FA4887-11-R-0004

Mechanical IDIQ 2011 Responses to Questions #4 7 July 2011

The 56th Contracting Squadron will not accept any more questions regarding the Mechanical IDIQ.

1. Statement of Work Item 4.1-Installation, Bullet Point #4 states “Pipe to Government Furnished Liebert Unit”. Is this unit an existing unit or a new unit to be installed? Where is or will the unit be located? What is the unit tonnage?

I. This is an existing unit that the contract will pipe. It is located inside the computer room, and it's 20-Ton.

2. Statement of Work Item 4.0-Scope of Work, lines #4 &#5 state “interface Direct Digital Controls for energy monitoring and control”. Is this work to be limited to the new chiller, air handling unit, Government furnished Liebert Unit and new control valves? Is this work to be tied into the existing control system or is a new DDC system required for the entire facility? Statement of Work Item 4.1-Installation, Bullet Point #12 states “Install New Thermostats”. Does this statement mean to replace all of the thermostats through out the facility?

I. No control work for existing Liebert Unit, however control will be on the Air Handler and Chiller to be tied with existing EMCS. The new thermostat will only be for the new Air Handler.