Attachment 33 - Base Contractor Storage Lot Agreement and Disclaimer Letter.doc

DOC document 212 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4855-10-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 33 - Base Contractor Storage Lot Agreement and Disclaimer Letter Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
MACC Solicitation Questions Part II.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
Attachment 60 - Bldg 206 Fire Inspection Reports.pdf PDF
Attachment 38 - Past Performance Questionaire.doc DOC document
MACC Amendment 2.doc DOC document
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 56 - Bldg 206 H208 Area.pdf PDF
Attachment 55 - Bldg 206 Square Footage.pdf PDF
Attachment 48 - Bldg 206 As Built Warehouse Supply Equipment.pdf PDF
Agenda for MACC Pre-Proposal Conference and Site Visit.pdf PDF
MACC solicitation Amendment.doc DOC document
Pre-Proposal Meeting Site Visit Instructions Revised.pdf PDF
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 23 - Cannon AFB Bldg 206 Communications Inputs.pdf PDF
Attachment 12 - 27 SOW ETL02-12 and 27 SOCS COMM Standards.pdf PDF
Attachment 36 - Letter of Instruction to Reference for PPQ.doc DOC document
Attachment 11 - Cannon AFB Contractor Security Handbook March 2009.pdf PDF
Attachment 10 - Sound Curtains Hanging Options.pdf PDF
Attachment 8 - Unified Facilities Criteria.pdf PDF
Attachment 29 - Form 1477 Construction Inspection Record.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 5 - 27 SOCES Cannon AFB CAD Standards.pdf PDF
Attachment 24 - AF Form 3052 Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc DOC document
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 16 - Seed Project Statement of Objective.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Attachment 9 - UNC-13 Tech Data Sheet.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 1 - General Provisions - MACC new.doc DOC document
Attachment 31 - Form 592 USAF Welding Cutting and Brazing Permit.pdf PDF
MACC Draft RFP.zip ZIP file
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 31

FA4855-10-R-0006
11 June 2010

DEPARTMENT OF THE AIR FORCE

27TH SPECIAL OPERATIONS CIVIL ENGINEER SQUADRON (AFSOC)

CANNON AIR FORCE BASE NEW MEXICO

INSERT DATE

MEMORANDUM FOR INSERT CONTRACTOR’S NAME

FROM: 27 SOCES/CEPM

SUBJECT: Base Contractor’s Storage Lot Agreement and Disclaimer

1. The purpose of the Contractor Storage Lot Agreement is to inform the Prime contractor of Cannon Air Force Base’s expectations for providing a safe and environmentally sound storage location while under an active contract. Therefore, the following items are not authorized:

a. Controlled substances or firearms

b. Vehicles, trailers, etc; or any other mechanical devices in a non-operating or non-functioning condition

c. Oil, batteries, or any chemicals deemed hazardous by the Hazardous Material Pharmacy (Hazmart Pharmacy)

d. Excess pallets, excess wood, scrap metal, trash, machine or engine parts. Excess wood and pallets shall be defined at those materials not necessary for use during any currently awarded contracts.

e. Vehicles requiring registration or licensing that are not current with the Department of Motor Vehicles and Cannon Air Force Base

2. Repair work on any type of machinery is not authorized in the Contractor Storage Lot (CSL) to eliminate the potential of oil spills or contaminates. If a lot has been contaminated, it will be reported as soon as possible to 27 CES/CEV (784-1099) for action/remediation, at the contractor’s expense. Storage of hazardous waste and material is not permitted in the storage area.

3. All vehicles, RVs, and trailers shall be maintained in a proper operating condition at all times and must have current insurance coverage. Vehicles, RVs, trailers, etc; shall not be stored on jacks or blocks. Additionally, vehicles will not be stored outside of the lots on grassy areas.

4. Each assigned lot shall have a weather-proof sign posted on the external gate listing the prime contractor in whose name the lot is assigned, contact information to include both phone and primary email, the current contract number(s), and the expected contract completion date of the contract(s). The sign shall be at least one foot by one foot, but no more than two foot by two foot, in dimension. The information contained on the sign shall be protected from the elements by plastic, laminate or plexiglass. The contractor also has the option of painting the information directly on the material, but the sign must be legible at all times. The sign may be wood, steel, or heavy duty plastic.

