DRAFT_CAF_ADAIR_Eglin_PWS_25_Jul_17.pdf

PDF 112 KB Posted

Attached to
CAF Contracted Air Support (CAS) Federal contract opportunity
Solicitation number
FA4890-17-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

Draft CAF ADAIR Eglin PWS

View the file

Other files for this federal contract opportunity

Other files attached to CAF Contracted Air Support (CAS), newest first.
File Type Posted
Appendix_I_-_Aircraft_Attributes.pdf PDF
FA4890-17-R-0007-0001_Conformed_Solicitation.pdf PDF
Appendix_L_-_CAF_CAS_Draft_DD_254.pdf PDF
FA4890-17-R-0007_QA.pdf PDF
CDRL_2_-_Air_Worthiness_Data_Package.pdf PDF
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
Appendix_I_-_Aircraft_Attributes.pdf PDF
Appendix_B_-_Contract_Data_Requirements_List_(CDRL).docx DOCX document
Section_L_Attachment_Task_Order_1_PWS.pdf PDF
Section_B,_Attachment_1_-_IDIQ_Pricing_Worksheet.xlsx XLSX spreadsheet
Section_J_Attachment_CAF_CAS_Master_PWS.pdf PDF
CAF_CAS_FOPR_Ordering_Guide.pdf PDF
QAs_in_Response_to_FBO_Posting_16_Aug_18.pdf PDF
CAF_CAS_Update_6_Aug_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_I_-_Aircraft_Attributes_4_Jun_2018.pdf PDF
DRAFT_CAF_CAS_Sections_L_M_5_Jun_2018.pdf PDF
DRAFT_TO_Ordering_Guide_24_May_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Jun_2018.pdf PDF
OL_Fielding_Release_for_Industry.pdf PDF
DRAFT_CAF_CAS_Task_Order_1_Master_PWS_2_Jun_2018.pdf PDF
Telecom_Points_of_Interest.pdf PDF
CAF_CAS_Pre-RFP_Conf-7_June_18.pdf PDF
CAF_CAS_Proposal_Writing_Conf_-_24_May_18.pdf PDF
Notice_to_Industry_for_NEPA_23_Apr_18.pdf PDF
CAF_CAS_Industry_Update_Teleconference_-_8_May_18.pdf PDF
CAF_CAS_Appendix_I_-_Aircraft_Attributes.pdf PDF
Q&A_Format.docx DOCX document
DRAFT_CAF_CAS_Appendix_M_-_Definitions,_Abbreviations,_and_Acronyms.pdf PDF
DRAFT_CAF_CAS_Appendix_N_-_CAF_ADAIR_Blue_1_Evaluation_2_Apr_2018.pdf PDF
DRAFT_TO_Ordering_Guide_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_B_-_Contract_Data_Requirements_List_(CDRL)_2_Apr_2018.docx DOCX document
CAF_ADAIR__Max_PPFH_Memo_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Master_PWS_2_Apr_2018.pdf PDF
DRAFT_CAF_CAS_Appendix_C_-_Publications_and_Forms_2_Apr_2018.pdf PDF
Attachment_1-Market_Research_Questionnaire.pdf PDF
Notice_to_Industry_5_Dec_17.pdf PDF
Spectrum_Management.pdf PDF
Projected_NEPA-EIAP.pdf PDF
Fundamentals_of_USAF_Airworthiness_Process.pdf PDF
Airworthiness_Assessment_Technical_Evaluation_Training.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17rev1.pdf PDF
Follow-up_Questions_for_Industry_19_Sep17.pdf PDF
Q&A_Format.docx DOCX document
Additional_Questions_for_Industry.pdf PDF
DRAFT_Pricing_Table_Section_J_Attachment_2_-_25_Jul_17.xlsx XLSX spreadsheet
DRAFT_SF_33_25_Jul_17.pdf PDF
CAF_ADAIR_Risk_Assessment_17_May_17.pdf PDF
DRAFT_CAF_ADAIR_Appendix_I_Government_-_Aircraft_Attributes_and_Fielding_25_Jul_17.pdf PDF
DRAFT_CAF_ADAIR_Kingsley_PWS_25_Jul_17.pdf PDF
Show all 50

CAF Contracted Air Support (CAS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

THE COMBAT AIR FORCES (CAF)

CONTRACT ADVERSARY AIR (ADAIR) SERVICES

EGLIN AFB SUPPORT

SECTION A

DESCRIPTION OF SERVICES

1.0 SCOPE AND COMPLIANCE. The objective of the CAF ADAIR acquisition is to provide realistic advanced adversary air threats from commercial ADAIR sources to support pilot combat readiness training. For the purpose of this document and program, the terminology

“CAF” refers to both the Combat Air Forces and those Formal Training Units (FTU) supplying

Combat Air Forces. This PWS is the task order servicing 33 Fighter Wing (FW). This PWS is must be utilized concurrent with the core PWS on CAF ADAIR. The contractor will provide sorties to facilitate 33 FW and Eglin AFB missions. ADAIR sorties will integrate as part of the

33 FW force in support of adversary air requirements. The Government will identify within

Appendix I the required threshold and objective aircraft performance attributes needed to progressively expand aircraft system capabilities to replicate peer combatant threats. CAF

ADAIR contractors may support multiple customers/locations across the CAF with Operations and Maintenance services. The contractor will be responsible for all supplies and services to meet task order requierments, except for those outlined in the PWS Section C, Government-

Furnished Property and Services, regardless of on- or off-base beddown.

