Attachment_3 _Line_item_Descriptions_(DRAFT).pdf
PDF 572 KB Posted
- Attached to
- Airfield Civil Works IDIQ Federal contract opportunity
- Solicitation number
- FA4819-15-B-0001
About this file
THE ATTACHED EXCEL SHEET IS A DRAFT LINE ITEM DESCRIPTION. THE FINAL LINE ITEM DESCRIPTIONS WILL BE POSTED WITH THE FINAL SOLICITATION.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield Civil Works IDIQ Tyndall Air Force Base Base Year
Attachment 3- Line item description
ITEM DESCRIPTION UNITS INCLUDED ITEMS, MEASURE AND USAGE
0001 Geotechnical, Exploratory Borings with Report and Recommendations
EA Contains all work (labor, material and equipment) required to perform geotechnical investigation, soils classification, seasonal high water table determination, and report. Typical boring frequency less than 8 with a depth to 15 feet.
Work performed by approved commercial testing laboratory.
0002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation
EA Contains all work (labor, material and equipment) required to perform field and/or laboratory permeability test. Typical frequency less than 3.
An addition to Geotechnical Borngs and Report line item. Work performed by approved commercial testing laboratory.
0003 Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services
AC Contains all work (labor, material and equipment) required to perform wetland delineation, ecological assessment with report, and permitting services to meet requirements for FDEP/USACE Joint Permit associated with wetland disturbance.
Work performed by approved environmental firm.
0004 Surveying, Construction Layout DAY Contains all work (labor, material and equipment) required to perform construction layout services.
Work performed by approved surveying firm.
0005 Surveying, Topographic/Specific Purpose HR Contains all work (labor, material and equipment) required to perform professional surveying services as indicated on SOW or contract plans.
Work performed by approved surveying firm.
0006 Engineering, Professional Services HR Contains all work (labor, material and equipment) required to perform professional engineering services as indicated on SOW or contract plans.
Work performed by approved engineering firm.
0007 Video Inspection LF Contains all work (labor, material and equipment) required to perform video inspection services as indicated on SOW or contract plans. Work performed by approved video inspection company. Deliverables include DVD/CD of inspection with report of findings with recommendations. Unit of measure is based on linear foot and pipe diameter contained in sub-items.
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
SECTION 01 31 13.20 - FIELD PERSONNEL
DRAFT
Attachment 3- Line item description
0008 Escorts WK Person and vehicle to be escort. Used for escorting personnel and equipment without AF Form 483, Airfield Driving (i.e. Concrete Trucks, Material Deliveries, and etc.). Duration based on time for escort service.
0009 Vacuum Truck DAY Person and equipment not related to other work.
Used for cleaning pavements associated in Provisions for Airfield pavement requirements.
Duration based on time for construction activities, vehicles, and equipment that may produce F.O.D.
or track debris on Base pavements.
0010 Low Profile Lighted Barricade WK Contains all work required for delivery, installation, maintenance, and removal for each barricade.
0011 Saw Cut Asphalt, ≤ 4 Inches LF Contains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items.
0012 Saw Cut Concrete Pavement LF-IN Contains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items. Unit of measure is linear foot per inch of depth for reinforced or non-reinforced pavement.
0013 Asphalt Milling SY Contains all work (labor, material and equipment) required to perform milling task. Not related to other items. Unit of measure is based on square yard and average depth.
0014 Demolition and Excavation of Asphalt SY Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
0015 Demolition and Excavation of Concrete (6 to 9 Inches)
SY Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
0016 Demolition and Excavation of Concrete (9 to 14 Inches)
SY Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
SECTION 01 56 23 - TEMPORARY BARRICADES
SECTION 02 41 00 - DEMOLITION
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
Attachment 3- Line item description
0017 Excavation, exist. base and/or subgrade material CY Contains all work (labor, material and equipment) required to excavate base and subgrade during demolition, related to random slab repair and precision excavation to limit damage to adjacent improvements. Not related to mass grading activities or utility installation or other items.
0018 Demolition and Removal, Storm Structure EA Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport.
0019 Demolition and Removal, Storm Pipe LF Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Unit of measure is based on linear foot and diameter contained in sub-items.
0020 Mooring Anchor w/ Static Grounding EA Contains all work (labor, material, equipment and testing) required to install mooring anchor with static grounding capabilities in accordance with ETL 12-8 and UFC 3-260-1.
0021 Welded Wire Fabric LB Contains all work (labor, material and equipment) required to install welded wire fabric for reinforced and/or irregular concrete slabs.
