Attachment_3 _Line_Item_Descriptions_(16_Jul_15).xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Airfield Civil Works IDIQ Federal contract opportunity
- Solicitation number
- FA4819-15-B-0001
About this file
Attachment 3 Line Item Descriptions (16 Jul 15).
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Descriptions
| ITEM | DESCRIPTION | UNITS | INCLUDED ITEMS, MEASURE AND USAGE |
| SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES | |||
| 0001 | Geotechnical, Exploratory Borings with Report and Recommendations | EA | Contains all work (labor, material and equipment) required to perform geotechnical investigation, soils classification, seasonal high water table determination, and report. Typical boring frequency less than 8 with a depth to 15 feet. Work performed by approved commercial testing laboratory. |
| 0002 | Geotechnical, Permeability Soil Test, Addition to Report and Recommendation | EA | Contains all work (labor, material and equipment) required to perform field and/or laboratory permeability test. Typical frequency less than 3. An addition to Geotechnical Borngs and Report line item. Work performed by approved commercial testing laboratory. |
| 0003 | Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting Services | AC | Contains all work (labor, material and equipment) required to perform wetland delineation, ecological assessment with report, and permitting services to meet requirements for FDEP/USACE Joint Permit associated with wetland disturbance. Work performed by approved environmental firm. |
| 0004 | Surveying, Construction Layout | DAY | Contains all work (labor, material and equipment) required to perform construction layout services. Work performed by approved surveying firm. |
| 0005 | Surveying, Topographic/Specific Purpose | HR | Contains all work (labor, material and equipment) required to perform professional surveying services as indicated on SOW or contract plans. Work performed by approved surveying firm. |
| 0006 | Engineering, Professional Services | HR | Contains all work (labor, material and equipment) required to perform professional engineering services as indicated on SOW or contract plans. Work performed by approved engineering firm. |
| 0007 | Video Inspection | LF | Contains all work (labor, material and equipment) required to perform video inspection services as indicated on SOW or contract plans. Work performed by approved video inspection company. Deliverables include DVD/CD of inspection with report of findings with recommendations. Unit of measure is based on linear foot and pipe diameter contained in sub-items. |
| SECTION 01 31 13.20 - FIELD PERSONNEL | |||
| 0008 | Escorts | WK | Person and vehicle to be escort. Used for escorting personnel and equipment without AF Form 483, Airfield Driving (i.e. Concrete Trucks, Material Deliveries, and etc.). Duration based on time for escort service. |
| SECTION 01 54 39 - CONSTRUCTION EQUIPMENT | |||
| 0009 | Vacuum Truck | DAY | Person and equipment not related to other work. Used for cleaning pavements associated in Provisions for Airfield pavement requirements. Duration based on time for construction activities, vehicles, and equipment that may produce F.O.D. or track debris on Base pavements. |
| SECTION 01 56 23 - TEMPORARY BARRICADES | |||
| 0010 | Low Profile Lighted Barricade | WK | Contains all work required for delivery, installation, maintenance, and removal for each barricade. |
| SECTION 02 41 00 - DEMOLITION | |||
| 0011 | Saw Cut Asphalt, ≤ 4 Inches | LF | Contains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items. |
| 0012 | Saw Cut Concrete Pavement | LF-IN | Contains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items. Unit of measure is linear foot per inch of depth for reinforced or non-reinforced pavement. |
| 0013 | Asphalt Milling | SY | Contains all work (labor, material and equipment) required to perform milling task. Not related to other items. Unit of measure is based on square yard and average depth. |
| 0014 | Demolition and Excavation of Asphalt | SY | Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth. |
| 0015 | Demolition and Excavation of Concrete (6 to 9 Inches) | SY | Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth. |
| 0016 | Demolition and Excavation of Concrete (9 to 14 Inches) | SY | Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth. |
| 0017 | Excavation, exist. base and/or subgrade material | CY | Contains all work (labor, material and equipment) required to excavate base and subgrade during demolition, related to random slab repair and precision excavation to limit damage to adjacent improvements. Not related to mass grading activities or utility installation or other items. |
| 0018 | Demolition and Removal, Storm Structure | EA | Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. |
| 0019 | Demolition and Removal, Storm Pipe | LF | Contains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Unit of measure is based on linear foot and diameter contained in sub-items. |
| SECTION 03 15 15 - CONCRETE ACCESSORIES | |||
| 0020 | Mooring Anchor w/ Static Grounding | EA | Contains all work (labor, material, equipment and testing) required to install mooring anchor with static grounding capabilities in accordance with ETL 12-8 and UFC 3-260-1. |
| SECTION 03 20 20 - CONCRETE REINFORCING | |||
| 0021 | Welded Wire Fabric | LB | Contains all work (labor, material and equipment) required to install welded wire fabric for reinforced and/or irregular concrete slabs. |
| 0022 | Dowels, 1" x 20" | EA | Contains all work (labor, material and equipment) required to install reinforcement dowel. Unit of measure is based on per item and pavement condition contained in sub-items. |
| SECTION 31 00 00 - EARTHWORK | |||
| 0023 | Eathwork, In-Place Fill Soil | CY | Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place fill soil. Unit of measure is based on cubic yard and source contained in sub-items. |
| 0024 | Earthwork, Excavation Soil | CY | Contains all work (labor, material and equipment) required to excavate soil. Removal from site requires transport line item. Not related to soil excavation for utilities. |
| 0025 | Transport, Demolition / Excavated Materials | CY | Contains all work (labor, material, equipment, transport and dump fees, when applicable) required to transport materials. Unit of measure based on cubic yard and final destination. |
| SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING | |||
| 0026 | Top Soiling Stripping | CY | Contains all work (labor, material, transport and equipment) to strip top soil and stockpile, typical removal 4-6 inches. Stockpile for re-use or load to transport truck included. Removal off-site to use to transport line item. |
| SECTION 31 23 19 - DEWATERING | |||
| 0027 | Open Trench Dewatering | MONTH | Contains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for dewatering activities. |
| 0028 | Wellpoint Dewatering | LFM | Contains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for open trench dewatering activities. Unit of measure is linear feet per month. |
| SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL | |||
| 0029 | Sediment Barrier | LF | Contains all work (labor, material, equipment, installation and removal) for structural BMP. |
| 0030 | Floating Turbidity Barrier | LF | Contains all work (labor, material, equipment, installation and removal) for structural BMP. |
| 0031 | Inlet Protection System | EA | Contains all work (labor, material, equipment, installation and removal) for structural BMP. |
| 0032 | Soil Tracking Prevention Device | EA | Contains all work (labor, material, equipment, installation and removal) for structural BMP. |
| SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES | |||
| 0033 | Paint Removal | SF | Contains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item. |
| 0034 | Rubber Removal | SF | Contains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item. |
| SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR | |||
| 0035 | Asphalt Pavement, Cleaning and Seal Random Cracks | LF | Contains all work (labor, material and equipment) required to clean and seal joint. Unit of measure is based on linear foot and quantity contained in sub-items. |
| 0036 | Rout and Seal Crack Add Per 1/2" Depth | LF | Contains all work (labor, material and equipment) required to route crack. Related to cleaning and sealing random cracks. Unit of measure is based on linear foot and depth of route. |
| SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR | |||
| 0037 | Route, Clean and Reseal Joint, Concrete Pavement | LF | Contains all work (labor, material and equipment) required to route, clean and seal joint. |
| 0038 | Route, Clean and Reseal Random Cracks, Concrete Pavement | LF | Contains all work (labor, material and equipment) required to route, clean and seal cracks. |
| 0039 | Spalled Joint Repair, Partial Depth | SF | Contains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items |
| 0040 | Corner Break / Spalled Joint Repair, Full Depth | SF | Contains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items |
| 0041 | Grooving PCC Pavement | SF | Contains all work (labor, material and equipment) required to groove runway pavement, 1/4" x 1/4" at 1.5" O.C., procedure per FDOT SSRBC, latest edition. Not related to other items. |
| 0042 | Crushing PCC Pavement | TON | Contains all work (labor, material, transport and equipment) for crushing demolished concrete. Crushed concrete to meet gradation and testing requirements contained in specifications. Transportation and stockpiling included. Not related to other items. |
| SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT | |||
| 0043 | Base Course Group 4, In-Place | SY | Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course. Unit of measure is based on cubic yard and source contained in sub-items. |
| 0044 | Type B Stabilization | SY | Contains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course. |
| 0045 | Base Course / Subgrade Preparation | SY | Contains all work (labor, material, equipment, grading, compaction and testing) required to dress existing base course affected by pavement removal. |
| SECTION 32 12 16 - ASPHALT PAVEMENT | |||
| 0046 | Asphalt Pavement, PG 76-22 | TN | Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement. |
| 0047 | Asphalt Pavement | TN | Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement. |
| SECTION 32 12 36.13 - ASPHALT EMULSION SEALER | |||
| 0048 | Asphalt Slurry Seal | SY | Contains all work (labor, material, equipment, transport, placement and testing) required to contruct seal. |
| SECTION 32 13 13 - CONCRETE PAVEMENT | |||
| 0049 | Portland Cement Concrete | SY | Contains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement. Unit of measure is based on square yard quantity contained in sub-items. |
| 0050 | Concrete Pavement Saw Cut Joints | LF | Contains all work (labor, material and equipment) required to perform saw cut pavement and clean joint. Related to Joint Sealing in Concrete Pavement. |
| SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT | |||
| 0051 | Joint Filler, Expansion Board | LF | Contains all work (labor, material and equipment) required to install joint filler. Related to pre-form elastometric joint sealant. |
| 0052 | Joint Sealant, Pre-Formed Elastometric | LF | Contains all work (labor, material and equipment) required to install joint sealant. |
| 0053 | Joint Sealant, Silicone | LF | Contains all work (labor, material and equipment) required to install joint sealant. Includes backer rod. |
| SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING | |||
| 0054 | Pavement Marking | SF | Contains all work (labor, material and equipment) required to perform pavement markings. Unit of measure based on square foot and operational execution contained in sub-items. |
| SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING | |||
| 0055 | Seed and Mulch, Drilled | SY | Contains all work (labor, material and equipment) required to drill seeding with mulch and fertilizer. Watering and maintenance included. |
| 0056 | Hydro-Seed with Flexible Growth Medium | SY | Contains all work (labor, material and equipment) required to place material. Watering and maintenance included. |
| 0057 | Solid Sod | SY | Contains all work (labor, material and equipment) required to place sod. Watering and maintenance included. |
| SECTION 33 42 00 - STORM DRAINAGE UTILITIES | |||
| 0058 | Manhole / Inlet Cleaning & Sealing | EA | Contains all work (labor, material and equipment) required to remove sediment and debris. |
| 0059 | Pipe Desilting | LF | Contains all work (labor, material and equipment) required to remove sediment and debris. Unit of measure based on linear foot and pipe diameter as contained in sub-items. |
| 0060 | Pipe Joint Clean and Repair | EA | Contains all work (labor, material, equipment, excavation, bedding and backfill) required to clean, prepare, and repair joint with geotextile fabric and concrete collar. Unit of measure based per joint and diameter as contained in sub-items. |
| 0061 | Reinforced Concrete Pipe, Round | LF | Contains all work (labor, material, equipment, excavation, testing, and backfill) required to install Class III concrete pipe. Not related to other items. Unit of measurement based on linear foor and diameter as contained in sub-items. |
| 0062 | Reinforced Concrete Pipe, Elliptical | LF | Contains all work (labor, material, equipment, excavation, bedding, testing, and backfill) required to install Class III concrete pipe. Not related to other items. Unit of measurement based on linear foor and diameter as contained in sub-items. |
| 0063 | Reinforced Concrete Structures | EA | Contains all work (labor, material, equipment, excavation, bedding, testing and backfill) required to install pre-cast concrete structures with cast iron grate or ring and cover. Not related to other items. Unit of measurement based structure type as contained in sub-items. |
| 0064 | Mitered End Section, Round Pipe | EA | Contains all work (labor, material and equipment) required to construct mitered end section. |
| 0065 | Mitered End Section, Elliptical Pipe | EA | Contains all work (labor, material and equipment) required to construct mitered end section. |
| 0066 | Rip-Rap w/ Geotextile Fabric | TN | Contains all work (labor, material, transport and equipment) required to install rip-rap. |
| 0067 | Manhole / Inlet, Adjust | EA | Contains all work (labor, material and equipment) required to modify concrete manhole and inlet resulting from grade adjustments. |
| 0068 | Valve Box / Hand Hole, Adjust | EA | Contains all work (labor, material and equipment) required to modify cast iron valve box and hand hole resulting from grade adjustments. |
| 0069 | Replace Manhole Cover/Inlet Grate | EA | Contains all work (labor, material and equipment) required to replace cast iron grate and/or ring and cover resulting from damage or missing from structure. |
| SECTION 33 71 00 - UNDEGROUND UTILITY DUCT | |||
| 0070 | Utility Duct | LF | Contains all work (labor, material equipment, excavation and backfill) required to construct reinforced concrete duct bank. Not related to other items. |
| SECTION 01 31 13 PROJECT COORDINATION | |||
| 0071 | Weekend Work Rate | DAY | Applied when outlined in the SOW based on a requirement from the Government where weekend work will be required due to mission/operational conflicts or emergencies. Unit of measure is based on the daily average rate of work determined to be performed on Saturday and/or Sunday per job (task order). |
| 0072 | After Hours Work Rate | DAY | Applied when outlined in the SOW based on a requirement from the Government where shift work will be required due to mission/operational conflicts or emergencies. Unit of measure is based on the daily average rate of work determined to be performed outside defined standard hours per job (task order). |
| SECTION 01 31 13.90 PERFORMANCE BOND | |||
| 0073 | Bonding | JB | Unit of measure per job (task order) and percent of total direct project cost |
| SECTION 01 71 13 - MOBILIZATION | |||
| 0074 | Mobilization / Demobilization (Task ≤ $300K) | JB | * SEE NOTE |
| 0075 | Mobilization / Demobilization (Task > $300K) | JB | * SEE NOTE |
| * Contains all work (labor, material and equipment) required to mobilize and de-mobilize construction equipment. Unit of measure based per job (task order) and cost for performing task contained in sub-item for individual task according to threshold. Examples include 1) concrete pavement and storm sewer project include sub-item, 2) asphalt shoulder replacement include sub-item, 3) utility cut and patch in asphalt pavement do not include sub-item, 4) mill and overlay runway include sub-item, 5) slurry seal overrun inlcude sub-item, rubber and paint removal for runway with re-painting include sub-item, 6) paint pavement markings for pavement affected by entire taxiway full depth replacement include sub-item, 7) paint section pavement affected by concrete slab replacement do not included sub-item. Multiple moblizations can occur based on required tasks contained in SOW and task order. Dollar threshold based on individual task related to mobilization and not based on task order total |
&"-,Regular"Airfield Civil Works IDIQ &"-,Regular"Tyndall Air Force Base Base Year
&"-,Bold"&11Attachment 3- Line item description