AppB2 SOMS - Install Beacon Lights B848 - 18-0013.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Install Beacon Lighting
Solicitation number
FA485522B0004
Issued by

View the file

Other files

File Type Posted
B848 Beacon Lighting IFB - RFIs - 2022 09 29.pdf PDF
Solicitation Amendment FA485522B00040005 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040005.pdf PDF
Solicitation Amendment - FA485522B00040004.pdf PDF
B848 - Reflected Ceiling Plan for RFI - 2022 08 25.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 21.pdf PDF
Solicitation Amendment FA485522B00040004 SF 30.pdf PDF
Atch 2. B848 Most Recent As-Built [FOUO].pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 16.pdf PDF
Solicitation Amendment - FA485522B00040003.pdf PDF
Solicitation Amendment FA485522B00040003 SF 30.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 14.docx DOCX document
Solicitation Amendment - FA485522B00040002.pdf PDF
Solicitation Amendment FA485522B00040002 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040001.pdf PDF
Solicitation Amendment FA485522B00040001 SF 30.pdf PDF
AppC3. AF3065 Progress Report Template.xlsx XLSX spreadsheet
AppD3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
AppC1. DD1354 Draft Template.pdf PDF
AppC2. AF3064 Schedule Template.xlsx XLSX spreadsheet
AppD4. AEC CAD Standards (Aug 2019).pdf PDF
AppC4. AF3000 Template.pdf PDF
AppD2. Architectural Compatibility Guide (2013).pdf PDF
AppD8. UFC 4-010-05 SENSITIVE COMPARTMENTED INFORMATION FACILITIES....pdf PDF
AppD1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
Atch 1. SOW - Install Beacon Lights B848.pdf PDF
Solicitation - FA485522B0004.pdf PDF
AppD9. UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS.pdf PDF
AppB1 Specifications Rev1.pdf PDF
AppD5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
AppD7. UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS.pdf PDF
AppD6. ICD 705.pdf PDF
AppC5. RFI Template.pdf PDF
AppA Government Conceptual Plan.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66

AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALSPROJECT #PROJECT TITLESOLICITATION/CONTRACT NO.
CZQZ 18-0013Install Beacon Lighting B848
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERREFERENCE, ITEMNUMBER OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEFOLLOW-UPCONTRACTOR NOTIFIED: Approval DateCONTRACTOR NOTIFIED: DisApproval DateCONTRACTOR RE-SUBMITTALFINAL APPROVALREMARKS
101 01 00 AF Form 103 - Work Clearance Request1NLT 14 days prior to work start
201 33 00 Surety Bonds15 days after NTP
301 33 00 Certificates of Insurance15 days after NTP
401 33 00 Project Schedule1NLT 14 days prior to work start
501 33 00 Health and Safety Plan1NLT 14 days prior to work start
601 33 00 List of Proposed Subcontractors1NLT 14 days prior to work start
701 33 00 List of Proposed Products1NLT 14 days prior to work start
801 35 26 Accident Prevention Plan1NLT 14 days prior to work start
901 35 26 Accident Notification1As incident occurs
1001 35 26 Accident Report1As incident occurs
1101 45 00 Quality Control Plan1NLT 14 days prior to work start
1201 57 19 Environmental Protection Plan1NLT 14 days prior to work start
1301 74 19 Waste Management Plan1NLT 14 days prior to work start
1401 74 19 CAFB/MAFR Contractor HAZMAT Worksheet*NLT 14 days prior to bringing HAZMAT on base
1501 74 19 CAFB/MAFR Contractor Usage HAZMAT Worksheet**NLT the 5th day of each month and at the completion of work
1601 74 19 Safety Data Sheet (SDS)*NLT 14 days prior to bringing HAZMAT on base
17As-BuiltPackage (with AutoCAD drawings)1NLT 7 days after completion of work
18Base Access Request Form1NLT 7 days prior to base access
19Construction Schedule (preliminary - AF3064)1With proposal
20For-Construction Drawings1NLT 21 days prior to work start
21O&M Manuals1NLT 7 days after completion of work
22Warranty Certification1NLT 7 days after completion of work

* Quantity to submit depends on number of HAZMAT items used. Each HAZMAT item requires a separate [CAFB/MAFR Contractor HAZMAT Worksheet] and [Safety Data Sheet].

** Quantity of [CAFB/MAFR Contractor Usage HAZMAT Worksheet] to submit is dependent on the length of the contract.

Note: The contractor is still responsbile for providing the Construction SOMS; this list is not all inclusive.

Note: All test reports and sealed plans need to be submitted as hard copies.

File details come from the government source that posted it. Updated .