| All quesitons asked are in black. All answers are in red. |
| 1. UPS "the UPS must provide sufficient backup time to allow for safe shutdown or continued operation during short outages" |
| Please elaborate with a minimum amount of time in min/hr you are requiring backup power. |
| 30 minutes. Updated in the Specifications |
| 2. Are we able to use any existing cable that is currently installed? |
| Yes |
| 3. Can we use Digital Watch Dog / DWC-PVX20WATX as the manufacturing cameras |
| Contractors are required to ensure the offered product meets the specifications. |
| 4. Submission Information. Please confirm that product data sheets are excluded from the technical proposal 10 page limit. |
| Page limit has been removed from the specifications |
| 5. CLIN list includes multiple "fisheye in-ceiling mounting kit". Is the intent to install the exterior fisheye cameras in soffits under the building eaves? No, its to replace the existing ones with getting better coverage. |
| 6. CLINS. Dorm 2412 includes qty=3 fisheye cameras but only 1 in-ceiling mount. Should there be 3 in-ceiling mounts for the fisheye cameras? See updated specifications |
| 7. Combined Synopsis: CLIN 0010 requires states "Help Desk Services, Programming, Testing, Commissioning, Training." requires." |
| Specifications: Each building includes a requirement for "Programming, Testing, Commissioning, and Training" |
| The two documents appear to specify differing requirements. Please clarify inconsistent requirements. If Help Desk Services are required please clearly define the performance requirements. |
| See updated specifications |
| 8. The RFQ specifies period of performance to be 90 days from award. Equipment availability and delivery may limit ability to meet this requirement. Would the Government consider revising the PoP to 120 days? |
| Contractors are invited to offer up their period of performance with respect to their choosen products deliver timeline. |
| 9. Please clarify what the Government considers to be the end of the 90 day PoP (construction complete, closeout deliverables submitted, project closeout complete and approved, etc.) |
| The end of the period of performance is considered as the completion of all work. |
| 10. Please confirm that all CLINs will be awarded together. |
| All CLINS will be awarded together. |
| 11. Please confirm that contractor will not be responsible for any cybersecurity/device hardening. |
| Not Applicable |
| 12. Documents do not specify warranty duration or warranty service requirements. Please clarify. |
| Industry standard. See revised Specifications |
| 13. During the site visit it was observed that there are existing systems in each dorm. Please confirm that the existing systems do not need to remain functional during the work resulting from this solicitation. |
| The exisiting system will be taken off line to install the new cameras. |
| 14. Please provide floor plans for all buildings showing locations of existing equipment, conveyances, floor penetrations) so that offerors can accurately estimate the level of effort. |
| Floor Plans can be found as an attachment to the solicitation |
| 15. Clauses included by full text. FAR 52.212-2 (a) includes fill-in fields. The Combined Synopsis document includes a section "FAR Provision *52.212-2, Evaluation -- Commercial Items (Nov 2021)" that identifies the factors and how they will be evaluated but does not appear to indicate their relative importance. Please clarify evaluation factor relative importance. |
| See updated solicitation |
| 16. 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American |
| Security Drone Act-Covered Foreign Entities (NOV 2024) is checked. Please clarify relevance for this RFQ. |
| This is a required clause for all solicitations and contracts. |
| 17. Page 44 of 44 is blank. Please confirm that there is no missing information. |
| There is no missing information. |
| 18. Paragraph 4.17. Please confirm that the RFQ scope to install camera systems in dorms does not require contractor personnel to access, store, issue, disposition, or transport firearms or ammunition. |
| No the contractor is not expected to access, store, issue, disposition, or transport firearms or munitions. |
| 19. Paragraph 1.1. Is there existing rack space available for contractor use to install the head-end NVR, switch, UPS? |
| See updated Specifications |
| 20. Does head-end location have adequate environmental controls for sensitive electronic equipment? |
| The offices are all air conditioned |
| 21. Is there available power at the head-end location to support the new equipment? |
| Yes |
| 22. Section 1.1. Please clarify the recording parameters to be used for calculating storage requirements (resolution, frame rate, motion vs always on, image quality, data aging, etc.) so that offerors can ensure solution meets the 30 days of storage requirement. |
| The minimum requirements are stated in the Specifications. It is the contractors responsibility to meet those minimum requirements and provide technical data sufficiently demonstrating the capabilities. |
| 23. Section 1.1 does not provide installation instructions. Is head-end equipment (NVR and UPS) to be installed in existing GFE racks? |
| You can use the old racks in the offices for the new equipment. |
| 24. Please provide the desired back up time for the UPS to meet the "continued operation during short outages" requirement. |
| See upated Specifications |
| 25. Paragraphs 1.1 - 1.4 and 2.0. Please identify or clarify the "GSA compliant" requirement being referenced. |
| See updated Specifications. This has been removed. |
| 26. Paragraph 1.3 bullet 3, Features. Please confirm that built-in microphone and audio recording is not required since there is no other reference to a requirement to record audio. |
| No audio is required. |
| 27. Section 1.3. Would camera substitutions be permitted? (I.e. dual-headed cameras in hallways or multisensors on the exterior?) |
| Contractors are responsible for ensuring they offer the minimum requirements on the Specifications. Contractors are welcome to provide substitutions as long as the coverage of the area remains unchanged. |
| 28. Paragraphs 1.3 and 1.4, Installation Locations. Please provide building floor plans to include interior (main office, head-end location and all interior/exterior locations identified in the Installation Locations heading) and adjacent site features such as parking lots so that offerors can ensure compliance with coverage requirements and accurately estimate cable runs. |
| Floor plans provided as an attachment to the solicitation. |
| 29. Paragraph 2.0. Please clarify training requirements to include number of sessions and students per session. |
| See updated specifications |
| 30. Please confirm that training is to be conducted per building. |
| All systems need to be the same, one building would suffice. |
| 31. Paragraphs 1.3 and 1.4. Is it acceptable to run cabling above ceilings via j-hooks? |
| Please run any cables that need to be changed in the same manner that they are currently ran in the buildings. |
| 32. Paragraphs 4.1, 4.3, and 4.8 reference security clearances and background checks are required if applicable. Please confirm that personnel performing onsite work under a contract resulting from this RFQ only require favorable background check and do not require a security clearance. |
| All contractor personnel must be able to gain access to the base. For additional questions on what would stop an individual from coming on base, please reach out directly to the Contracting Officer. |
| 33. Please clarify which cameras models are to be installed via wall mount and indicate location on floor plan for each building |
| See updated specifications |
| 34. During the pre-bid visit it was observed that existing cameras are surface mount. Please confirm that all new cameras other than those installed on wall mounts are to be installed in-ceiling. |
| See updated specifications |
| 35. The total number of cameras, mounts, and licenses identified in the specification document do not agree with the number of cameras listed in the CLINs. Please confirm the required number of cameras, mounts, and licenses by type for each building. |
| See updated specifications |
| 36. Should all NEC code violations be corre |
| All systems should be to NEC (National Electric Code) code. If it outside of the camera system that should be on MHAFB to fix. |
| 37. How should old equipment be disposed of |
| It is the contractors responsibility to dispose of the old cameras. |