Asbestos_Inventory_Report_B2110.pdf

PDF 26 KB Posted

Attached to
Fire Suppression HVAC Building 2110 Federal contract opportunity
Solicitation number
FA4855-16-R-0023
Issued by
Department of the Air Force Special Operations Command

About this file

Asbestos Inventory Report B2110

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression HVAC Building 2110, newest first.
File Type Posted
FA4855-16-R-0023_Questions_and_Answeres_Site_Visit.pdf PDF
Asbestos__Report_B2110.pdf PDF
Attachment_6_CAFB_Architec_Compat_Guide-2013.pdf PDF
Attachment_17_-_As-Built_Submittal_Guidelines.pdf PDF
Attachment_16_-_Appendix_F_Homeland_Security.pdf PDF
FA4855-16-R-0023_Amendment_0002.pdf PDF
Attachment_15_-_Appendix_D_Title_Blocks.pdf PDF
Attachment_11_-_AEC_CAD_Standard_TR-12-X_R-5.pdf PDF
Attachment_12_-_Appendix_A_Quality_Checklist.pdf PDF
Attachment_13_-_Appendix_B_Model_File_Layers.pdf PDF
Attachment_14_-_Appendix_C_Sheet_File_Layers.pdf PDF
FA4855-16-R-0023_Section_L_-_Amendment_0001.pdf PDF
FA4855-16-R-0023_SF_30_-_Solicitation_Amendment_0001.pdf PDF
Attachment_9_CAFB_DDC_Requirements_Guide_-_Sep_2014.pdf PDF
FA4855-16-R-0023.pdf PDF
Attachment_3_WD_NM20150023.pdf PDF
Attachment_1_SOO_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_4_CAFB_Electrical_Standards-2016.pdf PDF
Attachment_5_Contractor_Base_Briefing_Pamphlet_(March_2016).pdf PDF
Attachment_8_CAFB_Hardware_Specifications_Guideline-_2011.pdf PDF
Attachment_2_SOMS_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_6_CAFB_Architectural_Compatibility_Guide-2012.pdf PDF
Attachment_7_CANNONAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf PDF
Attachment_10_CAFB_Labeling_Standards__2009_Rev1.pptx PPTX presentation
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Asbestos Inventory by Facility Number

Facility No. 2 11 0 Year Constrtictecl 1956

Roont # Material Type Material Location Material Descrip Sample ID Res ~11t Asbestos Friable? Pri Date Present? Abated

JOINT-COMPOUND Joint Compound 21 10-15-25-Feb-93 N.D. No

PIPE-INSULATION MECHNICAL-ROOM Pipe Insulation 21 10-16-25-Feb-93 N.D. No

PIPE-INSULATION Pipe Insulation 21 10-01-07-Feb-94 N.D. No

ROOF-MAT ROOF Roofing Material 21 10-01-25-Jul-95 N.D.

ROOF-MAT ROOF Rolled Roofing 21 10-02-25-Jul-95 N.D.

ROOF-MAT ROOF Roofing material 21 10-03-25-Jul-95 N.D.

ROOF-MAT ROOF Roofing material 21 10-04-25-Jul-95 N.D.

FLOOR-TILE OFFICE Floor tile 21 10-01-10-Dec-98 N.D.

MASTIC-GLUE OFFICE Black Mastic 21 10-02-1 0-Dec-98 1-5% Chy Yes

Wecinestlny, September 15, 2010 Pnge 1 of 2

Facility No. 21 10 Year Constructed 1956

Roont # Moterial Type Material Locatio~z Material Descrip Sr~nzple ID Result Asbestos Friable? Pri Date Present? Abated

FLOOR-TILE OFFICE

MASTIC-GLUE OFFICE

OFFICE

Floor tile

Mastic

Linoloeum

21 10-01-06-Apr-01 .25% Chy NO NO NO

21 10-02-06-Apr-01 2% Chy Yes NO NO

21 10-03-06-Apr-01 N.D. No

Pngr 2 of2

File details come from the government source that posted it. Updated .