Attachment_10_CAFB_Labeling_Standards__2009_Rev1.pptx

PPTX presentation 109 KB Posted

Attached to
Fire Suppression HVAC Building 2110 Federal contract opportunity
Solicitation number
FA4855-16-R-0023
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 10 CAFB Labeling Standards 2009

View the file

Other files for this federal contract opportunity

Other files attached to Fire Suppression HVAC Building 2110, newest first.
File Type Posted
Asbestos_Inventory_Report_B2110.pdf PDF
Asbestos__Report_B2110.pdf PDF
FA4855-16-R-0023_Questions_and_Answeres_Site_Visit.pdf PDF
Attachment_15_-_Appendix_D_Title_Blocks.pdf PDF
Attachment_11_-_AEC_CAD_Standard_TR-12-X_R-5.pdf PDF
Attachment_6_CAFB_Architec_Compat_Guide-2013.pdf PDF
Attachment_17_-_As-Built_Submittal_Guidelines.pdf PDF
Attachment_12_-_Appendix_A_Quality_Checklist.pdf PDF
Attachment_13_-_Appendix_B_Model_File_Layers.pdf PDF
Attachment_14_-_Appendix_C_Sheet_File_Layers.pdf PDF
Attachment_16_-_Appendix_F_Homeland_Security.pdf PDF
FA4855-16-R-0023_Amendment_0002.pdf PDF
FA4855-16-R-0023_Section_L_-_Amendment_0001.pdf PDF
FA4855-16-R-0023_SF_30_-_Solicitation_Amendment_0001.pdf PDF
Attachment_5_Contractor_Base_Briefing_Pamphlet_(March_2016).pdf PDF
Attachment_8_CAFB_Hardware_Specifications_Guideline-_2011.pdf PDF
Attachment_2_SOMS_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_9_CAFB_DDC_Requirements_Guide_-_Sep_2014.pdf PDF
FA4855-16-R-0023.pdf PDF
Attachment_3_WD_NM20150023.pdf PDF
Attachment_1_SOO_-_CZQZ98-0130_Install_Fire_Suppression_and_HVAC _B2110.pdf PDF
Attachment_6_CAFB_Architectural_Compatibility_Guide-2012.pdf PDF
Attachment_7_CANNONAFBI32_201_Fire_Protection_Operations_N_Fire_Prevention_Program.pdf PDF
Attachment_4_CAFB_Electrical_Standards-2016.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATCH PANEL

TELECOMMUNICATIONS RACK

PORT ON PANEL

R1 -A -1

HORIZONTAL CABLES

TR1 - TR2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER

TERMINATED COUNT

TERMINATION LOCATIONS

CABLE SIZE

TR1 - TR2

12 FIBER MM

FO 01 1-12

TERMINATION LOCATIONS

FIBER CABLE NUMBER

SINGLE OR

CABLE GUAGE

FIBER TERMINATIONS

BUILDING BACKBONE CABLES

MMAC - 1 - X

R1 -A - X

TELECOMMUNICATIONS RACK

JACK NUMBER

DEVICE

CARD NUMBER

PORT NUMBER

PATCH CABLES

MULTIMODE

WARNING

IF THIS CLAMP OR CABLE

IS LOOSE OR MUST BE

REMOVED PLEASE CALL THE

BUILDING TELECOMMUNICATIONS

MANAGER

TMGB

TR1

ER1

TELECOMMUNICATIONS

MAIN GROUNDING

BUSBAR

TELECOMMUNICATIONS

ROOM

EQUIPMENT ROOM

GROUNDING

TBB

TGB

TGB

TBB

Premises Wiring - 27 SOCS/SCOS Cable labeling program 1/29/09 Questions can be directed to 575-784-2710

OUTLET PORT

R1-A 1 2

PATCH PANEL LETTER

(Patch Panels will be lettered in order starting with A)

TELECOMMUNICATIONS RACK NUMBER

(Telecommunications Racks will be numbered numerically, starting with 1, i.e. R1, R2)

3 R1-A 4

JACK LOCATION LABELS

1 2

5 6

Jacks shall be arranged and labeled according to their location in a room. They shall be arranged clockwise in ascending order around the room while standing in the doorway looking into the room. Floor jack number arrangement should work in clockwise order, looking out the TR doorway. The 27 SOCS labeling scheme adheres to the requirements outlined in the TIA/EIA 606 telecommunication standard.

A

NUMBER

OUTLET PORT LOCATION

SINGLE GANG

DOUBLE GANG

R1-A 3 4 R1-A 3 4 R1-A 7 8

OUTLET PORT

(Ports will be numbered according to port number on patch panel. Ports will be numbered consecutively per quad face plate.)

1 R1-A 2

100 PR 24 AWG

CA01 301 - 400

CABLE NUMBER

TERMINATED COUNT

FO Bxx- Bxx 1-12 MM or SM

Fiber Optic Cable I.D.

FIBER CABLE NUMBER

SINGLE OR

CABLE GUAGE

FIBER TERMINATIONS

OUTSIDE PLANT CABLES

MULTIMODE

File details come from the government source that posted it. Updated .