Final RFP FA4890-12-R-0006- FIAR Support.doc

DOC document 380 KB Posted

Attached to
Air Force Financial Improvement and Audit Readiness (FIAR) Support Federal contract opportunity
Solicitation number
FA4890-12-R-0006
Issued by
Department of the Air Force Air Combat Command

About this file

Final RFP FA4890-12-R-0006- FIAR Support

View the file

Other files for this federal contract opportunity

Other files attached to Air Force Financial Improvement and Audit Readiness (FIAR) Support, newest first.
File Type Posted
FA4890-12-R-0006-0003- Final RFP Amendment 0003.doc DOC document
Industry Questions with Government Responses 24 Apr 12.docx DOCX document
FA4890-12-R-0006 CO Letter Amenment 0003.docx DOCX document
4 - AF FIAR Spt IDIQ PWS Amendment 0003.docx DOCX document
FIAR QASP 20 Apr 2012.docx DOCX document
FA4890-12-R-0006-0002- Final RFP Amendment 0002.doc DOC document
FA4890-12-R-0006 CO Letter Amenment 0002.docx DOCX document
5 - FIAR Spt TO 0001 PM Spt PWS Amendment 0002.docx DOCX document
Industry Questions with Government Responses 20 Apr 12.docx DOCX document
1 - AF FIAR Spt IDIQ Pricing Table Amendment 0002.xlsx XLSX spreadsheet
4 - AF FIAR Spt IDIQ PWS Amendment 0002.docx DOCX document
FA4890-12-R-0006 CO Letter Proposal Due Date.docx DOCX document
6 - FIAR Spt TO 0002 SBR PWS Amendment 0001.docx DOCX document
7 - FIAR Spt TO 0003 E C PWS Amendment 0001 3 Apr 12.docx DOCX document
B - DI-MGMT-81453A.pdf PDF
5 - FIAR Spt TO 0001 PM Spt PWS Amendment 0001.docx DOCX document
FA4890-12-R-0006-0001- Final RFP Amendment 0001.doc DOC document
A - FIAR Spt CDRL A001 Amendment 0001.docx DOCX document
FA4890-12-R-0006 CO Letter Amendment 0001.docx DOCX document
8 - Draft- DD 254- Amendment 0001.pdf PDF
1 - AF FIAR Spt IDIQ Pricing Table Amendment 0001.xlsx XLSX spreadsheet
Industry Questions with Government Responses.docx DOCX document
3 - Subcontracting Plan Example Spreadsheet Amendment 0001.xlsx XLSX spreadsheet
Pre-Proposal Conference 4 Apr 12.pptx PPTX presentation
Industry Questions 3 Apr 12.docx DOCX document
Gov't Responses to Industry Questions.docx DOCX document
6 - FIAR Spt TO 0002 SBR FINAL PWS.docx DOCX document
7 - FIAR Spt TO 0003 E C FINAL PWS.docx DOCX document
3 - Subcontracting Plan Example Spreadsheet.xlsx XLSX spreadsheet
2 - SB Subcontracting Plan Checklist.docx DOCX document
10 - Draft DD254- FA4890-12-R-0006 FIAR Support 23 Mar 12.pdf PDF
1 - AF FIAR Spt IDIQ Pricing Table.xlsx XLSX spreadsheet
9 - DI-MGMT-81453A.pdf PDF
4 - FIAR Spt IDIQ FINAL PWS.docx DOCX document
5 - FIAR Spt TO 0001 PM Spt FINAL PWS.docx DOCX document
FA4890-12-R-0006 CO Letter- Potential OCIs.docx DOCX document
FIAR Spt TO 0001 PM Spt PWS 8 Mar 12.docx DOCX document
Attachement Subcontracting Goals.xlsx XLSX spreadsheet
FIAR Spt IDIQ PWS 8 Mar 12.docx DOCX document
FIAR Spt TO 0003 E C PWS 8 Mar 12.docx DOCX document
IDIQ Pricing Table 8 Mar 12.xlsx XLSX spreadsheet
Attachment Subcontracting Plan Checklist.docx DOCX document
Final Draft RFP 8 March 2012.docx DOCX document
FA4890-12-R-0006 CO Letter.docx DOCX document
FIAR Spt TO 0002 SBR PWS 8 Mar 12.docx DOCX document
FA4890-12-R-0006 Draft RFP- AF FAIR Support.doc DOC document
FA4890-12-R-0006-CO Letter Request for SB Capabilities-MR Questions Letter.docx DOCX document
FA4890-12-R-0006-Request for SB Capabilities-MR Questions Letter.docx DOCX document
FA4890-12-R-0006 AF Draft Acceleration Plan.pdf PDF
FA4890-12-R-0006-Draft PWS.docx DOCX document
Show all 50

Air Force Financial Improvement and Audit Readiness (FIAR) Support has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 3 - Schedule of Supplies and Services (CLINS)

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Dollars, U.S.

Firm Fixed Price

FFP

Firm Fixed Price non-personal Auditing Advisory and Assistance Services. Proposed loaded hourly labor rates will be the maximum allowable rates used throughout the life of this contract for Firm Fixed Price (FFP). Not all labor categories are necessarily required for all Task Orders.

FOB: Destination

SIGNAL CODE: A

MAX

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Dollars, U.S.

Firm Fixed Price Level of Effort Term

FFP-LOE

Firm Fixed Price Level of Effort non-personal Auditing Advisory and Proposed loaded hourly labor rates will be the maximum allowable rates used throughout the life of this contract for Firm-Fixed Price Level of Effort (FFP LOE) Task Orders. Not all labor categories are necessarily required for all Task Orders. Note: If the contractor does not expend the required effort, the Government can impose a pro rata reduction in payment.

MAX NET AMT

CEILING PRICE

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Dollars, U.S.

Cost Reimbursable Travel

COST

Government directed travel. The Government will only reimburse allowable costs in accordance with FAR 31.205-46, with the following guidelines: (1) make every commercially reasonable effort to schedule travel far enough in advance to utilize reduced airfares; (2) stay in Government-furnished lodging when available and allowed at TDY location; and (3) do not exceed one compact to medium sized rental car for every four (4) individuals on travel at the same location. The government may provide the funded amount per task order or estimated times, places and number of personnel required to travel for each task order. G&A is allowed but no other fees, or other charges are allowed. Any travel required for a Task Order will be added at award of each Task Order, unless otherwise specified in a Task Order requirement.

Not To Exceed (NTE) at the Task Order.

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Dollars, U.S.

Data / Software

The contractor shall provide the data / software in accordance with the documents set in the ID/IQ PWS, and Section 5, Exhibit A- Contract Data Requirements List (DD Form 1423-1).

MAX

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
1
Dollars, U.S.

Data / Software Licensing Fee

The Government desires at least Government Purpose Rights in all portions of an Assertion Package deliverable. The contractor shall provide a listing for each portion of an Assertion Package deliverable with less than Government Purpose rights and the corresponding data/software licensing fee for Government Purpose Rights or Unlimited Rights. For commercial items or commercial computer software, the contractor shall provide the data/software licensing fee for Government rights to release or disclose all such commercial technical data or computer software outside the Government, and to authorize the recipient of such information to use, modify, reproduce, release, perform, display or disclose such commercial technical data or computer software for any Government purpose. The contractor shall provide a sample license as part of its proposal.

MAX

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 30-JUL-2012 TO

29-JUL-2017

N/A
N/A
0002
POP 30-JUL-2012 TO

29-JUL-2017

N/A
N/A
0003
POP 30-JUL-2012 TO

29-JUL-2017

N/A
N/A
0004
POP 30-JUL-2012 TO

29-JUN-2017

N/A
N/A
0005
POP 30-JUL-2012 TO

29-JUN-2017

N/A
N/A

LABOR RATE TABLE

Labor Rate Table (will be inserted at contract award)

CONTRACT MIN / /MAX

MIN / MAX CONTRACT VALUE

At the time of the ID/IQ award three Task Orders will be issued (see ID/IQ PWS Section A, paragraph 1.2.5). The minimum contract amount will be $500,000.00. The maximum contract value (ceiling) for the entire AF FIAR Support Program shall not exceed $300 Million.

