PTR_QandAs from RFP- 13 Mar 12.pdf

PDF 246 KB Posted

Attached to
Primary Training Ranges (PTR) OM&S
Solicitation number
FA4890-11-R-0012
Issued by

About this file

PTR QandAs from RFP 13 Mar 12

View the file

Other files

File Type Posted
RFP_FA489011R0012-0005.pdf PDF
PTR_QandAs from RFP 29 Mar 12.pdf PDF
PTR_QandAs from RFP 26 Mar 12.pdf PDF
01_RFP_FA489011R0012-0004.pdf PDF
BCSS Information.pdf PDF
05_Atch1a_SOWSecC-6_ReqPubs_Rev_22Mar12.pdf PDF
PTR_QandAs from RFP 19 Mar 12.pdf PDF
10_Atch5_PriceSched_Rev_16Mar12.xlsx XLSX spreadsheet
PTR_QandAs —
01_RFP_FA489011R0012-0003.pdf PDF
AFI 13-212 Holloman Addendum Mar 11.pdf PDF
AFI13-212V1_SHAWAFBSUP1.pdf PDF
AFI13-212V1_Avon_Park(29Sep2005).pdf PDF
01_RFP_FA489011R0012-0002.pdf PDF
AFI13-212_ACCSUP_MOUNTAINHOMEAFB_ADD_A.pdf PDF
13-212 Dyess Addendum.pdf PDF
05_Atch1a_SOWSecC-6_ReqPubs_Rev_8Mar12.pdf PDF
PTR_QandAs from RFP_8 Mar12.pdf PDF
PTR_QandAs from RFP 2 Mar 12.pdf PDF
PTR QandAs from RFP 29 Feb 12.pdf PDF
INRMP 2000 - Reference for JBR Firefighters.pdf PDF
Range Utilization FY08-FY11.xlsx XLSX spreadsheet
07_Atch2_DD254.pdf PDF
08_Atch3_SBA_WDs.pdf PDF
11G_Synder CBA .pdf PDF
11A_Dare County CBA.pdf PDF
11D_Avon Park CBA.pdf PDF
03_ExB_ExtMaintLabor.xlsx XLSX spreadsheet
04_Atch1SOW.pdf PDF
02_ExA_AOH_Price.xlsx XLSX spreadsheet
05_Atch1a_SOWSecC-6_Req_Pubs.pdf PDF
11B_Grand Bay CBA.pdf PDF
11E_Belle Fourche CBA.pdf PDF
11C_Holloman CBA.pdf PDF
10_Atch5_PriceSched.xlsx XLSX spreadsheet
PTR_QandAs.pdf PDF
Atch 2- List of Attendees —
Minutes Snyder PTR SV FINAL.docx DOCX document
Atch 1- List of Attendees —
Atch 1-RIIS ITAS Bidders Briefing.pdf PDF
Minutes RIIS PTR SV FINAL.doc DOC document
Atch 1- List of Attendees —
DRAFT_PTR_RFP5_Atch2_DD254.pdf PDF
DRAFT_PTR_RFP3_ExB_Ext_Maint_Labor.pdf PDF
DRAFT_PTR_RFP1_FA489011R0012.pdf PDF
DRAFT_PTR_RFP8_Atch5_PriceSchedule.pdf PDF
DRAFT_PTR_RFP7_Atch4_CBA_WDs.pdf PDF
DRAFT_PTR_RFP2_ExA_AOH_Pricing.pdf PDF
DRAFT_PTR_RFP6_Atch3_SBA_WDs.pdf PDF
DRAFT_PTR_RFP4 Atch1_SOW.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Primary Training Ranges OM&S Government Responses to Industry Questions for RFP

ID Reference Question/Comment Response

SOW Para. 3.6.1 /MHAFB Wildland Management

Plan (WFMP) Pg. 14

Request the Government reconcile and clarify the GFE equipment provided against that required by the MHAFB WFMP specifically pertaining to the requirement to have two motor graders at Saylor Creek, one 2.5 ton pumper truck with 1200 gallon tank at Saylor Creek and two 1-ton trucks with 250-gallon and 350-gallon slip-on tanks at Saylor Creek. The GFE listing at TE-5 shows that one 2.5 ton truck located at Juniper Butte, 2 F-450 Pickups with slip-on tanks located at Juniper Butte and only one motor grader located at

Saylor Creek

SOW has been updated to remove all reference to the Wildland Fire

Management Plan. Will be updated in an Amendment to the RFP at a later date.