1.1 Eglin Task Order. Contractors shall provide complete ADAIR services including, aircraft, pilots, aircraft maintenance, program and contract management to meet this PWS requirements.

Eglin ADAIR contractor operations are projected to be on-station.

1.1.1 Task Order requirements may expand over time to support additional CAF ADAIR requirements. Additional exercise support for events or an increased required level of support may be best suited to be met through a contractor deployment capability versus a continual presence but is at the discretion of the contractor.

1.1.2 33 FW will provide a GFR and GGR and alternates, responsible to the AMIC Program

Management Office, to surveil flight and ground operations, including deployment locations.

GFRs and GGRs will surveil the Contractor using the criteria outlined in the core PWS, this task order, DCMA 8210.1C (AFI 10-220), Contractor’s Flight and Ground Operating

Procedures, Quality Assurance Surveillance Plan (QASP), and the approved Quality

Management System (QMS).

3.0. OPERATIONS AND MAINTENANCE

3.1. Operations. Contractors will: Provide advanced ADAIR sorties to meet 33 FW Task

Order PWS requirements and integrate as part of the sponsoring unit.

3.1.1. Flying hour program. The projected 33 FW ADAIR mission requirements are 2,568 hours, 1.2 Average Sortie Duration (ASD) and 2,140 sorties. The table below provides the projected monthly sorties, maximum and the typical turn-pattern. Included within this projection are night flying requirements of two-three weeks per quarter. Flying hour program may deviate 5% any given month or annually based upon mission needs and operational scheduling constraints.

3.1.2. Contractor shall also provide an ICADs capable mission data file for each aircraft to support debrief requirements.

3.2. Contractor Flight Operations Plan (FOP). The Contractor shall operate their aircraft

IAW 14 CFR. Ensure adherence to Government approved Core Contractor Flight Operations

Plan IAW DCMA 8210.1C (AFI 10-220), and augmented by the 33 FW Contractor Flight

Operations Plan. Contractor 33 FW FOP must specifically address the following:

3.2.1. Integration of operations with (INSERT EGLIN LOCAL OPERATIONS REG)

3.2.2. Integration of flight operation with (INSERT EGLIN LOCAL SAFETY

REGULATION).

3.2.3. A program to provide to the supported unit a complete ICADS-compatible mission file for all participating Contractor aircraft, not later than 30 minutes after the last Contractor aircraft landing, to support debrief requirements.

3.2.4. Typical profiles will require contract aircraft to travel to airspace including, but not limited to W-151 and W-470.

3.3. Ground Operations Plan (GOP). The Contractor shall maintain the aircraft IAW applicable FAA regulations and standards. Ensure the GOP includes all procedures required by

DCMA 8210.1C (AFI 10-220), plus any hazardous ground operations not specifically mentioned in the core PWS but required to operate at Eglin AFB. Ensure adherence to

Government approved Core GOP in accordance with DCMA 8210.1C (AFI 10-220), and 33

FW GOP.

3.3.1. Ensure contractor OL GOP is integrated with (INSERT 33 FW MX REGULATIONS)

Month Projected

Sorties

Max Turn

Pattern

Typical Turn

Pattern

October 160 8 T 6 4 T 4

November 200 8 T 8 6 T 4

December 160 8 T 6 4 T 4

January 160 8 T 6 4 T 4

February 200 8 T 8 6 T 4

March 200 8 T 8 6 T 4

April 160 8 T 6 4 T 4

May 160 8 T 6 4 T 4

June 200 8 T 8 6 T 4

July 200 8 T 8 6 T 4

August 180 8 T 6 4 T 4

September 160 8 T 6 4 T 4

3.3.1.1. Maintenance personnel shall receive Eglin AFB flight line maintenance support training as it pertains to flight line vehicle operations (day and night), maintenance safety requirements, Foreign Object Damage (FOD) prevention and reporting, flight line security, aircraft tow procedures including runway crossing, and all other subjects as deemed necessary by the 33 MXG to ensure safe flight line maintenance operations.

3.3.1.2. Acceptance and loading of equipment provided as Eglin GFE in Appendix I.

3.3.2. Integration of scheduling with (INSERT EGLIN LOCAL SCHEDULING

REGULATION)

3.3.2.1. The normal schedule for flight operations is Monday through Friday, 0600 to 2000 local time. The weekly schedule will identify when operations are required outside of this period or are of longer duration than 14 hours per day.

3.3.2.2. During periods of intensive test operations or major exercises, it is not uncommon for flight operations with all aircraft involved to run in excess of 14 hours a day, seven days a week for multiple weeks. When this type of schedule is anticipated to last one week or longer, the Government will give the Contractor at least 30 days advance notice.

3.3.2.3. During exercises such as Checkered Flag, or other 33 FW tasked exercises combat scheduling will be used.

File details come from the government source that posted it. Updated .