Section 4 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-2
Security Requirements
AUG 1996
52.204-4
Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.212-4
Contract Terms and Conditions--Commercial Items
FEB 2012
252.204-7000
Disclosure Of Information
DEC 1991
252.209-7001
Disclosure of Ownership or Control by the Government of a Terrorist Country
JAN 2009
252.209-7004
Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country
DEC 2006
252.227-7014
Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation
MAR 2011
252.227-7017
Identification and Assertion of Use, Release, or Disclosure Restrictions
JAN 2011
252.227-7019
Validation of Asserted Restrictions--Computer Software
SEP 2011
252.227-7027
Deferred Ordering Of Technical Data Or Computer Software
APR 1988
252.227-7030
Technical Data--Withholding Of Payment
MAR 2000
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
5352.242-9000
Contractor Access to Air Force Installations
AUG 2007

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (FEB 2012)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Feb 2012) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub. L. 111-5).

X (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note).

X (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JAN 2012) (41 U.S.C. 2313).

____ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).

____ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

____ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (11) [Reserved]

____ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).

____ (ii) Alternate I (NOV 2011).

____ (iii) Alternate II (NOV 2011).

____ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

____ (ii) Alternate I (Oct 1995) of 52.219-7.

____ (iii) Alternate II (Mar 2004) of 52.219-7.

X (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).

X (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (Oct 2001) of 52.219-9.

X (iii) Alternate II (Oct 2001) of 52.219-9.

____ (iv) Alternate III (Jul 2010) of 52.219-9.

____ (16) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).

____ (17) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

X (18) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

____ (ii) Alternate I (June 2003) of 52.219-23.

____ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

____ (21) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

____ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

____ (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2009) (15 U.S.C. 632(a)(2)).

____ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business Concerns (NOV 2011).

____ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (NOV 2011

X (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

____ (27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jul 2010) (E.O. 13126).

X (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

X (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

X (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010)(38 U.S.C. 4212).

X (31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).

X (32) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).

X (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

X (34) 52.222-54, Employment Eligibility Verification (Jan 2009). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).

____ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).

____ (ii) Alternate I (Dec 2007) of 52.223-16.

X (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).

____ (39) 52.225-1, Buy American Act—Supplies (Feb 2009) (41 U.S.C. 10a-10d).

____ (40)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (June 2009) (41 U.S.C. 10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, Pub. L. 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, and 110-138).

____ (ii) Alternate I (Jan 2004) of 52.225-3.

____ (iii) Alternate II (Jan 2004) of 52.225-3.

____ (41) 52.225-5, Trade Agreements (NOV 2011) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

X (42) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150

____ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

____ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

____ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

X (47) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C. 3332).

____ (48) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).

____ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).

____ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

____ (51)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

_____ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

_____ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (Nov 2007) (41 351, et seq.).

X (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services—Requirements (Feb 2009) (41 U.S.C. 351, et seq.).

_____ (7) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).

_____ (8) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).

(ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) Reserved.

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 1998) (29 U.S.C. 793).

(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).

(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).

Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).

(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services--Requirements (FEB 2009) (41 U.S.C. 351, et seq.).

(xii) 52.222-54, Employment Eligibility Verification (JAN 2009).

(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(End of clause)

52.216-18 Ordering. (OCT 1995)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 30 July 2012through 29 July 2017.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

(End of clause)

52.216-22 Indefinite Quantity. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 28 July 2018.

(End of clause)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 day; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 5 years.

(End of clause)

52.232-18 AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(End of clause)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ (End of provision

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

(End of clause)

252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (JANUARY 2012)

(a) The Contractor agrees to comply with the following Federal Acquisition Regulation (FAR) clause which, if checked, is included in this contract by reference to implement a provision of law applicable to acquisitions of commercial items or components.

X 52.203-3, Gratuities (APR 1984) (10 U.S.C. 2207).

(b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components.

(1) X 252.203-7000, Requirements Relating to Compensation of Former DoD Officials (SEP 2011) (Section 847 of Pub. L. 110-181).

