Aerial_Targets_PWS_App_L_(QF-4_to_QF-16_Transition_HAFB)_02_Sept_14_(Final).pdf

PDF 247 KB Posted

Attached to
Aerial Targets
Solicitation number
FA4890-14-R-0012
Issued by

View the file

Other files

File Type Posted
Amendment_0001.pdf PDF
Final_RFP_Ques__Govt_Resp_(FBO_30Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).docx DOCX document
Final_RFP_Ques_ _Govt_Resp_(FBO_17Dec14).pdf PDF
Final_RFP_Ques_ _Govt_Resp_(FBO_1Dec14).docx DOCX document
AT_Vehicles_List_(FBO_1Dec14).xlsx XLSX spreadsheet
Aerial_Targets_PWS_REV_App_A_(Definitions)_26Nov14_(Final).doc DOC document
AT_PPC_Safety_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
AT_PPC_Brief_20Nov14_(as_briefed _FBO_24Nov14).pdf PDF
CBA_Aerial_Tgts_Holloman_ _DS2_7May12-1May15.pdf PDF
CBA_Aerial_Tgts_Tyndall_ _DS2_5Aug13-31Jul16.pdf PDF
Govt_Responses_to_Industry_RFP_Ques__2_(FBO_17Nov14).pdf PDF
Govt_Responses_to_Industry_RFP_Ques_(FBO_17Nov14).pdf PDF
Aerial_Targets_PWS_App_G_(Quality_Managment_System)_02_Sept_14_(Final)_Updated_14Nov14.pdf PDF
CDRL_A009_DD1423_Master_Library_Index.pdf PDF
CDRL_A019_DD1423_SW_Test_Report.pdf PDF
CDRL_A016_DD1423_Technical_Reports.pdf PDF
CDRL_A004_DD1423_Operating_Instructions.pdf PDF
CDRL_A002_DD1423_Cost_Performance_Report.pdf PDF
CDRL_A010_DD1423_GFE_Inventory.pdf PDF
CDRL_A005_DD1423_Environmental_Protection_Program.pdf PDF
CDRL_A011_TAB_Spill_Report_Form.doc DOC document
CDRL_A008_DID_DI-IPSC-81427A_Software_Development_Plan_(SDP).pdf PDF
CDRL_A014_DID_DI-IPSC-81488_Computer_Software_Product.pdf PDF
CDRL_A007_DD1423_Property_Control_Plan.pdf PDF
CDRL_A012_DD1423_Incident_Report.pdf PDF
CDRL_A020_DD1423_SW_Improvement_Report.pdf PDF
CDRL_A003_DD1423_Management_Plan.pdf PDF
CDRL_A013_DD1423_CSIR.pdf PDF
CDRL_A001_DD1423_Monthly_Summary_Report.pdf PDF
CDRL_A012_DID_DI-SAFT-81563_Accident-Incident_Report.pdf PDF
CDRL_A008_DD1423_Software_Development_Plan_(SDP).pdf PDF
CDRL_A005_DID_DI-ENVR-81378_Environ_Operation_ _Maint_(O M)_Plan.pdf PDF
CDRL_A014_DD1423_RIS_SW_Code_Doc.pdf PDF
CDRL_A007_DID_DI-MISC-81420_Property_Control_Report.pdf PDF
CDRL_A013_DID_DI-DRPR-80151A_Comm-Computer_Systems_Install_Records_(CSIRs).pdf PDF
CDRL_A015_DD1423_Recomp_Info_for_Bidder_Library.pdf PDF
CDRL_A011_DID_DI-SAFT-80494A_Pollution_Incident_Report.pdf PDF
CDRL_A010_DID_DI-ILSS-81251_Equip_Inventory_Records_(EIRs).pdf PDF
CDRL_A017_DID_DI-IPSC-81442A_Software_Version_Descrip_(SVD).pdf PDF
CDRL_A002_DID_DI-MGMT-80227_Contractor's_Progress-Status-Mgmt_Report.pdf PDF
CDRL_A009_DID_DI-MISC-80393A_Master_Document_List_(MDL).pdf PDF
CDRL_A001_DID_DI-ADMN-80447A_Contract_Summary_Report.pdf PDF
CDRL_A006_DD1423_Safety_ _Health_Program.pdf PDF
CDRL_A004_DID_DI-MISC-80392_Operating_Instructions.pdf PDF
CDRL_A001-01_TAB_FSAT_O M.docx DOCX document
CDRL_A018_DID_DI-IPSC-81439A_Software_Test_Descrip_(STD).pdf PDF
CDRL_A017_DD1423_Version_Desc_Report.pdf PDF
CDRL_A003_DID_DI-MGMT-80004A_Management_Plan.pdf PDF
CDRL_A006_DID_DI-ENVR-81375_Environ_Health_and_Safety_Plan_(HSP).pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AERIAL TARGETS PWS

Solicitation No. FA4890-14-R-0012

APPENDIX L – QF-4 to QF-16 TRANSITION

L-1 02 Sept 14

1.0 FULLSCALE AERIAL TARGETS (FSAT) QF-4 TO QF-16 TRANSITION AT

HOLLOMAN AFB (HAFB) NM AND TYNDALL AFB (TAFB) FL. Starting the first quarter FY16 (TAFB) and first quarter FY18 (HAFB), the FSAT operations will be exclusively QF-16 Aircraft, unless otherwise stated. The transition will be a phased and iterative process at both locations as described below. The following paragraphs describe the levels of support required by the contractor to support PWS requirements and the required support during the transition period. It’s time-lined in terms of performance periods and fiscal years. Figure 1 depicts the estimated inventories and milestones based on the information available. It’s subject to change due to delivery delays, kills rates, aircraft mishaps, etc.

