This document is a Questions and Answers file for a Department of the Air Force Air Combat Command solicitation (FA489725QC067) for a dorm camera replacement project at Mountain Home Air Force Base. The project involves purchasing and installing a new video surveillance system across six dormitory buildings (2312, 2314, 2318, 2412, 2416, and 2422), requiring approximately 272 indoor/outdoor cameras with 5MP resolution for interior spaces and 12MP resolution for exterior areas. Key technical specifications include a network video recorder with 30 days of storage, capability to export footage, and installation of cameras, switches, UPS systems, and associated equipment.
The Q&A document provides detailed clarifications on camera quantities, mounting requirements, installation parameters, and contractor expectations. Significant points include confirmation that existing network cabling can be reused if viable, contractors must dispose of old cameras, all systems must comply with NEC code, and the period of performance is flexible (originally 90 days but contractors can propose their own timeline). The government emphasizes minimal disruption to resident airmen, requires new equipment, and expects contractors to ensure complete system functionality while respecting the residential environment.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Questions Sept 2
| All quesitons asked are in black. All answers are in red. |
| 1.Building 2312 (Phantom) 2nd floor. MHAFB count shows 12 cameras (3 stairwell and 9 ceiling mounted) . We count (3 stairwell and 10 Ceiling mounted) Please confirm correct amount. |
| Yes you are correct. Fixed in spec as well |
| 2.Building 2312 (Phantom) 3rd floor. MHAFB count shows 12 cameras (3 stairwell and 9 ceiling mounted). We count (3 stairwell and 10 ceiling mounted) Please confirm correct amount. |
| Yes you are correct. Fixed in spec as well |
| 3. The specification calls for a UPS for the switches, servers, and workstations, however the count is only 18 on the item sheet. We are counting 30. |
| We are requesting 24 UPS…. 3 for switches, 1 for the NVR and Workstation in the office per building |
| 4.Regarding the specified 12MP resolution for exterior cameras, we would like to propose an amendment to utilize 8MP cameras, which are the current enterprise standard for high-quality exterior AI camera systems. While 12MP cameras are available, they are typically specialty units, such as fisheye cameras, which may not be optimal for general exterior surveillance due to their specific application requirements. Using these could increase project costs significantly and may not align with the system's intended goals, potentially leading to inefficiencies or the need for future replacements or change orders. Our recommendation is to deploy crystal-clear 8MP cameras, which meet industry standards for enterprise-grade exterior surveillance, delivering excellent performance and reliability while maintaining cost-effectiveness. We are happy to discuss this further or provide additional details on how 8MP cameras will meet your project objectives. Could you confirm if amending the specification to 8MP for exterior cameras is acceptable? We look forward to your feedback to ensure the proposed solution aligns with your goals. |
| Understood, we are still requesting 12 MP camera's |
| 5. We are interested in bidding on this project. While I can see the floor plans and camera specifications on SAM.GOV, I am unable to locate the RFQ. Could you please email it to me? |
| Solicitation is attached as " Amendement 3 FA489725QC067" |
Contractor Question
| All quesitons asked are in black. All answers are in red. |
| 1. UPS "the UPS must provide sufficient backup time to allow for safe shutdown or continued operation during short outages" |
| Please elaborate with a minimum amount of time in min/hr you are requiring backup power. |
| 30 minutes. Updated in the Specifications |
| 2. Are we able to use any existing cable that is currently installed? |
| Yes |
| 3. Can we use Digital Watch Dog / DWC-PVX20WATX as the manufacturing cameras |
| Contractors are required to ensure the offered product meets the specifications. |
| 4. Submission Information. Please confirm that product data sheets are excluded from the technical proposal 10 page limit. |
| Page limit has been removed from the specifications |
| 5. CLIN list includes multiple "fisheye in-ceiling mounting kit". Is the intent to install the exterior fisheye cameras in soffits under the building eaves? No, its to replace the existing ones with getting better coverage. |
| 6. CLINS. Dorm 2412 includes qty=3 fisheye cameras but only 1 in-ceiling mount. Should there be 3 in-ceiling mounts for the fisheye cameras? See updated specifications |
| 7. Combined Synopsis: CLIN 0010 requires states "Help Desk Services, Programming, Testing, Commissioning, Training." requires." |
| Specifications: Each building includes a requirement for "Programming, Testing, Commissioning, and Training" |
| The two documents appear to specify differing requirements. Please clarify inconsistent requirements. If Help Desk Services are required please clearly define the performance requirements. |
| See updated specifications |
| 8. The RFQ specifies period of performance to be 90 days from award. Equipment availability and delivery may limit ability to meet this requirement. Would the Government consider revising the PoP to 120 days? |
| Contractors are invited to offer up their period of performance with respect to their choosen products deliver timeline. |
| 9. Please clarify what the Government considers to be the end of the 90 day PoP (construction complete, closeout deliverables submitted, project closeout complete and approved, etc.) |
| The end of the period of performance is considered as the completion of all work. |
| 10. Please confirm that all CLINs will be awarded together. |
| All CLINS will be awarded together. |
| 11. Please confirm that contractor will not be responsible for any cybersecurity/device hardening. |
| Not Applicable |
| 12. Documents do not specify warranty duration or warranty service requirements. Please clarify. |
| Industry standard. See revised Specifications |
| 13. During the site visit it was observed that there are existing systems in each dorm. Please confirm that the existing systems do not need to remain functional during the work resulting from this solicitation. |
| The exisiting system will be taken off line to install the new cameras. |
| 14. Please provide floor plans for all buildings showing locations of existing equipment, conveyances, floor penetrations) so that offerors can accurately estimate the level of effort. |
| Floor Plans can be found as an attachment to the solicitation |
| 15. Clauses included by full text. FAR 52.212-2 (a) includes fill-in fields. The Combined Synopsis document includes a section "FAR Provision *52.212-2, Evaluation -- Commercial Items (Nov 2021)" that identifies the factors and how they will be evaluated but does not appear to indicate their relative importance. Please clarify evaluation factor relative importance. |
| See updated solicitation |
| 16. 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American |
| Security Drone Act-Covered Foreign Entities (NOV 2024) is checked. Please clarify relevance for this RFQ. |
| This is a required clause for all solicitations and contracts. |
| 17. Page 44 of 44 is blank. Please confirm that there is no missing information. |
| There is no missing information. |
| 18. Paragraph 4.17. Please confirm that the RFQ scope to install camera systems in dorms does not require contractor personnel to access, store, issue, disposition, or transport firearms or ammunition. |
| No the contractor is not expected to access, store, issue, disposition, or transport firearms or munitions. |
| 19. Paragraph 1.1. Is there existing rack space available for contractor use to install the head-end NVR, switch, UPS? |
| See updated Specifications |
| 20. Does head-end location have adequate environmental controls for sensitive electronic equipment? |
| The offices are all air conditioned |
| 21. Is there available power at the head-end location to support the new equipment? |
| Yes |
| 22. Section 1.1. Please clarify the recording parameters to be used for calculating storage requirements (resolution, frame rate, motion vs always on, image quality, data aging, etc.) so that offerors can ensure solution meets the 30 days of storage requirement. |
| The minimum requirements are stated in the Specifications. It is the contractors responsibility to meet those minimum requirements and provide technical data sufficiently demonstrating the capabilities. |
| 23. Section 1.1 does not provide installation instructions. Is head-end equipment (NVR and UPS) to be installed in existing GFE racks? |
| You can use the old racks in the offices for the new equipment. |
| 24. Please provide the desired back up time for the UPS to meet the "continued operation during short outages" requirement. |
| See upated Specifications |
| 25. Paragraphs 1.1 - 1.4 and 2.0. Please identify or clarify the "GSA compliant" requirement being referenced. |
| See updated Specifications. This has been removed. |
| 26. Paragraph 1.3 bullet 3, Features. Please confirm that built-in microphone and audio recording is not required since there is no other reference to a requirement to record audio. |
| No audio is required. |
| 27. Section 1.3. Would camera substitutions be permitted? (I.e. dual-headed cameras in hallways or multisensors on the exterior?) |
