Attachment 6 CAFB Architectural Compatibility Guide 2013
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architectural Compatibility Guide
January 17, 2013 Cannon Air Force Base Page 1
U.S. AIR FORCE
Architectural Compatibility Guide
For Cannon Air Force Base
2 7 S O C E S / C E P
Page 2 Cannon Air Force Base January 17, 2013
(Blank Page)
January 17, 2013 Cannon Air Force Base Page 3
Table of Contents
COMMAND POLICY
THE PURPOSE
ACHIEVING DESIGN EXCELLENCE
1. DISTRIBUTION OF THE DESIGN STANDARD
2. ENFORCEMENT OF THE DESIGN STANDARD
3. ENGAGEMENT OF DESIGN PROFESSIONALS
4. DESIGN DEVELOPMENT AND REVIEW
THE VISUAL DISTRICTS
DISTRICT 1: THE COMMUNITY CENTER
DISTRICT 2: THE NORTHWEST FLIGHTLINE
DISTRICT 3: THE SOUTHEAST FLIGHTLINE
WHAT IS ARCHITECTURAL COMPATIBILITY?
COMPATIBILITY AND DIVERSITY
THE CANNON STYLE
CAMPUSING
THE DESIGN STANDARD
GENERAL REQUIREMENTS
PLANNING
BUILDING DESIGN BASICS
BUILDING ENTRANCES
WINDOWS AND DOORS
EXTERIOR WALLS
ROOFS
INTERIOR MATERIALS
ACOUSTICS
MISCELLANEOUS
ANCILLARY STRUCTURES
GENERAL REQUIREMENTS
PAVILIONS AND SHADE STRUCTURES
BARRIERS, SCREENS AND ENCLOSURES
Page 4 Cannon Air Force Base January 17, 2013
MOVABLE AND TEMPORARY FACILITIES
SITE DESIGN
OBJECTIVE
GENERAL REQUIREMENTS
PEDESTRIAN CIRCULATION
ROADWAYS AND SERVICE DRIVES
PARKING
APPENDIX A: EXTERIOR BUILDING MATERIALS LIST
BRICK
CAST STONE MASONRY UNITS
CONCRETE MASONRY UNITS
GLAZING
METALS
PAINT COLORS
ROOFING: METAL
ROOFING: TPO MEMBRANES
ROOFTOP EQUIPMENT SCREENS
STOREFRONTS AND CURTAIN WALLS
STUCCO AND EIFS COLORS
TRANSLUCENT PANELS
WALL CLADDING MATERIALS
APPENDIX B: CAFB DESIGN REVIEW SUBMITTAL STANDARDS
APPENDIX C: CAFB RECORD DOCUMENTATION STANDARD
APPENDIX D: TYPICAL REMOVABLE ATFP BOLLARD DETAILS
APPENDIX E: TYPICAL SITE BARRIER WALL DETAIL
APPENDIX F: STANDARD INTERIOR COLOR SCHEMES
INTERIOR FINISHES – GREEN SCHEME
INTERIOR FINISHES – BLUE SCHEME
INTERIOR FINISHES – GRAY SCHEME
INTERIOR FINISHES – CREAM SCHEME
INTERIOR FINISHES – BROWN SCHEME
APPENDIX G: LIST OF ACRONYMS
INDEX
January 17, 2013 Cannon Air Force Base Page 5
Architectural Compatibility Guide For Cannon Air Force Base
Command Policy
As stated in the AFSOC Facility Excellence Guide, “Regardless of use, all facilities on the installation must be efficient, healthy, safe and comfortable places to work and play”. In addition, the Air Force seeks to:
Incorporate “Principles of Smart Growth” in planning installation development.
Foster a strong sense of place for each installation through architectural compatibility and people friendly site design.
Provide quality facilities that achieve very high levels of sustainability and energy efficiency.
Pursue compact and efficient building designs that minimize land use and reduce costs.
Utilize cost effective, durable, low-maintenance materials with natural or integral colors.
Reuse existing infrastructure, facilities and raw materials to the maximum extent possible.
Incorporate landscaping principles to preserve or restore native vegetation and natural ecosystems and to minimize water usage.
The Purpose
This document establishes architectural and site design standards, often referred to as the Standard, for Cannon Air Force Base (CAFB). It encourages creative but practical design solutions to accommodate the growing mission requirements of the 27th Special Operations Wing (27SOW).
Specifically, it aims to improve the function and appearance of new and existing facilities, moderate construction and maintenance costs, achieve energy-efficiency and sustainability, and strengthen the overall architectural compatibility of the base.
This document should be understood by all persons involved in the design, construction or maintenance of base facilities. Its provisions will be enforced through standard review and approval procedures during project programming, planning, design and documentation, construction and occupancy.
These guidelines shall be applied to all MILCON and O&M projects at CAFB regardless of funding source or client organization.
As the Air Force mission dictates, this document will be periodically updated and revised.
Cannon AFB today is architecturally diverse
The Cannon Flightline
Page 6 Cannon Air Force Base January 17, 2013
Achieving Design Excellence
This section outlines the actions necessary to implement the Standards:
1. Distribution of the Design Standard
The Standards will be circulated among the installation leadership including all commanders of significant tenant organizations, all Architectural and Engineering (A-E) firms working on CAFB, the Army Corps of Engineers (COE) and throughout the civil engineering division including operations, branch chiefs, architects, engineers and planners. Copies will be provided to Headquarters of the U.S. Air Force Special Operations Command (HQ AFSOC) for review and coordination. A digital copy in portable document format (PDF) will be available on a publicly accessible folder at the CAFB website. Digital copies may be distributed to A-E firms and other contractors outside the base via CD/DVD or email.
Hard copies will be made available on a limited basis.
2. Enforcement of the Design Standard
These Standards will be enforced by the 27 SOW/CC or his/her designated representative. In the absence of any other designee, the Base Architect shall be assumed to be the representative. Any deviations from these Standards are subject to approval by the 27 SOW/CC or his/her designated representative during the course of project review. Deviations should be limited to necessary exceptions resulting from special programming requirements or new developments in building materials and technology.
3. Engagement of Design Professionals
Engagement of talented providers of A-E services is essential to the successful implementation of these Standards. Because of the substantial scope of new construction planned for CAFB, consideration should be given to extending design contract opportunities to a greater number of A-E service providers as a means of bringing new talent and ideas to the development of the base.
Design-Builders are expected to provide the same level of service and design excellence as A-E service providers.
4. Design Development and Review
A-E service providers and Design-Builders are expected to collaborate with the designated Air Force Project Manager (PM) to conduct an orderly process of design reviews.
A project design process shall typically begin with a kick-off meeting of interested parties to discuss and confirm program requirements and to establish general design parameters. Subsequently, at scheduled intervals, A-E service providers will submit design progress drawings, renderings or models for review, comment and ultimate approval by appropriate personnel.
Refer to Appendix B for submittal requirements during the phases of project design.
January 17, 2013 Cannon Air Force Base Page 7
The Visual Districts
Visual Districts are areas of the base where buildings have similar characteristics derived from the common function, form, scale, color, and texture of the facilities within each District.
CAFB can be divided into three Visual Districts: the Community Center, the Northwest Flightline and the Southeast Flightline.
District 1: The Community Center
The Community Center District is effectively the Town Center for military and civilian residents and workers. It includes administrative buildings, medical facilities, the Commissary/BX, a gas station and convenience store, a library, dry cleaners, a child development and youth activity centers, banks, dormitories and various other amenities. This District is located near the main gate, between a traditional residential neighborhood to the northwest and various facilities supporting the flight line to the southeast.
The Area Development Plan for this District includes substantial demolition and new construction over the next decade as improvements are made to accommodate expected new arrivals. This new development presents an excellent opportunity to transform the Community Center District into a more attractive, sustainable and pedestrian-friendly neighborhood.
The most prevalent exterior wall materials in this District, in various colors, are modular brick, concrete block and stucco. Roofs vary from concealed, low-slope roofs to exposed, medium-slope standing seam metal roofs in colors ranging from older dark brown to the newer red. Buildings in this District are limited to three stories in height.
District 2: The Northwest Flightline
The Northwest Flightline District is an area adjacent to the flightline that supports flight operations and training. In addition to numerous aircraft hangers, this District includes squadron operations facilities, administrative offices, buildings for flight simulators, training, storage and other industrial uses. Future development in this District will primarily relate to administrative and training functions and flightline support activities.
Large metal-sided aircraft hangers along the flightline notwithstanding, the most prevalent finish materials in this District are stucco, modular brick and concrete block of various colors and textures. Several low cost, temporary buildings with painted panel siding are also evident. Standing seam metal roofing is commonly used. Roof colors vary from white to dark brown to newer red.
District 3: The Southeast Flightline
The Southeast Flightline District is a large, developing area adjacent to the flight line. Significant new development is planned for this District that will support nearly every aspect the Air Force mission.
Projects in this District utilize an architectural style derived from historical southwestern and Spanish Colonial influences. It is the stylistic basis for all future projects at CAFB.
The 3 Visual Districts
Page 8 Cannon Air Force Base January 17, 2013
What is Architectural Compatibility?
According to the AFSOC Facility Excellence Guide, architectural compatibility exists when architectural features are “compatible in function, mass, shape, color and texture”.
The Oxford English Dictionary defines compatible as meaning, “able to exist or occur together without conflict”.
CAFB consists of a diverse variety of buildings that reflect the program needs, design values and technologies of the times in which they were built.
As a result, there is presently no single, unifying design style for the base. However, compatibility does not require uniformity. Architectural compatibility can still be gradually achieved through the use of a limited set of building forms and materials that can exist together without conflict. This Standard describes the basic forms and materials acceptable for use at CAFB.
Compatibility and Diversity
Many of our existing buildings will eventually be demolished to make room for new construction but many others will remain, possibly for decades. The challenge we face is how best to create a sense of aesthetic cohesiveness, or architectural compatibility, in which old and new buildings are able to coexist harmoniously.
Generally, forms and materials already in wide use on the base will continue to be acceptable for renovations and additions to existing buildings, but precise duplication of existing architectural features is not required. New features added to existing buildings should incorporate the new design ideas and technologies described in this Standard to enhance architectural compatibility and improve the general appearance of CAFB.
When new construction stands alone, as it will in the new Southeast Visual District, this Standard establishes a more limited set of building forms and materials.
When new construction occurs in close proximity to existing buildings, borrowing and blending forms and materials from the existing buildings may be an acceptable means of establishing a visual connection between old and new. In other words, flexibility in the use of forms and materials is permissible in order to improve architectural compatibility.
While the existing diversity of our facilities is undeniable, a more architecturally unified installation remains the objective. This will be achieved over time by the consistent application of this Design Standard as defined in the pages that follow.
