE SHEET D-111 FOR LOCATION OF ISOLATION VALVE

ADJACENT TO EXISTING FILTER BUILDING 11583 AND SHEET

M-114 FOR LOCATION OF ISOLATION VALVE ADJACENT TO NEW

FILTER BUILDING.

FUEL FARM #3 NOTES

1. FUEL FARM #3 MUST HAVE EXISTING DISPENSING CAPABILITIES

MAINTAINED OCTOBER 1ST THROUGH APRIL 30TH. CUTOVER

MUST HAPPEN BETWEEN MAY 1ST AND SEPTEMBER 30TH.

2. FUEL FARM #3 TANK 325 AND TANK 337, WHICH SERVE THE

EXISTING DISPENSERS, MUST HAVE A FUEL DELIVERY PRIOR

TO THE DISTURBANCE OF THE EXISTING OFFLOAD AREA.

GOVERNMENT WILL PROVIDE FUEL DELIVERY, COORDINATE

WITH CONTRACTING OFFICER A MINIMUM OF 30 DAYS IN

ADVANCE.

3. THE NEW AIRCRAFT GROUND EQUIPMENT (AGE) REFUELING

STATION AND OPERATIONS BUILDING MUST BE CONSTRUCTED,

TO THE EXTENT POSSIBLE, PRIOR TO TAKING THE EXISTING

AGE STATION OUT-OF-SERVICE TO MINIMIZE DOWNTIME. TIE-IN

TO TANKS 325 AND 337 CAN ONLY BE PERFORMED BETWEEN

MAY 1ST AND SEPTEMBER 30TH.

4. NEW AGE REFUELING STATION MUST BE IN OPERATION PRIOR

TO REMOVAL OF TANKS 42 THROUGH 45.

5. NOTIFY THE GOVERNMENT 30 DAYS IN ADVANCE TO SCHEDULE

SYSTEM DOWNTIME TO DEMOLISH THE EXISTING FUEL FARM

#3 CONNECTION TO THE TRANSFER PIPELINE. RESTORE THE

TRANSFER PIPELINE. SYSTEM DOWNTIME MUST NOT EXCEED

14 DAYS WITHOUT WRITTEN AUTHORIZATION.

LOW PROFILE BARRIER NOTES

1. BARRIERS MUST NOT EXCEED 10 INCHES IN HEIGHT

(EXCLUSIVE OF LIGHTS). MUST BE OF LOW MASS: EASILY

COLLAPISBILE UPON CONTACT WITH AN AIRCRAFT; WEIGHTED

OR STURDILY ATTACHED TO THE SURFACE TO PREVENT

DISPLACEMENT FROM JET BLAST OR OTHER WIND

DISTURBANCE.

2. BARRIER STRIPING MUST BE ORANGE AND WHITE

CONFORMING TO FAA AC 150/5370-2 OPERATIONAL SAFTEY ON

AIRPORTS DURING CONSTRUCTION.

3. FLASHING LIGHTS MUST BE USED AND HAVE AT LEAST 5

CANDELAS EFFECTIVE INTENSITY AND FLASH AT A RATE OF 55

TO 160 FLASHES PER MINUTE.

4. MAINTAIN A PERSON AVAILABLE 24 HOURS A DAY FOR

EMERGENCY MAINTENANCE OF LOW PROFILE BARRICADES

AND HAZARD LIGHTS. BEGIN REPAIR WITHIN 1 HOUR OF

NOTIFICATION FROM CONTRACTING OFFICER.

5. SPACE AT A MAXIMUM OF 10 FOOT ON CENTER UNLESS

OTHERWISE NOTED.

6. AT FUEL FARM #3 BARRIER LOCATIONS WILL NEED TO BE

COORDINATED WITH PHASING. BARRIERS MUST NOT BLOCK

REQUIRED FUELING OPERATIONS. ARRANGE BARRIERS TO

KEEP AIRFIELD VEHICLE TRAFFIC OUT OF CONSTRUCTION

AREAS.

AIRFIELD NOTES

1. WORKERS MUST ATTEND CLASS FOR AIRFIELD DRIVING.

CLASS WILL BE UP TO ONE HOUR LONG. CONTACT BRANDON

DOTY AT 907-552-8557 OR BRANDONT.DOTY.2@US.AF.MIL.

2. DRIVERS WHO WILL ONLY BE ON-SITE FOR A SHORT

DURATION OF CONSTRUCTION (E.G. CONCRETE TRUCK

DRIVER) MAY BE ESCORTED BY A WORKER WHO HAS

COMPLETED THE AIRFIELD DRIVING CLASS.

3. ACCESS GATE MUST BE SECURED AT ALL TIMES.

CONTRACTOR MAY CHOOSE TO PROVIDE A GUARD AT THE

GATE.

4. CONTRACTOR MUST NOTIFY AIRFIELD MANAGEMENT

OPERATIONS (907-522-2107) PRIOR TO THE START AND AFTER

COMPLETION OF WORK DAILY.

5. LOW PROFILE BARRIERS ARE REQUIRED AT THE NORTHERN

EDGE OF THE CONSTRUCTION SITE. PURPOSE IS BOTH TO

KEEP CONSTRUCTION TRAFFIC OFF OF AIRFIELD AND ALSO

TO KEEP AIRFIELD TRAFFIC FROM ENTERING CONSTRUCTION

SITE.

6. PREVENT FOREIGN OBJECT DEBRIS (FOD) FROM FROM

ENTERING BISMARK SEA DRIVE AND THE AIRFIELD VEHICLE

ACCESS ROAD. IMMEDIATELY CLEAN ANY FOD WHICH

OCCURS.

