Attachment 29 - Form 1477 Construction Inspection Record.pdf

PDF 500 KB Posted

Attached to
Multiple Award Construction Contract Federal contract opportunity
Solicitation number
FA4855-10-R-0006
Issued by
Department of the Air Force Special Operations Command

About this file

Attachment 29 - Form 1477 Construction Inspection Record Any attachments currently shown as draft will be finalized and a modification will be issued to incorporate them into the contract at a later date.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract, newest first.
File Type Posted
Attachment 41 - Bldg 206 Proposed Roof Plan.pdf PDF
Attachment 52 - Bldg 206 Floor Plan.pdf PDF
Attachment 59 - Bldg 206 Roll Up Door.pdf PDF
Attachment 46 - Bldg 206 As Built Repair Gutter Seals.pdf PDF
Attachment 22 - Cannon AFB Bldg 206 Lead Base Paint Data.pdf PDF
Attachment 45 - Bldg 206 As Built Lights and Paint.pdf PDF
Attachment 42 - Bldg 206 As Built Install Dock Leveler.pdf PDF
Bldg 206 AutoCAD files.zip ZIP file
Attachment 53 - Bldg 206 BRAC Floor Plan.pdf PDF
Attachment 49 - Bldg 206 As Built ADAL Base Supply Warehouse.pdf PDF
Attachment 43 - Bldg 206 As Built Vehicle Area.pdf PDF
Attachment 44 - Bldg 206 As Built Repair Elect Dist System.pdf PDF
Attachment 51 - Bldg 206 As Built Regrade Drain Ditch.pdf PDF
MACC Solicitation Q A.pdf PDF
Attachment 61 - Bldg 206 Resurfacing.pdf PDF
Attachment 50 - Bldg 206 As Built Warehouse Supply Corrective Work.pdf PDF
Attachment 40 - Bldg 206 Existing Roof Plan.pdf PDF
Attachment 47 - Bldg 206 As Built Warehouse Supply Equipment Vault.pdf PDF
MACC Pre-Proposal Conference and Site Visit.pdf PDF
Pre-proposal Meeting and Site Visit Attended 20 July 2010.pdf PDF
MACC Solicitation Conformed copy1.doc DOC document
Pre-Proposal Meeting Site Visit Instructions.pdf PDF
Attachment 27 - Schedule of Material Submittals.xls XLS spreadsheet
Attachment 26 - AF Form 3065 Contract Progress Report.xls XLS spreadsheet
Attachment 3 - Cannon AFB Architectural Compatibility Plan for Draft Solicitation.pdf PDF
Attachment 37 - Past Performance Project Data.doc DOC document
Attachment 25 - AF Form 3064 Contract Progress Schedule.xls XLS spreadsheet
Attachment 38 - Past Performance Questionaire.doc DOC document
Attachment 13 - Wage Determination-NM1.pdf PDF
Attachment 15 - Wage Determination-NM9.pdf PDF
Attachment 6 - GeoBase Initial Operating Capability Implementation.pdf PDF
Attachment 19 - Cannon AFB Bldg 206 Projected Construction 8 June 2010.pdf PDF
Attachment 2 - Cannon AFB Standards for Draft Solicitation.doc DOC document
Attachment 32 - Form DD1354 Transfer and Acceptance of Military Real Property.pdf PDF
Attachment 16 - Seed Project Statement of Objective.pdf PDF
Attachment 17 - Cannon AFB Bldg 206 Existing Layout 8 June 2010.pdf PDF
Attachment 4 - US Army Corps Of Engineer Mobile District Design Manual.pdf PDF
Attachment 9 - UNC-13 Tech Data Sheet.pdf PDF
Attachment 28 - AF Form 3000 Material Approval Submittal.pdf PDF
Attachment 35 - SF 295 Summary Subcontract Report.pdf PDF
Attachment 20 - Cannon AFB Bldg 206 Projected Demolition 24 June 2010.pdf PDF
Attachment 34 - SF 294 Subcontracting Report for Individual Contracts.pdf PDF
Attachment 21 - Cannon AFB Bldg 206A As Built 9 March 2009.pdf PDF
Attachment 23 - Cannon AFB Bldg 206 Communications Inputs.pdf PDF
Attachment 12 - 27 SOW ETL02-12 and 27 SOCS COMM Standards.pdf PDF
Attachment 36 - Letter of Instruction to Reference for PPQ.doc DOC document
Attachment 11 - Cannon AFB Contractor Security Handbook March 2009.pdf PDF
Attachment 10 - Sound Curtains Hanging Options.pdf PDF
Attachment 8 - Unified Facilities Criteria.pdf PDF
MACC Draft RFP.zip ZIP file
Show all 50

Multiple Award Construction Contract has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION INSPECTION RECORD

(TYPE OR WRITE ALL ENTRIES LEGIBLY IN INK)