Medical/Dental Clinic Replacement (Conceptual Rendering by USAF)
January 17, 2013 Cannon Air Force Base Page 9
The Cannon Style
The renderings on this page illustrate planned and existing projects. Several new projects at CAFB utilize an architectural style derived from historical southwestern influences. It is the stylistic basis of what can be termed The Cannon Style.
The Cannon Style utilizes red, sloping metal roofs and earth-toned colors in stucco and masonry.
Additional materials recommended by project architects will be considered on a project-by-project basis.
When new buildings will be located near existing ones, architects should be mindful of opportunities to improve architectural compatibility by combining new and existing building forms, colors and materials.
Youth Center Annex by OZ Architecture – Denver, CO (Rendering by USAF)
Existing Dining Facility
Airman & Family Readiness Center (Conceptual Rendering by USAF)
Enlisted Dormitory (Conceptual Rendering by USAF)
January 17, 2013 Cannon Air Force Base Page 10
Campusing
Campusing creates opportunities to resolve Anti-Terrorism and Force Protection (ATFP) requirements at the site perimeter so that buildings can share relatively secure, landscaped common areas and other amenities such as auditoriums, classrooms and break areas. Campusing can improve the feasibility of cost and energy-saving amenities such as rainwater collection for irrigation, geothermal and ice storage cooling systems, and photovoltaic arrays.
Campusing requires careful cooperation among all Air Force organizations involved in facility planning, programming, funding, contracting, design and construction at CAFB.
Administrative Campus Concept (Renderings by USAF)
January 17, 2013 Cannon Air Force Base Page 11
The Design Standard
General Requirements
1. This Standard is applicable to all new building projects and all major renovations or additions at
CAFB.
2. The International Building Code (IBC) and all compatible specialty codes issued by the
International Code Council (ICC) are applicable to all facility design and construction projects at CAFB. The latest versions of the IBC codes adopted by the Air Force (AF) and in effect upon commencement of design services shall remain valid provided construction begins within one year of design completion. If the one year period is exceeded, the Air Force PM or Contracting
Officer’s Representative (COR) may require adjustments to the project design to accommodate a newer code, for which additional design fees may be warranted.
3. All new facilities, parking lots and sites shall be accessible in accordance with the Americans with Disabilities Act (ADA) and Architectural Barriers
Act (ABA) accessibility guidelines unless specifically waived by the AF during the design review process.
4. All new vertical construction and significant renovations shall incorporate sustainable concepts meeting the latest USGBC LEED
Minimum Program Requirements (MPR) and shall be formally certified LEED v3 Silver (or better) with not less than 20 points derived from energy efficiency and water conservation.
5. All new vertical construction and major renovations not meeting LEED MPR shall fully incorporate the Federal requirements for High
Performance and Sustainable Buildings (HPSB).
6. Room sizes for all occupancies shall conform to limits defined in Air Force Manual
AFMAN 32-1084 - Facility Requirements.
7. Anti-Terrorism and Force Protection (ATFP) requirements will be established during early design phases in coordination with the base Anti-
Terrorism Officer (ATO). Refer to Unified Facilities Criteria UFC 4-010-02 - DOD
Minimum Anti-Terrorism Standards for Buildings for specific information.
8. Fire Protection: Per UFC 3-600-01 - Fire
Protection Engineering for Facilities, buildings that have alteration, modernization, modification, rehabilitation, and renovation costs equal to or exceeding 50% of the replacement cost of the building, must bring the entire building into compliance with new construction requirements.
(The estimated replacement cost is exclusive of the costs to bring the building into full compliance.) Facilities in which alteration, modernization, rehabilitation, and renovation work is less than 50% of the replacement value, the building must comply with the criteria in this
UFC for new construction, to the maximum extent practical. All new work accomplished as part of alteration, modernization, modification, rehabilitation, and renovation actions/projects must meet the requirements for new construction.
9. Refer to the CAFB Electrical Standards for building and site electrical requirements.
Planning
10. Campusing multiple projects should be considered early in the planning and programming stages. Coordination and consolidation of site and utility requirements among several buildings may enable the use of various sustainable systems by sharing system costs and advantages among several buildings.
11. Related occupancies should be consolidated within single buildings to the maximum extent practical.
Building Design Basics
12. Every project must incorporate efficient use of materials, systems and assemblies to minimize complexity, improve constructability, reduce
Page 12 Cannon Air Force Base January 17, 2013 maintenance requirements and achieve the necessary performance at minimal cost.
13. Building forms should be simple with a linear, horizontal emphasis derived from roof lines, fenestration patterns and wall materials.
14. Buildings should be designed to engage public streets and sidewalks at a human scale through the use of materials, detailing and transparency (within the parameters of security requirements).
15. To the maximum practical extent, develop compact and efficient floor plans to reduce building footprints, construction costs and land consumption. Two and three story buildings are permitted. All buildings shall be fully accessible unless specifically waived by the AF.
16. Open floor plans in office and shops areas that are readily adaptable to different uses and space allocations are strongly preferred.
17. Ceiling heights and building floor plan depth should be considered to maximize natural daylighting per LEED Indoor Environmental
Quality (IEQ) Credit 8.1.
18. New projects will utilize exterior materials identified in Appendix A. Other materials will be considered on a case by case basis.
Renovations and additions to existing buildings may utilize exterior materials that are identical or complementary to existing materials.
19. Interior mechanical rooms are preferred and strongly recommended. If necessary, mechanical equipment may be located on the building roof or on the ground. Ground locations will require an enclosure and compliance with UFC 4-010-01 - DOD
Minimum Anti-Terrorism Standards for
Buildings. (See Roofs section for rooftop equipment access requirements.)
Building Entrances
20. Primary building entrances should be clearly recognizable, sheltered from the weather and accessible. Entrance elements that are highly transparent and formally external to the main structure are encouraged. Primary entrance storefront frames shall be aluminum with integral thermal-breaks.
21. Secondary building entrances should be clearly recognizable, accessible and provide shelter from the weather but should be less prominent than the primary entrance.
22. Service entrances and loading docks should be located away from main entrances and provided overhead protection from the elements. Hollow metal service doors and frames should be painted to match adjacent wall surfaces.
23. Elevators, if provided, shall be located near the front entrance and immediately visible to visitors.
All elevators shall be capable of accommodating an emergency gurney.
Windows and Doors
24. In normally occupied spaces with exterior walls, windows shall be designed and located to provide natural daylighting, fresh air, abundant views to the outdoors and adjacent outdoor gathering areas (within the parameters of security requirements). As a general rule of thumb, window area should equal at least 20% of the room floor area.
25. Window curtain walls and storefront systems are permitted. In some instances, curtain walls will be required to meet anti-terrorism requirements as defined by UFC 4-010-01.
26. Windows may be operable in locations accessible from the building interior and in rooms normally occupied (within the parameters of security requirements). Operable windows shall not open more than 4 inches unless a larger opening is required for emergency egress. Exterior screens firmly secured to the window frame are required
January 17, 2013 Cannon Air Force Base Page 13 for all operable windows.
27. Recommended ranges for glazing design values are as follows:
a. U Insulation Value: U ≤.35
b. Solar Heat Gain Coefficient: SHGC ≤.51
c. Visible Light Transmittance: Tvis ≤ 62%
Glazing design values should be carefully selected to balance the desired levels of thermal performance, privacy and transparency. Generally, greater transparency is preferred.
28. Window shading structures are recommended for curtain walls and large south-facing windows. Shading structures may be internal or external to the building.
External shading structures shall be permanent and constructed of factory-coated aluminum or steel.
29. External and internal window shading structures shall be designed and permanently installed to appropriately manage natural light and solar heat gain in both summer and winter. If additional light control is needed, retractable translucent or opaque window blinds or other interior window treatments should be included in the building furnishings.
30. Skylights, clerestory windows and tubular daylighting devices (such as Solatube) may be utilized to provide natural daylight to interior spaces. (Care must be taken to locate, detail and install natural light sources to prevent leaks and air infiltration.)
31. Glass block, translucent glazing and translucent fiberglass panels (such as Kalwall) are allowed wherever natural daylighting and interior privacy are desired.
32. Emergency egress doors that are not part of a primary or secondary entrance shall have hollow metal doors and frames painted to match adjacent wall surfaces.
Exterior Walls
33. Exterior walls shall have an average insulation value of R-19 and a vapor barrier located at the interior side of the wall assembly.
34. Foundations and slabs shall incorporate an integral thermal break or include perimeter thermal insulation at all occupied spaces.
35. Structural wood framing, metal framing and steel structures with non-bearing metal stud walls are preferred over bearing masonry.
(Stud walls allow for simpler and more cost effective installation of insulation, electrical wiring and devices, plumbing lines and finish materials at a lower relative cost.)
36. Brick and concrete block veneer are the preferred exterior wall finish materials.
Multiple colors and combinations of 4 inch and 8 inch courses and split-face, smooth-face or ground-face textures are encouraged to create visual interest. Standard masonry colors are listed in Appendix A. (Painting of new exterior masonry is not permitted.)
37. Stucco (aka, Portland Cement Plaster) may be used when masonry is inappropriate or exceeds budget limitations. When used, stucco shall utilize a mesh-reinforced, three-coat system with control joints spaced roughly
12 feet on center horizontally and vertically or approximately every 144 square feet. The distance between control joints shall not exceed 18 feet. Control joints should be logically located at corners, long spans and large surfaces in patterns that relate to building fenestration and forms.
In areas of the building wall surface particularly vulnerable to cracking, the use of mesh reinforcing and fiberglass admixtures is required. In all cases, stucco shall be applied to rigid substrates (masonry, concrete or rigid sheathing over metal or wood framing) to minimize cracking and reduce surface warping. Care must be taken during stucco installation to compensate for high winds and
Page 14 Cannon Air Force Base January 17, 2013 temperatures that may accelerate drying time and increase cracking.
38. Stucco shall have a medium dash texture with integral color mixed into the finish coat or an elastomeric color coat.
39. Exterior Insulated Finish Systems (EIFS) shall utilize a reinforced, impact resistant assembly consisting of a two or three coat stucco finish. (Soft, elastomeric color coats are not acceptable except when applied over stucco.)
40. Metal panel siding is approved for use on hangars when located 8 feet or more above finish grade. Panels shall be an insulated sandwich-type with an embossed exterior surface. Use of metal panels on other facilities is discouraged and subject to approval by the 27 SOW/CC or his/her designated representative.
41. Exposed Fastener Composite Wall Panels (such as Northclad EF Panel System) may be permitted as an accent material.
42. Fiber cement board planks and panels applied to wood framing and sheathing may be permitted at approved locations.
Roofs
43. Roof assemblies for normally occupied buildings shall have an average insulation value of R-30 or more with a vapor barrier located at the interior side of the roof insulation or integral to the roof assembly.
44. Metal roofing shall be a steel standing seam system with a factory-applied color coat matching “Colonial Red” by Petersen Aluminum.