39 SOW B&G Services Summary

PO05 Range Target Maintenance & Construction lists an MPP of 25% for Avon Park. Is the Government's intention to have the PTR contractor perform this function at Avon Park versus the BOS contractor?

No. The Workload estimate shows strafe pits are maintained by this contract. Please note clarification of strafe targets on North

Conventional Range. Will be updated in an Amendment to the RFP at a later date.

40 SOW B&G Services Summary

B&G Services Summary PO07 Roads, Grounds, and Firebreak:

Maintain improved/unimproved roads, firebreaks, fences, and grounds. (C-2.1, 2.4, 3.5). The MPP is listed as 12% for Avon Park.

Is it the Government's intention that the PTR contractor perform this maintenance effort versus the current Avon Park BOS contractor?

No. The Workload estimate shows ground maintenance to be accomplished at Avon Park.

SOW EC Services Summary and Poinsett EC

Workload estimate

EC Services Summary PO016 Maintain assigned range equipment

(AN/MSR-T4) TRAINS shows an MPP for PE of 11% and an MPP for PT of 0%. Page 111 of the Services Summary lists the abbreviation for

Poinsett ECR as PT. The MPP for PO016 is apparently in agreement with the Poinsett Workload estimate. Will the Government please clarify what the MPP for PE at 11% represents?

PE Removed. Will be updated in an Amendment to the RFP at a later date.

42 SOW EC Services Summary

PO015 Maintain assigned range equipment (AN/MST-T1A) MUTES.

This item has an MPP listed for PE of 18% and PT of 14%. Page 111 of the EC Service Summary lists the abbreviation for Poinsett ECR as PT and there is no abbreviation of PE listed.

Will the Government please clarify the abbreviation PE and clarify exactly what MPP percentage pertains to MUTES at Poinsett ECR?

PE Removed. Will be updated in an Amendment to the RFP at a later date.

43 SOW EC Services Summary

PO01 Site Operations. (Qualified Manpower requirements)

The MPP for Poinsett for this item does not contain any percentage.

Will the Government please clarify the MPP for this item?

It is 4%. Will be updated in an Amendment to the RFP at a later date.

44 SOW EC Service Summary PO24

PO24 MPP lists GP at 4%.

Assuming GP means Granite Peak, will the Government please update the EC Services Summary to remove all reference to GP?

Removed. Will be updated in an Amendment to the RFP at a later date.

FA4890-11-R-0012 Page 1 of 2 3/13/2012

Primary Training Ranges OM&S Government Responses to Industry Questions for RFP

ID Reference Question/Comment Response

45 SOW Section C-1, Table 1-2

The mentioned table lists Avon Park, Belle Fourche ESS, Poinsett EC and B&G, RIIS, and Snyder ESS as optional sites.

Will the Government please explain the rationale for listing these as optional and provide some assurance that if a site in not exercised during one contract option year, that it will not be exercised in any subsequent year? Due to the nature of the equipment maintained on these sites, bringing a site back on-line after closing it down presents a nearly insurmountable risk to the contractor. Once the trained/qualified workforce is dispersed, it will be very difficult to reconstitute a trained/qualified workforce within any reasonable timeframe. Can the Government assure bidders that the situation described above will not occur?

These sites are listed as optional due to uncertainty of funding during the current debate on DoD funding. If an option is not exercised, the government does not intend to exercise an out year option. If the decision is made to reopen a site in later years it will have to be separately negotiated due to the pre-existing conditions changing.

Does Avon Park, which is a Class B/C range, utilize a remotely located RCO?

A Class B/C range by definition does not have a RCO. Scoring systems for the south conventional range are located in the former RCO tower.

47 Collective Bargaining Agreements

Previous CBAs included an employee seniority listing which included original hire date. This is important for new offerors in order to know who much non-productive labor to build into their pricing. Can seniority listings for each location be provided?

IAW FAR 52.222-41(n) Seniority list. Not less than 10 days prior to completion of any contract being performed at a Federal facility where service employees may be retained in the performance of the succeeding contract and subject to a wage determination which contains vacation or other benefit provisions based upon length of service with a

Contractor (predecessor) or successor (29 CFR 4.173), the incumbent

Prime Contractor shall furnish the Contracting Officer a certified list of the names of all service employees on the Contractor’s or subcontractor’s payroll during the last month of contract performance.

Such list shall also contain anniversary dates of employment on the contract either with the current or predecessor Contractors of each such service employee. The Contracting Officer shall turn over such list to the successor Contractor at the commencement of the succeeding contract.

FA4890-11-R-0012 Page 2 of 2 3/13/2012