Attachment_2 _Bid_Schedule_(DRAFT).pdf
PDF 791 KB Posted
- Attached to
- Airfield Civil Works IDIQ Federal contract opportunity
- Solicitation number
- FA4819-15-B-0001
About this file
THE ATTACHED BID SCHEDULE IS A DRAFT BID SCHEDULE. THE FINAL BID SCHEDULE WILL BE POSTED WITH THE FINAL SOLICITATION.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Airfield Civil Works IDIQ Tyndall Air Force Base Base Year
Attachment 2- Bid Schedule
ITEM DESCRIPTION UNITS EST. QTY UNIT PRICE EST. TOTAL
0001 Geotechnical, Exploratory Borings with Report and Recommendations EA 12 -$
0002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation EA 8 -$
Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services AC 33 -$
0004 Surveying, Construction Layout DAY 15 -$ 0005 Surveying, Topographic/Specific Purpose HR 140 -$ 0006 Engineering, Professional Services HR 112 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24"- ≤ 48" Diameter LF 0 -$ AC > 48" Diameter/ Box Culvert LF 0 -$
0008 Escorts WK 40 -$
0009 Vacuum Truck DAY 295 -$
0010 Low Profile Lighted Barricade WK 2448 -$
0011 Saw Cut Asphalt, ≤ 4 Inches LF 3375 -$ AA Dowel Rod Reinforced LF-IN 103408 -$ AB Non-Reinforced LF-IN 103408 -$
AA ≤ 2 inch avg depth SY 0 -$ AB > 2 and < 4 avg depth SY 0 -$ AC ≥ 4 inch avg depth SY 0 -$
AA ≤ 3 Inches (Saw Cut Not Included) SY 23760 -$ AB > 3 Inches, Addition Per Inch SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 12150 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 12150 -$
0017 Excavation, exist. base and/or subgrade material CY 4820 -$ 0018 Demolition and Removal, Storm Structure EA 3 -$ AA ≤ 24" Diameter LF 100 -$ AB > 24 " and ≤ 48" Diameter LF 50 -$ AC > 48" Diameter/ Box Culvert LF 50 -$
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
Asphalt Milling
Saw Cut Concrete Pavement
SECTION 02 41 00 - DEMOLITION
SECTION 01 56 23 - TEMPORARY BARRICADES
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
SECTION 01 31 13.20 - FIELD PERSONNEL
Video Inspection
Demolition and Removal, Storm Pipe
Demolition and Excavation of Concrete (9 to 14 Inches)
Demolition and Excavation of Concrete (6 to 9 Inches)
Demolition and Excavation of Asphalt
DRAFT
Attachment 2- Bid Schedule
0020 Mooring Anchor w/ Static Grounding EA 0 -$
0021 Welded Wire Fabric LB 2400 -$ AA Installed, one end drilled and grouted into existing PCC, other end new placed PCC EA 7636 -$ AB Installed, both ends in new placed PCC EA 7636 -$
AA Off-Base source CY 88642 -$ AB On-Base source CY 1275 -$
0024 Earthwork, Excavation Soil CY 2838 -$ AA Off-Base CY 35857 -$ AB On-Base CY 26620 -$
0026 Top Soil Stripping CY 26620 -$
0027 Open Trench Dewatering MONTH 6 $0.00 0028 Wellpoint Dewatering LFM 2500 $0.00
0029 Sediment Barrier LF 1000 -$ 0030 Floating Turbidity Barrier LF 200 -$ 0031 Inlet Protection System EA 50 -$ 0032 Soil Tracking Prevention Device EA 1 -$
0033 Paint Removal SF 27304 -$ 0034 Rubber Removal SF 514060 -$
AA Quantity ≤ 500 LF LF 0 -$ AB Quantity > 500 LF to 1000 LF LF 0 -$ AC Quantity > 1000 LF to 5000 LF LF 0 -$ AD Quantity > 5000 LF LF 0 -$
0036 Rout and Seal Crack Add Per 1/2" Depth LF 0 -$
0037 Route, Clean and Reseal Joint, Concrete Pavement LF 0 -$
0038 Route, Clean and Reseal Random Cracks, Concrete Pavement LF 0 -$
0039 Spalled Joint Repair, Partial Depth SF 0 -$ 0040 Corner Break / Spalled Joint Repair, Full Depth SF 1683 -$ 0041 Grooving PCC Pavement SF 37561 -$ 0042 Crushing PCC Pavement TON 0 -$
AA Off-Base Source SY 0 -$ AB On-Base Source SY 29046 -$
0044 Type B Stabilization SY 0 -$ 0045 Base Course / Subgrade Preparation SY 32489 -$
0046 Asphalt Pavement, PG 76-22 TN 2370 -$ 0047 Asphalt Pavement TN 0 -$
Dowels, 1" x 20"
SECTION 03 20 20 - CONCRETE REINFORCING
SECTION 32 12 16 - ASPHALT PAVEMENT
Base Course Group 4, In-Place
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
Asphalt Pavement, Cleaning and Seal Random Cracks
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 31 23 19 - DEWATERING
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
Transport, Demolition / Excavated Materials
Eathwork, In-Place Fill Soil
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 31 00 00 - EARTHWORK
Attachment 2- Bid Schedule
0048 Asphalt Slurry Seal SY 180472 -$
AA 6" depth, ≤ 1,000 SY SY 0 -$ AB 6" depth, > 1,000 SY and ≤ 5,000 SY SY 0 -$ AC 6" depth, > 5,000 SY SY 6622 -$ AD Addition Per Inch > 6" SY 119280 -$
0050 Concrete Pavement Saw Cut Joints LF 22630 -$
0051 Joint Filler, Expansion Board LF 11180 -$ 0052 Joint Sealant, Pre-Formed Elastometric LF 22360 -$ 0053 Joint Sealant, Silicone LF 0 -$
AA Truck/Palletized Mounted Operation SF 137325 -$ AB Walk Behind/Self-Propelled Operation SF 23740 -$ AC Stencilled Handwork SF 10930 -$
0055 Seed and Mulch, Drilled SY 25600 -$ 0056 Hydro-Seed with Flexible Growth Medium SY 159720 -$ 0057 Solid Sod SY 0 -$
0058 Manhole / Inlet Cleaning & Sealing EA 0 -$ AA ≤ 24" Diameter LF 1000 -$ AB > 24" and ≤ 48" Diameter LF 500 -$ AC > 48" Diameter LF 0 -$ AD Box Culvert LF 0 -$
AA ≤ 24" Diameter EA 0 -$ AB > 24" and ≤ 48" Diameter EA 0 -$ AC > 48" Diameter EA 0 -$ AD Box Culvert EA 0 -$
AA 18" Diameter LF 200 -$ AB 24" Diameter LF 250 -$ AC 36" Diameter LF 300 -$ AD 48" Diameter LF 300 -$
AA 18" Elliptical LF 5040 -$ AB 24" Elliptical LF 925 -$ AC 36" Elliptical LF 1605 -$ AD 48" Elliptical LF 100 -$
AA Manhole, Cast Iron Ring and Cover EA 5 -$ AC Type C, D, and E Inlet with Cast Grate EA 30 -$ AE Type H Inlet with Cast Iron Grate EA 5 -$
AA Mitered End Section, 18" Round EA 0 -$ AB Mitered End Section, 24" Round EA 0 -$ AC Mitered End Section, 36" Round EA 0 -$ AD Mitered End Section, 48" Round EA 0 -$
SECTION 32 13 13 - CONCRETE PAVEMENT
Mitered End Section, Elliptical Pipe
Mitered End Section, Round Pipe
Reinforced Concrete Structures
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
Pavement Marking
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
Portland Cement Concrete
Reinforced Concrete Pipe, Elliptical
Reinforced Concrete Pipe, Round
Pipe Joint Clean and Repair
SECTION 32 12 36.13 - ASPHALT EMULSION SEALER
Pipe Desilting
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
Attachment 2- Bid Schedule
AA Mitered End Section, 18" Elliptical EA 0 -$ AB Mitered End Section, 24" Elliptical EA 0 -$ AC Mitered End Section, 36" Elliptical EA 4 -$ AD Mitered End Section, 48" Elliptical EA 0 -$
0066 Rip-Rap w/ Geotextile Fabric TN 10 -$ 0067 Manhole / Inlet, Adjust EA 3 -$ 0068 Valve Box / Hand Hole, Adjust EA 0 -$ 0069 Replace Manhole Cover/Inlet Grate EA 0 -$
0070 Utility Duct LF 0 -$
0071 Weekend / Night Work (% of project required) JB 0.5 % =
0072 Bonding JB 1 % =
AA Concrete, Grading, and Drainage JB 1 -$ AB Asphalt JB 1 -$ AC Milling JB 1 -$ AD Slurry Seal JB 1 -$ AE Paint / Rubber Removal JB 2 -$
AA Concrete, Grading, and Drainage JB 1 -$ AB Asphalt JB 0 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 0 -$
-$ TOTAL
Mobilization / Demobilization (Task > $300K)
Mobilization / Demobilization (Task ≤ $300K)
SECTION 01 71 13 - MOBILIZATION
SUBTOTAL
SUBTOTAL
SECTION 01 31 13.90 PERFORMANCE BOND
SECTION 01 31 13 PROJECT COORDINATION
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
Option Year 1
Attachment 2- Bid Schedule
ITEM DESCRIPTION UNITS EST. QTY UNIT PRICE EST. TOTAL
1001 Geotechnical, Exploratory Borings with Report and Recommendations EA 0 -$
1002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation EA 0 -$
Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services AC 0 -$
1004 Surveying, Construction Layout DAY 18 -$ 1005 Surveying, Topographic/Specific Purpose HR 158 -$ 1006 Engineering, Professional Services HR 120 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24"- ≤ 48" Diameter LF 0 -$ AC > 48" Diameter/ Box Culvert LF 0 -$
1008 Escorts WK 40 -$
1009 Vacuum Truck DAY 455 -$
1010 Low Profile Lighted Barricade WK 5328 -$
1011 Saw Cut Asphalt, ≤ 4 Inches LF 0 -$ AA Dowel Rod Reinforced LF-IN 51318 -$ AB Non-Reinforced LF-IN 51318 -$
AA ≤ 2 inch avg depth SY 0 -$ AB > 2 and < 4 avg depth SY 78667 -$ AC ≥ 4 inch avg depth SY 0 -$
AA ≤ 3 Inches (Saw Cut Not Included) SY 1300 -$ AB > 3 Inches, Addition Per Inch SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 5445 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 8333 -$ AF Quantity ≥ 10,000 SY SY 10526 -$
1017 Excavation, exist. base and/or subgrade material CY 50618 -$ 1018 Demolition and Removal, Storm Structure EA 0 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24 " and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter/ Box Culvert LF 0 -$
Saw Cut Concrete Pavement