(See Appendix A: Exterior Building Materials List)
Standing seams shall be spaced no less than 16 inches apart and shall be no less than 1-1/2 inches in height. Metal roofs more than one-story above grade shall have matching snow guards, gutters and downspouts unless specifically waived during design review.
45. For metal roofing, a 4:12 roof pitch is standard.
46. Replacement metal roofing on existing structures such as hangars and warehouses having less than a 2:12 slope must be specified, detailed and warrantied for low slope applications.
47. Metal roofs shall have minimum eave overhangs, measured horizontally from the surface of the exterior wall to the roof eave fascia, as follows:
One Story - 2 feet
Two or More Stories - 3 feet
48. Low-slope roofing shall be a 60 mil, White, TPO
(Thermoplastic Polyolefin) fully-adhered membrane system. For low-slope roofing, a 1:24 roof pitch is standard unless specifically waived during design review.
49. Low-slope roofs shall be bounded on at least three sides by parapet walls and shall drain to through-wall scuppers or to a roof edge with a gutter and downspout(s). Internal roof drains shall be located to prevent freezing and shall be cast iron or insulated PVC to prevent noises in occupied interior spaces.
50. Through-wall overflow scuppers are standard.
When necessary, overflow drains may be piped internally and shall daylight 12 inches above grade.
51. New buildings may have a combination of standing seam metal and low-slope TPO roofs.
52. Renovations or additions to existing buildings may utilize existing roof forms, materials and colors in visible locations.
53. At all roof downspout outlets, provide splash blocks or Rip Rap channel to facilitate proper discharge to planned detention areas or storm drainage systems as approved by CAFB.
54. Where roof drainage crosses a sidewalk, provide underground piping or a trench with a removable cover plate so that flow occurs underneath the walking surface. (Ice build-up on sidewalks and landings must be avoided!) Provide a Rip Rap channel to facilitate proper drainage away from the building.
January 17, 2013 Cannon Air Force Base Page 15
55. Rooftop equipment is permitted. If rooftop equipment requiring periodic maintenance is necessary, a low slope roof area for placement of the equipment is required. In addition, secure roof access shall be provided from a room within the building interior. Access shall include a permanently installed ladder, ships ladder or stair and lockable roof hatch. Permanent walking pads or pavers must be provided from roof access points to and around all rooftop equipment requiring periodic maintenance.
56. Where rooftop equipment is located in publicly visible locations, high parapets or screen walls are required.
57. Any rooftop mechanical equipment with moving parts shall be placed on supports capable of damping and isolating vibrations from the building structure.
58. In buildings with three or more stories, at least one secure roof access shall be provided by continuation of a stairwell from grade level to above the roof level. If the stairwell is enclosed, it shall be enclosed for its entire height.
Interior Materials
59. Interior materials shall be durable, relatively easy to maintain, and shall create colorful and attractive interior spaces.
60. Suggested interior materials and color schemes are identified in Appendix F: Standard Interior
Color Schemes. Other interior materials, products and color schemes may be acceptable upon approval by CAFB. All interior finish samples must be submitted simultaneously in a complete package, fully labeled and their intended use identified, on one or more sample boards. Sample boards shall not exceed 24 inches wide by 30 inches tall.
61. At ceiling height changes a vertical, painted gypsum board transition element over metal framing is required. (Vertical installation of acoustic ceiling tile is not permitted.)
Acoustics
62. Interior room separations require a Sound
Transmission Classification (STC) as follows:
a. Standard minimum: STC 38.
b. Offices, classrooms and conference rooms:
STC 43 minimum.
c. Rooms identified as having higher requirements: STC 50 minimum. In these rooms, provide acoustic door seals and sound baffles at ductwork and return air openings.
63. Building exterior envelopes and interior rooms requiring special acoustic insulating properties will be identified during project programming.
Miscellaneous
64. Barring other specific directives, the interior and exterior foot-candle illumination requirements set forth by the Illuminating Engineering Society of North America (IESNA) shall be met.
65. In buildings with an anticipated occupant load of 10 or more, motion sensors are required to control interior lighting.
66. In buildings with an anticipated occupant load of 10 or more, motion-sensing controls for toilets and urinals are required. Devices shall be hard-wired rather than battery powered. Lavatories shall be controlled by motion sensors or manually operated using faucets with self-closing valves.
67. Fire Alarm Control Panel (FACP) and Knox box locations shall be coordinated with the
CAFB Fire Department.
68. Vents and louvers shall be painted to match adjacent surfaces.
69. Exterior stairs, guardrails and handrails shall be brushed aluminum or unpainted galvanized steel.
70. Provide integrally-colored or factory-finished, corrosion-resistant metal flashing in all locations exposed to public view.
Page 16 Cannon Air Force Base January 17, 2013
71. Joint sealants shall match the color of adjacent materials.
72. In facilities equipped with Aqueous Film Forming
Foam (AFFF) or High Expansion (HX) foam fire suppression systems, floor trenches shall not be provided to the extent possible and allowed by applicable building codes/regulations. Facilities requiring floor trenches shall provide removable plugs connected by metal cable to the floor trench gate to keep foam from entering the sanitary sewer collection system, in addition to other systems such as automatic valves that shut off flow from trenches into the sanitary sewer system. Mechanical rooms housing AFFF/HX foam systems shall not be equipped with a floor drain connected to the sanitary sewer system.