(2) X 252.203-7003, Agency Office of the Inspector General (SEP 2010)(section 6101 of Pub. L. 110-252, 41 U.S.C. 3509).

(3) X 252.205-7000, Provision of Information to Cooperative Agreement Holders (DEC 1991) (10 U.S.C. 2416).

(4) X 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) (SEP 2011) (15 U.S.C. 637).

(5) ____ 252.219-7004, Small Business Subcontracting Plan (Test Program) (JAN 2011) (15 U.S.C. 637 note).

(6)(i) ____ 252.225-7001, Buy American Act and Balance of Payments Program (OCT 2011) (41 U.S.C. chapter 83, E.O. 10582).

(ii) ____ Alternate I (OCT 2011) of 252.225-7001.

(7) ____ 252.225-7008, Restriction on Acquisition of Specialty Metals (JUL 2009) (10 U.S.C. 2533b).

(8) ____ 252.225-7009, Restriction on Acquisition of Certain Articles Containing Specialty Metals (JAN 2011) (10 U.S.C. 2533b).

(9) ____ 252.225-7012, Preference for Certain Domestic Commodities (JUN 2010) (10 U.S.C. 2533a).

(10) ____ 252.225-7015, Restriction on Acquisition of Hand or Measuring Tools (JUN 2005) (10 U.S.C. 2533a).

(11) ____ 252.225-7016, Restriction on Acquisition of Ball and Roller Bearings (JUN 2011) (Section 8065 of Pub. L. 107-117 and the same restriction in subsequent DoD appropriations acts).

(12) ____ 252.225-7017, Photovoltaic Devices (DEC 2011) (Section 846 of Pub. L. 111-383).

(13)(i) ____ 252.225-7021, Trade Agreements (JANUARY 2012) (19 U.S.C. 2501-2518 and 19 U.S.C. 3301 note).

(ii) ____ Alternate I (OCT 2011) of 252.225-7021.

(iii) ____ Alternate II (OCT 2011) of 252.225-7021.

(14) ____ 252.225-7027, Restriction on Contingent Fees for Foreign Military Sales (APR 2003) (22 U.S.C. 2779).

(15) ____ 252.225-7028, Exclusionary Policies and Practices of Foreign Governments (APR 2003) (22 U.S.C. 2755).

(16)(i) ____ 252.225-7036, Buy American Act—Free Trade Agreements—Balance of Payments Program (OCT 2011) (41 U.S.C. chapter 83 and 19 U.S.C. 3301 note).

(ii) ____ Alternate I (OCT 2011) of 252.225-7036.

(iii) ____ Alternate II (OCT 2011) of 252.225-7036.

(iv) ____ Alternate III (OCT 2011) of 252.225-7036.

(17) ____ 252.225-7038, Restriction on Acquisition of Air Circuit Breakers (JUN 2005) (10 U.S.C. 2534(a)(3)).

(18) ____ 252.225-7039, Contractors Performing Private Security Functions (AUG 2011) (Section 862 of Pub. L. 110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).

(19) ____ 252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns (SEP 2004) (Section 8021 of Pub. L. 107-248 and similar sections in subsequent DoD appropriations acts).

(20) ____ 252.227-7013, Rights in Technical Data--Noncommercial Items (SEP 2011), if applicable (see 227.7103-6(a)).

(21) X 252.227-7015, Technical Data—Commercial Items (DEC 2011) (10 U.S.C. 2320).

(22) ____ 252.227-7037, Validation of Restrictive Markings on Technical Data ((SEP 2011), if applicable (see 227.7102-4(c)))(10 U.S.C. 2321).

(23) X 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (MAR 2008) (10 U.S.C. 2227).

(24) ____ 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84)

(25) ____ 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).

(26) X 252.243-7002, Requests for Equitable Adjustment (MAR 1998) (10 U.S.C. 2410).

(27) ____ 252.246-7004, Safety of Facilities, Infrastructure, and Equipment For Military Operations (OCT 2010) (Section 807 of Pub. L. 111-84).