| Contractors are responsible for ensuring they offer the minimum requirements on the Specifications. Contractors are welcome to provide substitutions as long as the coverage of the area remains unchanged. |
| 28. Paragraphs 1.3 and 1.4, Installation Locations. Please provide building floor plans to include interior (main office, head-end location and all interior/exterior locations identified in the Installation Locations heading) and adjacent site features such as parking lots so that offerors can ensure compliance with coverage requirements and accurately estimate cable runs. |
| Floor plans provided as an attachment to the solicitation. |
| 29. Paragraph 2.0. Please clarify training requirements to include number of sessions and students per session. |
| See updated specifications |
| 30. Please confirm that training is to be conducted per building. |
| All systems need to be the same, one building would suffice. |
| 31. Paragraphs 1.3 and 1.4. Is it acceptable to run cabling above ceilings via j-hooks? |
| Please run any cables that need to be changed in the same manner that they are currently ran in the buildings. |
| 32. Paragraphs 4.1, 4.3, and 4.8 reference security clearances and background checks are required if applicable. Please confirm that personnel performing onsite work under a contract resulting from this RFQ only require favorable background check and do not require a security clearance. |
| All contractor personnel must be able to gain access to the base. For additional questions on what would stop an individual from coming on base, please reach out directly to the Contracting Officer. |
| 33. Please clarify which cameras models are to be installed via wall mount and indicate location on floor plan for each building |
| See updated specifications |
| 34. During the pre-bid visit it was observed that existing cameras are surface mount. Please confirm that all new cameras other than those installed on wall mounts are to be installed in-ceiling. |
| See updated specifications |
| 35. The total number of cameras, mounts, and licenses identified in the specification document do not agree with the number of cameras listed in the CLINs. Please confirm the required number of cameras, mounts, and licenses by type for each building. |
| See updated specifications |
| 36. Should all NEC code violations be corre |
| All systems should be to NEC (National Electric Code) code. If it outside of the camera system that should be on MHAFB to fix. |
| 37. How should old equipment be disposed of |
| It is the contractors responsibility to dispose of the old cameras. |
| 38. Is there asbestoses present in any of the dorm buildings? |
| No |
| 39. In an effort to understand the scope of work, I assume the new cameras will be mounted in the same location as the existing cameras; however, I assume there will be more cameras in the new camera system which would require new wire runs that are not currently existing, how many new cameras/wire runs in the new system, per building? |
| We will not be able to install new camera’s |
| 40. If possible, could you send the building drawings for the 6 dorms. |
| Building layouts have been included as an attachment to the solicitation |
| 41. Are there any special consideration needed, being in a residential environment. |
| Just be respectful of the Airman that live in the buildings. This project should have minimal impact to the residents. |
| 42. Are you able to provide a snapshot/overview with each buildings identification? |
| Building layouts have been included as an attachment to the solicitation |
| 43. The difference is the Indoor/Outdoor 5MP cameras: |
| Dorm 2312 has 46 (5MP ) cameras. |
| Dorm 2314 has 52. |
| Dorm 2318 has 38. |
| Dorm 2412 has 51. |
| Dorm 2416 has 46. |
| Dorm 2422 has 39. |
| CLIN camera count is 13 Panoramic Fisheye and 233 Indoor/ outdoor 5MP cameras. |
| Specifications list calls out 13 Panoramic and 272 Indoor/ outdoor 5 MP cameras |
| Difference is -39 cameras. |
| Please advise. |
| Then I need a clarification on the brackets/mounts for the cameras. |
| I couldn’t find instructions on how ALL cameras will be mounted so this could be correct, but I wanted to bring it to attention. I am getting these numbers from the Specification sheet.: |
| Dorm 2312 has a total count of 47 cameras but only a total of 41 brackets accounted for. (-6) |
| Dorm 2314 has a total count of 54 cameras but only a total of 45 brackets accounted for. (-7) |
| Dorm 2318 has a total count of 44 cameras but only a total of 40 brackets accounted for. (-4) |
| Dorm 2412 has a total count of 54 cameras, but 55 brackets accounted for. (+1) |
| Dorm 2416 has a total count of 47 cameras but only a total 41 brackets accounted for. (-6) |
| Dorm 2422 has a total count of 39 cameras and 39 brackets accounted for. (+/-0) |
| Per Specification sheet here are 11 Fisheye camera brackets, 20 wall mounts and 232 in-ceiling mounting/brackets. |
| This is harder to narrow down since I don’t know the configuration that will be used on how the cameras will be mounted. |
| Logically there should be 13 fisheye camera brackets since we have 13 fisheye cameras. The difference is in Dorm 2412 where it only calls out for 1 fisheye bracket. There should be 3. |
| Then the wall-mounts and in-ceiling mounting/bracket kit are harder to interpret. |
| Difference is -22 brackets. |
| See updated specifications |
| 44. Is there a minimum frame rate for the video recordings? No |
| 45. In the documentation there is a difference in the exact numbers of camera for the dorm buildings. Can you please publish a final number of cameras for each dorm buildings? |
| See updated specifications |
| 46.Does the government require managed network switches or unmanaged? Unmanaged |
| a. From Cisco.com “Unmanaged switches are designed to just plug in and run, with no settings to configure. These are fine to use in small networks with only basic needs. Managed switches, however, are fully configurable, are customizable, and provide a range of data on performance. Those attributes make them more suitable for larger networks and networks supporting critical activities.” |
| b. There is a substantial cost differential between the two (2) options. |
| 47.Will the contractor be expected to reuse existing network racks? Yes |
| c. If no network rack is present, is the contractor expected to provide one? If you deem it necessary |
| d. Please detail which buildings have a network rack and which will require one? Rack space is provided in each buildling |
| 48.What is the government’s requirement regarding disposal of the removed devices? Does the government wish to maintain possession of them, or should the contractor plan to dispose of them? |
| It is the contractors responsibility to dispose of the old cameras. |
| 49.Please confirm that all network cabling should be reused. |
| Yes as long as it is still viable |
| 48.Please confirm that there are no planned changes to the camera layout for position or quantity. |
| f. If changes are anticipated, please detail them. |
| 49.Is the contractor expected to “patch and paint” where cameras were removed? No |
| h. Will proper cover plates be sufficient? yes |
| 50.Is this a Davis-Bacon prevailing wage requirement? |
| No |
| 51.For the level of work required, 90 days is not a sufficient period of time for performance. Can that be extended? |
| Contractors are invited to offer up their period of performance with respect to their choosen products deliver timeline. |
| 52. Will video surveillance be required in the community kitchen area of each dorm as outlined in the SOW? Specifications_Dorms, Page 4_Installation Locations |
| no |
| 53. Will exterior cameras be required on the south side of Dorm Building 2416? Yes, there is a camera at the South entrance of the building |
| 54. Can existing VSS equipment components be reformatted and updated to meet Solicitation requirements for cost efficiencies in the Offer's solution? No new equipment is required |
| 55. Can the video surveillance software platform be upgraded to exceed the Statement of Work requirements and provide access to the latest features? Specifications_Dorms, Page 2_Requirements |
| 56. What specific requirements must the video surveillance installation meet to comply with building codes, particularly regarding utilities and sprinkler systems, while remaining independent of existing infrastructure? N/A, Site Survey Clarification |
| 57. Can the Offer's solution use existing functional CAT5e or CAT6 cable runs, provided their transmission capabilities meet the Solicitation requirements for VSS system functionality? Specifications_Dorms, Page 4_Cabling |
| 58. What are the Government's specific expectations for training on the installed VSS solution? For example, will there be one on-site training session (required delivery format, duration, etc.) for designated personnel? Specifications_Dorms, Page 1 |
| 59. Given that base access can take up to 30 days, will the Contractor's staff be expedited to ensure work can commence on the first day of the Period of Performance? N/A, Site Survey Clarification |
| 60. Is the Contractor required to provide post-acceptance technical support for the VSS system? If so, what are the specific requirements and duration of that support? Industry standard warranty language added to SPECs |
| 61. Will functional, like-new equipment that meets the specified standards be acceptable for use in this contract? No, new equipment is required |