January 17, 2013 Cannon Air Force Base Page 17
Ancillary Structures
General Requirements
1. All ancillary structures and locations are subject to review and approval by CAFB.
2. All ancillary structures shall meet all current wind-uplift and snow load requirements.
3. All ancillary structures shall use materials and colors listed in Appendix A.
4. Weather resistant, factory finished and corrosion resistant materials shall be used.
Pavilions and Shade Structures
5. Tensile membrane shade structures are permitted in all Districts and shall be designed to withstand very high winds common at CAFB.
Membranes that are divided into overlapping panels to reduce wind resistance are permitted.
At children’s play areas, tensile membranes shall be designed to be removed during winter months. Structures shall have beige, translucent canopies with clear anodized aluminum or unpainted galvanized steel posts.
6. Prefabricated metal pavilions are permitted in all Districts except for the Southeast Flightline
District.
7. All pavilions and shade structures shall be made accessible by concrete walks, pavers or crusher fine paths.
Barriers, Screens and Enclosures
8. ATFP walls and site measures shall be addressed during the project’s programming stage and developed during design. Projects must meet minimum ATFP standards described in UFC 4-
010-01.
9. ATFP: Bollards used to prevent vehicular access to buildings shall be spaced no more than 54” between bollards. Refer to Section 6-2, UFC 4- 022-02 for additional information related to vehicle barriers. Refer to Appendices D and E for typical security bollard and site wall details.
10. ATFP: Any equipment that could be used to conceal an object 6 inches wide, long and deep and is located on the ground within 33 feet of a normally occupied building will require a secure enclosure with a cover or roof to prevent unauthorized access to the equipment.
Enclosure covers are typically expanded metal or chain link mesh installed horizontally at the top edge of the enclosure wall. Metal structural support is usually required.
11. Where required by ATFP, crash-rated steel gates shall restrict access to facilities and enclosures.
12. Service yards and storage areas, loading docks and dumpsters should be screened from public view to the extent possible.
13. Screening walls shall be constructed with integrally colored concrete block or other masonry. Landscape elements such as berms, boulders and plant materials may also be used as screening. (Landscaping is an acceptable screening material only if it will be effective year round and easily maintained.)
14. All screen walls shall 8 feet high or shall extend at least 18 inches above the top of any piece of equipment. Screen walls shall provide the necessary clearances for maintenance and equipment operation per the manufacturer’s requirements.
15. A typical enclosure for one dumpster shall be 15 feet by 11 feet or larger. A typical enclosure for two dumpsters shall be 28 feet by 16 feet.
Hinged or rolling steel gates operable by one person are strongly recommended to conceal enclosure contents.
16. Wood plank fences or gates are not allowed for any type of screening or enclosures around facilities. Chain link fences may be acceptable in low visibility, utilitarian locations.
17. Fabric screening is not allowed except for temporary use during construction.
18. Concrete pads are required for all enclosures containing permanently installed equipment.
Page 18 Cannon Air Force Base January 17, 2013
Movable and Temporary Facilities
19. Movable and temporary facilities are generally prohibited but may be considered if they are essential to the mission of CAFB. If used, they shall be located to minimize their visibility to the public.
20. Movable and temporary facilities shall utilize standard colors and materials in Appendix A.
21. All temporary facilities shall be accessible and include stairs, a ramp, site lighting and accessible walkways. A continuous skirt shall be installed immediately after trailer placement.
22. If more than one temporary trailer is provided, all shall be uniform in color and materials when placed in close proximity. Temporary facilities shall be delivered in good condition.
January 17, 2013 Cannon Air Force Base Page 19
Site Design
Objective
Good site design will create attractive and sustainable outdoor spaces that enhance the appearance of each building and the pedestrian connections between them. It will incorporate native vegetation with minimal irrigation and maintenance requirements, and use natural, durable materials and permeable surfaces to the greatest practrical degree.
In addition, good site design will create functional and efficient vehicular circulation, and provide well illuminated parking areas and pedestrian pathways.
General Requirements
1. Per UFC 4-010-01 – DOD Minimum
Antiterrorism Standards for Buildings, site design shall incorporate security provisions, if required, such as walls, fences, gates, berms or other barriers as determined during project design review. Refer to Page 16, Barriers, Screens and
Enclosures for additional information related to
Site Design.
2. Site Signage: Free-standing monument and marquee signage shall conform to the CAFB standard illustrated below. For other signage, including temporary construction signage, refer to UFC 3-120-01 - Air Force Sign Standard.
3. Each project shall provide adequate parking for occupants and visitors in accordance with the Architectural Barriers Act (ABA) for the
Department of Defense.
4. Outdoor seating and gathering spaces are desired for most normally-occupied buildings. Outdoor spaces shall be observable and readily accessible from the building, include hard-surfaced and porous areas, provide both sunlit and shaded areas, and be shielded from wind and public view by low walls and landscaping. The use of stained or stamped concrete in these outdoor areas is permitted.
5. Refer to the CAFB Sustainable Landscape Development Plan for a list of recommended plants and other landscaping requirements.
Xeriscaping for low-water usage is required except in prestige areas as noted below.
6. Preserve or restore natural vegetation to the greatest extent possible. All new native vegetation shall be irrigated for one year or until established.
7. Existing trees, if healthy, should be preserved whenever possible. For new projects located at least 300 feet from flightline operations, one new
CAFB Monument or Marquee Signage Standard
Page 20 Cannon Air Force Base January 17, 2013 tree should be planted for every 1000 square feet of on-site paved or landscaped area. Trees must be of a disease and drought resistant species.
