AF FORM 66
| AF FORM 66 SCHEDULE OF MATERIALS SUBMITTALS | PROJECT # | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |
| CZQZ 18-0013 | Install Beacon Lighting B848 | |||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
| LINE NUMBER | REFERENCE, ITEM | NUMBER OF COPIES REQUIRED | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | FOLLOW-UP | CONTRACTOR NOTIFIED: Approval Date | CONTRACTOR NOTIFIED: DisApproval Date | CONTRACTOR RE-SUBMITTAL | FINAL APPROVAL | REMARKS |
| 1 | 01 01 00 AF Form 103 - Work Clearance Request | 1 | NLT 14 days prior to work start | |||||||||
| 2 | 01 33 00 Surety Bonds | 1 | 5 days after NTP | |||||||||
| 3 | 01 33 00 Certificates of Insurance | 1 | 5 days after NTP | |||||||||
| 4 | 01 33 00 Project Schedule | 1 | NLT 14 days prior to work start | |||||||||
| 5 | 01 33 00 Health and Safety Plan | 1 | NLT 14 days prior to work start | |||||||||
| 6 | 01 33 00 List of Proposed Subcontractors | 1 | NLT 14 days prior to work start | |||||||||
| 7 | 01 33 00 List of Proposed Products | 1 | NLT 14 days prior to work start | |||||||||
| 8 | 01 35 26 Accident Prevention Plan | 1 | NLT 14 days prior to work start | |||||||||
| 9 | 01 35 26 Accident Notification | 1 | As incident occurs | |||||||||
| 10 | 01 35 26 Accident Report | 1 | As incident occurs | |||||||||
| 11 | 01 45 00 Quality Control Plan | 1 | NLT 14 days prior to work start | |||||||||
| 12 | 01 57 19 Environmental Protection Plan | 1 | NLT 14 days prior to work start | |||||||||
| 13 | 01 74 19 Waste Management Plan | 1 | NLT 14 days prior to work start | |||||||||
| 14 | 01 74 19 CAFB/MAFR Contractor HAZMAT Worksheet | * | NLT 14 days prior to bringing HAZMAT on base | |||||||||
| 15 | 01 74 19 CAFB/MAFR Contractor Usage HAZMAT Worksheet | ** | NLT the 5th day of each month and at the completion of work | |||||||||
| 16 | 01 74 19 Safety Data Sheet (SDS) | * | NLT 14 days prior to bringing HAZMAT on base | |||||||||
| 17 | As-BuiltPackage (with AutoCAD drawings) | 1 | NLT 7 days after completion of work | |||||||||
| 18 | Base Access Request Form | 1 | NLT 7 days prior to base access | |||||||||
| 19 | Construction Schedule (preliminary - AF3064) | 1 | With proposal | |||||||||
| 20 | For-Construction Drawings | 1 | NLT 21 days prior to work start | |||||||||
| 21 | O&M Manuals | 1 | NLT 7 days after completion of work | |||||||||
| 22 | Warranty Certification | 1 | NLT 7 days after completion of work |
* Quantity to submit depends on number of HAZMAT items used. Each HAZMAT item requires a separate [CAFB/MAFR Contractor HAZMAT Worksheet] and [Safety Data Sheet].
** Quantity of [CAFB/MAFR Contractor Usage HAZMAT Worksheet] to submit is dependent on the length of the contract.
Note: The contractor is still responsbile for providing the Construction SOMS; this list is not all inclusive.
Note: All test reports and sealed plans need to be submitted as hard copies.