B848 Beacon Lighting IFB - RFIs - 2022 09 16.pdf

PDF 291 KB Posted

Attached to
Install Beacon Lighting
Solicitation number
FA485522B0004
Issued by

View the file

Other files

File Type Posted
B848 Beacon Lighting IFB - RFIs - 2022 09 29.pdf PDF
Solicitation Amendment FA485522B00040005 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040005.pdf PDF
Solicitation Amendment - FA485522B00040004.pdf PDF
B848 - Reflected Ceiling Plan for RFI - 2022 08 25.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 21.pdf PDF
Solicitation Amendment FA485522B00040004 SF 30.pdf PDF
Atch 2. B848 Most Recent As-Built [FOUO].pdf PDF
Solicitation Amendment - FA485522B00040003.pdf PDF
Solicitation Amendment FA485522B00040003 SF 30.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 14.docx DOCX document
Solicitation Amendment - FA485522B00040002.pdf PDF
Solicitation Amendment FA485522B00040002 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040001.pdf PDF
Solicitation Amendment FA485522B00040001 SF 30.pdf PDF
AppC3. AF3065 Progress Report Template.xlsx XLSX spreadsheet
AppD3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
AppC1. DD1354 Draft Template.pdf PDF
AppC2. AF3064 Schedule Template.xlsx XLSX spreadsheet
AppB2 SOMS - Install Beacon Lights B848 - 18-0013.xlsx XLSX spreadsheet
AppD4. AEC CAD Standards (Aug 2019).pdf PDF
AppC4. AF3000 Template.pdf PDF
AppD2. Architectural Compatibility Guide (2013).pdf PDF
AppD8. UFC 4-010-05 SENSITIVE COMPARTMENTED INFORMATION FACILITIES....pdf PDF
AppD1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
Atch 1. SOW - Install Beacon Lights B848.pdf PDF
Solicitation - FA485522B0004.pdf PDF
AppD9. UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS.pdf PDF
AppB1 Specifications Rev1.pdf PDF
AppD5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
AppD7. UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS.pdf PDF
AppD6. ICD 705.pdf PDF
AppC5. RFI Template.pdf PDF
AppA Government Conceptual Plan.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CONTRACTING SQUADRON (AFSOC)

CANNON AIR FORCE BASE NEW MEXICO

FOCUSED, INNOVATIVE, RESOURCEFUL, EXECUTION

16 September 2022

MEMORANDUM FOR RECORD

SUBJECT: B848 Beacon Lighting, Invitation for Bid – Requests for Information (RFIs) Responses

1. Question 1: 1) The SOW states this opportunity is for n17 Beacon lights to be installed, but this attachment talks about linear LED lamps and retrofit LED fixtures. 2) Is this a complete retrofit of the entire office? If this is the case we need an audit of the facility to quote this entire opportunity. 3) Are the ceilings drop ceiling or hard ceiling, what type of ceilings do you have?

Answer 1: 1) UFC 3-530-01 provides a broad range of requirements for interior and exterior lighting equipment; not every part of the document will be applicable to this project. 2) This project is not a complete retrofit. It is limited to the n17 beacon lights, switches, and supporting electrical infrastructure. 3) Reflected ceiling plans have been provided.

2. Question 2: How soon did you want this project completed? Do you currently have the funds for this opportunity?

Answer 2: The period of performance for this project is 60 days. The Government has no set completion date goal for this project, but we can reasonably expect work-start to begin no later than 1 November 2022, depending on long-lead items. Completion date would be 60 days from then. The Government has an Authority to Advertise this requirement – it does not have certified funds. This means that the funds have been requested, and are technically there, but there is the possibility that funds could not be certified or given for this project.

3. Question 3: Would it be possible to get photos of the ceiling where the lights are installed and anything else electrical like the electrical panels ect?

Answer 3: Photos within the SCIF are unavailable currently. Refer to as-builts and reflected ceiling plan for ceiling, light, and electrical panel details.

4. Question 4: Can the Government provide a full set of plans/as-builts to scale?

Answer 4: Yes, see separate attachment(s).

5. Question 5: Will the government consider changing the NAICS code and size standard?

Answer 5: The Government considers the NAICS 238210 - Electrical Contractors and Other Wiring Installation Contractors to be the most appropriate for this acquisition.

6. Question 6: Does the Government require additional security systems restricting certain personnel from accessing the light switches?

Answer 6: No additional security is required for light switches. They shall be accessible to all personnel.

7. Question 7: Will the Government please identify the location of all accessible electrical rooms?

Answer 7: See as-built drawings for locations.

8. Question 8: 1) During what hours is the facility in use? 2) Is it possible to schedule time when the facility will be closed?

Answer 8: 1) The facility is in use 24 hours a day, 365 days a year. 2) It is possible to schedule downtime. October through February is preferable.

9. Question 9: Does the Government require light switches to be color coded and labeled according to the zone the switch is responsible for?

Answer 9: Yes.

10. Question 10: What percentage or monetary amount of the work will the prime contractor be responsible for performing?

Answer 10: There is no standard or expectation for a percentage of work to be completed by the prime and all potential subs. Offerors could 100% subcontract out, or 0% subcontract out. Bid as you see in the best interest of your business and the Government.

11. Question 11: Will the prime contractor have to provide and indicate key personnel per each trade performing the work or will this only be pertinent to the subcontractors?

Answer 11: This is not a bid requirement.

12. Question 12: Are there any available as-builts or historical drawings available to reference electrical panel locations, existing structural, and existing architectural conditions in proximity to the installation of the Beacon lights to further develop the design, engineering, and electrical estimate?

Answer 12: Yes, see separate attachment(s).

13. Question 13: In lieu of the Edwards Signal 50B-N5-40WH, will the LED equivalent model #51XBRFB120A be acceptable?

Answer 13: Specific model proposed is unacceptable due to audible warning feature. Beacon light must not emit sound. However, LED type lights are acceptable. Ensure light meets intent equal to “Edwards Signal 50B-N5-40WH”.

14. Question 14: Will the prime contractor be required to be in possession of any sensitive, classified, or controlled documents that will require compliance to the updated NIST/CMMC requirements?

Answer 14: As-built documents are "For Official Use Only (FOUO)". No information higher than FOUO -level are expected to be required to complete this requirement.

CHESTER D. HILL, SrA, USAF Contract Specialist