CDRL_A001-03_TAB_RIS_O M.doc
DOC document 44 KB Posted
- Attached to
- Aerial Targets Federal contract opportunity
- Solicitation number
- FA4890-14-R-0012
About this file
Aerial Targets PWS App B CDRL A001-03 TAB RIS O M
View the file
Other files for this federal contract opportunity
Show all 50
Aerial Targets has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AERIAL TARGETS PWS
Solicitation No. FA4890-14-R-0001
APPENDIX B – CONTRACT DATA REQUIREMENTS LIST (CDRL)
Tab 03 (CDRL A001-03)
Range Instrumentation System (RIS) Operations & Maintenance (O&M) Activities
Monthly Reports for RIS O&M shall include the following:
· Operational Availability or A(o) for the Tellabs Switch and Data/Comm circuits
· Report shall include the most recent month and a rolling average of the preceding 12 months. Calculate A(o) IAW PWS Table 1.6 Service Summary section 3.
· Mission Availability or M(a) for the GRDCS, BC3, Orion Communication System, MCS Vans, TPS-75 RADAR, and the Mission Video System,
· Report shall include the most recent month and a rolling average of the preceding 12 months. Calculate M(a) IAW PWS Table 1.6 Service Summary section 3.
· Summary of maintenance actions for RIS equipment/circuits and GRDCS Tracking Pods. Include the following data:
· The number of missions cancelled due to an outage of the GRDCS, BC3, Orion Communication System, MCS Vans, or TPS-75 RADAR equipment.
· Start Date/Time, Stop Date/Time, Duration, Outage, Equipment, Repair Actions, Parts Used.
· Operating hours for GRDCS and BC3, including the number of hours devoted to:
· Mission support.
· Maintenance.
· Engineering and systems programming efforts.
· Administrative or other overhead functions.
· Maintenance and Logistics Problems:
· List of top 5 parts most frequently ordered during preceding 12-month period.
· List of top 5 parts ordered with longest time on order.
· Describe areas which have impacted past mission accomplishment.
· Identify problems which may affect future mission capabilities.
· Summary of information regarding range tower conditions affecting safety or mission operations.
· Summary of Scheduled Maintenance actions for RIS equipment:
· Due in the next 45 days.
· Accomplished during the preceding calendar month.
· Current status of accounts authorized for GRDCS and BC3 operations
· The first report shall include:
· Amount of time used by each account during the month in hours of fractions.
· Name of the individual to whom the account was issued.
· Degree of access provided.
· Subsequent reports shall contain:
· Changes to account status.
· Additions and deletions.
· The times utilized by each account are required each month.
· Synopsis of engineering and systems programming tasks in progress, identified by:
· Short title.
· Date initiated.
· Estimated date of completion.
· Current status.
· Problems anticipated or encountered.
· Special Projects: Provide a summary of GRDCS/BC3/Telecommunications related test projects supported.
AERIAL TARGETS PWS
B-A001-03-1