Atch 1. SOW - Install Beacon Lights B848.pdf

PDF 381 KB Posted

Attached to
Install Beacon Lighting
Solicitation number
FA485522B0004
Issued by

View the file

Other files

File Type Posted
B848 Beacon Lighting IFB - RFIs - 2022 09 29.pdf PDF
Solicitation Amendment FA485522B00040005 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040005.pdf PDF
Solicitation Amendment - FA485522B00040004.pdf PDF
B848 - Reflected Ceiling Plan for RFI - 2022 08 25.pdf PDF
Solicitation Amendment FA485522B00040004 SF 30.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 21.pdf PDF
Solicitation Amendment - FA485522B00040003.pdf PDF
Solicitation Amendment FA485522B00040003 SF 30.pdf PDF
Atch 2. B848 Most Recent As-Built [FOUO].pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 16.pdf PDF
B848 Beacon Lighting IFB - RFIs - 2022 09 14.docx DOCX document
Solicitation Amendment FA485522B00040002 SF 30.pdf PDF
Solicitation Amendment - FA485522B00040002.pdf PDF
Solicitation Amendment - FA485522B00040001.pdf PDF
Solicitation Amendment FA485522B00040001 SF 30.pdf PDF
AppC3. AF3065 Progress Report Template.xlsx XLSX spreadsheet
AppD3. Contractor Base Briefing Pamphlet (Mar 2016).pdf PDF
AppC1. DD1354 Draft Template.pdf PDF
AppC2. AF3064 Schedule Template.xlsx XLSX spreadsheet
AppC4. AF3000 Template.pdf PDF
AppD2. Architectural Compatibility Guide (2013).pdf PDF
AppD8. UFC 4-010-05 SENSITIVE COMPARTMENTED INFORMATION FACILITIES....pdf PDF
AppD1. Fire Protection Operations & Fire Prevention (June 2020).pdf PDF
Solicitation - FA485522B0004.pdf PDF
AppD9. UFC 3-530-01 INTERIOR AND EXTERIOR LIGHTING SYSTEMS AND CONTROLS.pdf PDF
AppB1 Specifications Rev1.pdf PDF
AppD5. As-Built Submittal Guidelines (Feb 2014).pdf PDF
AppD7. UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS.pdf PDF
AppD6. ICD 705.pdf PDF
AppC5. RFI Template.pdf PDF
AppA Government Conceptual Plan.pdf PDF
AppB2 SOMS - Install Beacon Lights B848 - 18-0013.xlsx XLSX spreadsheet
AppD4. AEC CAD Standards (Aug 2019).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR PROJECT

CZQZ 18-0013

Install Beacon Lighting B848

Air Force Special Operations Command

27th Special Operations Wing

Cannon Air Force Base, New Mexico

27TH Special Operations Civil Engineer Squadron

19 August 2022

TABLE OF CONTENTS

Table of Contents……………………………………………………...2

Division 01 – General Requirements

Part 1 – General

Part 2 – Technical Description of Project

Part 3 – Submittals/Deliverables

Part 4 – Close-Out

Part 5 – References

Appendix A – Drawings and Photos

Appendix B – Specifications

Appendix C – Forms

Appendix D – Guides and Standards

DIVISION 01 – GENERAL REQUIREMENTS

PART 1 – GENERAL

1.0 Description of Proposed Work: The scope of work includes providing all engineering, labor, materials, equipment, supervision and effort necessary to install 17 flashing, blue, wall/ceiling mounted beacon lights, with light switches and associated infrastructure, within the OSA and SCIF spaces of B848.

1.1 Period of Performance: The Period of Performance (POP) duration is not to exceed 60 calendar days after Notice to Proceed (NTP) is issued per paragraph 1.4.4.

1.2 General Requirements: The Contractor shall perform all the tasks necessary to deliver the requirement in compliance with this Statement of Work (SOW), Specifications, and

Drawings attached to the contract. The Contractor shall supply all labor, materials, transportation, equipment, and supervision to provide a complete, finished, functional product meeting the specifications provided. Refer to Appendix B – Specifications: UFGS

Section 01 14 00 Work Restrictions for this project. Beacon lights to be installed shall be equal to “EDWARDS SIGNAL: 50B-N5-40WH”. Beacon lights shall be blue, flashing, and non-motorized type. All wall penetrations necessary to perform work shall be less than 90in2 and must be submitted to the CO for approval 21 calendar days ahead of time.