1.1 FY16-FY17. The contractor shall:

1.1.1 HAFB

1.1.1.1 Receive and induct remaining QF-4Es from the Tyndall AFB (TAFB) fleet starting approximately the first quarter.

1.1.1.2 QF-16 Support Preparation. Establish logistics functions (equipment and supply accounts); ensure needed tools and equipment are in-place; arrange host wing support (PMEL, wheel/tire, NDI, etc…); and ensure AGE and support equipment are mission ready to commence

QF-16 operations by the third quarter of FY16.

1.1.1.3 Maintain and support ground operation exclusively for the QF-4 IAW PWS Section A, Paragraph 3.0 and 4.0 for the first and second quarter (approx.) of FY16.

1.1.1.4 Heritage Flight. The Contractor shall be prepared to support AF Heritage Flight operations of the QF-4 FSAT. This effort is expected to be, but not limited to, one (1) on-station events and five (5) off-station events per year at HAFB. Prior to each air show season (which commences at the conclusion of the Heritage Conference in mid-March), identify support personnel at HAFB who will support the Heritage show schedule. For continuity, the individuals identified shall be the only personnel authorized to support Heritage events for a given air show season. For each Heritage event or other special events as specified by the Government, support personnel shall wear Heritage team uniforms.

1.1.1.5 Accept delivery of QF-16 aircraft at a rate of 1 per quarter starting approximately third quarter FY16.

1.1.1.6 Perform acceptance inspections and SAFE flights IAW PWS Section A, Paragraph 3.0.

1.1.1.7 Manage the QF-16 and QF-4 fleet inventory and scheduled/unscheduled maintenance

IAW PWS Section A, Paragraph 3.0.

1.1.1.8 Sustain a sufficient combination QF-4 and QF-16 manned flyers to support the flying operations and pilot qualifications IAW Section A, Paragraph 4.4.

L-2 02 Sept 14

1.1.2 TAFB

1.1.2.1 Maintain and support ground operation for the QF-16 IAW PWS Section A, Paragraph

3.0 and 4.0 for the entire period. It’s anticipated to be QF-16 ground operations exclusively starting fourth quarter FY15/first quarter FY16, but it’s subject to change due to unexpected QF-

16 delivery delays, drone kills rates, aircraft mishaps, etc. The Contractor must be prepared to support QF-4 operations during FY16.

1.1.3 QF-4 DEACTIVATION, DEMILITARIZATION, AND DISPOSAL (3D) PLAN.

Support field disposal DEMIL of remaining QF-4 aircraft (expected 20 aircraft) IAW the 3D

Plan. The support shall include but not limited to:

Preparation of aircraft for Demil.

Safe aircraft for maintenance.

Remove and purge fuel and fluids. Disposal of these liquids shall be IAW Federal, State and Local regulations.

Remove egress items, CAD/PAD and other explosive devices, Remove save list items. Disposition removed items and material appropriately.

Perform any unique tasks as requested by the SPO and approved by the PM (if applicable and within scope).

Disposition engines per engine management office instruction.

Sign off applicable blocks in the Demil checklist.

Notify and coordinate with applicable on-base organizations for hazardous material turn-in accomplished in Phase 2 and obtain any necessary containers to facilitate turn-in.

Ensure availability of tools to support Phase 2 activities. Notify the SPO upon completion of Phase 1.

Provide technical data and equipment to DEMIL team

Provide technical subject matter expertise to DEMIL team

Tow equipment and aircraft as required for DEMIL activity

1.1.4 QF-4 Support Equipment. Process and turn-in, through applicable supply or GFE channels, QF-4 equipment that is no longer needed to support QF-4 or QF-16 operations.

1.2 FY18 – FY21. The contractor shall maintain and support ground operation for the QF-16s exclusively at both TAFB and HAFB IAW PWS Section A, Paragraph 3.0 and 4.0. The contractor shall support DEMIL IAW Paragraph 1.1.3 at both locations until the fleet is properly disposed and removed from the inventory.

L-3 02 Sept 14

Figure 1. Transition Projected Milestones and Inventories.

QF-4

TYN

QF-4

HMN

QF-4

DEMIL

QF-16

TYN

QF-16

HMN

FY14 32 29 5 0

23 29 5 0

20 29 5 0

16 24 5 0

FY15 12 23 5 0

8 23 5 0

4 23 7 0

0 27 12 0

FY16 0 27 17 0

0 26 18 0

0 26 19 0

0 25 19 1

FY17 0 25 19 2

0 24 19 3

0 24 19 4

0 23 19 5

L-4 02 Sept 14

FY18 0 23 19 6

0 18 19 7

0 13 19 8

0 8 19 8

FY19 0 3 19 9

0 0 19 9

0 0 19 10

0 0 19 10

FY20 0 0 19 11

Figure 2. Projected FSAT Inventory