5. One container, supplied with electricity as needed by the base, per lot is authorized. Any additional office trailers/connexes/sheds are not authorized and shall not be provided power. A container shall be defined as a structure that can be completely enclosed through a locking mechanism, has a minimum of one door, and has no open faces.

6. If a contractor deems that an additional lot is needed for storage, a request will be made of CEPM NCOIC in writing, either by email or memorandum. Confirmation from the CEPM NCOIC in writing will be required prior to occupation of lot.

7. Areas inside the CSLs must be kept clean and present an orderly configuration. Compliance with CAFB standards with regards to cleanliness inside/outside fence shall include, but is not limited to the removal of tumbleweeds, leaves, grass, weeds, trash, etc. It is recommended that all lots be cleaned weekly or more frequently as determined by the 27th SOCES. Failure to properly maintain a clean lot may result in the contractor being removed from the CSL at no additional expense to the government and may affect future requests for storage areas at the lot. Contractor is responsible for all maintenance within 5 feet of the contractor’s assigned area’s perimeter, with the exception of adjoining occupied lots. The contractor’s required maintenance shall include the complete interior of the assigned lot. Grass shall not exceed 2 inches in height. Demolition debris shall not be stored inside the CSLs.

8. Tarps shall be used for loose / granular material, and secured in a way that will prevent high winds from dislodging material. If the material in question is able to be dislodged by high winds, it must be secured. If loose items are found to be blown around the lot, the items shall be secured with a tarp, rope, or container, as deemed sufficient for protection from the elements.

9. All wood, plumbing pieces, loose cables, tools and metals shall be stacked in a neat orderly appearance. This list is not all-inclusive.

10. Upon contract completion, the Prime contractor shall clean and vacate the assigned storage lot and inform a representative from the 27 CES/CEP no later than 30 days after beneficial occupancy/acceptance of the project by the government. Failure to clean the lot properly prior to vacancy may result in the contractor being denied usage of any requested storage lots in the future. The option will be given to the contractor regarding ownership of the fence after completion of the project. If the contractor determines it will be more feasible to leave the fence in-place and turn it over to the government, a memorandum of record will be written by the NCOIC from Construction Management, or the next higher-up, and signed by the contractor.

11. The Electrical Requirements are as follows:

a. An in-line meter box on the exterior of the trailer with a standard single phase watt hour meter, preferably a Schneider electric power ion 8600 series meter as that is the base standard for metering.

b. 1” rigid conduit exiting the trailer transitioning to a 1 inch 90 degree sweep in either rigid metal or PVC. The base of the sweep shall terminate no less than 20 inches below grade or more than 30 inches below grade.

c. 1” schedule 80 pvc pipe run underground at a depth of not less than 20 inches, and not more than 28 inches deep. This conduit will terminate in one of the above mentioned hand holes without cutting into the hand hole.

d. No less than 4 each #6AWG conductors will be pulled from the trailer, through the hand hole and into the main panel. This wire will terminate as follows: 1 green or bare wire to the ground lug, 1 white or natural grey wire will terminate into the neutral buss, the remaining two wires will terminate on a 2 pole, 60 amp breaker provided in the service panel.

e. When trailer is removed, all accompanying electrical apparatus must be removed.

f. For a single trailer (one off), the following will be an acceptable statement of work:

1. Determine nearest source of usable power by liaising with the electrical shop through contract management.

2. Install copper wire (thhn or thwn) in the following sizes, not to exceed the following lengths:

a. Less than 20 feet, unidirectional, #6, 4 each in 1” sched 80 PVC

b. 21 feet to 84 feet, unidirectional, #4, 3 each plus 1 #6 ground in 1” sched 80 PVC

c. 84 feet to 109 feet, unidirectional, #3, 3 each plus 1 #6 ground in 1 ¼” sched 80 PVC

d. 110 feet to 139 feet, unidirectional, #2, 3 each plus 1 #6 ground in 1 ½” sched 80 PVC

e. 150 feet to 175 feet, unidirectional, #1, 3 each plus 1 #6 ground in 2” sched 80 PVC

g. Lengths over 175 feet will necessitate installation of a transformer nearer the site. See HV below

h. Install low voltage cables in PVC underground at a depth of not less than 20 inches, and not more than 28 inches deep. This conduit will terminate at a 60 amp single phase disconnect bolted to the source. The electric shop will mount and terminate the line side of the contractor provided disconnect. Sweeps will be used (or made) to turn up and into the disconnect. The PVC may be used to perform very large diameter sweeps underground (less than 1 foot per ten feet of length).