Asphalt Milling
Demolition and Excavation of Asphalt
Demolition and Excavation of Concrete (6 to 9 Inches)
Demolition and Removal, Storm Pipe
Demolition and Excavation of Concrete (9 to 14 Inches)
SECTION 02 41 00 - DEMOLITION
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
Video Inspection
SECTION 01 31 13.20 - FIELD PERSONNEL
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
SECTION 01 56 23 - TEMPORARY BARRICADES
Attachment 2- Bid Schedule
1020 Mooring Anchor w/ Static Grounding EA 150 -$
1021 Welded Wire Fabric LB 7850 -$ AA Installed, one end drilled and grouted into existing PCC, other end new placed PCC EA 24880 -$ AB Installed, both ends in new placed PCC EA 24880 -$
AA Off-Base source CY 5890 -$ AB On-Base source CY 0 -$
1024 Earthwork, Excavation Soil CY 7278 -$ AA Off-Base CY 14999 -$ AB On-Base CY 7084 -$
1026 Top Soil Stripping CY 0 -$
1027 Open Trench Dewatering MONTH 0 -$ 1028 Wellpoint Dewatering LFM 0 -$
1029 Sediment Barrier LF 0 -$ 1030 Floating Turbidity Barrier LF 0 -$ 1031 Inlet Protection System EA 0 -$ 1032 Soil Tracking Prevention Device EA 0 -$
1033 Paint Removal SF 27309 -$ 1034 Rubber Removal SF 514030 -$
AA Quantity ≤ 500 LF LF 0 -$ AB Quantity > 500 LF to 1000 LF LF 0 -$ AC Quantity > 1000 LF to 5000 LF LF 0 -$ AD Quantity > 5000 LF LF 0 -$
1036 Rout and Seal Crack Add Per 1/2" Depth LF 0 -$
1037 Route, Clean and Reseal Joint, Concrete Pavement LF 0 -$
1038 Route, Clean and Reseal Random Cracks, Concrete Pavement LF 0 -$
1039 Spalled Joint Repair, Partial Depth SF 0 -$ 1040 Corner Break / Spalled Joint Repair, Full Depth SF 0 -$ 1041 Grooving PCC Pavement SF 708000 -$ 1042 Crushing PCC Pavement TON 2100 -$
AA Off-Base Source SY 30000 -$ AB On-Base Source SY 0 -$
1044 Type B Stabilization SY 0 -$ 1045 Base Course / Subgrade Preparation SY 30000 -$
1046 Asphalt Pavement, PG 76-22 TN 13110 -$ 1047 Asphalt Pavement TN 0 -$
SECTION 32 12 16 - ASPHALT PAVEMENT
Base Course Group 4, In-Place
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
Dowels, 1" x 20"
SECTION 03 20 20 - CONCRETE REINFORCING
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
Asphalt Pavement, Cleaning and Seal Random Cracks
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 31 23 19 - DEWATERING
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
Transport, Demolition / Excavated Materials
Eathwork, In-Place Fill Soil
SECTION 31 00 00 - EARTHWORK
Attachment 2- Bid Schedule
1048 Asphalt Slurry Seal SY 0 -$
AA 6" depth, ≤ 1,000 SY SY 0 -$ AB 6" depth, > 1,000 SY and ≤ 5,000 SY SY 0 -$ AC 6" depth, > 5,000 SY SY 25666 -$ AD Addition Per Inch > 6" SY 153998 -$
1050 Concrete Pavement Saw Cut Joints LF 144000 -$
1051 Joint Filler, Expansion Board LF 9760 -$ 1052 Joint Sealant, Pre-Formed Elastometric LF 17520 -$ 1053 Joint Sealant, Silicone LF 36000 -$
AA Truck/Palletized Mounted Operation SF 216475 -$ AB Walk Behind/Self-Propelled Operation SF 109890 -$ AC Stencilled Handwork SF 32800 -$
1055 Seed and Mulch, Drilled SY 70000 -$ 1056 Hydro-Seed with Flexible Growth Medium SY 0 -$ 1057 Solid Sod SY 0 -$
1058 Manhole / Inlet Cleaning & Sealing EA 0 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24" and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter LF 0 -$ AD Box Culvert LF 0 -$
AA ≤ 24" Diameter EA 0 -$ AB > 24" and ≤ 48" Diameter EA 0 -$ AC > 48" Diameter EA 0 -$ AD Box Culvert EA 0 -$
AA 18" Diameter LF 0 -$ AB 24" Diameter LF 0 -$ AC 36" Diameter LF 0 -$ AD 48" Diameter LF 0 -$
AA 18" Elliptical LF 0 -$ AB 24" Elliptical LF 0 -$ AC 36" Elliptical LF 0 -$ AD 48" Elliptical LF 0 -$
AA Manhole, Cast Iron Ring and Cover EA 0 -$ AC Type C, D, and E Inlet with Cast Grate EA 0 -$ AE Type H Inlet with Cast Iron Grate EA 0 -$
AA Mitered End Section, 18" Round EA 0 -$ AB Mitered End Section, 24" Round EA 0 -$ AC Mitered End Section, 36" Round EA 0 -$ AD Mitered End Section, 48" Round EA 0 -$
SECTION 32 12 36.13 - ASPHALT EMULSION SEALER
Mitered End Section, Elliptical Pipe
Mitered End Section, Round Pipe
Reinforced Concrete Structures
Reinforced Concrete Pipe, Elliptical
Reinforced Concrete Pipe, Round
Pipe Joint Clean and Repair
Pipe Desilting
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
Pavement Marking
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
Portland Cement Concrete
SECTION 32 13 13 - CONCRETE PAVEMENT
Attachment 2- Bid Schedule
AA Mitered End Section, 18" Elliptical EA 0 -$ AB Mitered End Section, 24" Elliptical EA 0 -$ AC Mitered End Section, 36" Elliptical EA 0 -$ AD Mitered End Section, 48" Elliptical EA 0 -$
1066 Rip-Rap w/ Geotextile Fabric TN 0 -$ 1067 Manhole / Inlet, Adjust EA 0 -$ 1068 Valve Box / Hand Hole, Adjust EA 0 -$ 1069 Replace Manhole Cover/Inlet Grate EA 0 -$
1070 Utility Duct LF 300 -$
1071 Weekend / Night Work (% of project required) JB 0.5 % =
1072 Bonding JB 1 % =
AA Concrete, Grading, and Drainage JB 0 -$ AB Asphalt JB 1 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 4 -$
AA Concrete, Grading, and Drainage JB 3 -$ AB Asphalt JB 1 -$ AC Milling JB 1 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 0 -$
-$ TOTAL
SECTION 01 71 13 - MOBILIZATION
SECTION 01 31 13.90 PERFORMANCE BOND
SECTION 01 31 13 PROJECT COORDINATION
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
SUBTOTAL
SUBTOTAL
Option Year 2
Attachment 2- Bid Schedule
ITEM DESCRIPTION UNITS EST. QTY UNIT PRICE EST. TOTAL
2001 Geotechnical, Exploratory Borings with Report and Recommendations EA 10 -$
2002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation EA 5 -$
Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services AC 29 -$
2004 Surveying, Construction Layout DAY 30 -$ 2005 Surveying, Topographic/Specific Purpose HR 320 -$ 2006 Engineering, Professional Services HR 310 -$ AA ≤ 24" Diameter LF 1000 -$ AB > 24"- ≤ 48" Diameter LF 20000 -$ AC > 48" Diameter/ Box Culvert LF 12000 -$
2008 Escorts WK 42 -$
2009 Vacuum Truck DAY 384 -$
2010 Low Profile Lighted Barricade WK 52930 -$
2011 Saw Cut Asphalt, ≤ 4 Inches LF 200 -$ AA Dowel Rod Reinforced LF-IN 34830 -$ AB Non-Reinforced LF-IN 34830 -$
AA ≤ 2 inch avg depth SY 0 -$ AB > 2 and < 4 avg depth SY 0 -$ AC ≥ 4 inch avg depth SY 17778 -$
AA ≤ 3 Inches (Saw Cut Not Included) SY 1928 -$ AB > 3 Inches, Addition Per Inch SY 1928 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 2000 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 22500 -$
2017 Excavation, exist. base and/or subgrade material CY 3734 -$ 2018 Demolition and Removal, Storm Structure EA 2 -$ AA ≤ 24" Diameter LF 100 -$ AB > 24 " and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter/ Box Culvert LF 0 -$
Saw Cut Concrete Pavement
Asphalt Milling
Demolition and Excavation of Asphalt
Demolition and Excavation of Concrete (6 to 9 Inches)
Demolition and Excavation of Concrete (9 to 14 Inches)
Demolition and Removal, Storm Pipe
SECTION 02 41 00 - DEMOLITION
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
Video Inspection
SECTION 01 31 13.20 - FIELD PERSONNEL
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
Attachment 2- Bid Schedule
2020 Mooring Anchor w/ Static Grounding EA 0 -$
2021 Welded Wire Fabric LB 4000 -$ AA Installed, one end drilled and grouted into existing PCC, other end new placed PCC EA 12000 -$ AB Installed, both ends in new placed PCC EA 12000 -$
AA Off-Base source CY 89230 -$ AB On-Base source CY 20000 -$
2024 Earthwork, Excavation Soil CY 14618 -$ AA Off-Base CY 32859 -$ AB On-Base CY 7500 -$
2026 Top Soil Stripping CY 23877 -$
2027 Open Trench Dewatering MONTH 3 $0.00 2028 Wellpoint Dewatering LFM 5000 $0.00
2029 Sediment Barrier LF 5000 -$ 2030 Floating Turbidity Barrier LF 100 -$ 2031 Inlet Protection System EA 40 -$ 2032 Soil Tracking Prevention Device EA 1 -$
2033 Paint Removal SF 27309 -$ 2034 Rubber Removal SF 514060 -$
AA Quantity ≤ 500 LF LF 0 -$ AB Quantity > 500 LF to 1000 LF LF 0 -$ AC Quantity > 1000 LF to 5000 LF LF 0 -$ AD Quantity > 5000 LF LF 0 -$
2036 Rout and Seal Crack Add Per 1/2" Depth LF 0 -$
2037 Route, Clean and Reseal Joint, Concrete Pavement LF 0 -$
2038 Route, Clean and Reseal Random Cracks, Concrete Pavement LF 0 -$
2039 Spalled Joint Repair, Partial Depth SF 0 -$ 2040 Corner Break / Spalled Joint Repair, Full Depth SF 0 -$ 2041 Grooving PCC Pavement SF 0 -$ 2042 Crushing PCC Pavement TON 11400 -$
AA Off-Base Source SY 62500 -$ AB On-Base Source SY 7 -$
2044 Type B Stabilization SY 0 -$ 2045 Base Course / Subgrade Preparation SY 62507 -$
2046 Asphalt Pavement, PG 76-22 TN 0 -$ 2047 Asphalt Pavement TN 1956 -$
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
SECTION 31 23 19 - DEWATERING
