Responses to Questions 4.docx
DOCX document 15 KB Posted
- Attached to
- Mechanical IDIQ 2011
- Solicitation number
- FA4887-10-R-0004
About this file
Responses to Questions 4. Posted 7 July 2011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses to Questions 3.docx | DOCX document | |
| Responses to Questions 2.docx | DOCX document | |
| Responses to Questions 1.docx | DOCX document | |
| Attch 2 - Past Performance Information.rtf | RTF text file | |
| FA4887-11-R-0004 - Mechanical IDIQ.pdf | ||
| Attch 7 - HNDBK 419A.pdf | ||
| Attch 1 - Past and Present Performance Questionnaire.docx | DOCX document | |
| Attachment Table of Contents.rtf | RTF text file | |
| Attch 6 - AFOSHSTD 91-501.pdf | ||
| Attch 11 - Sample Project SOW.docx | DOCX document | |
| Attch 4 - AFI 32-1065 Grounding Systems.pdf | ||
| Attch 5 - AFOSHSTD91-66.pdf | ||
| Attch 12 - Sample Project Drawings.zip | ZIP file | |
| Attch 3 - Statement of Work - Mechanical IDIQ B.docx | DOCX document | |
| Attch 10 - Wage Determination - Mechanical IDIQ.docx | DOCX document | |
| Attch 9 - UFC_3_560_01 1 Electrical Safety.pdf | ||
| Attch 8 - Master Base Specs CSI 48 Div.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4887-11-R-0004
Mechanical IDIQ 2011 Responses to Questions #4 7 July 2011
The 56th Contracting Squadron will not accept any more questions regarding the Mechanical IDIQ.
1. Statement of Work Item 4.1-Installation, Bullet Point #4 states “Pipe to Government Furnished Liebert Unit”. Is this unit an existing unit or a new unit to be installed? Where is or will the unit be located? What is the unit tonnage?
I. This is an existing unit that the contract will pipe. It is located inside the computer room, and it's 20-Ton.
2. Statement of Work Item 4.0-Scope of Work, lines #4  state “interface Direct Digital Controls for energy monitoring and control”. Is this work to be limited to the new chiller, air handling unit, Government furnished Liebert Unit and new control valves? Is this work to be tied into the existing control system or is a new DDC system required for the entire facility? Statement of Work Item 4.1-Installation, Bullet Point #12 states “Install New Thermostats”. Does this statement mean to replace all of the thermostats through out the facility?
I. No control work for existing Liebert Unit, however control will be on the Air Handler and Chiller to be tied with existing EMCS. The new thermostat will only be for the new Air Handler.