(28) ____ 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).

(29)(i) ____ 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(ii) ____ Alternate I (MAR 2000) of 252.247-7023.

(iii) ____ Alternate II (MAR 2000) of 252.247-7023.

(iv) ____ Alternate III (MAY 2002) of 252.247-7023.

(30) ____ 252.247-7024, Notification of Transportation of Supplies by Sea (MAR (2000) (10 U.S.C. 2631).

(31) ____ 252.247-7027, Riding Gang Member Requirements (OCT 2011) (Section 3504 of Pub. L. 110-417).

c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:

(1) 252.225-7039, Contractors Performing Private Security Functions (AUG 2011) (Section 862 of Pub. L. 110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).

2) 252.227-7013, Rights in Technical Data--Noncommercial Items (SEP 2011), if applicable (see 227.7103-6(a)).

(3) 252.227-7015, Technical Data--Commercial Items (DEC 2011), if applicable (see 227.7102-4(a)).

(4) 252.227-7037, Validation of Restrictive Markings on Technical Data (SEP 2011), if applicable (see 227.7102-4(c)).

(5) 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).

(6) 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).

(7) 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).

(8) 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).

(9) 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631).

(End of clause)

252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION (MAY 2006)

(a) Contract line item(s) through are incrementally funded. For these item(s), the sum of $ of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.

(b) For items(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit and estimated termination settlement costs for those item(s).

(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT".

(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraph (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.

(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "disputes."

(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.

(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "DEFAULT." The provisions of this clause are limited to work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract if fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) or (e) of this clause.

(h) Nothing in this clause affects the right of the Government to this contract pursuant to the clause of this contract entitled "TERMINATION FOR CONVENIENCE OF THE GOVERNMENT."

(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.

(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:

On execution of contract $-- (month) (day), (year) $---- (month) (day), (year) $---- (month) (day), (year) $---- This contract will be incrementally funded and the clause will be filled out at contract award.

(End of clause)

5352.201-9101 OMBUDSMAN (APR 2010)

(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the party to another official who can resolve the concern.

(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMBC A-76 competition performance decisions).

(c) If resolution cannot be made by the contracting officer, concerned parties may contact the Center/MAJCOM or AFISRA ombudsmen, Mr. Eric Thaxton, 129 Andrews St, Langley AFB, VA 23665-2769, phone number (757) 764-5372, facsimile number (757) 764-4400, Email address: eric.thaxton@langley.af.mil.. Concerns, issues, disagreements, and recommendations that cannot be resolved at the MAJCOM/DRU or ARISRA level, may be brought by the concerned party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (703) 588-7004, facsimile number (703) 588-1067.

(d) The ombudsman has no authority to render a decision that binds the agency.

(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the Contracting Officer.

5352.204-9000 NOTIFICATION OF GOVERNMENT SECURITY ACTIVITY AND VISITOR GROUP SECURITY AGREEMENTS (APR 2003)

This contract contains a DD Form 254, DOD Contract Security Classification Specification, and requires performance at a government location in the U.S. or overseas. Prior to beginning operations involving classified information on an installation identified on the DD Form 254, the contractor shall take the following actions:

(a) At least thirty days prior to beginning operations, notify the security police activity shown in the distribution block of the DD Form 254 as to:

(1) The name, address, and telephone number of this contract company’s representative and designated alternate in the U.S. or overseas area, as appropriate;

(2) The contract number and military contracting command;

(3) The highest classification category of defense information to which contractor employees will have access;

(4) The Air Force installations in the U.S. (in overseas areas, identify only the APO number(s)) where the contract work will be performed;

(5) The date contractor operations will begin on base in the U.S. or in the overseas area;

(6) The estimated completion date of operations on base in the U.S. or in the overseas area; and

(7) Any changes to information previously provided under this clause.

This requirement is in addition to visit request procedures contained in DOD 5220.22-M, National Industrial Security Program Operating Manual.