0022 Dowels, 1" x 20" EA Contains all work (labor, material and equipment) required to install reinforcement dowel. Unit of measure is based on per item and pavement condition contained in sub-items.
0023 Eathwork, In-Place Fill Soil CY Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place fill soil. Unit of measure is based on cubic yard and source contained in sub-items.
0024 Earthwork, Excavation Soil CY Contains all work (labor, material and equipment) required to excavate soil. Removal from site requires transport line item. Not related to soil excavation for utilities.
0025 Transport, Demolition / Excavated Materials CY Contains all work (labor, material, equipment, transport and dump fees, when applicable) required to transport materials. Unit of measure based on cubic yard and final destination.
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
SECTION 03 20 20 - CONCRETE REINFORCING
SECTION 31 00 00 - EARTHWORK
Attachment 3- Line item description
0026 Top Soiling Stripping CY Contains all work (labor, material, transport and equipment) to strip top soil and stockpile, typical removal 4-6 inches. Stockpile for re-use or load to transport truck included. Removal off-site to use to transport line item.
0027 Open Trench Dewatering MONTH Contains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for dewatering activities.
0028 Wellpoint Dewatering LFM Contains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for open trench dewatering activities. Unit of measure is linear feet per month.
0029 Sediment Barrier LF Contains all work (labor, material, equipment, installation and removal) for structural BMP.
0030 Floating Turbidity Barrier LF Contains all work (labor, material, equipment, installation and removal) for structural BMP.
0031 Inlet Protection System EA Contains all work (labor, material, equipment, installation and removal) for structural BMP.
0032 Soil Tracking Prevention Device EA Contains all work (labor, material, equipment, installation and removal) for structural BMP.
0033 Paint Removal SF Contains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item.
0034 Rubber Removal SF Contains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item
0035 Asphalt Pavement, Cleaning and Seal Random Cracks
LF Contains all work (labor, material and equipment) required to clean and seal joint. Unit of measure is based on linear foot and quantity contained in sub-items.
0036 Rout and Seal Crack Add Per 1/2" Depth LF Contains all work (labor, material and equipment) required to route crack. Related to cleaning and sealing random cracks. Unit of measure is based on linear foot and depth of route.
SECTION 31 23 19 - DEWATERING
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
Attachment 3- Line item description
0037 Route, Clean and Reseal Joint, Concrete Pavement
LF Contains all work (labor, material and equipment) required to route, clean and seal joint.
0038 Route, Clean and Reseal Random Cracks, Concrete Pavement
LF Contains all work (labor, material and equipment) required to route, clean and seal cracks.
0039 Spalled Joint Repair, Partial Depth SF Contains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items
0040 Corner Break / Spalled Joint Repair, Full Depth SF Contains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items
0041 Grooving PCC Pavement SF Contains all work (labor, material and equipment) required to groove runway pavement, 1/4" x 1/4" at 1.5" O.C., procedure per FDOT SSRBC, latest edition. Not related to other items.
0042 Crushing PCC Pavement TON Contains all work (labor, material, transport and equipment) for crushing demolished concrete.
Crushed concrete to meet gradation and testing requirements contained in specifications.
Transportation and stockpiling included. Not related to other items.
0043 Base Course Group 4, In-Place SY Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course. Unit of measure is based on cubic yard and source contained in sub-items
0044 Type B Stabilization SY Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course.
0045 Base Course / Subgrade Preparation SY Contains all work (labor, material, equipment, grading, compaction and testing) required to dress existing base course affected by pavement removal.
0046 Asphalt Pavement, PG 76-22 TN Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement.
0047 Asphalt Pavement TN Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement.
0048 Asphalt Slurry Seal SY Contains all work (labor, material, equipment, transport, placement and testing) required to contruct seal.
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
SECTION 32 12 16 - ASPHALT PAVEMENT
SECTION 32 12 36.13 - ASPHALT EMULSION SEALER
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
SECTION 32 13 13 - CONCRETE PAVEMENT
Attachment 3- Line item description
0049 Portland Cement Concrete SY Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement. Unit of measure is based on square yard quantity contained in sub-items.
0050 Concrete Pavement Saw Cut Joints LF Contains all work (labor, material and equipment) required to perform saw cut pavement and clean joint. Related to Joint Sealing in Concrete Pavement.
0051 Joint Filler, Expansion Board LF Contains all work (labor, material and equipment) required to install joint filler. Related to pre-form elastometric joint sealant.
0052 Joint Sealant, Pre-Formed Elastometric LF Contains all work (labor, material and equipment) required to install joint sealant.
0053 Joint Sealant, Silicone LF Contains all work (labor, material and equipment) required to install joint sealant. Includes backer rod.