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
Asphalt Pavement, Cleaning and Seal Random Cracks
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
Base Course Group 4, In-Place
SECTION 32 12 16 - ASPHALT PAVEMENT
Transport, Demolition / Excavated Materials
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 03 20 20 - CONCRETE REINFORCING
Dowels, 1" x 20"
SECTION 31 00 00 - EARTHWORK
Eathwork, In-Place Fill Soil
Attachment 2- Bid Schedule
2048 Asphalt Slurry Seal SY 0 -$
AA 6" depth, ≤ 1,000 SY SY 0 -$ AB 6" depth, > 1,000 SY and ≤ 5,000 SY SY 0 -$ AC 6" depth, > 5,000 SY SY 12500 -$ AD Addition Per Inch > 6" SY 75000 -$
2050 Concrete Pavement Saw Cut Joints LF 0 -$
2051 Joint Filler, Expansion Board LF 8100 -$ 2052 Joint Sealant, Pre-Formed Elastometric LF 16200 -$ 2053 Joint Sealant, Silicone LF 0 -$
AA Truck/Palletized Mounted Operation SF 172325 -$ AB Walk Behind/Self-Propelled Operation SF 57640 -$ AC Stencilled Handwork SF 4700 -$
2055 Seed and Mulch, Drilled SY 169064 -$ 2056 Hydro-Seed with Flexible Growth Medium SY 0 -$ 2057 Solid Sod SY 35960 -$
2058 Manhole / Inlet Cleaning & Sealing EA 0 -$ AA ≤ 24" Diameter LF 1350 -$ AB > 24" and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter LF 0 -$ AD Box Culvert LF 0 -$
AA ≤ 24" Diameter EA 0 -$ AB > 24" and ≤ 48" Diameter EA 0 -$ AC > 48" Diameter EA 0 -$ AD Box Culvert EA 0 -$
AA 18" Diameter LF 0 -$ AB 24" Diameter LF 0 -$ AC 36" Diameter LF 0 -$ AD 48" Diameter LF 0 -$
AA 18" Elliptical LF 4385 -$ AB 24" Elliptical LF 803 -$ AC 36" Elliptical LF 1395 -$ AD 48" Elliptical LF 0 -$
AA Manhole, Cast Iron Ring and Cover EA 0 -$ AC Type C, D, and E Inlet with Cast Grate EA 29 -$ AE Type H Inlet with Cast Iron Grate EA 2 -$
AA Mitered End Section, 18" Round EA 0 -$ AB Mitered End Section, 24" Round EA 0 -$ AC Mitered End Section, 36" Round EA 0 -$ AD Mitered End Section, 48" Round EA 0 -$
2065 Mitered End Section, Elliptical Pipe
Mitered End Section, Round Pipe
Portland Cement Concrete
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
Pavement Marking
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
Pipe Desilting
Pipe Joint Clean and Repair
Reinforced Concrete Pipe, Round
Reinforced Concrete Pipe, Elliptical
Reinforced Concrete Structures
SECTION 32 13 13 - CONCRETE PAVEMENT
SECTION 32 12 36.13 - ASPHALT EMULSION SEALER
Attachment 2- Bid Schedule
AA Mitered End Section, 18" Elliptical EA 0 -$ AB Mitered End Section, 24" Elliptical EA 0 -$ AC Mitered End Section, 36" Elliptical EA 1 -$ AD Mitered End Section, 48" Elliptical EA 0 -$
2066 Rip-Rap w/ Geotextile Fabric TN 0 -$ 2067 Manhole / Inlet, Adjust EA 0 -$ 2068 Valve Box / Hand Hole, Adjust EA 3 -$ 2069 Replace Manhole Cover/Inlet Grate EA 0 -$
2070 Utility Duct LF 300 -$
2071 Weekend / Night Work (% of project required) JB 0.5 % =
2072 Bonding JB 1 % =
AA Concrete, Grading, and Drainage JB 1 -$ AB Asphalt JB 0 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 3 -$
AA Concrete, Grading, and Drainage JB 2 -$ AB Asphalt JB 1 -$ AC Milling JB 1 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 0 -$
SECTION 01 71 13 - MOBILIZATION
Mobilization / Demobilization (Task ≤ $300K)
Mobilization / Demobilization (Task > $300K)
TOTAL
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
SUBTOTAL
SECTION 01 31 13 PROJECT COORDINATION
SECTION 01 31 13.90 PERFORMANCE BOND
Option Year 3
Attachment 2- Bid Schedule
ITEM DESCRIPTION UNITS EST. QTY UNIT PRICE EST. TOTAL
3001 Geotechnical, Exploratory Borings with Report and Recommendations EA 0 -$
3002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation EA 0 -$
Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services AC 0 -$
3004 Surveying, Construction Layout DAY 42 -$ 3005 Surveying, Topographic/Specific Purpose HR 318 -$ 3006 Engineering, Professional Services HR 220 -$ AA ≤ 24" Diameter LF 1200 -$ AB > 24"- ≤ 48" Diameter LF 1500 -$ AC > 48" Diameter/ Box Culvert LF 4200 -$
3008 Escorts WK 46 -$
3009 Vacuum Truck DAY 749 -$
3010 Low Profile Lighted Barricade WK 7558 -$
3011 Saw Cut Asphalt, ≤ 4 Inches LF 0 -$ AA Dowel Rod Reinforced LF-IN 72498 -$ AB Non-Reinforced LF-IN 72498 -$
AA ≤ 2 inch avg depth SY 0 -$ AB > 2 and < 4 avg depth SY 0 -$ AC ≥ 4 inch avg depth SY 0 -$
AA ≤ 3 Inches (Saw Cut Not Included) SY 10200 -$ AB > 3 Inches, Addition Per Inch SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 5445 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 0 -$
AA Quantity < 500 SY SY 0 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 0 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 39167 -$
3017 Excavation, exist. base and/or subgrade material CY 13589 -$ 3018 Demolition and Removal, Storm Structure EA 35 -$ AA ≤ 24" Diameter LF 1200 -$ AB > 24 " and ≤ 48" Diameter LF 1500 -$
Saw Cut Concrete Pavement
Asphalt Milling
Demolition and Excavation of Asphalt
Demolition and Excavation of Concrete (6 to 9 Inches)
Demolition and Excavation of Concrete (9 to 14 Inches)
Demolition and Removal, Storm Pipe
SECTION 02 41 00 - DEMOLITION
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
Video Inspection
SECTION 01 31 13.20 - FIELD PERSONNEL
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
Attachment 2- Bid Schedule
AC > 48" Diameter/ Box Culvert LF 4200 -$
3020 Mooring Anchor w/ Static Grounding EA 0 -$
3021 Welded Wire Fabric LB 8850 -$ AA Installed, one end drilled and grouted into existing PCC, other end new placed PCC EA 23380 -$ AB Installed, both ends in new placed PCC EA 23380 -$
AA Off-Base source CY 25290 -$ AB On-Base source CY 5000 -$
3024 Earthwork, Excavation Soil CY 25290 -$ AA Off-Base CY 23416 -$ AB On-Base CY 15612 -$
3026 Top Soil Stripping CY 0 -$
3027 Open Trench Dewatering MONTH 0 $0.00 3028 Wellpoint Dewatering LFM 0 $0.00
3029 Sediment Barrier LF 1000 -$ 3030 Floating Turbidity Barrier LF 150 -$ 3031 Inlet Protection System EA 35 -$ 3032 Soil Tracking Prevention Device EA 3 -$
3033 Paint Removal SF 27309 -$ 3034 Rubber Removal SF 514060 -$
AA Quantity ≤ 500 LF LF 0 -$ AB Quantity > 500 LF to 1000 LF LF 0 -$ AC Quantity > 1000 LF to 5000 LF LF 0 -$ AD Quantity > 5000 LF LF 0 -$
3036 Rout and Seal Crack Add Per 1/2" Depth LF 0 -$
3037 Route, Clean and Reseal Joint, Concrete Pavement LF 0 -$
3038 Route, Clean and Reseal Random Cracks, Concrete Pavement LF 0 -$
3039 Spalled Joint Repair, Partial Depth SF 0 -$ 3040 Corner Break / Spalled Joint Repair, Full Depth SF 0 -$ 3041 Grooving PCC Pavement SF 0 -$ 3042 Crushing PCC Pavement TON 5100 -$
AA Off-Base Source SY 30167 -$ AB On-Base Source SY 16667 -$
3044 Type B Stabilization SY 22500 -$ 3045 Base Course / Subgrade Preparation SY 46834 -$
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
SECTION 31 23 19 - DEWATERING
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
Asphalt Pavement, Cleaning and Seal Random Cracks
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
Base Course Group 4, In-Place
SECTION 32 12 16 - ASPHALT PAVEMENT
Transport, Demolition / Excavated Materials
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 03 20 20 - CONCRETE REINFORCING
Dowels, 1" x 20"
SECTION 31 00 00 - EARTHWORK
Attachment 2- Bid Schedule
3046 Asphalt Pavement, PG 76-22 TN 620 -$ 3047 Asphalt Pavement TN 500 -$
3048 Asphalt Slurry Seal SY 0 -$
AA 6" depth, ≤ 1,000 SY SY 0 -$ AB 6" depth, > 1,000 SY and ≤ 5,000 SY SY 0 -$ AC 6" depth, > 5,000 SY SY 37250 -$ AD Addition Per Inch > 6" SY 221500 -$
3050 Concrete Pavement Saw Cut Joints LF 26000 -$
3051 Joint Filler, Expansion Board LF 16860 -$ 3052 Joint Sealant, Pre-Formed Elastometric LF 33720 -$ 3053 Joint Sealant, Silicone LF 0 -$
AA Truck/Palletized Mounted Operation SF 138825 -$ AB Walk Behind/Self-Propelled Operation SF 65140 -$ AC Stencilled Handwork SF 3740 -$
3055 Seed and Mulch, Drilled SY 40000 -$ 3056 Hydro-Seed with Flexible Growth Medium SY 0 -$ 3057 Solid Sod SY 0 -$
3058 Manhole / Inlet Cleaning & Sealing EA 20 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24" and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter LF 0 -$ AD Box Culvert LF 0 -$
AA ≤ 24" Diameter EA 0 -$ AB > 24" and ≤ 48" Diameter EA 0 -$ AC > 48" Diameter EA 0 -$ AD Box Culvert EA 0 -$
AA 18" Diameter LF 0 -$ AB 24" Diameter LF 0 -$ AC 36" Diameter LF 0 -$ AD 48" Diameter LF 0 -$
AA 18" Elliptical LF 0 -$ AB 24" Elliptical LF 0 -$ AC 36" Elliptical LF 0 -$ AD 48" Elliptical LF 0 -$
AA Manhole, Cast Iron Ring and Cover EA 10 -$ AC Type C, D, and E Inlet with Cast Grate EA 4 -$ AE Type H Inlet with Cast Iron Grate EA 4 -$
AA Mitered End Section, 18" Round EA 2 -$ AB Mitered End Section, 24" Round EA 2 -$
Mitered End Section, Round Pipe
Portland Cement Concrete
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
Pavement Marking
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
Pipe Desilting
Pipe Joint Clean and Repair
Reinforced Concrete Pipe, Round
Reinforced Concrete Pipe, Elliptical
Reinforced Concrete Structures
SECTION 32 13 13 - CONCRETE PAVEMENT
Attachment 2- Bid Schedule
AC Mitered End Section, 36" Round EA 2 -$ AD Mitered End Section, 48" Round EA 2 -$
AA Mitered End Section, 18" Elliptical EA 6 -$ AB Mitered End Section, 24" Elliptical EA 6 -$ AC Mitered End Section, 36" Elliptical EA 0 -$ AD Mitered End Section, 48" Elliptical EA 2 -$
3066 Rip-Rap w/ Geotextile Fabric TN 800 -$ 3067 Manhole / Inlet, Adjust EA 0 -$ 3068 Valve Box / Hand Hole, Adjust EA 0 -$ 3069 Replace Manhole Cover/Inlet Grate EA 0 -$
3070 Utility Duct LF 900 -$
3071 Weekend / Night Work (% of project required) JB 0.5 % =
3072 Bonding JB 1 % =
AA Concrete, Grading, and Drainage JB 0 -$ AB Asphalt JB 3 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 4 -$
AA Concrete, Grading, and Drainage JB 4 -$ AB Asphalt JB 0 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 0 -$
SECTION 01 71 13 - MOBILIZATION
Mobilization / Demobilization (Task ≤ $300K)
Mobilization / Demobilization (Task > $300K)
TOTAL
Mitered End Section, Elliptical Pipe
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
SUBTOTAL
SECTION 01 31 13 PROJECT COORDINATION
SECTION 01 31 13.90 PERFORMANCE BOND
Option Year 4
Attachment 2- Bid Schedule
ITEM DESCRIPTION UNITS EST. QTY UNIT PRICE EST. TOTAL
4001 Geotechnical, Exploratory Borings with Report and Recommendations EA 50 -$
4002 Geotechnical, Permeability Soil Test, Addition to Report and Recommendation EA 20 -$
Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services AC 25 -$
4004 Surveying, Construction Layout DAY 37 -$ 4005 Surveying, Topographic/Specific Purpose HR 260 -$ 4006 Engineering, Professional Services HR 310 -$ AA ≤ 24" Diameter LF 15000 -$ AB > 24"- ≤ 48" Diameter LF 10000 -$ AC > 48" Diameter/ Box Culvert LF 10000 -$
4008 Escorts WK 69 -$
4009 Vacuum Truck DAY 725 -$
4010 Low Profile Lighted Barricade WK 2520 -$
4011 Saw Cut Asphalt, ≤ 4 Inches LF 1200 -$ AA Dowel Rod Reinforced LF-IN 25500 -$ AB Non-Reinforced LF-IN 25500 -$
AA ≤ 2 inch avg depth SY 18000 -$ AB > 2 and < 4 avg depth SY 0 -$ AC ≥ 4 inch avg depth SY 0 -$
AA ≤ 3 Inches (Saw Cut Not Included) SY 7700 -$ AB > 3 Inches, Addition Per Inch SY 0 -$
AA Quantity < 500 SY SY 5000 -$ AB Quantity > 500 to 1,000 SY SY 0 -$ AC Quantity > 1,000 to 2,500 SY SY 5000 -$ AD Quantity > 2,500 to 5,000 SY SY 0 -$ AE Quantity > 2,500 to 10,000 SY SY 10625 -$ AF Quantity ≥ 10,000 SY SY 0 -$
AA Quantity < 500 SY SY 4500 -$ AB Quantity > 500 to 1,000 SY SY 4500 -$ AC Quantity > 1,000 to 2,500 SY SY 5000 -$ AD Quantity > 2,500 to 5,000 SY SY 5000 -$ AE Quantity > 2,500 to 10,000 SY SY 0 -$ AF Quantity ≥ 10,000 SY SY 0 -$
4017 Excavation, exist. base and/or subgrade material CY 16000 -$ 4018 Demolition and Removal, Storm Structure EA 0 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24 " and ≤ 48" Diameter LF 0 -$
Saw Cut Concrete Pavement
Asphalt Milling
Demolition and Excavation of Asphalt
Demolition and Excavation of Concrete (6 to 9 Inches)
Demolition and Excavation of Concrete (9 to 14 Inches)
Demolition and Removal, Storm Pipe
SECTION 02 41 00 - DEMOLITION
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
Video Inspection
SECTION 01 31 13.20 - FIELD PERSONNEL
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
Attachment 2- Bid Schedule
AC > 48" Diameter/ Box Culvert LF 0 -$
4020 Mooring Anchor w/ Static Grounding EA 0 -$
4021 Welded Wire Fabric LB 20160 -$ AA Installed, one end drilled and grouted into existing PCC, other end new placed PCC EA 12045 -$ AB Installed, both ends in new placed PCC EA 12045 -$
AA Off-Base source CY 26567 -$ AB On-Base source CY 34000 -$
4024 Earthwork, Excavation Soil CY 31567 -$ AA Off-Base CY 71000 -$ AB On-Base CY 12000 -$
4026 Top Soil Stripping CY 16000 -$
4027 Open Trench Dewatering MONTH 0 $0.00 4028 Wellpoint Dewatering LFM 8000 $0.00
4029 Sediment Barrier LF 0 -$ 4030 Floating Turbidity Barrier LF 0 -$ 4031 Inlet Protection System EA 0 -$ 4032 Soil Tracking Prevention Device EA 0 -$
4033 Paint Removal SF 27309 -$ 4034 Rubber Removal SF 514060 -$
AA Quantity ≤ 500 LF LF 600 -$ AB Quantity > 500 LF to 1000 LF LF 750 -$ AC Quantity > 1000 LF to 5000 LF LF 1250 -$ AD Quantity > 5000 LF LF 10000 -$
4036 Rout and Seal Crack Add Per 1/2" Depth LF 35000 -$
4037 Route, Clean and Reseal Joint, Concrete Pavement LF 10000 -$
4038 Route, Clean and Reseal Random Cracks, Concrete Pavement LF 10000 -$
4039 Spalled Joint Repair, Partial Depth SF 500 -$ 4040 Corner Break / Spalled Joint Repair, Full Depth SF 0 -$ 4041 Grooving PCC Pavement SF 0 -$ 4042 Crushing PCC Pavement TON 1450 -$
AA Off-Base Source SY 24000 -$ AB On-Base Source SY 26000 -$
4044 Type B Stabilization SY 2000 -$ 4045 Base Course / Subgrade Preparation SY 50000 -$
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
SECTION 31 23 19 - DEWATERING
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
Asphalt Pavement, Cleaning and Seal Random Cracks
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
Base Course Group 4, In-Place
SECTION 32 12 16 - ASPHALT PAVEMENT
Transport, Demolition / Excavated Materials
SECTION 03 15 15 - CONCRETE ACCESSORIES
SECTION 03 20 20 - CONCRETE REINFORCING
Dowels, 1" x 20"
SECTION 31 00 00 - EARTHWORK
Attachment 2- Bid Schedule
4046 Asphalt Pavement, PG 76-22 TN 3240 -$ 4047 Asphalt Pavement TN 0 -$
4048 Asphalt Slurry Seal SY 0 -$
AA 6" depth, ≤ 1,000 SY SY 5000 -$ AB 6" depth, > 1,000 SY and ≤ 5,000 SY SY 5000 -$ AC 6" depth, > 5,000 SY SY 5625 -$ AD Addition Per Inch > 6" SY 33750 -$
4050 Concrete Pavement Saw Cut Joints LF 24090 -$
4051 Joint Filler, Expansion Board LF 7000 -$ 4052 Joint Sealant, Pre-Formed Elastometric LF 24090 -$ 4053 Joint Sealant, Silicone LF 0 -$
AA Truck/Palletized Mounted Operation SF 146475 -$ AB Walk Behind/Self-Propelled Operation SF 39890 -$ AC Stencilled Handwork SF 7800 -$
4055 Seed and Mulch, Drilled SY 40000 -$ 4056 Hydro-Seed with Flexible Growth Medium SY 25000 -$ 4057 Solid Sod SY 15000 -$
4058 Manhole / Inlet Cleaning & Sealing EA 10 -$ AA ≤ 24" Diameter LF 0 -$ AB > 24" and ≤ 48" Diameter LF 0 -$ AC > 48" Diameter LF 500 -$ AD Box Culvert LF 250 -$
AA ≤ 24" Diameter EA 50 -$ AB > 24" and ≤ 48" Diameter EA 35 -$ AC > 48" Diameter EA 30 -$ AD Box Culvert EA 10 -$
AA 18" Diameter LF 0 -$ AB 24" Diameter LF 0 -$ AC 36" Diameter LF 0 -$ AD 48" Diameter LF 0 -$
AA 18" Elliptical LF 0 -$ AB 24" Elliptical LF 0 -$ AC 36" Elliptical LF 0 -$ AD 48" Elliptical LF 0 -$
AA Manhole, Cast Iron Ring and Cover EA 0 -$ AC Type C, D, and E Inlet with Cast Grate EA 0 -$ AE Type H Inlet with Cast Iron Grate EA 0 -$
AA Mitered End Section, 18" Round EA 0 -$ AB Mitered End Section, 24" Round EA 0 -$
Mitered End Section, Round Pipe
Portland Cement Concrete
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
Pavement Marking
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
Pipe Desilting
Pipe Joint Clean and Repair
Reinforced Concrete Pipe, Round
Reinforced Concrete Pipe, Elliptical
Reinforced Concrete Structures
SECTION 32 13 13 - CONCRETE PAVEMENT
Attachment 2- Bid Schedule
AC Mitered End Section, 36" Round EA 0 -$ AD Mitered End Section, 48" Round EA 0 -$
AA Mitered End Section, 18" Elliptical EA 0 -$ AB Mitered End Section, 24" Elliptical EA 0 -$ AC Mitered End Section, 36" Elliptical EA 0 -$ AD Mitered End Section, 48" Elliptical EA 0 -$
4066 Rip-Rap w/ Geotextile Fabric TN 1500 -$ 4067 Manhole / Inlet, Adjust EA 0 -$ 4068 Valve Box / Hand Hole, Adjust EA 0 -$ 4069 Replace Manhole Cover/Inlet Grate EA 0 -$
4070 Utility Duct LF 600 -$
4071 Weekend / Night Work (% of project required) JB 0.5 % =
4072 Bonding JB 1 % =
AA Concrete, Grading, and Drainage JB 0 -$ AB Asphalt JB 1 -$ AC Milling JB 0 -$ AD Slurry Seal JB 0 -$ AE Paint / Rubber Removal JB 3 -$
AA Concrete, Grading, and Drainage JB 4 -$ AB Asphalt JB 3 -$ AC Milling JB 0 -$ AD Slurry Seal JB 1 -$ AE Paint / Rubber Removal JB 1 -$
SECTION 01 71 13 - MOBILIZATION
Mobilization / Demobilization (Task ≤ $300K)
Mobilization / Demobilization (Task > $300K)
TOTAL
Mitered End Section, Elliptical Pipe
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
SUBTOTAL
SECTION 01 31 13 PROJECT COORDINATION
SECTION 01 31 13.90 PERFORMANCE BOND
| Base Year |
| Option Year 1 |
| Option Year 2 |
| Option Year 3 |
| Option Year 4 |