7. WORK WITHIN 20 FEET OF AIRFIELD VEHICLE ACCESS RAMP

MUST BE CLOSELY COORDINATED WITH AIRFIELD MANAGER

AND MAY NOT OCCUR DURING PLANNED EXERCISES. 2021

EXERCISES ARE PLANNED FOR JULY 8 THROUGH AUGUST 18.

COORDINATE WITH AIRFIELD MANAGER EARLY 2022 FOR 2022

EXERCISE SCHEDULE.

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

X X X X X X X X X X X X X X X X X X X X X X

SD/MH

TOP=186.20

N INV=180.90 (6")

E INV=179.02 (18")

W INV=179.26 (18")

NW INV=179.90 (12")

CB

TOP=186.14

S INV=183.69(6")

SD/MH

TOP=185.58

N INV=180.84 (6")

E INV=178.01 (18")

W INV=178.13 (18")

CB

TOP=184.98

S INV=182.67 (6")

SD/MH

TOP=185.04

N INV=177.47 (12")

E INV=177.44 (12")

W INV=178.01 (12")

SS/MH

TOP=185.42

N INV=178.91(6")

ELEC/MH

TOP=187.19

F.F.=178.76

SS/MH

TOP=185.76

N INV=179.79 (10")

NE INV=183.77 (8")

SE INV=179.92 (8")

W INV=179.56 (12")

UTILIDOR

TOP=186.01

F.F.=178.86

SS/MH

TOP=185.39

N INV=175.73 (6")

S INV=175.72 (6")

SS/MH

TOP=187.24

E INV=176.66 (8")

S INV=176.41 (8")

SS/MH

TOP=185.16

E INV=179.15 (12")

SW INV=179.47 (12")

UTILIDOR

TOP=185.77

F.F.=177.69

CB/CURB

TOP=186.61

F.F.=182.40

FUEL PUMP (TYP.)

ELEC/MH

TOP=185.16

F.F.=176.32

BLDG

11583

BLIND FLANGE

16" x 16" CONCRETE

FOOTING (TYP.)

GRAVEL ROAD

E 1, 3, E 1, 3, E 1, 3, E 1, 4, E 1, 4, N 2,648,400

N 2,648,600

N 2,648,800

N 2,648,400

4.6

4.8

4.8

4.7

5.0

4.8

4.9

4.9

5.1

5.2

5.5

5.8

5.0

5.0

5.0

5.0

5.2

4.8

4.8

4.9

4.6

4.9

4.9

5.1

5.1

5.3

5.5

4.9

5.1

4.6 18

5.1

4.9 18 5.6

T

G

7.4

7.4

TV

6.6

T

J

TV

7.7

T

T

6.9

6.4

7.3

7.5

7.1

7.0

6.4

TV

8.1

8.1

8.1

8.2

T

JJ

5.5

5.9

6.7

7.2

7.5

8.0

8.1

8.5

8.5

7.9

7.5

7.2

6.9

6.4

6.8

6.9

7.2

7.4

7.5

7.4

7.4

7.6

7.8

7.9

8.3

8.5

8.4

8.2

8.0

7.5

7.3

6.5

6.0

5 18 5.8

5.8

7.3

7.7

8.2

8.3

8.6

8.4

7.6

7.1

6.8

7.0

7.4

SS S

7.6

7.6

7.5

7.1

7.6

7.4

7.9

7.9

7.9

7.9

7.9

7.6

7.7

7.6

7.7

7.6

7.6

7.6

7.6

7.7

7.7

7.8

7.7

6.7

7.6

7.7

7.6

7.6

7.6

7.6

7.4

7.4

6.9

7.6

7.6

6.7

6.8

6.9

6.6

6.5

6.5

6.5

6.6

6.4

6.4

6.3

T

5.9

6.0

6.0

6.1

6.5

7.1

6.5

6.4

6.2

6.0

6.1

6.0

7.4

5.0

5.8

3 18 5.6

5.6

5.5

5.4

5.2

5.1

5.5

5.7

5.9

5.8

5.4

5.4

5.1

5.5

5.6

5.4

5.2

5.0

5.1

5.4

T

6.1

6.3

6.4

6.5

6.5

6.9

7.2

7.0

6.0

4.6

4.6

4.7

4.8

5.8

6.8

7.0

7.3

5.1

4.9

5.3

6.1

5.4

5.0

5.4 18

5.6

6.1

6.118

5.4

5.7

5.6

5.5

5.4

5.0

5.018 4.7

5.0

5.9 18

6.5

6.8 18 7.1

7.4

7.3

7.4

7.3

4.8

4.8

3.6

3.7

4.9

5.3

5.2

4.6

6.3

6.3

6.0

6.1

5.5

5.9

6.6

7.1

7.0

7.6

7.3

7.3

6.7

5.8

7.1

6.6

6.1

6.3

6.1

7.3

7.3

7.6

7.6

6.9

5.8

6.4

7.0

7.5

7.5

7.8

7.8

7.3

6.7

6.4 18

6.7

6.8

6.318

6.3

6.1

5.818 6.1

6.8

8.0

6.9

6.5

6.4

7.6

7.5

7.5

7.5

7.4

6.4

6.6

6.7

7.0

7.4

6.5

7.1

7.3

7.7

7.8

7.9

8.0

6.9 18

6.6

6.9

7.618

7.3

6.9

6.7

6.8

6.8

7.0

7.4

8.918

8.1

7.2

7.7

7.9

7.5

7.6

7.5

7.0

8.9

9.7

9.218

8.618 7.8

8.618

8.0

7.6

7.6

7.7 18

8.0 18 8.3

7.3

7.9

7.2

6.9

6.6

6.7

F.F.= 185.94

TNK

TNK

TNK

PIPE EXITS

GROUND

PIPE EXITS

GROUND

EJ

J E

2" CONDUIT ON WALL

4" VENT PIPES

ON WALL

2" CONDUIT ON WALL

1" CONDUIT ON WALL

FUEL LINE EXITS

GROUND AND

ENTERS WALL AT 10'BLDG 11584

FUEL LINE EXITS

GROUND AND

ENTERS WALL AT 2'