1.3 Administrative Requirements: The Contractor shall identify a lead Program Manager who shall perform all program management functions and tasks necessary to satisfy the requirements consistent with operational quality, safety, security, and environmental standards as required in Appendix B - Specifications listed: UFGS 01 30 00 Administrative

Requirements, UFGS 01 35 26 Government Safety Requirements and UFGS 01 45 00.00 10

Quality Control. The program management function of this contract shall provide insight to the Government for all technical and programmatic activities performed under this contract.

1.3.1 On-Site Supervision: The Contractor shall provide the manpower, equipment, materials, services, and transportation necessary to ensure oversight services throughout accomplishment of this contract. It is the responsibility of the Contractor to establish and maintain open communications with the CO and COR associated with accomplishment of this contract and as required in the specifications listed above in Administrative

Requirements.

1.3.2 Staffing and Resources: The Contractor shall provide the manpower, equipment, materials, services, and transportation necessary to execute the project requirements in accordance with contract documents and within the period of performance.

1.3.2.1 Qualified Personnel: The Contractor shall ensure that only qualified, competent personnel carry out the tasks outlined in Appendix B – Specifications: UFGS 01 35

26, Governmental Safety Requirements. Competent is defined as registered professional or, where registration is not applicable, trained and/or certified in their respective field. If a key personnel position is vacated, the contractor shall refill the position within 48 hours. Key personnel are as follows: Site Superintendent, Site

Safety and Health Officer, and the Quality Control Manager. The employee filling each of these positions shall meet the minimum experience requirements of Appendix

B – Specifications: UFGS 01 30 00, Administrative Requirements, UFGS 01 35 26

Governmental Safety Requirements 1.6.1.1, UFGS 01 45 00.10 Quality Control. The contractor shall submit the qualifications of the employee(s) who will be assigned to each role.

1.4 Execution:

1.4.1 Designs: The Government will provide the Contractor access to the Government

Conceptual Plan and any available existing engineering plans, as-built drawings, diagrams, aerial photographs, digitized map files, etc. to facilitate evaluation of the site/building, as needed. Use of any such available existing engineering plans, as-built drawings, diagrams and other data provided by the USAF does not relieve the Contractor of his/her responsibility for field measurement verification, utility locates, and validation of existing conditions in the effort of developing their own necessary design/construction drawings for this project.

1.4.2 Government Furnished Equipment (GFE) or Property (GFP): Not applicable to this project.

1.4.3 Contractor Operation Hours: The Contractor shall establish a work schedule, which requires work to be performed from 7:00AM to 4:00PM, Monday through Friday. The

Contractor shall provide to the CO or COR in writing any request to work additional hours or weekends (overtime), a minimum of 7 calendar days prior to the requested time interval. Approved overtime requests shall be at no additional cost to the Government.

The contractor shall receive written approval from the CO prior to any overtime being worked. Refer to paragraphs 1.5.5 and 1.5.6 for additional information.

1.4.4 Pre-Construction Site Survey: Prior to the start of any on-site construction activities, the

Contractor shall: conduct a project site condition survey with the 27 SOCES Construction

Manager (CM) and COR. The Contractor shall note the condition of trees, shrubs, grassed areas, concrete, asphalt, and any structural damage that may exist immediately within or adjacent to the work site. Existing infrastructure that is not part of the project shall be maintained in working order. If damage occurs, it is the responsibility of the

Contractor to restore the infrastructure to equal or better condition than it was prior to the damage. If the Contractor fails to note conditions, the government shall direct the

Contractor’s repairs and may require a full removal and replacement of the damaged infrastructure by qualified personnel.

1.4.5 Verification of Existing Conditions: Use of existing condition data provided by the USAF conveys acceptance and as such does not relieve the Contractor of liability associated with performance as the Engineer of Record. The Contractor shall be solely responsible for verification and validation of existing conditions, coordination of existing conditions in parallel with proposed requirements, and above and below-grade condition assessments. The Contractor shall visit the premises and take into consideration all conditions which might affect the work. The Contractor shall field verify all dimensions or examine covered connections before ordering materials or performing any work.

Unless there are unforeseen site conditions which the contractor could not have been aware of prior to the commencement of the project, no consideration will be given to any claims based on lack of knowledge of existing conditions.

1.4.6 Construction: Upon the approval of CO, completion of the pre-construction survey per paragraph 1.4.5, and written NTP, the Contractor may commence the material approval submittal process. Upon signature and approval of AF Form 103, Work Clearance

Request per paragraph 1.5.1, on-site construction activities may commence.

1.4.7 Safety: The Contractor shall comply with Appendix B – Specifications: UFGS 01 35 26, Governmental Safety Requirements, the Occupational Safety and Health Administration

(OSHA) standards, the current U.S. Army Corps of Engineers, “Safety and Health

Requirements Manual”, EM 385-1-1

(https://usace.contentdm.oclc.org/digital/collection/p16021coll9/id/51/rec/247).

1.4.7.1 Temporary Fence: Job site fencing/barriers are required. The Contractor shall provide temporary fencing around the site perimeter and site signage as determined by COR and the CO, in accordance with Appendix B – Specifications: UFGS 01 50 00

Temporary Construction Facilities and Controls.

1.4.7.2 Construction materials and equipment shall not block facility egress points and emergency vehicle access in accordance with Appendix B – Specifications: UFGS 01

50 00 Temporary Construction Facilities and Controls.

1.4.8 Use of Utilities: The Contractor shall provide sanitary facilities, telephone service for their own use. Water will be supplied without charge via base fill station. The Contractor shall be responsible for providing all materials and operations necessary to make connections and/or hookups to these hydrants. Hydrant connections shall include backflow preventers provided by the Contractor. Prior to use, the backflow preventer must be routed through the COR to be approved by the Water and Fuel Systems

Maintenance (WFSM) shop.

1.5 Work Planning/Coordination

1.5.1 Work Permit/Utility Coordination: The Contractor shall submit the standard AF Form

103 Work Clearance Request required prior to starting any construction. The AF Form https://usace.contentdm.oclc.org/digital/collection/p16021coll9/id/51/rec/247

103 will be furnished to the Contractor upon award. Contractor may collect AF Form 103 signatures during BCE work permit meetings, conducted every Thursday at 0730. BCE is located in Building 355, Conference Room 1.

1.5.2 Utility Outages: If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes, the Contractor shall provide information and request permission, in writing, to the 27 SOCES CM/COR for coordination of outages 21 calendar days in advance. Requests shall stipulate specific utility system(s) to be affected, location of work, time at which shutdown will occur, and duration of the outage for each system. Outages shall be kept to a minimum both in number and duration. Please reference Appendix B – Specifications: UFGS 01 14 00 Work Restrictions for more information.

1.5.3 Phasing: Contractor shall include preliminary phasing plan in their proposal (project narrative). Prior to work start the phasing plan shall be submitted to the Base Civil

Engineering (BCE) and CO for approval. This phasing plan will be fluid, and it will be susceptible to change at any time, depending on CAFB mission and user needs.

1.5.4 Staging Area: At the contractor’s request, the COR and 27 SOCES CM will identify space on the jobsite or in a base Contractor outdoor staging area/laydown yard where the

Contractor may deliver and store non-hazardous materials within the installation. The

Contractor may also provide their own field offices, and trailers, and they must be in accordance with Appendix B – Specifications: UFGS 01 50 00 Temporary Construction

Facilities and Controls.

1.5.5 Base Access and Security: The Contractor shall ensure that all employees comply with security requirements imposed by Cannon Air Force Base (CAFB) when entering, occupying and departing the base and designated restricted areas. All contractor personnel shall be screened prior to being granted base access. Base access will be given at the discretion of the 27 SOSFS. Initial base access can be obtained through the CO but must be submitted 7 calendar days prior to entry date. The contractor and their employees

(to include partners and subcontractors) shall be able to gain and maintain base access for the duration of the project.

1.5.5.1 Secure Areas: Work for this project takes place predominately in secure areas (OSA, SCIF). Contractors and visitors require designated Government escort at all times they are present in these areas. Government will provide escort at no additional cost to the contractor.

PART 2 – TECHNICAL DESCRIPTION OF PROJECT

2.0 General: The beacon lights and light switches shall be installed at the locations indicated in

Appendix A - Drawings and Photos: Government Conceptual Plan. The beacon lights and switches shall be separated into five (5) distinct zones. The beacon lights in each zone shall be controlled by the light switches associated with that zone.

Specify beacon lights equal to EDWARDS SIGNAL: 50B-N5-40WH (Flashing). Non-flashing beacon lights, or lights which use a motor (rotating), shall NOT be used.

The contractor shall provide construction drawings in AutoCAD and PDF format which indicate all work to be done. Drawings must be approved by the Government before any site work begins.

Particular attention shall be paid to compliance with most current version of:

• UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, And Construction

• UFC 3-520-01 Interior Electrical Systems

• UFC 3-530-01 Interior And Exterior Lighting Systems And Controls

• INTELLIGENCE COMMUNITY DIRECTIVE (ICD) NUMBER 705

These documents are located in Appendix D - Guides and Standards.

2.1 Recycling/Construction Debris Diversion: See UFGS 01 57 19 for Debris, Waste

Management, and Recycling.

2.2 Environmental Requirements: The Contractor shall comply with all relevant and applicable Federal, State, and local environmental laws, regulations, and executive orders, and base regulations as documented in 27 SOCES Environmental Specification, UFGS 01 57

19 which outlines provisions to help ensure Contractor compliance with environmental law and base requirements. Any project waste that does not meet these specifications shall be disposed of off base in accordance with (IAW) Federal, State, and local environmental laws, regulations, executive orders and procedures.

PART 3 – SUBMITTALS/DELIVERABLES

3.0 Format for Deliverables: An electronic copy of all deliverables shall be provided, formatted for use on the latest version and compatible with the Government’s version of Microsoft

Word (2016), Excel (2016), Adobe Acrobat, and AutoCAD. All deliverables shall be dated.

Samples may be provided to the Contractor upon request. Refer to Specifications Section 01

33 00 Submittal Procedures for additional submittal information.

3.1 Submittal Register: An example submittal register is provided for this project included within UFGS 01 33 00A Submittal Register. Provide submittals and maintain the Submittal

Register throughout project construction POP, as required by the Specifications UFGS 01 33

00, Submittal Procedures. Additionally, Contractor shall comply with submittal requirements of the schedule of material submittals (SOMS), specifications and this SOW.

Submittal requirements may change based on the means and methods chosen by the construction Contractor, and are governed by the specifications. Contractor shall submit the

Master Submittal Register to the CO and COR within fourteen (14) calendar days after the

NTP.

3.1.1 All submittals shall be submitted to the CO and COR on and AF Form 3000, Material

Approval Submittal (Appendix C).

3.1.2 The Contractor shall plan for, and submit submittals requiring Government approval prior to the acquisition of the material or equipment covered in the SOW.

3.2 Government Review: For all submittals and deliverables requiring Government review, the

Contractor shall allow fourteen (14) calendar days for Government processing and review unless otherwise stated. Government approval shall be received prior to use/implementation of materials or equipment requiring government review.

3.2.1 Approved Submittals. The Government’s approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, and other information are satisfactory. Approval will not relieve the contractor of the responsibility for any error that may exist.

3.2.2 Disapproved Submittals. The contractor shall make all corrections required by the

Government and furnish a corrected submittal. Corrected submittals shall be submitted within seven (7) calendar days, or as required by the disapproved submittal, after receipt of disapproved submittal. If the contractor considers any correction indicated on the submittals to constitute a contract change, a written notice shall be given promptly to the

CO and COR.

3.3 Contract Progress Schedule (AF 3064): Within fourteen (14) calendar days of contract award the Contractor shall submit a project schedule showing all long lead material procurement timelines, major project milestones, definable features of work and shall clearly identify the critical path. Contractor shall provide this schedule on an AF3064, and in accordance with UFGS 01 32 16.00 20, Small Project Construction Progress Schedules. The

Contractor will submit an updated AF 3064 as directed by the CO and COR.

3.4 Contract Progress Report (AF 3065): The Contractor shall submit AF 3065, Contract

Progress Report (Appendix C). This report shall be signed by the Contractor’s on-site representative. The work elements and percentages of the total job identified on the AF 3065 shall be identical to the work elements and percentages on the AF 3064. The Contractor shall obtain the COR approval by signature of the actual reported progress prior to submission. The report shall also include the following:

a) Current Project Status

b) Expected work activities for the following month

c) Problems and/or concerns

d) Updated Submittal Register (UFGS 01 33 00 Submittal Procedures)

Each invoice submitted in WAWF shall be accomplished by an AF 3065 signed by the CO and the COR. The AF 3065 and invoice shall all cover the same time period. If the COR does not agree that the progress is as represented by the Contractor they shall return the documents to the Contractor for correction.

PART 4 – CLOSE-OUT

4.1 General Requirements: The Contractor shall perform all closeout requirements as shown in

UFGS 01 78 00 Closeout Submittals and UFGS 01 78 23 Operations and Maintenance Data.

4.2 Final Inspection: The Contractor shall request a Final Inspection through the CO. The CO will coordinate the final inspection with pertinent key personnel. BCE will publish the Pre-Final

Inspection findings in a Pre-Final Inspection (Punch List) Report. All punch list items shall be resolved prior to acceptance. Prior to the Final Inspection, the Contractor shall submit a completed DD Form 1354 to the 27 SOCES COR for signature and acceptance by the BCE.

Refer to Appendix B Specifications-UFGS 01 78 00 Closeout Submittals for additional closeout information.

4.3 Warranty Information: The Contractor shall provide a one (1) year warranty on labor and materials in addition to manufacturer warranties. The warranty shall be issued in accordance with FAR 52.246-21. The warranty data shall be submitted to the Government within seven (7) calendar days of final inspection. The contractor shall also provide documentation on all manufacturer’s extended warranties.

4.4 O&M Data: In compliance with UFGS 01 78 23, Operations and Maintenance Data, the

Contractor shall submit one (1) hard copy and one (1) electronic copy containing operations and maintenance information prior to project closeout. The O&M data shall be submitted to the

Government within seven (7) calendar days of final inspection.

4.5 Final Payment: Prior to final payment, the contractor shall submit and receive approval of all required submittals, including 100% completion of work listed on the AF 3064, and complete all work according to contract documents.

PART 5 – REFERENCES

5.0 References: For the contractor’s convenience, applicable specifications sections are referenced in this SOW; however, it is the contactor’s responsibility for compliance with contract documents including this SOW, conceptual plan and provided specifications that are applicable to the means and methods chosen by the contractor. Should further guidance be required, the contractor shall submit a written request for information (RFI) for government review and response.

5.1 The contractor shall comply with all applicable Federal, State, Local, DoD, and Air Force regulations, including supplements pertaining to base policies, safety, traffic control, and fire prevention. Additionally, all work associated with this project shall comply with:

A. Unified Facility Criteria (UFC):

http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4

B. Unified Facility Guide Specifications (UFGS):

http://www.wbdg.org/ccb/browse_cat.php?c=3

C. Architectural Barriers Act (ABA): http://www.dol.gov/agencies/oasam/centers-offices/civil-rights-center/dlms2-0600

D. Air Force Criteria as published on the Whole Building Design Guide:

http://www.wbdg.org/ccb/browse_org.php?o=33

E. UFC 1-200-01 General Building Requirements - Review this document as it is applicable to all new and renovated Government-owned facilities for the

Department of Defense. Review this document for current International Building

Code (IBC) adoption, and other design criteria requirements

F. UFC 4-010-05 Sensitive Compartmented Information Facilities Planning, Design, And Construction

G. UFC 3-520-01 Interior Electrical Systems

H. UFC 3-530-01 Interior And Exterior Lighting Systems And Controls

I. INTELLIGENCE COMMUNITY DIRECTIVE (ICD) NUMBER 705

END OF SECTION – DIVISION 01 – General Requirements