FA4855-16-R-0023_Questions_and_Answeres_Site_Visit.pdf

PDF 228 KB Posted

Attached to
Fire Suppression HVAC Building 2110
Solicitation number
FA4855-16-R-0023
Issued by

About this file

Questions and Answers_Site Visit B2110

View the file

Other files

File Type Posted
Asbestos__Report_B2110.pdf PDF
Asbestos_Inventory_Report_B2110.pdf PDF
Attachment_11_-_AEC_CAD_Standard_TR-12-X_R-5.pdf PDF
Attachment_6_CAFB_Architec_Compat_Guide-2013.pdf PDF
Attachment_12_-_Appendix_A_Quality_Checklist.pdf PDF
Attachment_17_-_As-Built_Submittal_Guidelines.pdf PDF
Attachment_14_-_Appendix_C_Sheet_File_Layers.pdf PDF
Attachment_13_-_Appendix_B_Model_File_Layers.pdf PDF
FA4855-16-R-0023_Amendment_0002.pdf PDF
Attachment_16_-_Appendix_F_Homeland_Security.pdf PDF
Attachment_15_-_Appendix_D_Title_Blocks.pdf PDF
FA4855-16-R-0023_Section_L_-_Amendment_0001.pdf PDF
FA4855-16-R-0023_SF_30_-_Solicitation_Amendment_0001.pdf PDF
Attachment_6_CAFB_Architectural_Compatibility_Guide-2012.pdf PDF
FA4855-16-R-0023.pdf PDF
Attachment_9_CAFB_DDC_Requirements_Guide_-_Sep_2014.pdf PDF
Attachment_7_CANNONAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf PDF
Attachment_3_WD_NM20150023.pdf PDF
Attachment_4_CAFB_Electrical_Standards-2016.pdf PDF
Attachment_1_SOO_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_10_CAFB_Labeling_Standards__2009_Rev1.pptx PPTX presentation
Attachment_5_Contractor_Base_Briefing_Pamphlet_(March_2016).pdf PDF
Attachment_2_SOMS_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_8_CAFB_Hardware_Specifications_Guideline-_2011.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CONTRACTING SQUADRON (AFSOC)

CANNON AIR FORCE BASE NEW MEXICO

AIR COMMANDOS

13 July 2016

MEMORANDUM FOR RECORD

FROM: 27 SOCONS Ms. Taneisha Harper

SUBJECT: FA4855-16-R-0023; CZQZ98-0130; Install Fire Suppression and HVAC Building 2110 - Site Visit/General Questions

1. A Pre-Proposal site visit was held on 6 Jul 16 at 1300 for building 2110 to ascertain the condition of the building.

2. The following are questions presented as a result of the site visit (answers are in red):

1. Are there any as built drawings of the existing building?

As-builts are not available for building 2110.

2. Has the building been tested for asbestos or lead?

Limited asbestos testing has been performed on suspect materials and will be provided. Contractor to provide additional testing of materials prior to construction of materials that will be disturbed.

**Asbestos report will be posted with questions and answers MEMO (CONS).

3. Where can the construction crew store/stage their materials?

Staging area will be available inside of the munitions compound. Exact location will be dependent on the size of lay down area being requested and materials being stored.

4. How do we access the roof?

The roof does not have a roof hatch and access will need to be provided by the contractor.

5. Are their restrictions or guidelines regarding roof penetrations?

Designer of record shall design in accordance with United Facilities Criteria and United Facilities Guide Specifications. Coordinate current roofing manufacturer’s warranty to have the roof and new penetrations recertified. Also, provide a certificate stating the new work has not voided the existing roof warranty.

Integris Projects, LLC./Nations Roof – 2 year limited roof warranty for workmanship (17 April 2015)

D

EP

AR

TMENT OF DEFEN

SE

UNITED STATES OF AMERIC

A

Mule-Hide Products Co., Inc. – 20 year Standard System Warranty for Commercial Buildings (17 April 2015)

6. What inspections are required at closing?

There will be a pre-final and final inspection in addition to commissioning each new system.

Designer of record shall research the United Facilities Criteria and United Facilities Guide Specifications for applicable inspections and commissioning requirements.

7. On page 31 of the solicitation, is there a difference between section iii, past performance examples for the offeror’s team (with a two page limit), and iii.2, Performance Surveys.

Yes, section (iii) Past Performance and section (iii) (2) Performance Surveys are separate entities.

Past performances are references for recent/relevant past efforts that are submitted directly from the Contractor to the buying agency (27 SOCONS) via a submitted proposal.

Performance Surveys are used to access past performance from the offeror or any other sources of information available to the Government.

a. A survey is commonly sent to a client for their input into the company’s performance; is this what is being requested in iii.2?

Yes, client surveys are one way to obtain performance information as well as any other means listed in section (iii); client surveys should be sent directly to the buying agent (27 SOCONS).

b. If so, are the surveys to be sent directly to you or are they to be included in each company’s proposal?

Client surveys should be sent directly to the buying agent (27 SOCONS) and do not have to be included in the company’s proposal.

c. What is meant by “submit original only”?

Documents submitted from a third party to the buying agent (27 SOCONS) should be the original copy only, no duplicates.

8. Do you have to have a fire system install license for this job?

Minimum licensing and qualification requirements are required. Designer of record to determine which United Facilities Criteria and United Facilities Design Criteria are applicable for the minimum licensing and qualifications.

9. What is the name of the roofing manufacturer?

Integris Projects, LLC./Nations Roof – 2 year limited roof warranty for workmanship (17 April 2015)

Mule-Hide Products Co., Inc. – 20 year Standard System Warranty for Commercial Buildings (17 April 2015)

10. What hours/days is the crew allowed to work?

Refer to Statement of Objectives paragraph 19 for work hours.

“DAILY WORK SCHEDULE: Workdays shall be from 0700 to 1600, Monday to Friday. Federal holidays, military down days, military safety days, and weekend work will not be allowed unless approved by the CO. The Contractor shall provide written notification to the Contracting Officer fourteen (14) calendar days lead time for work schedule changes.”

TANEISHA M. HARPER, USAF

Contract Specialist

2016-07-13T12:21:24-0600
HARPER.TANEISHA.MONIQUE.1075820042