INSTALLATION PROJECT NUMBER

CONTRACT NUMBER AWARD COST

FINAL COST

PROJECT TITLE

PROJECT DESCRIPTION

NUMBER OF CALENDAR DAYS IN CONTRACT DATE NOTICE TO PROCEED ISSUED (YYYYMMDD)

SCHEDULED COMPLETION DATE (YYYYMMDD) ACTUAL COMPLETION DATE (YYYYMMDD)

PRIME CONTRACTOR NAME OF AIR FORCE PROJECT ENGINEER

SUB CONTRACTORS

CERTIFICATION

I CERTIFY THAT I HAVE READ, UNDERSTAND, AND WILL REQUIRE COMPLIANCE WITH THE FOLLOWING ASPECTS AS PERTAIN TO THIS PROJECT: PLANS; TECHNICAL PROVISIONS; FEDERAL SPECIFICATIONS; PROGRESS SCHEDULE; AND FIELD TESTS.

I FURTHER CERTIFY THAT I UNDERSTAND THAT I HAVE NO AUTHORITY TO MAKE CHANGES IN THE PLANS OR SPECIFICATIONS AND THAT MY DUTIES CONSIST PRIMARILY OF SEEING THAT TERMS AND CONDITIONS OF THE CONTRACT ARE CARRIED OUT, TO PROVIDE A PERMANENT RECORD OF THE ACCOMPLISHMENT OF THE PROEJCT BY MEANS OF AF FORM , SUPPLEMENTED

AS NECESSARY BY ANNOTATED COPIES OF PLANS AND SPECIFICATION, AND FURTHER, TO PROVIDE TIMELY RECOMMENDATIONS TO THE BASE CIVIL ENGINEER FOR CHANGES IN THE CONTRACT PLANS AND SPECIFICATIONS, IF REQUIRED.

I WILL MAINTAIN THIS RECORD ON A CURRENT BASIS, IN ACCORDANCE WITH THE REQURIEMENTS OF PERTINENT REGULATIONS AND INSTRUCTIONS GOVERNING THE PREPARATION, MAINTENANCE, AND COMPLETION OF THIS RECORD.

NAME AND GRADE OF INSPECTOR SIGNATURE DATE

AIR FORCE CONSTRUCTION MANAGER PERIOD COVERED (YYYYMMDD)

FROM TO

COMPLETED REPORTS

1 THROUGH BOOK NO. OF BOOKS

PAGE OF PREVIOUS EDITION IS OBSOLETE. 1 PAGES AF IMT 1477, 19800701, V1

Attachment 29 FA4855-10-R-0006 11 June 2010

NON-COMPLIANCE ITEMS

ITEM

NO.

DATE

IDENTIFIED

DATE

COMPLETED PLANS OR SPECS DESCRIPTION REMARKS

OF PAGE 2 PAGES AF IMT 1477, 19800701, V1

DAILY INSPECTION RECORD

DATE (YYYYMMDD) TIME OF INSPECTOR'S VISIT TO SITE

ARRIVAL DEPARTURE ARRIVAL DEPARTURE ARRIVAL DEPARTURE ARRIVAL DEPARTURE

WEATHER CONDITIONS SATISFACTORY FOR WORK YES NO (IF NO, DESCRIBE CONDITIONS.)

CONTINUE REPORT ON PAGE 4

NOTE: WRITE ALL ENTRIES LEGIBLY IN INK. LINE OUT ALL UNUSED PORTIONS. INSPECTOR SIGNS FIRST NAME, MIDDLE INITIAL AND LAST NAME ON EACH COMPLETED DAILY INSPECTION RECORD

PAGE OF 3 PAGES AF IMT 1477, 19800701, V1

WORK FORCE - CONTRACTOR AND SUB-CONTRACTOR

TRADE NO. TRADE NO. TRADE NO. TRADE NO.

MATERIALS DELIVERED TO JOB SITE

ITEM QUANTITY ITEM QUANTITY

CONTRACTOR EQUIPMENT ON HAND

TYPE NO. TYPE NO. TYPE NO. TYPE NO.

WORK ACCOMPLISHED OR IN PROGRESS - TESTS PERFORMED

REPORT NO.

REMARKS (Delays; safety; special instructions given or received; reasons for rejecting materials and/or work.)

SIGNATURE DATE

PAGE OF 4 PAGES AF IMT 1477, 19800701, V1

RECORD OF SUBMITTAL DATA

OF PAGE 5 PAGES

TYPE

SUBMITTAL

DATE

DUE

DATE

RECEIVED

DATE

APPROVED ITEM DESCRIPTION REMARKS SECTION.

GOVERNMENT FURNISHED EQUIPMENT/MATERIALS

DATE

ORDERED

DATE

RECEIVED

DATE INSPECTED BY/REMARKS DESCRIPTION INSPECTED

File details come from the government source that posted it. Updated .