(b) Prior to beginning operations involving classified information on an installation identified on the DD Form 254 where the contractor is not required to have a facility security clearance, the contractor shall enter into a Visitor Group Security Agreement (or understanding) with the installation commander to ensure that the contractor’s security procedures are properly integrated with those of the installation. As a minimum, the agreement shall identify the security actions that will be performed:

(1) By the installation for the contractor, such as providing storage and classified reproduction facilities, guard services, security forms, security inspections under DOD 5220.22-M, classified mail services, security badges, visitor control, and investigating security incidents; and

(2) Jointly by the contractor and the installation, such as packaging and addressing classified transmittals, security checks, internal security controls, and implementing emergency procedures to protect classified material.

5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUN 1997)

(a) In performing work under this contract on a Government installation, the contractor shall:

(1) Comply with the specific health and safety requirements established by this contract;

(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;

(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and

(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.

(b) The contracting officer may, by written order, direct Air Force Occupational Safety and Health Standards (AFOSH) and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.

(c) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.

(End of clause)

5352.242-9001 COMMON ACCESS CARDS (CACs) FOR CONTRACTOR PERSONNEL (AUG 2004)

(a) For installation(s)/location(s) cited in the contract, contractors shall ensure Common Access Cards (CACs) are obtained by all contract or subcontract personnel who meet one or both of the following criteria:

(1) Require logical access to Department of Defense computer networks and systems in either:

(i) the unclassified environment; or

(ii) the classified environment where authorized by governing security directives.

(2) Perform work which requires the use of a CAC for installation entry control or physical access to facilities and buildings.

(b) Contractors and their personnel shall use the following procedures to obtain CACs:

(1) Contractors shall provide a listing of personnel authorized a CAC to the contracting officer. The contracting officer will provide a copy of the listing to the government representative in the local organization designated to authorize issuance of contractor CACs (i.e., “authorizing official”).

(2) Contractor personnel on the listing shall each complete and submit a DD Form 1172-2 or other authorized DoD electronic form to the authorizing official. The authorizing official will verify the applicant’s name against the contractor’s listing and return the DD Form 1172-2 to the contractor personnel.

(3) Contractor personnel will proceed to the nearest CAC issuance workstation (usually the local Military Personnel Flight (MPF) with the DD Form 1172-2 and appropriate documentation to support their identification and/or citizenship. The CAC issuance workstation will then issue the CAC.

(c) While visiting or performing work on installation(s)/location(s), contractor personnel shall wear or prominently display the CAC as required by the governing local policy.

(d) During the performance period of the contract, the contractor shall:

(1) Within 7 working days of any changes to the listing of the contract personnel authorized a CAC, provide an updated listing to the contracting officer who will provide the updated listing to the authorizing official;

(2) Return CACs in accordance with local policy/directives within 7 working days of a change in status for contractor personnel who no longer require logical or physical access;

(3) Return CACs in accordance with local policy/directives within 7 working days following a CACs expiration date; and

(4) Report lost or stolen CACs in accordance with local policy/directives.

(e) Within 7 working days following completion/termination of the contract, the contractor shall return all CACs issued to their personnel to the issuing office or the location specified by local policy/directives.

(f) Failure to comply with these requirements may result in withholding of final payment.

Section 4a - Addendum to 52-212-4

ADDENDUM

4a-1

INCORPORATION OF CONTRACTOR’S PROPOSAL

1. The Government reserves the right to incorporate into this contract, by reference or full text, portions of the successful Contractor’s proposal submitted in response to this solicitation as revised and supplemented through the date of award. The Performance Work Statement (PWS) and the terms and conditions of this contract take precedence over any ambiguity in the contractor’s proposal.

2. In those areas where the contractor’s proposal exceeds the stated PWS requirements, the contractor’s proposal is binding and prevails. The Contractor is expected and required to adhere to its proposal approach to meeting the contract requirements.

4a-2

DISPOSITION OF UNSUCCESSFUL PROPOSALS

In compliance with FAR Subpart 4.8, the Government will retain one hard copy of all unsuccessful proposals. The Government will destroy extra copies of such unsuccessful proposals.

4a-3

ASSOCIATE CONTRACTOR AGREEMENT

The Contractor shall enter into Associate Contractor Agreements (ACA) for any portion of the contract requiring joint participation or access to another Government Contractor’s proprietary information in the accomplishment of the Government’s requirement. The agreements shall include the basis for sharing information, data, technical knowledge, expertise, and/or resources essential to the interaction of the FIAR Support program, which shall ensure the greatest degree of cooperation for the development of the program to meet the terms of the contract. Associate Contractor information identified below shall be provided for individual task orders as required.

ACAs shall include the following general information:

· Identify the associate Contractors and their relationships

· Identify the program involved and the relevant Government contracts of the associate Contractors

· Describe the associate Contractor interfaces by general subject matter

· Specify the categories of information to be exchanged or support to be provided

· Include the expiration date (or event) of the ACA

· Identify potential conflicts between relevant Government contracts and the ACA; include agreements on protection of proprietary data and restrictions on employees

The cooperating Contactors shall provide a copy of such agreement to the Contracting Officer for review before execution of the document.

The Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate Contractor. However, the Government may assist the Contractor in the event of non-responsiveness from an associate Contractor.

Liability for the improper disclosure of any proprietary data contained in or referenced by any agreement shall rest with the parties to the agreement, and not the Government.

All costs associated with the agreements are included in the negotiated cost of this contract. Agreements may be amended as required by the Government during the performance of this contract.

The following Contractors are associate Contractors with whom agreements are required:

CONTRACTOR

ADDRESS

PROGRAM/CONTRACT

CAAS IV Contractor selected to provide AF FIAR administrative support in the areas of FIAR Planning Tool (FIAR-PT) support, meeting support, and FMSuite/Open Document Listing (ODL) review support.

4a-4

CONTRACTING OFFICER AUTHORITY

CO responsibilities for this contract shall reside at HQ ACC AMIC/A&AS Division, Langley AFB, VA. The CO is the only person authorized to approve changes in any of the requirements under this contract and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the CO.

4a-5

DISSEMINATION OF INFORMATION

There shall be no dissemination or publication, except within and between the Contractor and any subcontractors, of information developed under this contract or contained in the reports to be furnished pursuant to this contract without prior written approval of the CO. No news release (including photographs and film, public announcements or denial or confirmation of same) on any part of the subject matter of this contract or any phase of any program hereunder, shall be made without written approval of the CO. The Contractor shall pay particular notice to any distribution markings included on Government correspondence and maintain control of information to prevent improper distribution.

4a-6

ORGANIZATIONAL CONFLICTS OF INTEREST

The Contractor shall maintain an Organizational Conflict of Interest (OCI) Plan to reduce the likelihood of an actual or perceived OCI. In order to prevent OCI under this contract, guidance in this clause will apply to eliminate:

a) Conflicting roles which might bias a Contractor's judgment or objectivity

b) An unfair competitive advantage to a Contractor

c) The appearance of an unfair competitive advantage

Parties recognize Contractors will play a very visible and responsible role in fulfilling the broad range of services involved in this requirement. In that capacity, Contractors may have access to information that is not available to the public, which:

a) May give a Contractor an unfair competitive advantage; and/or

b) Creates an appearance that a Contractor has an unfair competitive advantage even if no such advantage actually exists.

The technical judgment of a Contractor will often influence the systems, training, services, policy or guidance adopted by the Air Force, and a Contractor will play a key technical review role over other Contractors' work. Both the Government and all Contractors must have the utmost confidence that acquisitions are fair and that a Contractor's judgment and recommendations are objective, impartial, and independent. To avoid, neutralize, or mitigate a potential conflict of interest, the Contractor shall not, during performance of the contract, engage (as a prime contractor, subcontractor, supplier, or consultant) in any other contract that would design, develop, implement, operate, or sustain any system or deliverable that is based on a recommended solution provided under this contract without an OCI Plan that has been approved by the CO.

If a Contractor assisted in preparing this requirement, or provided information leading directly or predictably to the preparation of this requirement, that Contractor's parent companies, subsidiaries, and any organization with which the Contractor is affiliated through an ownership or direct financial interest shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .