Fundamentals_of_USAF_Airworthiness_Process.pdf
PDF 3 MB Posted
- Attached to
- CAF Contracted Air Support (CAS) Federal contract opportunity
- Solicitation number
- FA4890-17-R-0007
About this file
Fundamentals of USAF Airworthiness Process
View the file
Other files for this federal contract opportunity
Show all 50
CAF Contracted Air Support (CAS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Birthplace, Home & Future of Aerospace
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Fundamentals of
USAF Airworthiness
Process
Mark Mueller
Airworthiness Technical Expert
USAF Airworthiness Office
Air Force Life Cycle Management Center
Email: Mark.Mueller.9@us.af.mil
+1 (937) 656-9503
USAF Airworthiness Office:
USAF.Airworthiness.Office@us.af.mil
+1 (937) 656-9438
Case # 88ABW-2017-1667
USAF AW PROCESS ASSUMPTIONS
• USAF Airworthiness Process has hidden assumptions:
– USAF owns or has possession of FMS aircraft
– Aircraft Program Office (and Engineering Team) exists and is responsible for executing the Airworthiness Process
– The Aircraft Program Office is the repository of prior
Airworthiness Artifacts
– The Technical Airworthiness Authority (TAA) provides an independent airworthiness assessment/approval.
– The TAA does not design or test aircraft modifications.
Program Elements
Civil Operations
Maint Manual
A.I.P. (Insp Prog)
Organization (Org Chart)
Training (Mx & Ops)
Mx Scheduling
Mx Recording &
Record Keeping
USAF Operations
TO 00-5-1
TO 00-20-1
AFI 38-101 (Org Chart)
AFI 36-2201
TO 00-20-1
TO 00-20-2
“It’s a Small World After All “
Assumes Industry
Infrastructure
Assumes USAF
Infrastructure
Agenda
• Key Terms and Definitions
• Airworthiness Policy
• Airworthiness Process Overview
– Airworthiness Planning / Airworthiness Determination Form
– Certification Basis
– Compliance Review
– Risk Acceptance
– Flight Authorization
• Summary
• Questions
• Lisa’s Final Observations
All Airworthiness Authorities (DoD, FAA, Foreign Civil & Military) have different terms and definitions, but the concept is the same
Key Airworthiness Terms and Definitions (Reference: DoDD 5030.61, DOD Airworthiness Policy)
• Airworthiness - The property of an air system configuration to safely attain, sustain, and complete flight in accordance with approved usage limits
• Airworthiness Assessment - A technical evaluation of data against specific airworthiness criteria and determination of residual risk
• Airworthiness Approval
– Documents issued by an empowered airworthiness authority that affirm:
o Appropriate tenets of the airworthiness process are met o Aircraft/air system was assessed against required airworthiness standards o Residual risk to aircrew, ground crew, passengers, or to other third parties has been accepted by the appropriate authority
– USAF Flight Authorization = Airworthiness Approval:
Military Type Certificate (MTC) or Military Flight Release (MFR)
Airworthiness Policy Structure
DoD Directive 5030.61, DoD Airworthiness Policy
Title 10 United States Code, Chapter 803, Section 8013
Air Force Policy Directive 62-6, USAF Airworthiness
Air Force Instruction 62-601, USAF Airworthiness
AFMC Supplement to AFI 62-601, USAF Airworthiness
Airworthiness
Bulletins
(AWB)
AFLCMC
Operating
Instruction
62-601
AFLCMC
Standard Process for
Reportable
Airworthiness
Flight
Authorization
Key Airworthiness Activities
• Overlay Airworthiness Certification
• Key Activities:
– Airworthiness Planning
– Certification Basis Development
– First Flight
– Design Compliance Verification
PDR IOT&E
Contract Award
ECP or CCB
Approved CDD or 1067 CDR First Flight
Design Compliance Verification
Certification Basis Development
Planning
Pre First Flight Activities
MS-CMS-B
USAF Airworthiness Data Package
2. Certification Basis/Compliance Report
TAILORED
MIL-HDBK-
516C*
* USAF required Criteria, Standards, and Methods of Compliance
1.
Certification
Basis
Data-Driven Process:
• Consistent
• Repeatable
• Traceable
3.
Risk Acceptance Documentation
System Safety Risk Assessment
Hazards &
Mitigations
Criteria Non-compliances
Data Artifacts
4.
Flight
Authorization
MFR
or
MTC
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
AW Plan or AW Determination Form
• Overall airworthiness approach
• Initial description of system or mod
• Certification basis development and approval
• Schedule/Project Tracker
• Planning for first flight release and conduct of flight test program
• Entrance and exit criteria for major reviews
Airworthiness Determination Form: Impact &
Reportability
Does Mod impact
Airworthiness?
No MACC is required
MACC is required
Is Mod
Reportable?
TAA Approval
• Cert Basis
• Compliance Report
• MTCs/ MFRs
RAA Approval
• Residual Risk
Yes Yes
No No
DOE/DTA Approval
• Cert Basis
• Compliance Report
• MTCs/ MFRs
CE/DTA Approval
• As delegated by DOE/DTA
RAA Approval
• Residual Risk
TAA: Technical AW Authority DOE: Director of Engineering
DTA: Delegated Technical Authority CE: Chief Engineer
RAA: Risk Acceptance Authority
USAF Airworthiness Data Package
2. Certification Basis/Compliance Report
TAILORED
MIL-HDBK-
516C*
* USAF required Criteria, Standards, and Methods of Compliance
1.
Certification
Basis
Data-Driven Process:
• Consistent
• Repeatable
• Traceable
3.
Risk Acceptance Documentation
System Safety Risk Assessment
Hazards &
Mitigations
Criteria Non-compliances
Data Artifacts
4.
Flight
Authorization
MFR
or
MTC
MIL-HDBK-516C
4.0 Systems Engineering
5.0 Structures
6.0 Flight technology
7.0 Propulsion and Propulsion Installations
8.0 Air Vehicle Subsystems
9.0 Crew Systems
10.0 Diagnostic Systems
11.0 Avionics
12.0 Electrical Systems
13.0 Electromagnetic Environmental Effects
14.0 System Safety
15.0 Computer Systems and Software
16.0 Maintenance
17.0 Armament and Stores Integration
18.0 Passenger Safety
19.0 Materials
20.0 Air Transportability, Airdrop, Mission/Test Equipment
and Cargo/Payload Safety
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
Certification Basis
• Criteria, Standards, and Methods of Compliance
• “Basis” of an airworthiness assessment
• Cert Basis is the key stone of the process
Experimental Flight Release Basis
• Tailored “Cert Basis” for flight test
Certification Basis Analogy
AWB-004
One might equate the establishment of a certification basis to that of a high jump competition in track and field. For example:
a. Criterion: The criterion is that the athlete must jump over the bar without knocking it off. This is not debatable or tailorable.
b.Standard: How high is the bar set? Note that the bar may be set at different heights depending upon the type of athlete (e.g., male, female, age group, etc.). Similarly, for the same given airworthiness criterion, the standards for a fighter aircraft may be significantly different than that required for a tanker aircraft.
c. Method of Compliance: Generally, how must the athlete go over the bar?
Must they go over the bar and have the exact clearance measured (test)? Can they go over the bar and have no measurement beyond that done
(demonstration)? Can they simply say “I have done this before and will provide proof” (similarity)?
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
Compliance Review
• Obtain & review substantiating data
• Program Office SHOWS Compliance
• TAA/DTA FINDS Compliance
• What about non-compliances…?
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
Risk Assessment
• Identify criterion non-compliance
• Identify associated hazard
• Quantify mishap probability & severity
• Use AWB-013A
VERY IMPROBABLE (F)
<0.001/100K flt hrs
VERY IMPROBABLE
10 >= X <100
1 >= X <10
0.01 >= X <1
0.001 >= X <0.01
* Per 100K flt hrs
X >= 100
Revised 12/18/12 Frequency Ranges
Added Category & Frequency, 12/18
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
AW Risk Matrix:
Airworthiness Bulletin #013A
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
Risk Acceptance Authority
• Who accepts the assessed risks?
Risk Acceptance Authority:
Criteria Non-Compliance
USAF
Chief of Staff
(CSAF)
AFMC/CC
AFLCMC/EN
Director
Technical
Airworthiness
Authority (TAA)
Component
Acquisition
Executive (CAE)
Program
Executive
Officer (PEO)
Program
Manager (PM)
Major Operational Commands
(MAJCOM)
• Air Combat Command (ACC)
• Air Mobility Command (AMC)
• Air Education and Training Command (AETC)
• AF Special Operations Command (AFSOC)
• etc.
Air Force
Safety Center
Risk Identification Serious Risk
Acceptance
(Acquisition)
High Risk Acceptance
(Acquisition)
Operational Risk
Acceptance (Serious and
High)
Low to Medium Risk
Acceptance
(Acquisition)
A Flight Release Is Granted Only After The Risks Of
Non-Compliance Are Formally Accepted
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
MFR
• Design-based or Non-design-based
• Significant non-compliance
• Experimental
• Restricted
• Time-limited
• Residual Risk: Low-High
MTC
• Design-based
• Config defined
• Sufficient compliance
• Tech data
• Usage defined
• Service life limit
• Residual Risk: Low-Med
Airworthiness Process Data-Driven Processes
AW Plan
Experimental Flight Release Basis
Compliance Review & Risk Assessment
Ops MFR/MTC Issuance
Potentially more than one iteration
Risk Acceptance
Airworthiness Project Phases Design-Based
Compliance Review & Risk Assessment
Test MFR Issuance
Risk Acceptance
Flight Test Compliance Data
Cert Basis
“Typical” Path to Operational Flight Authorization
F li g h t T e s t
O p e ra ti o n s
Ground Test Compliance Data
QUESTIONS
Observations of a soon to be 6 knot Engineer
• Living Between the Cracks
• FAA
• USAF as AA vs Regulatory Agency
• Define your future or have it defined for you
File details come from the government source that posted it.