0054 Pavement Marking SF Contains all work (labor, material and equipment) required to perform pavement markings. Unit of measure based on square foot and operational execution contained in sub-items.
0055 Seed and Mulch, Drilled SY Contains all work (labor, material and equipment) required to drill seeding with mulch and fertilizer.
Watering and maintenance included.
0056 Hydro-Seed with Flexible Growth Medium SY Contains all work (labor, material and equipment) required to place material. Watering and maintenance included.
0057 Solid Sod SY Contains all work (labor, material and equipment) required to place sod. Watering and maintenance included.
0058 Manhole / Inlet Cleaning & Sealing EA Contains all work (labor, material and equipment) required to remove sediment and debris.
0059 Pipe Desilting LF Contains all work (labor, material and equipment) required to remove sediment and debris. Unit of measure based on linear foot and pipe diameter as contained in sub-items.
0060 Pipe Joint Clean and Repair EA Contains all work (labor, material, equipment, excavation, bedding and backfill) required to clean, prepare, and repair joint with geotextile fabric and concrete collar. Unit of measure based per joint and diameter as contained in sub-items.
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
Attachment 3- Line item description
0061 Reinforced Concrete Pipe, Round LF Contains all work (labor, material, equipment, excavation, testing, and backfill) required to install Class III concrete pipe. Not related to other items.
Unit of measurement based on linear foor and diameter as contained in sub-items.
0062 Reinforced Concrete Pipe, Elliptical LF Contains all work (labor, material, equipment, excavation, bedding, testing, and backfill) required to install Class III concrete pipe. Not related to other items. Unit of measurement based on linear foor and diameter as contained in sub-items.
0063 Reinforced Concrete Structures EA Contains all work (labor, material, equipment, excavation, bedding, testing and backfill) required to install pre-cast concrete structures with cast iron grate or ring and cover. Not related to other items. Unit of measurement based structure type as contained in sub-items.
0064 Mitered End Section, Round Pipe EA Contains all work (labor, material and equipment) required to construct mitered end section.
0065 Mitered End Section, Elliptical Pipe EA Contains all work (labor, material and equipment) required to construct mitered end section.
0066 Rip-Rap w/ Geotextile Fabric TN Contains all work (labor, material, transport and equipment) required to install rip-rap.
0067 Manhole / Inlet, Adjust EA Contains all work (labor, material and equipment) required to modify concrete manhole and inlet resulting from grade adjustments.
0068 Valve Box / Hand Hole, Adjust EA Contains all work (labor, material and equipment) required to modify cast iron valve box and hand hole resulting from grade adjustments.
0069 Replace Manhole Cover/Inlet Grate EA Contains all work (labor, material and equipment) required to replace cast iron grate and/or ring and cover resulting from damage or missing from structure.
0070 Utility Duct LF Contains all work (labor, material equipment, excavation and backfill) required to construct reinforced concrete duct bank. Not related to other items.
0071 Weekend / Night Work (% of project required) JB Applied when outlined in the SOW based requiremet from Government for emergency, night, and/or weekend work due to mission and operational conflicts. Unit of measure is based per job (task order) and percent of work determined to be performed outside standard hours.
SECTION 01 31 13 PROJECT COORDINATION
SECTION 33 71 00 - UNDEGROUND UTILITY DUCTDRAFT
Attachment 3- Line item description
0072 Bonding JB Unit of measure per job (task order) and percent of total direct project cost
0073 Mobilization / Demobilization (Task ≤ $300K)
JB * SEE NOTE
0074 Mobilization / Demobilization (Task > $300K)
JB * SEE NOTE
* Contains all work (labor, material and equipment) required to mobilize and de-mobilize construction equipment.
Unit of measure based per job (task order) and cost for performing task contained in sub-item for individual task according to threshold. Examples include 1) concrete pavement and storm sewer project include sub-item, 2) asphalt shoulder replacement include sub-item, 3) utility cut and patch in asphalt pavement do not include sub-item, 4) mill and overlay runway include sub-item, 5) slurry seal overrun inlcude sub-item, rubber and paint removal for runway with re-painting include sub-item, 6) paint pavement markings for pavement affected by entire taxiway full depth replacement include sub-item, 7) paint section pavement affected by concrete slab replacement do not included sub-item. Multiple moblizations can occur based on required tasks contained in SOW and task order.
Dollar threshold based on individual task related to mobilization and not based on task order total
SECTION 01 71 13 - MOBILIZATION
SECTION 01 31 13.90 PERFORMANCE BOND
Descriptions
File details come from the government source that posted it. Updated .