AppC2. AF3064 Schedule Template.xlsx

XLSX spreadsheet 47 KB Posted

Attached to
Install Beacon Lighting
Solicitation number
FA485522B0004
Issued by

View the file

Other files

File Type Posted
B848 Beacon Lighting IFB - RFIs - 2022 09 29.pdf PDF
Solicitation Amendment FA485522B00040005 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040005.pdf PDF
Solicitation Amendment - FA485522B00040004.pdf PDF
B848 - Reflected Ceiling Plan for RFI - 2022 08 25.pdf PDF
Solicitation Amendment FA485522B00040004 SF 30.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 21.pdf PDF
Solicitation Amendment - FA485522B00040003.pdf PDF
Solicitation Amendment FA485522B00040003 SF 30.pdf PDF
Atch 2. B848 Most Recent As-Built [FOUO].pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 16.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 14.docx DOCX document
Solicitation Amendment - FA485522B00040002.pdf PDF
Solicitation Amendment FA485522B00040002 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040001.pdf PDF
Solicitation Amendment FA485522B00040001 SF 30.pdf PDF
AppC3. AF3065 Progress Report Template.xlsx XLSX spreadsheet
AppD3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
AppC1. DD1354 Draft Template.pdf PDF
AppC4. AF3000 Template.pdf PDF
AppD2. Architectural Compatibility Guide (2013).pdf PDF
AppD8. UFC 4-010-05 SENSITIVE COMPARTMENTED INFORMATION FACILITIES....pdf PDF
AppD1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
Atch 1. SOW - Install Beacon Lights B848.pdf PDF
AppB2 SOMS - Install Beacon Lights B848 - 18-0013.xlsx XLSX spreadsheet
AppD4. AEC CAD Standards (Aug 2019).pdf PDF
Solicitation - FA485522B0004.pdf PDF
AppD9. UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS.pdf PDF
AppB1 Specifications Rev1.pdf PDF
AppD5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
AppD7. UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS.pdf PDF
AppD6. ICD 705.pdf PDF
AppC5. RFI Template.pdf PDF
AppA Government Conceptual Plan.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3064 Front

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
FA4801-enter hereenter hereDATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATEenter here
3. COMPLETION DATEenter here9. SUBMITTED BY:
4. PURCHASE REQUEST NO.n/aDATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESSCONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.enter KWRD#(Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATEenter hereenter here
7. ACTUAL COMPLETION DATEenter here
LINE NO.WORK ELEMENTS%31-Oct-1130-Nov-1131-Dec-1131-Jan-1229-Feb-1231-Mar-1230-Apr-1231-May-1230-Jun-1231-Jul-1231-Aug-1230-Sep-1210-Oct-12line %
ABCDEFGHIJKLMNOPQ
1Excavation50%10%45%45%100%
5%23%23%0%0%0%0%0%0%0%0%0%0%
2Concrete Work30%33%33%34%100%
0%0%0%10%10%10%0%0%0%0%0%0%0%
3Backfill20%50%50%100%
0%0%0%0%0%0%10%10%0%0%0%0%0%
40%
0%0%0%0%0%0%0%0%0%0%0%0%0%
50%
0%0%0%0%0%0%0%0%0%0%0%0%0%
60%
0%0%0%0%0%0%0%0%0%0%0%0%0%
70%
0%0%0%0%0%0%0%0%0%0%0%0%0%
80%
0%0%0%0%0%0%0%0%0%0%0%0%0%
90%
0%0%0%0%0%0%0%0%0%0%0%0%0%
100%
0%0%0%0%0%0%0%0%0%0%0%0%0%
110%
0%0%0%0%0%0%0%0%0%0%0%0%0%
120%
0%0%0%0%0%0%0%0%0%0%0%0%0%
130%
0%0%0%0%0%0%0%0%0%0%0%0%0%
140%
0%0%0%0%0%0%0%0%0%0%0%0%0%
15Column Total5.0%22.5%22.5%9.9%9.9%10.2%10.0%10.0%0.0%0.0%0.0%0.0%0.0%
PROJECT TOTAL100.00%5.0%27.5%50.0%59.9%69.8%80.0%90.0%100.0%100.0%100.0%100.0%100.0%100.0%

AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 Back

INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established
by the contracting officer.

2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized
representative of the firm.
5. Lines 1 through 15. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of
communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract
calls for more than 14 work elements, additional copies of the AF Form 3064 may be used as a continuation for the work elements.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown:
excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown
opposite each element. The total must equal 100%.
7. Columns D through P will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the
space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it
is planned to accomplish 10% of the excavation work the 1st week and 45% each week until excavation is complete, 10 would be shown in the upper half of Line 1
under Column D, 45 under Column E and 45 under Column F for a total of 100%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks
in equal amounts, 33,33, and 34 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 50 would
be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064 may be used as a continuation of performance record.
8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of line 15.
Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be
used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract
for performance time.
9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting
work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised
schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these
factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared.
The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title.
Time of submission of the revised schedule will be determined by the contracting officer.
10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report,"
indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the
contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection
with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for
any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately.

AF FORM 3064, JUN 90 (REVERSE)