i. The trailer shall be wired with the appropriate size wire into the main panel using rigid metal conduit. This wire will terminate as follows: 1 green or bare wire to the ground lug, 1 white or natural grey wire will terminate into the neutral buss, the remaining two wires will terminate on a 2 pole, 60 amp breaker (main) provided in the service panel.

j. HV installations: Install a transformer as close to the site as possible Transformers will be single phase, no less than 10kVA in either 7200 or 2400 primary voltages with a secondary of 120/240. The transformer must be fed by #2 AWG 15kV 133% insulated XLPE shielded conductor buried a minimum of 36”, concrete encased. No live front transformers or HV apparatus will be used. HV lines must be kept to under 490 feet unidirectional. Sectionalizer cabinets will be utilized for runs over 490 feet. All newly installed HV lines must be fault tested with a 5000 VDC megohmeter prior to commissioning. 200 amp load break elbows must be the termination method on all terminations for temporary power unless all that is available at the source is 600 amp dead break elbows. Contractors must provide and install the terminations. Contractors must work with the electric shop, through the contract manager to coordinate power outages to connect HV lines.

12. Further clarifications not specifically written in this agreement can be found in OSHA standard 1926.250

13. Fencing will be installed at the contractor’s convenience and at no cost to the government.

14. In addition to the expectations above, I INSERT CONTRACTOR’S COMPANY NAME, understand that:

a. As long as my company has an active contract with CAFB, my company and my subcontractors are eligible to place equipment/materials/vehicles in my assigned CSL at no charge.

b. My company may not store items, materials, equipment, etc. for any other contractors unless they are subcontractors for my active contract. My company is not authorized to use any other storage lots/spaces/areas other than the one assigned.

c. It my company’s responsibility to keep my equipment/materials/vehicles or personal property secured or locked at all times, other than during active usage, with a company representative on site. My company also understands that no security is provided for the CSL, other than what I install.

d. My company understands that the Government has the right to confiscate any construction material outside the assigned fenced area or within lots that are not signed for by a prime contractor.

e. The United States Air Force, neither CAFB nor its designated officials will be responsible for any damage or theft to my property or contents thereof as a result of vandalism, weather, and other occupants or by any other means to any equipment/materials/vehicles or personal property and contents that is stored in my storage lot.

f. CAFB requires all contractors utilizing the CSL to have full comprehensive insurance coverage to provide financial protection in the event of damage or loss of property. My company understands that we can be held liable for any damages in which my employees, guest, and I may cause to any personal or Government property.

g. My company has and will continue to maintain the required vehicle insurance coverage. Please initial here_______________.

h. If an additional storage lot is needed, I am to submit another request through my Contracting Officer for approval from 27 CES/CEP.

i. Failure to comply with this storage agreement is grounds for removal from the storage lot.

9. Prime Contractor Project Manager: I have read, understand and will comply with all the above requirements in the Contractor Storage Lot Agreement and Disclaimer. And on the next page, I will fill in all the information as best I can. Upon notification of approval, I will perform a check of the assigned area for any existing damage and report it to 27 CES/CEP immediately. Within 10 days of approval, I will also post the requested sign as requested above (see 4).

PRINT NAME: _________________________________________________________

SIGNATURE: ________________________________________ DATE: __________________

1. SPACE ASSIGNMENT

Storage Lot #______________

Print: POC Last Name, First MI Company Home Phone

Duty Phone

Occupant Signature

Date Engineering Flight Rep Signature Date

SUBCONTRACTORS

1.

2.

3.

4.

5.

6.

7.

8.

Occupant Signature

Date Engineering Flight Rep Signature Date

2. SPACE TERMINATION

INSERT CONTRACTOR’S NAME has cleared Contractor Storage Lot number ___________ on INSERT DATE.

Occupant Signature

Date Engineering Flight Rep Signature Date Air Commandos