8. Grass sod may be located only in prestige areas near the building entrances and other important outdoor spaces. Permanent irrigation of grass sod areas will be required.
9. Trees, shrubs and other plantings shall be located to enhance the outdoor spaces by providing shade, wind protection and improved views.
10. Crusher fines, gravel and rock may be used as additional groundcover around buildings. Multiple gravel colors separated into distinct areas or bands are preferred.
11. Site grading shall cause drainage away from the building and sidewalks to on-site locations for detention or off-site discharge in accordance with the overall base drainage plan.
12. A plan for erosion and sediment control shall be provided that meets or exceeds the requirements of the National Pollutant Discharge
Elimination System (NPDES) Construction
General Permit (CGP) regulation (40 CFR 122) and Environmental Protection Agency (EPA)
EPA-833-R-060-4. Additionally, erosion and sediment plans are required for individual construction sites that impact more than one acre.
13. Compliance is mandatory for environmental issues as stated in National Environmental Policy Act (NEPA), Underground Storage Tank (UST), the Clean Water Act (CWA), the Safe Drinking
Water Act (SDWA), the Clean Air Act, the Toxic Substance Control Act (TSCA), the
Resource Conservation and Recovery Act (RCRA), the Occupational Safety and Health Act
(OSHA), the National Historic Preservation Act
(NHPA), Section 438 of the Energy Independence and Security Act (EISA) and all local regulations that are more strict.
14. Site design shall include exterior lighting for parking areas, pedestrian circulation and other activities in accordance with user requirements.
Solar powered signage and lighting is encouraged.
(See the CAFB Electrical Standards 2011 for more detailed information.)
Pedestrian Circulation
15. Paved walkways connecting parking areas to building entrances and to adjacent sites and walkways shall be included for all new construction.
16. Sidewalks shall be constructed of concrete and shall be 6 feet wide (minimum) and increase to 8 feet or more in close proximity to buildings or where pedestrian usage dictates. (ATFP considerations must be taken into account when deciding sidewalk width and bollard placement.)
17. A maximum 12 foot wide landscaped separation shall be provided between parallel streets and sidewalks when space permits. Separations less than 2 feet wide are not permitted. In such cases, sidewalks shall be adjacent to the back of curb.
18. Typical concrete sidewalks shall have a broomed finish and troweled edges. Control joints shall be provided at intervals not to exceed sidewalk width.
19. Sidewalks and recreational paths shall be placed at intersections at a 90 degree angle to roadway traffic.
January 17, 2013 Cannon Air Force Base Page 21
20. Stamped concrete textures may be used to signify sidewalk intersections, benches or other amenities.
Roadways and Service Drives
21. Primary and secondary roadways shall be identified during the design review process.
22. Primary roadways shall have sidewalks on both sides.
23. Secondary roadways shall have a sidewalk on at least one side.
24. Sites shall be designed to minimize curb cuts and access points to primary roadways. Site access points should be located as far from street intersections as possible.
25. Service drives shall be designed to support a
30,000 lb. vehicle with ten wheels.
26. To the extent possible, service drives shall be located out of public view.
27. Emergency access road requirements located behind ATFP barriers shall be determined during the design review process.
28. All roadways in developed areas shall have an integrated 6-inch concrete curb and an 18-inch gutter. Provide curb cuts to direct water from roadways into landscaping and detention ponds.
29. Within 50 feet of an intersection, limit the height of shrubs to 30 inches and prune low-hanging tree branches to 10 feet above grade.
30. Gravel paving is not permitted in developed areas of the base.
31. All utility work crossing pavement shall be jack-and-bored. Exceptions must be evaluated during the design review process.
32. Paving repairs shall match existing surfaces and materials.
33. Where paved roads encounter unpaved roads, reinforced aprons shall separate the different surfaces.
Parking
34. The following requirements are derived from
UFC 3-210-02 - POV Site Circulation and Parking (January 16, 2004) and Technical Instruction
TI 804-11 (November 20, 1998).
35. A typical 90° parking space shall be 9 feet wide and 18 feet long. Compact spaces are not permitted.
36. Accessible parking spaces shall be provided in accordance with the ABA. (Accessibility requirements may be reduced or waived by CAFB in order to better support the particular mission of each facility.)
37. Access driveways to parking lots should be located at least 100 feet from any primary or secondary roadway intersection. Parking lots with more than 100 spaces should have two access driveways.
38. Perpendicular parking spaces (90° to the drive lane) and 24 foot wide two-way drive lanes are preferred.
39. Angled parking shall be 60° relative to the drive lane. Drive lane traffic shall be one-way for angled parking. One-way drive lane width with parking on both sides of the drive lane shall be 16 feet or greater. One-way drive lane width with parking on one side shall be 14 feet or greater.
40. Parking parallel to the curb may be permitted in some instances with the approval of CAFB.
Parallel spaces shall be 9 feet wide and 20 feet long.
41. 90° and angled parking shall not be used on the same drive lane.
42. A parked vehicle may overhang a sidewalk if the remaining sidewalk width is 5 feet or greater
(assume a maximum overhang of 2 feet and sidewalk width of 7 feet or more). In such instances, the parking stall length may be reduced by 2 feet.
43. Parking lot layout shall permit vehicles to easily turn around within the boundaries of the parking
Page 22 Cannon Air Force Base January 17, 2013 lot. (Dead-end, two-way drive lanes with 90° parking for 20 or fewer vehicles may use the drive lane to turn around. Dead-end angled parking drive lanes are prohibited.)
44. The visual impact of parking lots shall be minimized by the placement of the lot on the site by the use of landscaping, berms, site walls and other built elements along primary and secondary roadways.
45. Landscaping: Landscaped or Xeriscaped areas equal to approximately 10% of the paved parking lot surface should be provided. Refer to the CAFB Sustainable Landscape Development Plan
2012 and Technical Manual TM 5-803-13 for additional information.
46. Shaded parking is preferred. Shade may be created by any combination of large trees or man-made shade structures.
47. Parking lots for 100 or more vehicles shall be designed with islands for shade trees at regular intervals of 10 parking spaces or less. New shade trees should be selected and located to provide shade for at least 10% of the parking area after
10 years of growth.
48. Parking lots for more than 100 vehicles and with two or more double rows of parking shall have 6 foot wide planting strips between sections, continuous and parallel to the drive lane.
Xeriscaping is required. Trees for shading are recommended in the planting strip.
49. Use of porous concrete and other pervious paving strategies at parking areas are permitted.
50. All curbs and gutters should be monolithic.
(Independent wheel stops are prohibited.)
51. Surface-applied striping, symbols and directional markings shall be of reflective paint.
52. Reserved parking shall be minimized and consolidated in one area. Reserved signs shall be mounted on the curb at the front of each space.
53. Designated areas for pedestrian cross-traffic shall be clearly marked.
54. Motorcycle parking spaces shall have concrete pads and be clearly designated in each lot.
January 17, 2013 Cannon Air Force Base Page 23
Appendix A: Exterior Building Materials List
The following products were selected for their appearance. All manufacturers listed below represent an acceptable level of quality but the list is not exclusive. Other manufacturers and products of equal or better quality may be submitted for evaluation. Colors listed represent the design intent. Alternative colors should conform to the design intent, but some color variation may be acceptable on a case-by-case basis.
Brick
Modular brick is standard. Larger sizes will be considered on a case-by-case basis.
Cannon Style: Predominant Color
Manufacturer: Glen-Gery Brick or equal
Color: Burnt Almond (S21-22), Beige
Finish: Smooth
Mortar: To match brick
Cannon Style: Optional Accent Colors
Manufacturer: Glen-Gery Brick or equal
Color: Cedar Ridge (R58), Light Brown
Color: Burgundy Ironspot (WIS81), Dark Brown
Finish: Various
Mortar: To match brick
Cast Stone Masonry Units
Cast stone is a more costly masonry veneer that is suitable for special applications where an enhanced appearance is desired.
Manufacturer: Arriscraft or equal
Type: Renaissance
Color: Champagne (Georgia Plant)
Textures and Sizes: Various
Page 24 Cannon Air Force Base January 17, 2013
Concrete Masonry Units
Designers may combine various unit dimensions, colors and textures (including ground-face, smooth-face and split-face block) to improve building appearance. Mortar matching the color of the CMU is required.
Manufacturers: Crego Block, Featherlite Building Products or equal.
Color: Light Beige “El Paso Buff” by Crego Block, “Buff” by Featherlite or approved equal
Cannon Style: Optional Accent Colors
Manufacturers: Crego Block, Featherlite Building Products or equal.
Colors: Gray “Sandstone”, Brown “Cordova Stone”, Red “Sunset” by Featherlite Products or equal.
Glazing
Unless matching existing materials and colors, provide the following:
Manufacturer: PPG Industries or equal with the following recommended design values:
U-Value: ≤.35
SHGC: ≤.51
Tvis: ≤62%
Metals
All exterior metal exposed to the elements and in public view shall be brushed anodized aluminum, unpainted galvanized steel or factory-finished with an approved, durable color coat. (This requirement does not necessarily apply to hydrants, bollards or barricades that may have specific color requirements.)
Paint Colors
For building exterior applications such as steel doors and louvers, unless matching existing materials and colors, provide one the following:
Manufacturer: Sherwin Williams or equal
Color: Match SW7689 - Row House Tan
Cannon Style: Optional Accent Color
Manufacturer: Sherwin Williams or equal
Color: Match SW7705 - Wheat Penny
If matching existing utilitarian exterior applications such as steel bollards and gates, provide the following:
January 17, 2013 Cannon Air Force Base Page 25
Cannon Style: Cannon Brown*
Manufacturer: Sherwin Williams or equal
Color: Match SW 6061, Tanbark
* Cannon Brown will be gradually phased out and replaced by Accent Color SW7705 – Wheat Penny.
Roofing: Metal
Unless matching existing materials and colors, provide the following:
Cannon Style: For 2:12 or greater roof slopes
Manufacturer: PAC-CLAD (Petersen Aluminum Corp. or equal)
Material: Minimum 24 gage steel
Color: Colonial Red (Finish: Kynar 500/Hylar 5000)
Style: Preformed snap-on battens approximately 1-1/2” high and wide at approximately 18” O.C.
For less than 2:12 low-slope metal roofs on hangars or other utilitarian structures
Manufacturer: PAC-CLAD (Petersen Aluminum Corp. or equal)
Material: Minimum 24 gage steel
Color: White (Finish: Kynar 500/Hylar 5000)
Style: Standing seam approximately 1-1/2” high at approximately 18” O.C.
Roofing: TPO Membranes
Cannon Style: For concealed, low-slope membrane roofs
Manufacturer: Johns Manville or equal
Color: White
Type: TPO (Thermal Polyolefin); Minimum 60 mil, reinforced, fully-adhered membrane with preformed boots, flashing and…