Attch 10 - Wage Determination - Mechanical IDIQ.docx

DOCX document 18 KB Posted

Attached to
Mechanical IDIQ 2011
Solicitation number
FA4887-10-R-0004
Issued by

View the file

Other files

File Type Posted
Responses to Questions 4.docx DOCX document
Responses to Questions 3.docx DOCX document
Responses to Questions 2.docx DOCX document
Responses to Questions 1.docx DOCX document
Attch 2 - Past Performance Information.rtf RTF text file
FA4887-11-R-0004 - Mechanical IDIQ.pdf PDF
Attch 7 - HNDBK 419A.pdf PDF
Attch 1 - Past and Present Performance Questionnaire.docx DOCX document
Attachment Table of Contents.rtf RTF text file
Attch 6 - AFOSHSTD 91-501.pdf PDF
Attch 11 - Sample Project SOW.docx DOCX document
Attch 4 - AFI 32-1065 Grounding Systems.pdf PDF
Attch 5 - AFOSHSTD91-66.pdf PDF
Attch 12 - Sample Project Drawings.zip ZIP file
Attch 3 - Statement of Work - Mechanical IDIQ B.docx DOCX document
Attch 9 - UFC_3_560_01 1 Electrical Safety.pdf PDF
Attch 8 - Master Base Specs CSI 48 Div.docx DOCX document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4887-11-R-0004 Attachment 4 Luke AFB Mechanical IDIQ

General Decision Number: AZ100001 05/13/2011 AZ1 Superseded General Decision Number: AZ20080001 State: Arizona Construction Type: Building Counties: Coconino, Maricopa, Mohave, Pima, Pinal and Yuma Counties in Arizona.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) Modification Number Publication Date 0 03/12/2010 1 06/04/2010 2 07/02/2010 3 07/09/2010 4 07/23/2010 5 08/06/2010 6 08/27/2010 7 09/10/2010 8 10/15/2010 9 11/05/2010 10 11/19/2010 11 12/03/2010 12 01/21/2011 13 02/04/2011 14 04/01/2011 15 04/08/2011 16 04/15/2011 17 05/13/2011

BRAZ0003-003 11/23/2009

COCONINO, MARICOPA, MOHAVE, PINAL (Area West and North of the San Francisco River to the Gila River), & YUMA COUNTIES

Rates Fringes
Bricklayer - Cement Block Layer............................$ 24.62 4.57

BRAZ0003-008 11/23/2009

PIMA AND PINAL (Area East and South of the San Francisco River to the Gila River) COUNTIES

Rates Fringes
Bricklayer - Cement Block Layer............................$ 18.00 4.49

CARP0408-001 07/01/2009

Rates Fringes
CARPENTER........................$ 23.00 7.24

CARP1327-001 01/01/2010

Rates Fringes
DRYWALL HANGER...................$ 19.25 6.61

ELEC0570-003 12/01/2010

PIMA, PINAL (Southern Part), AND YUMA COUNTIES

Rates Fringes
Electrician/Wireman..............$ 22.90 18%+4.70

Zone Definitions (b) ZONE PAY -Workmen employed in Zones B and C shall be paid Zone Pay as follows:

Zone B............an additional $ 1.25 per hour Zone C............an additional $ 3.75 per hour

SECTION 3.05 ZONES

(a) Zones shall be created in Tucson, Arizona, the headquarters of the Union. Zones may be established in other localities by mutual consent of the parties hereto (Section 1.03). Zones and the applicable rates of pay shall be the same for all Employers coming under the terms of this Agreement. In Tucson, Zone A shall be the area within a twenty-nine (29) mile radius from a basing point at the City Hall. Zone B shall be the area from the outer limits of the twenty-nine (29) mile radius, extending out another seventeen (17) miles (a 46 mile radius total). Zone C shall be the area from the forty-six (46) mile radius, extending to the outside limits of the Local Union's jurisdiction. If any owner's contiguous property falls within more than one Zone, it shall all be considered to be within the closer Zone.

ELEC0640-005 06/21/2010

COCONINO, MARICOPA, MOHAVE, and PINAL (Area North and West of the boundary line beginning at a point where Papago Indian Reservation Road No. 15 crosses the Pima-Pinal County line, then Northeasterly on Road No. 15 to the intersection with Highway FAS-267, extending North on FAS-267 to the intersection with Florence Canal, North & East on Florence Canal to the intersection of the line "Second Guide Meridian East" then North to the Maricopa-Pinal County Lines) COUNTIES

Rates Fringes
Electrician/Wireman..............$ 24.80 3%+7.14

ENGI0428-003 06/01/2010

Rates Fringes Power Equipment Operator

(2) Crane under 15 tons................$ 25.22 9.79
(3) Crane,15 tons to 100 tons........................$ 26.30 9.79
(4) Crane, 100 tons and over........................$ 27.33 9.79

IRON0075-002 08/01/2009

Rates Fringes

IRONWORKER, STRUCTURAL

Zone 1:..................... $ 26.52 17.59 Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO0383-005 06/01/2009

Rates Fringes
LABORER (Brick/Block Tender).....$ 16.72 4.35

PAIN0086-003 04/01/2010

Rates Fringes
PAINTER..........................$ 17.85 4.70

* PAIN0086-005 07/01/2010

Rates Fringes
GLAZIER..........................$ 25.75 6.29

PLUM0469-002 07/01/2010

ZONE A: COCONINO, MARICOPA, MOHAVE & YUMA COUNTIES

ZONE B: PIMA AND PINAL COUNTIES

Rates Fringes

PLUMBER/PIPEFITTER

Zone A......................$ 31.65 14.90
Zone B......................$ 28.55 14.65

SFAZ0669-001 04/01/2011

Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 29.85 17.45

SHEE0359-002 01/01/2011

PIMA and PINAL (South of the 33rd Parallel) COUNTIES Rates Fringes Sheet Metal Worker (Including HVAC) Zone 1...................... $ 28.75 13.00+3%

SHEE0359-003 01/01/2011

COCONINO, MARICOPA, MOHAVE, PINAL (North of the 33rd Parallel), and YUMA COUNTIES

Rates Fringes
Sheet Metal Worker (Including HVAC)...................$ 28.75 13.00+3%

SUAZ2004-001 01/14/2004

Rates Fringes
Cement Mason/Finisher............$ 15.25 5.01

Laborers:

Concrete Worker.............$ 8.88 0.00
Form Setter.................$ 9.63 0.00
General/Cleanup.............$ 11.37 2.91
Waterproofing...............$ 12.59 0.00
PLASTERER........................$ 15.00 0.00

Power Equipment Operator

Backhoe.....................$ 14.78 0.00
TILE FINISHER....................$ 11.00 0.00
TILE SETTER......................$ 14.98 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .