01_RFP_FA489011R0012-0002.pdf

PDF 22 KB Posted

Attached to
Primary Training Ranges (PTR) OM&S
Solicitation number
FA4890-11-R-0012
Issued by

About this file

Amendment 0002 RFP FA4890-11-R-0012-0002

View the file

Other files

File Type Posted
PTR_QandAs from RFP 29 Mar 12.pdf PDF
PTR_QandAs from RFP 26 Mar 12.pdf PDF
01_RFP_FA489011R0012-0004.pdf PDF
BCSS Information.pdf PDF
04_Atch1SOW_Rev_22Mar12.pdf PDF
PTR_QandAs from RFP 22 Mar 12.pdf PDF
PTR_QandAs from RFP 19 Mar 12.pdf PDF
10_Atch5_PriceSched_Rev_16Mar12.xlsx XLSX spreadsheet
PTR_QandAs —
AFI 13-212 Holloman Addendum Mar 11.pdf PDF
AFI13-212V1_SHAWAFBSUP1.pdf PDF
AFI13-212V1_Avon_Park(29Sep2005).pdf PDF
PTR_QandAs from RFP- 13 Mar 12.pdf PDF
AFI 13-212 ACCSUP EAFB ADDENDUM 15 Jan 11.pdf PDF
AFI 13-212 DCBR Addendum Sep 10.pdf PDF
AFI13-212V1_ACCSUP1_MoodyAFBSUP1(12Oct2001).pdf PDF
04_Atch1SOW_Rev_13Mar12.pdf PDF
05_Atch1a_SOWSecC-6_ReqPubs_Rev_8Mar12.pdf PDF
01_RFP_FA489011R0012-0001.pdf PDF
04_Atch1SOW_Rev_8Mar12.pdf PDF
PTR_QandAs from RFP_8 Mar12.pdf PDF
PTR_QandAs from RFP 2 Mar 12.pdf PDF
PTR QandAs from RFP 29 Feb 12.pdf PDF
INRMP 2000 - Reference for JBR Firefighters.pdf PDF
Range Utilization FY08-FY11.xlsx XLSX spreadsheet
MHAFB WFMP-Final.pdf PDF
07_Atch2_DD254.pdf PDF
08_Atch3_SBA_WDs.pdf PDF
11G_Synder CBA .pdf PDF
11A_Dare County CBA.pdf PDF
11D_Avon Park CBA.pdf PDF
03_ExB_ExtMaintLabor.xlsx XLSX spreadsheet
04_Atch1SOW.pdf PDF
02_ExA_AOH_Price.xlsx XLSX spreadsheet
06_Atch1b_SOW_TE-5_GFE.pdf PDF
01_RFP_FA489011R0012.pdf PDF
PTR_QandAs.pdf PDF
PTR_QandAs.pdf PDF
Atch 2- List of Attendees —
Minutes Snyder PTR SV FINAL.docx DOCX document
Atch 1- List of Attendees —
Minutes HAFB PTR SV FINAL.doc DOC document
Atch 1-RIIS ITAS Bidders Briefing.pdf PDF
DRAFT_PTR_RFP4A_SOW_TE-5_GFE_List .pdf PDF
DRAFT_PTR_RFP5_Atch2_DD254.pdf PDF
DRAFT_PTR_RFP3_ExB_Ext_Maint_Labor.pdf PDF
DRAFT_PTR_RFP1_FA489011R0012.pdf PDF
DRAFT_PTR_RFP8_Atch5_PriceSchedule.pdf PDF
DRAFT_PTR_RFP7_Atch4_CBA_WDs.pdf PDF
DRAFT_PTR_RFP5_Atch2_DD254.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Incorporate the Revised PTR SOW, dated 8 March 2012. Revisions to the SOW are annotated w ith a change bar in the left hand margin.

2) Revise and add clauses and provisions. See Summary of Changes.

3) Amend Section J.

1. CONTRACT ID CODE PAGE OF PAGES

S 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Mar-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4890-11-R-0012

X 9B. DATED (SEE ITEM 11)

23-Feb-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Mar-2012

CODE

ACC AMIC/PKC

11817 CANON BLVD, SUITE 306

NEWPORT NEWS VA 23606-4516

FA4890 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

1) Incorporate the Revised PTR SOW, dated 13 March 2012. Revisions to the SOW are annotated with a change bar in the left hand margin.

2) Revise the Response Date for the Technical and Pricing Volumes from 2 Apr 12 to 6 Apr 12 at 4:30 pm Eastern time.

3) Amend Sections J and L.

13-Mar-2012 x

13-Mar-2012

FA4890-11-R-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A AOH Pricing - All

Periods

1 21-FEB-2012

Exhibit B Extended Maintenance

Labor Rates - All Periods

2 21-FEB-2012

Attachment 1 PTR SOW and

Attachments

350 08-MAR-2012

Attachment 2 DD254 4 01-FEB-2012

Attachment 3 SBA Wage

Determinations

124 14-DEC-2011

Attachment 4 CBA Wage

Determinations

8 14-DEC-2011

Attachment 5 Pricing Schedule 32 21-FEB-2012 to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A AOH Pricing - All

Periods

1 21-FEB-2012

Exhibit B Extended Maintenance

Labor Rates - All Periods

2 21-FEB-2012

Attachment 1 PTR SOW and

Attachments

350 13-MAR-2012

Attachment 2 DD254 4 01-FEB-2012

Attachment 3 SBA Wage

Determinations

124 14-DEC-2011

Attachment 4 CBA Wage

Determinations

8 14-DEC-2011

Attachment 5 Pricing Schedule 32 21-FEB-2012

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

The following have been changed from:

L-6.3.3 Organization/Copies/Page Limit. Information submitted shall not exceed the page limits stated below for each volume. Evaluators will only read up to the maximum number of pages specified. If the page limit is

FA4890-11-R-0012

exceeded, the pages in excess of the limit will be removed from the applicable volume and will not be considered as part of the evaluation. Copy requirements and page limitations are as follows:

VOL TITLE Page Limit HARD

COPIES

Disk/CD

ROM

Closing Date

I

TECHNICAL 70

Original + 4 1 2 April 2012

4:30 PM. EST.

II

PAST PERFORMANCE See Para L-9 Original + 4 1 16 March 2012

2:00 PM. EST.

III

PRICE (See Note) NONE Original + 4 2 2 April 2012

NOTE: One original proposal, which includes a signature on the SF33 in Volume III, shall be submitted. The remaining copies plus original shall be submitted for evaluation in accordance with the instructions provided in

Section L-4.

to:

L-6.3.3 Organization/Copies/Page Limit. Information submitted shall not exceed the page limits stated below for each volume. Evaluators will only read up to the maximum number of pages specified. If the page limit is exceeded, the pages in excess of the limit will be removed from the applicable volume and will not be considered as part of the evaluation. Copy requirements and page limitations are as follows:

VOL TITLE Page Limit HARD

COPIES

Disk/CD

ROM

Closing Date

I

TECHNICAL 70

Original + 4 1 6 April 2012

II

PAST PERFORMANCE See Para L-9 Original + 4 1 16 March 2012

2:00 PM. EST.

III

PRICE (See Note) NONE Original + 4 2 6 April 2012

NOTE: One original proposal, which includes a signature on the SF33 in Volume III, shall be submitted. The remaining copies plus original shall be submitted for evaluation in accordance with the instructions provided in

Section L-4.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .