DRAFT_CAF_ADAIR_Eglin_PWS_25_Jul_17.pdf
PDF 112 KB Posted
- Attached to
- CAF Contracted Air Support (CAS) Federal contract opportunity
- Solicitation number
- FA4890-17-R-0007
About this file
Draft CAF ADAIR Eglin PWS
View the file
Other files for this federal contract opportunity
Show all 50
CAF Contracted Air Support (CAS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
THE COMBAT AIR FORCES (CAF)
CONTRACT ADVERSARY AIR (ADAIR) SERVICES
EGLIN AFB SUPPORT
SECTION A
DESCRIPTION OF SERVICES
1.0 SCOPE AND COMPLIANCE. The objective of the CAF ADAIR acquisition is to provide realistic advanced adversary air threats from commercial ADAIR sources to support pilot combat readiness training. For the purpose of this document and program, the terminology
“CAF” refers to both the Combat Air Forces and those Formal Training Units (FTU) supplying
Combat Air Forces. This PWS is the task order servicing 33 Fighter Wing (FW). This PWS is must be utilized concurrent with the core PWS on CAF ADAIR. The contractor will provide sorties to facilitate 33 FW and Eglin AFB missions. ADAIR sorties will integrate as part of the
33 FW force in support of adversary air requirements. The Government will identify within
Appendix I the required threshold and objective aircraft performance attributes needed to progressively expand aircraft system capabilities to replicate peer combatant threats. CAF
ADAIR contractors may support multiple customers/locations across the CAF with Operations and Maintenance services. The contractor will be responsible for all supplies and services to meet task order requierments, except for those outlined in the PWS Section C, Government-
Furnished Property and Services, regardless of on- or off-base beddown.
1.1 Eglin Task Order. Contractors shall provide complete ADAIR services including, aircraft, pilots, aircraft maintenance, program and contract management to meet this PWS requirements.
Eglin ADAIR contractor operations are projected to be on-station.
1.1.1 Task Order requirements may expand over time to support additional CAF ADAIR requirements. Additional exercise support for events or an increased required level of support may be best suited to be met through a contractor deployment capability versus a continual presence but is at the discretion of the contractor.
1.1.2 33 FW will provide a GFR and GGR and alternates, responsible to the AMIC Program
Management Office, to surveil flight and ground operations, including deployment locations.
GFRs and GGRs will surveil the Contractor using the criteria outlined in the core PWS, this task order, DCMA 8210.1C (AFI 10-220), Contractor’s Flight and Ground Operating
Procedures, Quality Assurance Surveillance Plan (QASP), and the approved Quality
Management System (QMS).
3.0. OPERATIONS AND MAINTENANCE
3.1. Operations. Contractors will: Provide advanced ADAIR sorties to meet 33 FW Task
Order PWS requirements and integrate as part of the sponsoring unit.
3.1.1. Flying hour program. The projected 33 FW ADAIR mission requirements are 2,568 hours, 1.2 Average Sortie Duration (ASD) and 2,140 sorties. The table below provides the projected monthly sorties, maximum and the typical turn-pattern. Included within this projection are night flying requirements of two-three weeks per quarter. Flying hour program may deviate 5% any given month or annually based upon mission needs and operational scheduling constraints.
3.1.2. Contractor shall also provide an ICADs capable mission data file for each aircraft to support debrief requirements.
3.2. Contractor Flight Operations Plan (FOP). The Contractor shall operate their aircraft
IAW 14 CFR. Ensure adherence to Government approved Core Contractor Flight Operations
Plan IAW DCMA 8210.1C (AFI 10-220), and augmented by the 33 FW Contractor Flight
Operations Plan. Contractor 33 FW FOP must specifically address the following:
3.2.1. Integration of operations with (INSERT EGLIN LOCAL OPERATIONS REG)
3.2.2. Integration of flight operation with (INSERT EGLIN LOCAL SAFETY
REGULATION).
3.2.3. A program to provide to the supported unit a complete ICADS-compatible mission file for all participating Contractor aircraft, not later than 30 minutes after the last Contractor aircraft landing, to support debrief requirements.
3.2.4. Typical profiles will require contract aircraft to travel to airspace including, but not limited to W-151 and W-470.
3.3. Ground Operations Plan (GOP). The Contractor shall maintain the aircraft IAW applicable FAA regulations and standards. Ensure the GOP includes all procedures required by
DCMA 8210.1C (AFI 10-220), plus any hazardous ground operations not specifically mentioned in the core PWS but required to operate at Eglin AFB. Ensure adherence to
Government approved Core GOP in accordance with DCMA 8210.1C (AFI 10-220), and 33
FW GOP.
3.3.1. Ensure contractor OL GOP is integrated with (INSERT 33 FW MX REGULATIONS)
Month Projected
Sorties
Max Turn
Pattern
Typical Turn
Pattern
October 160 8 T 6 4 T 4
November 200 8 T 8 6 T 4
December 160 8 T 6 4 T 4
January 160 8 T 6 4 T 4
February 200 8 T 8 6 T 4
March 200 8 T 8 6 T 4
April 160 8 T 6 4 T 4
May 160 8 T 6 4 T 4
June 200 8 T 8 6 T 4
July 200 8 T 8 6 T 4
August 180 8 T 6 4 T 4
September 160 8 T 6 4 T 4
3.3.1.1. Maintenance personnel shall receive Eglin AFB flight line maintenance support training as it pertains to flight line vehicle operations (day and night), maintenance safety requirements, Foreign Object Damage (FOD) prevention and reporting, flight line security, aircraft tow procedures including runway crossing, and all other subjects as deemed necessary by the 33 MXG to ensure safe flight line maintenance operations.
3.3.1.2. Acceptance and loading of equipment provided as Eglin GFE in Appendix I.
3.3.2. Integration of scheduling with (INSERT EGLIN LOCAL SCHEDULING
REGULATION)
3.3.2.1. The normal schedule for flight operations is Monday through Friday, 0600 to 2000 local time. The weekly schedule will identify when operations are required outside of this period or are of longer duration than 14 hours per day.
3.3.2.2. During periods of intensive test operations or major exercises, it is not uncommon for flight operations with all aircraft involved to run in excess of 14 hours a day, seven days a week for multiple weeks. When this type of schedule is anticipated to last one week or longer, the Government will give the Contractor at least 30 days advance notice.
3.3.2.3. During exercises such as Checkered Flag, or other 33 FW tasked exercises combat scheduling will be used.
File details come from the government source that posted it. Updated .