PTR QandAs from RFP 29 Feb 12.pdf

PDF 65 KB Posted

Attached to
Primary Training Ranges (PTR) OM&S
Solicitation number
FA4890-11-R-0012
Issued by

About this file

PTR Q As from RFP 29 Feb 12

View the file

Other files

File Type Posted
RFP_FA489011R0012-0005.pdf PDF
PTR_QandAs from RFP 29 Mar 12.pdf PDF
PTR_QandAs from RFP 26 Mar 12.pdf PDF
04_Atch1SOW_Rev_22Mar12.pdf PDF
01_RFP_FA489011R0012-0004.pdf PDF
BCSS Information.pdf PDF
05_Atch1a_SOWSecC-6_ReqPubs_Rev_22Mar12.pdf PDF
PTR_QandAs from RFP 22 Mar 12.pdf PDF
PTR_QandAs from RFP 19 Mar 12.pdf PDF
PTR_QandAs —
10_Atch5_PriceSched_Rev_16Mar12.xlsx XLSX spreadsheet
01_RFP_FA489011R0012-0003.pdf PDF
04_Atch1SOW_Rev_13Mar12.pdf PDF
AFI 13-212 ACCSUP EAFB ADDENDUM 15 Jan 11.pdf PDF
AFI 13-212 Holloman Addendum Mar 11.pdf PDF
AFI 13-212 DCBR Addendum Sep 10.pdf PDF
AFI13-212V1_SHAWAFBSUP1.pdf PDF
PTR_QandAs from RFP- 13 Mar 12.pdf PDF
AFI13-212V1_ACCSUP1_MoodyAFBSUP1(12Oct2001).pdf PDF
AFI13-212V1_Avon_Park(29Sep2005).pdf PDF
13-212 Dyess Addendum.pdf PDF
AFI13-212_ACCSUP_MOUNTAINHOMEAFB_ADD_A.pdf PDF
01_RFP_FA489011R0012-0002.pdf PDF
05_Atch1a_SOWSecC-6_ReqPubs_Rev_8Mar12.pdf PDF
01_RFP_FA489011R0012-0001.pdf PDF
04_Atch1SOW_Rev_8Mar12.pdf PDF
PTR_QandAs from RFP_8 Mar12.pdf PDF
PTR QandAs from RFP_6 Mar 12.pdf PDF
PTR_QandAs from RFP 2 Mar 12.pdf PDF
Range Utilization FY08-FY11.xlsx XLSX spreadsheet
MHAFB WFMP-Final.pdf PDF
INRMP 2000 - Reference for JBR Firefighters.pdf PDF
09_Atch4_CBA_WDs.pdf PDF
11F_Poinsett Bulldog CBA.pdf PDF
01_RFP_FA489011R0012.pdf PDF
02_ExA_AOH_Price.xlsx XLSX spreadsheet
07_Atch2_DD254.pdf PDF
11G_Synder CBA .pdf PDF
08_Atch3_SBA_WDs.pdf PDF
06_Atch1b_SOW_TE-5_GFE.pdf PDF
03_ExB_ExtMaintLabor.xlsx XLSX spreadsheet
11A_Dare County CBA.pdf PDF
11D_Avon Park CBA.pdf PDF
04_Atch1SOW.pdf PDF
10_Atch5_PriceSched.xlsx XLSX spreadsheet
05_Atch1a_SOWSecC-6_Req_Pubs.pdf PDF
11E_Belle Fourche CBA.pdf PDF
11C_Holloman CBA.pdf PDF
11B_Grand Bay CBA.pdf PDF
PTR_QandAs.pdf PDF
Show 40 more

Latest 50 of 69 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Primary Training Ranges OM&S Government Responses to Industry Questions for RFP

ID Reference Question/Comment Response

Reference SOW 3.6.1.2 Please clarify if Juniper Butte Integrated Natural Resources

Management Plan (INRMP) is a required document?

It is mandatory in knowing prohibited activities on range and how management of range natural resources affects range operations. (SEE Referenced INRMP 2000 and MHAFB WFMP)

Reference SOW 3.6.1.2 Does Juniper Butte Integrated Natural Resources Management Plan (INRMP) state any minimum number of firefighters the range O&M contractor must have present at Juniper Butte to open the range and keep it open?

The original INRMP dated 2000, called for 7 firefighters to be present during the fire threat season. The requirement has been moved to the Wildland Fire Management Plan and calls for "Enough firefighting personnel during fire season to operate every piece of equipment simultaneously for an immediate and comple attack on a wildfire using every available capability." JBR has the following fire equipment:

2 x 250 Gallon Slip‐Ons 1 x 1200 Gallon Pumper Truck 1 x 3000 Gallon Tanker Truck Case Tractor with Disk (SEE Referenced INRMP 2000 and MHAFB WFMP)

Reference SOW 3.6.1.2 Must the contractor comply with this minimum number listed in this document?

See Question 2

Reference SOW 3.6.1.2 If Juniper Butte Integrated Natural Resources Management Plan (INRMP) state any minimum number of firefighter the contractor must have present at Juniper Butte to open the range and keep it open what is that minimum number?

See Question 2

Reference SOW 3.6.1.2 Is there any other directive that states what the minimum number of firefighters must be?

See Question 2

Reference SOW 1.3 Hours of Operation and Table 1‐2

The note #4 says “five consecutive work days” Does the mean Monday to Friday or will the Government interpret that to also be Tuesday to Saturday or Wednesday to Sunday? Please clarify

It can be any that are listed in the question. Mon‐Fri are predominately used, any other schedule is a rare exception.

Reference SOW 1.3 Hours of Operation and Table 1‐2

If the five consecutive work days can be other than M‐F please clarify how that relates to the 132 annual weekend hours which is assumed to be Saturdays and Sundays?

The purpose of the weekend hours are to support host wing special activities and known UTA weekend fly days for Guard and Reserves.

Historically this was accomplished with AOH, but the workload is an established requirement and is being shifted to FFP. (See Range Utilization Data)

Reference SOW 1.3 Hours of Operation and Table 1‐2

Please clarify how hours are counted during the day. For example if the first flight was at 0800 and the last flight was at 2200 is that a 14 hr day counted as part of the 60 hr work week? If not please clarify and provide an example to clear understanding.

The Range Operating Agency (owning wing) publishes the operating hours for the range. Example 0800‐2200‐ Mon‐ Thur. 0800‐1200 Fri.

The operational day begins at 0800 even if the first flight is not scheduled until later in the day. Published hours are historically static for B&G and may change quarterly for ESS operations. Hours per week are used in the SOW instead of published hours to provide maximum flexibility to wing commanders. Note the answer to question 6. (See Range Utilization Data)

FA4890‐11‐R‐0012 Page 1 of 1

File details come from the government source that posted it. Updated .