GATE

BI

SM

AR

K

SE

A

D R

IV

E

GOLD RAMP

AP 4799 AP 4801

AP 4802

AP 4804

AP 4800

AP 4798

AP 4797

AP 4803

AP 4805

AP 4806

AP 4807

AP 4808

SURVEY CONTROL

HORIZONTAL CONTROL

Coordinates are ASPC Zone 4, NAD83 (1992) in US Survey Feet. The Basis of Coordinates are U.S.A.C.E points "TT AN 7", having a value of N2,644,654.40 and E1,673,694.16, and "N-1B-DE", having a value of N2,650,423.79 and E1,679,364.05. Other positions are derived from GPS observations taken April 15, 2004.

SCALE FACTOR

The Project Combined Scale Factor is 0.99989173943. To convert ground distances to ASP grid distances, multiply by a combined scale factor of 0.99990385. To convert ASP grid distances to ground distances, multiply by a combined scale factor of 100000000/99989173943.

VERTICAL CONTROL

Elevations are NAVD88 U.S. Feet. The Basis of Elevations is Joint Base Elmendorf Richardson Control Point "MB-137A", a brass cap having a value of 180.44 feet. Elevations of other points were determined by differential leveling using closed level loops originating from MB-137A.

Measurements were taken in April, 2019.

UTILITY NOTE

The underground utilities shown have been located from field survey information. The surveyor makes no guarantees that the underground utilities shown comprise all such utilities in the area, either in service or abandoned. The surveyor further does not warrant that the underground utilities shown are in the exact location indicated, although he does certify that they are located as accurately as possible from information available.

A title search was not performed and there was no attempt to locate easements of record.

HISTORICAL UTILITY ASBUILT DRAWINGS AND OTHER INFORMATION MAY NOT

RELATE TO THE HORIZONTAL AND VERTICAL DATUM FOR THIS PROJECT. USE

HISTORICAL INFORMATION WITH CAUTION!

SURVEY CONTROL POINTS

POINT NORTHING EASTING ELEVATION DESCRIPTION

FSF-1 2,647,682.43 1,672,431.41 176.75 BRASS CAP

FSF-2 2,647,203.03 1,672,913.09 177.90 BRASS CAP

MB-137A 2,648,121.92 1,672,948.52 180.44 BRASS CAP

LEGEND

LIGHT POLE

TRANSFORMER W/ PAD

JUNCTION BOX

MANHOLE

GUARD POST / BOLLARD

FENCE LINE

MAJOR CONTOUR

MINOR CONTOUR

SPOT ELEVATION

J

CATHODIC PROTECTION TEST STATION

TRANSFORMER

X

XX.XX

POL PETROLEUM, OIL, LUBRICANTS LINE

SHUT OFF VALVE

F.F. FINISH FLOOR

ACCESS LID

CATCH BASIN

E METER BOX

VERTICAL PUMP

EDGE OF PAVEMENT

BUILDING

CONCRETE

G NATURAL GAS VALVE

TV CABLE TV PEDESTAL

T

MW MONITORING WELL

USACE SBC

HIGH MAST LIGHT POLE

SHUT OFF SWITCHS

AP 4802

TEST BORING

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-V-111.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:08pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-V

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

V-111

TO

PO

G R

AP

H

IC

S

U R

VE

Y

AN

D

B O

R

IN

G L

O C

AT

IO

N S

O

F

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

TOPOGRAPHIC SURVEY AND BORING LOCATIONS 1 OF 2

SCALE: 1" = 40'

N

0' 40' 80'B1

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

X X X X X X X X X X X X X X X X X X X X X X X X

X X

X X

X

SD/MH

TOP=189.36

N INV=185.29 (6")

E INV=182.39 (16")

W INV=182.26 (16")

CB

TOP=189.07

S INV=186.76 (6")

SS/MH

TOP=190.67

NE INV=183.22 (10")

S INV=183.31 (6")

SS/MH

TOP=190.61

N INV=177.64 (6")

N INV=178.60 (6")

E INV=177.51 (6")

E INV=179.04 (6")

S INV=177.50 (6")

W INV=177.59 (6")

SS/MH

TOP=187.48

N INV=177.47 (8")

E INV=177.63 (8")

CB

TOP=186.67

E INV=180.90 (18")

W INV=180.85 (18")

UTILIDOR

TOP=189.27

F.F.=181.68

UTILIDOR

TOP=189.50

F.F.=181.64

ELEC/MH

TOP=189.41

F.F.=180.44

UTILIDOR

TOP=188.56

F.F.=181.47

UTILIDOR

TOP=188.61

F.F.=180.65

SD/MH

TOP=187.59

NE INV=180.85 (10")

E INV=180.55 (16")

S INV=180.26 (16")

W INV=180.73 (6")

SS/MH

TOP=188.96

E INV=175.88 (8")

S INV=175.87 (8")

W INV=176.33 (8")

SD/MH

TOP=188.41

N INV=183.56 (6")

E INV=181.51 (16")

W INV=181.28 (18")

CB

TOP=188.24

S INV=186.10 (6")

SD/MH

TOP=187.49

N INV=180.95 (6")

E INV=180.18 (18")

W INV=180.16 (18")

CB

TOP=187.00

S INV=184.62 (6")

SS/MH

TOP=189.57

W INV=181.98(6")

ELEC/MH

TOP=188.17

F.F.=178.76

ELEC/MH

TOP=188.70

F.F.=180.78

UTILIDOR

TOP=189.30

F.F.=181.89

SD/MH

TOP=188.08

N INV=180.09 (12")

E INV=181.11 (18")

W INV=180.76 (18")

ELEC/MH

TOP=187.58

F.F.=179.89

CHANNEL DRAIN

BLDG

11567

F.F.=188.99

BLDG

11568

24" x 24" CONCRETE

FOOTING (TYP.)

GRAVEL ROAD

E 1, 4, E 1, 4, E 1, 5, E 1, 5, E 1, 5, N 2,648,400 N 2,648,400

N 2,648,600

N 2,648,800

6.8

6.8

7.2

T

7.8

8.3

8.1

8.7

7.2

7.3

7.6

8.718 8.5

8.0

7.8

9.3

8.2

8.3

9.8

9.8

J

9.5

9.2

0.4 19 1.1

8.5

1.0

0.419

0.018 9.6

8.2

TV

7.1

7.5

7.9

8.2

8.8

8.218 8.4

9.1

8.018

7.7

9.418

9.218 8.9

8.8

8.7

8.4

8.6

9.1

8.9

8.3

8.6

8.0

7.6

8.2

8.4

8.1

7.3

6.9

7.0

7.2

9.218

9.1

9.1

9.3

9.1

8.6 18 8.9

8.9

8.7

9.0

8.5

8.2

8.3

T

T

T

9.1

0.1

0.9

0.5

9.3

9.3

9.0

8.7

7.9

J

8.4

7.5

7.6

8.4

8.8

9.2

9.3

0.2

0.8

0.0 18

9.0J

8.8

9.0

9.0

8.8

9.1

9.0

8.5

7.7

J

8.9

0.2

0.1

0.5

0.0

9.2

9.0

8.9

8.9

9.3

9.3

9.2

9.4

9.4

9.3

9.1

8.7

0.6

0.5

7.9

S

8.1

8.7

8.8

9.1

9.2

9.6

9.7

9.2

9.8

9.6

9.4

9.8

8.9

J

J

9.7

7.3

8.1

8.1

8.4

8.6

8.6

8.5

8.6

8.4

8.0

C J

8.5

9.6

9.6

7.4

8.1

8.3

8.4

8.1

8.2

8.1

GG

1.3

9.5

9.6

8.1

8.1

8.3

8.3

8.4

8.7

8.8

9.5

9.9

0.0

9.8

9.8

9.4

9.4

9.4

9.4

9.5

9.6

9.6

8.7

9.2

9.2

8.9

8.9

9.0

8.9

8.9

1.1

8.3

8.5

8.1

8.6

8.1

8.0

8.5

8.7

9.6

9.3

9.5

8.1

8.4

9.7

8.7

9.5

8.6

8.9

9.2

9.6

9.3

9.3

9.3

9.2

9.0

8.8

8.3

7.6

9.0

8.5

T

9.7

9.4

MW18

8.4

9.0

MW

0.0

0.0

J

TV

8.7

J

J 18 9.1

4 18 8.8

8.4

7.7

8.1

9.4

7.5

7.4

7.6

7.5

7.7

7.4

7.6

8.7

8.3

8.4

8.0

7.6

8.5

9.1

8.1

0.9

0.9

0.9

0.2

0.4

0.5

0.0

9.2

0.9

9.2

9.0

0.0

9.7

8.4

9.6

9.8

9.9

9.6

9.6

9.4

9.6

9.8

9.9

0 18 9.8

0.2

0.9

0.2

0.4

0.4

J

9.5

0.2

1.3

1.3

1.3

0.5

0.3

9.8

9.2

T

T

9.1

9.7

9.9

9.8

9.0

9.3

9.1

9.3

9.6

9.7

HAZARDOUS WASTE STORAGE

9.3

8.9

8.9

9.5

9.4

9.5

9.6

8.2

8.1

8.4

8.3

8.9

0.7

8.9

9.7

0.1

9.9

8.9

7.6

8.9

7.5

8.8

J

9.1

0.7

1.9

9.4

0.2

0.3

9.1

9.5

0.1

0.1

9.6

8.8

9.2

TNK 42

TNK 43

TNK 44

TNK 45

188188

189188

BLIND FLANGE

3" DIA. PIPE RAIL, 4' TALL

3" DIA.

PIPE RAIL,

4' TALL

PIPE EXITS

GROUND

J E J

E J

4" VENT PIPES

ON WALL

GOLD RAMP

BLDG 11551

HANGAR 1

H O

LL

AN

D

IA

D R

IV

E

TRUCK

FILL

STATION

AP 4810

AP 4811

AP 4809

SURVEY CONTROL

HORIZONTAL CONTROL

Coordinates are ASPC Zone 4, NAD83 (1992) in US Survey Feet. The Basis of Coordinates are U.S.A.C.E points "TT AN 7", having a value of N2,644,654.40 and E1,673,694.16, and "N-1B-DE", having a value of N2,650,423.79 and E1,679,364.05. Other positions are derived from GPS observations taken April 15, 2004.

SCALE FACTOR

The Project Combined Scale Factor is 0.99989173943. To convert ground distances to ASP grid distances, multiply by a combined scale factor of 0.99990385. To convert ASP grid distances to ground distances, multiply by a combined scale factor of 100000000/99989173943.

VERTICAL CONTROL

Elevations are NAVD88 U.S. Feet. The Basis of Elevations is Joint Base Elmendorf Richardson Control Point "MB-137A", a brass cap having a value of 180.44 feet. Elevations of other points were determined by differential leveling using closed level loops originating from MB-137A.

Measurements were taken in April, 2019.

UTILITY NOTE

The underground utilities shown have been located from field survey information. The surveyor makes no guarantees that the underground utilities shown comprise all such utilities in the area, either in service or abandoned. The surveyor further does not warrant that the underground utilities shown are in the exact location indicated, although he does certify that they are located as accurately as possible from information available.

A title search was not performed and there was no attempt to locate easements of record.

HISTORICAL UTILITY ASBUILT DRAWINGS AND OTHER INFORMATION MAY NOT

RELATE TO THE HORIZONTAL AND VERTICAL DATUM FOR THIS PROJECT. USE

HISTORICAL INFORMATION WITH CAUTION!

SURVEY CONTROL POINTS

POINT NORTHING EASTING ELEVATION DESCRIPTION

FSF-1 2,647,682.43 1,672,431.41 176.75 BRASS CAP

FSF-2 2,647,203.03 1,672,913.09 177.90 BRASS CAP

MB-137A 2,648,121.92 1,672,948.52 180.44 BRASS CAP

LEGEND

LIGHT POLE

TRANSFORMER W/ PAD

JUNCTION BOX

MANHOLE

GUARD POST / BOLLARD

FENCE LINE

MAJOR CONTOUR

MINOR CONTOUR

SPOT ELEVATION

J

CATHODIC PROTECTION TEST STATION

TRANSFORMER

X

XX.XX

POL PETROLEUM, OIL, LUBRICANTS LINE

SHUT OFF VALVE

F.F. FINISH FLOOR

ACCESS LID

CATCH BASIN

E METER BOX

VERTICAL PUMP

EDGE OF PAVEMENT

BUILDING

CONCRETE

G NATURAL GAS VALVE

TV CABLE TV PEDESTAL

T

MW MONITORING WELL

USACE SBC

HIGH MAST LIGHT POLE

SHUT OFF SWITCHS

AP 4802

TEST BORING

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-V-151.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:08pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-V

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

V-151

TO

PO

G R

AP

H

IC

S

U R

VE

Y

AN

D

B O

R

IN

G L

O C

AT

IO

N S

O

F

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

TOPOGRAPHIC SURVEY AND BORING LOCATIONS 2 OF 2

SCALE: 1" = 40'

N

0' 40' 80'B1

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-B-601.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:08pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-B

-6

.d w g

W

1-

KB

-2 0-

R -X

XX

X

B-601

BO

R

IN

G

L O

G S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-B-602.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:08pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-B

-6

.d w g

W

1-

KB

-2 0-

R -X

XX

X

B-602

BO

R

IN

G

L O

G S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-B-603.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:08pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-B

-6

.d w g

W

1-

KB

-2 0-

R -X

XX

X

B-603

BO

R

IN

G

L O

G S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

T

T

T

T

TT

T

POLxPOLx

J E

EJ

J E J

E

J

POL x

POL x POLx

PO

L x

POL x

POL x

POLx POLx

STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx

STEAMx STEAMx

STEAMx STEAMx STEAM

POLx POLx

SD x SD x SD x

ES x

ES x

POLx POLx

PO

Lx

POLx POLx

POLx

PO

Lx

PO

Lx

ST

EA

M x

ST

EA

M x

ST

EA

M x

ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x

ST

EA

M x

SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD

W x

W x

W x

W x

W x

G

TV

J

TV

TV

JJ

S

CP

J

TV

J

J

J

S

J

POL

x

J

POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx

C J

GG

PO

L x

MW

MW

UNK

J

TV

J

J

J

J

ABANDONED

GOLD RAMP

POLx POLx POLx

ABANDONED

PO

L x

SD

x

SD

x

SD

x

SD x SD xSD x SD x

SS x SS x

SS

x

G x G x G x G x G x G x G x G x G x G x G x G x G x G x G x G x G x G x G x

Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx

POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx POLx

ABANDONEDABANDONED

H O

LL

AN

D

IA

D R

IV

E

AIRFIELD VEHICLE ACCESS ROAD

SLAMMER AVENUE

BI

SM

AR

K

SE

A

D R

IV

E

ES

x

ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x

ES

x

SLAMMER AVENUE

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

CP

C x C x

C x

C x C W x

10" TRANSITE

10" TRANSITE

CP

ES x ES x

S

FUEL FARM #4 FUEL FARM #3

SEE SHEET D-111 SEE SHEET D-151

TA

N K

TA

N

K

FF4

TRUCK

RACK

TANK 42

TANK 43

TANK 44

TANK 45

FF3

TRUCK

RACK

USTS TO REMAIN

BUILDING

11567,11568

DEMOLITION (SEE

SHEET AD151)

N:2648531 ± E:1674038 ±

N:2648531 ± E:1674728 ±

BUILDING 11583, 11584

DEMOLITION (SEE SHEET AD111)

TA

N

K

TA

N

K

TA

N

K

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-D-101.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:03pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-D

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

D-101

O

VE

R

AL

L

EX

IS

TI

N G

C O

N D

IT

IO

N S

A N

D D

EM

O

LI

TI

O N

P

LA

N

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

DEMOLITION ITEMS

ABANDON IN PLACE 8-INCH POL TRANSFER LINE. SEE SHEET D-111 AND SHEET

D-151 FOR LIMITS OF REMOVAL/ABANDONMENT. ABANDON APPROXIMATELY

690 LF.

ABANDON ELECTRICAL CONDUIT IN PLACE. SEE SHEET D-111 AND SHEET D-151

FOR LIMITS OF REMOVAL/ABANDONMENT. ABANDON APPROXIMATELY 690 LF.

OVERALL EXISTING CONDITIONS AND DEMOLITION PLAN

SCALE: 1" = 40'

N

0' 40' 80'D1

GENERAL DEMOLITION NOTES

1. PROTECT UTILITIES AND STRUCTURES THAT WILL NOT BE DEMOLISHED.

2. FIELD VERIFY EXISTING CONDITIONS PRIOR TO DEMOLITION.

3. COORDINATE DEMOLITION LIMITS WITH PROVIDED WORK.

PIPELINE ABANDONMENT NOTES

1. PIPING TO BE ABANDONED MUST BE DRAINED, CLEANED BY PIGGING,

FILLED WITH FLOWABLE CONRETE/GROUT SLURRY, AND CAPPED. BURIED

PIPING MUST BE CAPPED WITH EITHER A PLATE OR PIPE CAP.

2. PIGGING MUST CONSIST OF A MINIMUM OF FIVE FOAM PIG RUNS PER

PIPELINE TO REMOVE AS MUCH RESIDUAL FUEL AS POSSIBLE. IT IS

EXPECTED CLEANING CAN BE ACCOMPLISHED WITHOUT THE

INSTALLATION OF CONVENTIONAL PIG LAUNCHER AND RECEIVER

BARRELS AS THE PIGS MUST BE PROPELLED BY COMPRESSED AIR

AND/OR VACUUM PROVIDED BY A VACUUM TRUCK. TEMPORARY FLANGES

MUST BE INSTALLED AS REQUIRED TO FACILITATE PIGGING ACTIVITIES.

3. ABANDON PIPE PER 18 AAC 75.080. NOTIFY CONTRACTING OFFICER

AFTER ABANDONMENT IS COMPLETE. GOVERNMENT WILL CONTACT

ADEC.

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

T

POLx

POLx

POLx

POLx

PO

L x

J E

EJ

POL x

POL x

POL x

POL x

POL x

POLx POLx PO Lx

POLx

PO

L x

POL x

POL x

POL x

POL x

POL x

POLx POLx POLx POLx

STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx STEAMx

POLx POLx POL x POLx

PO

L xES x

SD x SD x SD x SD x SD x SD x SD x

ES x

ES x

ES x

ES x

ES x

ST

EA

M x

ST

EA

M x

ST

EA

M x

ST

EA

M x

ST

EA

M x

ST

EA

M x

ST

EA

M x

ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x ES x

ST

EA

M x

ST

EA

M x

SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x SD x W x W x W x W x W x W x W x W x W x

G

J

TV

JJ

S

CP

POLx

POL

x

POL

x

POLx POLx POLx POLx POLx POLx POLx POLx POLx

ABANDONED

POLx POLx POLx POLx POLx POLx

ABANDONED

SD

x

SD

x

SD

x

SD

x

SD

x

SD

x

SD

xG x G x G x G x G x G x G x G x G x G x G x G x G x G x G x

Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx

POLx POLx POLx POLx POLx POLx POLx

AIRFIELD VEHICLE ACCESS ROAD

SLAMMER AVENUE

BI

SM

AR

K

SE

A

D R

IV

E

ES

x

ES

x

ES x ES x ES x ES x ES x ES x

CP

CP

CP

C x

C x

C x C x C x C x

W x

10" TRANSITE

S

STEAM

x

A1 D-611

E7 D-611

E1 D-611

E4 D-611

A4 D-611

JP-8

TRUCK FILLSTAND

TO REMAIN

CAUTION!

ACTIVE POL

PIPELINE

LOW POINT

DRAIN AND

BOLLARDS

TO REMAIN

FOD SIGN

(NOTE 1)

TA

N

K

TA

N

K

TA

N

K

FILTER

BLDG

11583

CONTROLLED

AREA SIGN

CONTROLLED

AREA SIGN

(NOTE 1)

(NOTE 3)

N:2648571 ± E:1674007 ±

(SEE SHEET M-114)

N:2648570 ± E:1674009 ±

(SEE SHEET M-114)

N:2648531 ± E:1674038 ±

ABANDON

DEMOLISH

(NOTE 4)

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-D-111.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:03pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-D

-1

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

D-111

FU

EL

F

AR

M

D

EM

O

LI

TI

O N

P

LA

N

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

DEMOLITION ITEMS

REMOVE METAL CANOPY (BUILDING 11584) AND

FOUNDATIONS. SEE SHEETS AD111 AND H-111.

RELOCATE SIGN. SEE SHEETS C-111 AND C-115 FOR

NEW SIGN LOCATIONS.

REMOVE CONCRETE CURB, APPROXIMATELY 105 LF.

REMOVE ASPHALT PAVEMENT, ASSUME 4-INCH

ASPHALT, APPROXIMATELY 3,400 SF. SEE DETAIL

F5/C-501.

REMOVE 50,000-GALLON SINGLE WALL UST,

CONCRETE VAULT, AND APPURTENANCES. TANK IS

APPROXIMATELY 10 FEET DEEP (TO TOP) AND 12 FEET

DIAMETER. TYP OF 3.

REMOVE 8-INCH ABOVE GRADE POL PIPING ,

APPROXIMATELY 300 LF, AND SUPPORTS.

REMOVE BOLLARDS, TYP OF 2.

REMOVE BUILDING AND FOUNDATION (BUILDING

11583). SEE SHEETS AD111 AND H-111. RELOCATE 2

FILTER/SEPARATORS, SEE SHEETS M-114 AND M-414.

REMOVE BELOW GRADE POL PIPING, 8-INCH SS,

APPROXIMATELY 95 LF.

REMOVE MANHOLE AND 6-INCH PIPE (UNKNOWN

UTILITY), APPROXIMATELY 10 LF. INSIDE OF MANHOLE

IS APPROXIMATELY 8 FEET DEEP WITH STANDING

WATER.

REMOVE TELEPHONE PEDESTAL.

REMOVE CONCRETE PAD, APPROXIMATELY 35 SF,

ASSUME 6-INCH THICK.

REMOVE CP TEST STATION.

REMOVE JUNCTION BOX.

EXTENTS OF STEAM PIPE(S) ARE UNKNOWN. ASSUME

STEAM PIPE(S) ARE 1" AND 2" STEEL AND RUN

THROUGH NEW TANK AREA. REMOVE STEAM PIPE(S)

WITHIN TANK EXCAVATION AREA. CAP/PLUG ENDS OF

STEAM LINES TO BE LEFT IN PLACE. APPROXIMATELY

240 LF OF 1" AND 2" STEEL PIPE WITH INSULATION. SEE

H-001 FOR HAZARDOUS MATERIALS REQUIREMENTS.

REMOVE TANK VENT LINES, 4-INCH, APPROXIMATELY

150 LF.

REMOVE RECTIFIER AND JUNCTION BOX. SALVAGE

RECTIFIER FOR REINSTALLATION. REMOVE ANODE

DEEPWELL (CASING AND VENT PIPE) TO 2 FEET BELOW

PROPOSED TANK ELEVATION. SEE SHEET EC111.

REMOVE COMMUNICATIONS LINES WITHIN NEW TANK

AREA, ABANDON CONDUIT IN PLACE WEST OF

BISMARK SEA DRIVE. SEE SHEET ED111.

REMOVE EFSO.

REMOVE PAD AND RELOCATE TRANSFORMER, SEE

SHEET C-114.

FUEL FARM #4 DEMOLITION PLAN

SCALE: 1" = 20'

N

0' 20' 40'A1

DEMOLITION NOTES

1. RELOCATE FOD CHECK SIGN TO OPPOSITE

SIDE OF BISMARK SEA DRIVE DURING

CONSTRUCTION. MOVE BACK TO EXISTING

LOCATION WHEN POSSIBLE.

2. SEE MECHANICAL SHEETS FOR EXTENTS

OF FUEL PIPING REMOVAL AND WORK

REQUIREMENTS.

3. FUEL PIPING AND VALVE TO REMAIN.

ISOLATE SYSTEM PER MECHANICAL

REQUIREMENTS PRIOR TO DEMOLITION.

4. ASSUMED LIMITS FOR TANK WORK.

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: P:\projects\9480\Cad\Current Dwg %\General\JBE057_058-D-611.dwg MODIFIED BY: parpanr PLOT DATE: Apr 27, 2021 - 12:03pm

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

U

S R

O U

TE

N O

R

TH

S U

IT

E

B

FA

LM

O

U

TH

, M E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

U S

R O

U

TE

N

O R

TH

S

U

IT

E B

FA

LM

O U

TH

, M

E

G

AM

BE

LL

S

TR

EE

T

SU

IT

E

AN

C H

O R

AG

E, A K

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

-D

-6

.d w g

W

1-

KB

-2 0-

R -X

XX

X

04/26/21

REENIGNELANOISSEFORPDERETSIGER

RYAN P. PARPAN

CE 14074

D-611

FU

EL

F

AR

M

D

EM

O

LI

TI

O N

P H

O

TO

S

R . P

AR

PA

N

J.

R

O

JA

S

C . B

AS

SL

ER

A.

L

EW

IS

SCALE: NO SCALE

PHOTO 1E1

SCALE: NO SCALE

PHOTO 4A1

SCALE: NO SCALE

PHOTO 2E4

SCALE: NO SCALE

PHOTO 5A4

SCALE: NO SCALE

PHOTO 3E7

REMOVE

BUILDING

11583

REMOVE

CANOPY

(BUILDING

11584)

REMOVE

CANOPY

(BUILDING

11584)

RELOCATE

FOD SIGN

REMOVE TANK 46

REMOVE TANK 47

REMOVE

CANOPY

(BUILDING 11584)

REMOVE

CANOPY

(BUILDING 11584)

REMOVE

BUILDING 11583

JP-8 TRUCK

FILLSTAND

TO REMAIN

REMOVE TANK 48

REMOVE ABOVE

GROUND PIPING AND

PIPE SUPPORTS

CONTAINMENT

CURB TO REMAIN

BISMARK SEA DRIVE

REMOVE CURB AND

ASPHALT (BYPASS

LANE)

REMOVE ABOVE GROUND

PIPING AND PIPE SUPPORTS

RELOCATE

FOD SIGN

REMOVE

TRANSFORMER

AND PAD (SEE

ED111)

RELOCATE

CONTROLLED

ACCESS SIGN

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

FUEL FARM #4 - FILTER BUILDING AND CANOPY DEMOLITION

SCALE: 1/4"=1'-0"

N

0' 4' 8'A1

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: W:\2015\15082.04 EEI JBE057 058 Tank Farm 3&4\DWG\JBE057_058 AD111.dwg MODIFIED BY: sschell PLOT DATE: Apr 27, 2021 - 11:43am

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

A

D

1.

dw g

W

1-

KB

-2 0-

R -X

XX

X

A R

C H

IT

EC

TS

A

LA

S

K A

A K C or p.

A ut ho ri za tio n

A

EC

C

W

5t h

A ve nu e, S ui te

A nc ho ra ge

A la sk a

7.

2.

AD111

FU

EL

F

AR

M

FI

LT

ER

B U

IL

D

IN

G

A N

D C

AN

O

PY

D

EM

O

LI

TI

O N

F

LO

O R

P

LA

N

S.

SC

H

EL

L

S.

SC

H

EL

L

D .M

O O

R E

A.

L

EW

IS

REMOVE BUILDING IN ITS ENTIRETY. REFER TO

OTHER DISCIPLINES FOR MORE INFORMATION

48'-7" 21'-5"

'-4

'-1

1 2"

REMOVE STEEL WINDOWS

REMOVE WALL ASSEMBLY (TYP.

CONCRETE WITH INTERIOR GWB AND/OR

CAB FURRING)

REMOVE STEEL DOORS AND FRAMES, TYP.

SALVAGE LOCKS AND CORES AND

RETURN TO 773 CES/CE0HS LOCK SHOP.

BLDG 11584

BLDG 11583

REMOVE STEEL CANOPY, INCLUDING

COLUMNS, FOUNDATIONS, MECHANICAL

AND ELECTRICAL EQUIPMENT

DEMOLISH CONCRETE

FOOTING TYP.

DEMOLISH STEAM PIT AND

STEAM PIPING

DEMOLISH CONCRETE

SLAB AND FOOTING, TYP

B5

AD112

B9

AD112

B1

AD112

D1

AD112

F5

AD112

D5

AD112

E9

AD112

F1

AD112

FXSB 17-4704 and FXSB 17-4720, Repair Tank Farms 3 and 4

Solicitation - FA500023B0001

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.B1

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

FU

EL

F

AR

M

AN

D

R

EC

O

N

ST

R U

C

TI

O N

JB

ER

-E

LM

EN

D

O R

F, A

N C

H O

R

AG

E, A

LA

SK

A

JB

E0

KA

D

IS

TR

IC

T

AN

C

H O

R

AG

E, A

LA

SK

A

AP

R

IL

FI

LE

N

AM

E

AN

SI

D

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FILE LOCATION: W:\2015\15082.04 EEI JBE057 058 Tank Farm 3&4\DWG\JBE057_058 AD112.dwg MODIFIED BY: sschell PLOT DATE: Apr 27, 2021 - 11:43am

Ø R

EA

D

Y

TO

A D

VE

R

TI

SE

/2

6/

FI

LE

N U

M

BE

R

US Army Corps of Engineers

JB

E0

_0

A

D

2.

dw g

W

1-

KB

-2 0-

R -X

XX

X

A R

C H

IT

EC

TS

A

LA

S

K A

A K C or p.

A ut ho ri za tio n

A

EC

C

W

5t h

A ve nu e, S ui te

A nc ho ra ge

A la sk a

7.

2.

AD112

FU

EL

F

AR

M

FI

LT

ER

B U

IL

D

IN

G

A N

D C

AN

O

PY

D

EM

O

LI

TI

O N

P H

O

TO

E

XH

IB

IT

S.

SC

H

EL

L

S.

SC

H

EL

L

D .M

O O

R E

A.

L

EW

IS

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.F1

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.D1

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.B5 FF #4 - FILTER ROOM

SCALE: N.T.S.B9

FF #4 - MCC ROOM

SCALE: N.T.S.E9

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.D5

FUEL FARM #4 - FILTER BUILDING DEMOLITION

SCALE: N.T.S.F5

REMOVE STEEL CANOPY

STRUCTURE

REMOVE POL PIPING, SEE

DEMO DRAWINGS

REMOVE ROLLING PIT

COVERS, TYP.

REMOVE CONCRETE

FOOTINGS, TYP.

REMOVE ELECTRICAL EQUIPMENT

REMOVE STEEL FRAMED CANOPY

REMOVE METAL ROOF

REMOVE BUILDING FOUNDATION

REMOVE LIGHT

FIXTURES,TYP

REMOVE ELECTRICAL

EQUIPMENT

REMOVE CABINET UNIT

HEATER

REMOVE METAL ROOFING

AND FASCIA

REMOVE METAL ROOFING

AND FASCIA

REMOVE STEEL CANOPY

STRUCTURE

REMOVE POL PIPING, SEE

DEMO DRAWINGS

REMOVE CONCRETE

FOOTINGS AND STOOPS,

TYP.

REMOVE MCC EQUIPMENT

REMOVE HOUSEKEEPING PADS, TYP.

REMOVE STEAM PIT AND STEAM

PIPING. STEAM PIT IS

APPROXIMATELY 10'-0" DEEP.

REMOVE ELECTIRCAL

EQUIPMENT, TYP.

REMOVE HVAC EQUIPMENT, TYP.

REMOVE CONCRETE BEAMS

AND DECK, TYP

REMOVE ELECTRICAL EQUIPMENT,

TYP.

REMOVE POL PIPING, TYP.

REMOVE HVAC EQUIPMENT, TYP.

REMOVE CONCRETE ROOF

DECK, ROOFING, AND FASCIA

REMOVE WINDOWS AND

RELITES

REMOVE ELECTRICAL

EQUIPMENT

REMOVE HM DOORS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .