Attachment_3 _Line_item_Descriptions.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Airfield Civil Works IDIQ Federal contract opportunity
Solicitation number
FA4819-15-B-0001
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3 - Line Item Descriptions

View the file

Other files for this federal contract opportunity

Other files attached to Airfield Civil Works IDIQ, newest first.
File Type Posted
Attachment_2 _Bid_Schedule_(16_Jul_15).xlsx XLSX spreadsheet
Attachment_7 _Proposed_Task_Order_(Project___TYN_2052G)_Bid_Schedule_(16_Jul_15).xlsx XLSX spreadsheet
FA4819-15-B-0001-0003.pdf PDF
Attachment_3 _Line_Item_Descriptions_(16_Jul_15).xlsx XLSX spreadsheet
Attachment_1 _Airfield_Civil_Works_SOW_(16_Jul_15).pdf PDF
Attachment_2 _Bid_Schedule_(16_Jul_15).xlsx XLSX spreadsheet
Attachment_2 _Bid_Schedule_(15_Jul_15-Corrected).xlsx XLSX spreadsheet
FA4819-15-B-0001-0002.pdf PDF
Airfield_Civil_Works_IDIQ_-_Questions_ _Answers_(Final).doc DOC document
Airfield_Civil_Works_IDIQ_Site_Visit_-_Questions_ _Answers.pdf PDF
Site_Visit_Minutes_-_Airfield_Civil_Works_IDIQ.pdf PDF
FA4819-15-B-0001-0001.pdf PDF
FA4819-15-B-0001_(Final).doc DOC document
Attachment_6 _Proposed_Task_Order_(Project___TYN_2052G)_Scope_of_Work.pdf PDF
Attachment_4 _DBA__FL150201.pdf PDF
Attachment_2 _Bid_Schedule.xlsx XLSX spreadsheet
Attachment_7 _Proposed_Task_Order_(Project___TYN_2052G)_Bid_Schedule-Quantity_Only.xlsx XLSX spreadsheet
Attachment_5 _General_Financial_Information.pdf PDF
Attachment_1 _Airfield_Civil_Works_SOW_(6_Mar_15).pdf PDF
Attachment_4 _DBA__FL150201_(DRAFT).pdf PDF
Attachment_1 _Airfield_Civil_Works_SOW_(DRAFT).pdf PDF
Attachment_3 _Line_item_Descriptions_(DRAFT).pdf PDF
FA4819-15-B-0001_(DRAFT).pdf PDF
Attachment_2 _Bid_Schedule_(DRAFT).pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Descriptions

ITEMDESCRIPTIONUNITSINCLUDED ITEMS, MEASURE AND USAGE
SECTION 01 11 31 - PRELIMINARY AND PROFESSIONAL SERVICES
0001Geotechnical, Exploratory Borings with Report and RecommendationsEAContains all work (labor, material and equipment) required to perform geotechnical investigation, soils classification, seasonal high water table determination, and report. Typical boring frequency less than 8 with a depth to 15 feet. Work performed by approved commercial testing laboratory.
0002Geotechnical, Permeability Soil Test, Addition to Report and RecommendationEAContains all work (labor, material and equipment) required to perform field and/or laboratory permeability test. Typical frequency less than 3. An addition to Geotechnical Borngs and Report line item. Work performed by approved commercial testing laboratory.
0003Environmental, Wetland Delineation, Ecological Assessment with Report, and Permitting ServicesACContains all work (labor, material and equipment) required to perform wetland delineation, ecological assessment with report, and permitting services to meet requirements for FDEP/USACE Joint Permit associated with wetland disturbance. Work performed by approved environmental firm.
0004Surveying, Construction LayoutDAYContains all work (labor, material and equipment) required to perform construction layout services. Work performed by approved surveying firm.
0005Surveying, Topographic/Specific PurposeHRContains all work (labor, material and equipment) required to perform professional surveying services as indicated on SOW or contract plans. Work performed by approved surveying firm.
0006Engineering, Professional ServicesHRContains all work (labor, material and equipment) required to perform professional engineering services as indicated on SOW or contract plans. Work performed by approved engineering firm.
0007Video InspectionLFContains all work (labor, material and equipment) required to perform video inspection services as indicated on SOW or contract plans. Work performed by approved video inspection company. Deliverables include DVD/CD of inspection with report of findings with recommendations. Unit of measure is based on linear foot and pipe diameter contained in sub-items.
SECTION 01 31 13.20 - FIELD PERSONNEL
0008EscortsWKPerson and vehicle to be escort. Used for escorting personnel and equipment without AF Form 483, Airfield Driving (i.e. Concrete Trucks, Material Deliveries, and etc.). Duration based on time for escort service.
SECTION 01 54 39 - CONSTRUCTION EQUIPMENT
0009Vacuum TruckDAYPerson and equipment not related to other work. Used for cleaning pavements associated in Provisions for Airfield pavement requirements. Duration based on time for construction activities, vehicles, and equipment that may produce F.O.D. or track debris on Base pavements.
SECTION 01 56 23 - TEMPORARY BARRICADES
0010Low Profile Lighted BarricadeWKContains all work required for delivery, installation, maintenance, and removal for each barricade.
SECTION 02 41 00 - DEMOLITION
0011Saw Cut Asphalt, ≤ 4 InchesLFContains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items.
0012Saw Cut Concrete PavementLF-INContains all work (labor, material and equipment) required to perform saw cutting task. Not related to other items. Unit of measure is linear foot per inch of depth for reinforced or non-reinforced pavement.
0013Asphalt MillingSYContains all work (labor, material and equipment) required to perform milling task. Not related to other items. Unit of measure is based on square yard and average depth.
0014Demolition and Excavation of AsphaltSYContains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
0015Demolition and Excavation of Concrete (6 to 9 Inches)SYContains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
0016Demolition and Excavation of Concrete (9 to 14 Inches)SYContains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Saw cutting not included. Unit of measure is based on square yard and average depth.
0017Excavation, exist. base and/or subgrade materialCYContains all work (labor, material and equipment) required to excavate base and subgrade during demolition, related to random slab repair and precision excavation to limit damage to adjacent improvements. Not related to mass grading activities or utility installation or other items.
0018Demolition and Removal, Storm StructureEAContains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport.
0019Demolition and Removal, Storm PipeLFContains all work (labor, material and equipment) required to perform demolish and excavate material, and load to truck for transport. Unit of measure is based on linear foot and diameter contained in sub-items.
SECTION 03 15 15 - CONCRETE ACCESSORIES
0020Mooring Anchor w/ Static GroundingEAContains all work (labor, material, equipment and testing) required to install mooring anchor with static grounding capabilities in accordance with ETL 12-8 and UFC 3-260-1.
SECTION 03 20 20 - CONCRETE REINFORCING
0021Welded Wire FabricLBContains all work (labor, material and equipment) required to install welded wire fabric for reinforced and/or irregular concrete slabs.
0022Dowels, 1" x 20"EAContains all work (labor, material and equipment) required to install reinforcement dowel. Unit of measure is based on per item and pavement condition contained in sub-items.
SECTION 31 00 00 - EARTHWORK
0023Eathwork, In-Place Fill SoilCYContains all work (labor, material, equipment, transport, grading, compaction and testing) required to place fill soil. Unit of measure is based on cubic yard and source contained in sub-items.
0024Earthwork, Excavation SoilCYContains all work (labor, material and equipment) required to excavate soil. Removal from site requires transport line item. Not related to soil excavation for utilities.
0025Transport, Demolition / Excavated MaterialsCYContains all work (labor, material, equipment, transport and dump fees, when applicable) required to transport materials. Unit of measure based on cubic yard and final destination.
SECTION 31 14 13.23 - TOPSOIL STRIPPING AND STOCKPILING
0026Top Soiling StrippingCYContains all work (labor, material, transport and equipment) to strip top soil and stockpile, typical removal 4-6 inches. Stockpile for re-use or load to transport truck included. Removal off-site to use to transport line item.
SECTION 31 23 19 - DEWATERING
0027Open Trench DewateringMONTHContains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for dewatering activities.
0028Wellpoint DewateringLFMContains all work (labor, material, transport, equipment, installation, removal and permitting requirements) for open trench dewatering activities. Unit of measure is linear feet per month.
SECTION 31 25 00 - EROSION AND ENVIRONMENTAL CONTROL
0029Sediment BarrierLFContains all work (labor, material, equipment, installation and removal) for structural BMP.
0030Floating Turbidity BarrierLFContains all work (labor, material, equipment, installation and removal) for structural BMP.
0031Inlet Protection SystemEAContains all work (labor, material, equipment, installation and removal) for structural BMP.
0032Soil Tracking Prevention DeviceEAContains all work (labor, material, equipment, installation and removal) for structural BMP.
SECTION 32 01 11.51 - RUBBER AND PAINT REMOVAL ON AIRFIELD SURFACES
0033Paint RemovalSFContains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item.
0034Rubber RemovalSFContains all work (labor, material, transport and equipment) for pavement paint removal. Recycled water and solids to be transported to on-base drying bed location. Solids to be removed off-base. Mobilization cost use separate mobilization line item.
SECTION 32 01 17 - ASPHALT PAVEMENT REPAIR
0035Asphalt Pavement, Cleaning and Seal Random CracksLFContains all work (labor, material and equipment) required to clean and seal joint. Unit of measure is based on linear foot and quantity contained in sub-items.
0036Rout and Seal Crack Add Per 1/2" DepthLFContains all work (labor, material and equipment) required to route crack. Related to cleaning and sealing random cracks. Unit of measure is based on linear foot and depth of route.
SECTION 32 01 26 - CONCRETE PAVEMENT REPAIR
0037Route, Clean and Reseal Joint, Concrete PavementLFContains all work (labor, material and equipment) required to route, clean and seal joint.
0038Route, Clean and Reseal Random Cracks, Concrete PavementLFContains all work (labor, material and equipment) required to route, clean and seal cracks.
0039Spalled Joint Repair, Partial DepthSFContains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items
0040Corner Break / Spalled Joint Repair, Full DepthSFContains all work (labor, material and equipment) required to perform spalled joint repair and remove demolished materials. Not related to other items
0041Grooving PCC PavementSFContains all work (labor, material and equipment) required to groove runway pavement, 1/4" x 1/4" at 1.5" O.C., procedure per FDOT SSRBC, latest edition. Not related to other items.
0042Crushing PCC PavementTONContains all work (labor, material, transport and equipment) for crushing demolished concrete. Crushed concrete to meet gradation and testing requirements contained in specifications. Transportation and stockpiling included. Not related to other items.
SECTION 32 11 00 - BASE AND SUBBASE COURSES FOR AIRFIELD PAVEMENT
0043Base Course Group 4, In-PlaceSYContains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course. Unit of measure is based on cubic yard and source contained in sub-items.
0044Type B StabilizationSYContains all work (labor, material, equipment, transport, grading, compaction and testing) required to place base course.
0045Base Course / Subgrade PreparationSYContains all work (labor, material, equipment, grading, compaction and testing) required to dress existing base course affected by pavement removal.
SECTION 32 12 16 - ASPHALT PAVEMENT
0046Asphalt Pavement, PG 76-22TNContains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement.
0047Asphalt PavementTNContains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement.
SECTION 32 12 36.13 - ASPHALT EMULSION SEALER
0048Asphalt Slurry SealSYContains all work (labor, material, equipment, transport, placement and testing) required to contruct seal.
SECTION 32 13 13 - CONCRETE PAVEMENT
0049Portland Cement ConcreteSYContains all work (labor, material, equipment, transport, placement and testing) required to contruct pavement. Unit of measure is based on square yard quantity contained in sub-items.
0050Concrete Pavement Saw Cut JointsLFContains all work (labor, material and equipment) required to perform saw cut pavement and clean joint. Related to Joint Sealing in Concrete Pavement.
SECTION 32 13 73.19 - JOINT SEALING IN CONCRETE PAVEMENT
0051Joint Filler, Expansion BoardLFContains all work (labor, material and equipment) required to install joint filler. Related to pre-form elastometric joint sealant.
0052Joint Sealant, Pre-Formed ElastometricLFContains all work (labor, material and equipment) required to install joint sealant.
0053Joint Sealant, SiliconeLFContains all work (labor, material and equipment) required to install joint sealant. Includes backer rod.
SECTION 32 17 23 - AIRFIELD AND TRAFFIC ROADWAY MARKING
0054Pavement MarkingSFContains all work (labor, material and equipment) required to perform pavement markings. Unit of measure based on square foot and operational execution contained in sub-items.
SECTION 32 92 00 - GRASSING BY SEEDING AND SODDING
0055Seed and Mulch, DrilledSYContains all work (labor, material and equipment) required to drill seeding with mulch and fertilizer. Watering and maintenance included.
0056Hydro-Seed with Flexible Growth MediumSYContains all work (labor, material and equipment) required to place material. Watering and maintenance included.
0057Solid SodSYContains all work (labor, material and equipment) required to place sod. Watering and maintenance included.
SECTION 33 40 00 - STORM DRAINAGE UTILITIES
0058Manhole / Inlet Cleaning & SealingEAContains all work (labor, material and equipment) required to remove sediment and debris.
0059Pipe DesiltingLFContains all work (labor, material and equipment) required to remove sediment and debris. Unit of measure based on linear foot and pipe diameter as contained in sub-items.
0060Pipe Joint Clean and RepairEAContains all work (labor, material, equipment, excavation, bedding and backfill) required to clean, prepare, and repair joint with geotextile fabric and concrete collar. Unit of measure based per joint and diameter as contained in sub-items.
0061Reinforced Concrete Pipe, RoundLFContains all work (labor, material, equipment, excavation, testing, and backfill) required to install Class III concrete pipe. Not related to other items. Unit of measurement based on linear foor and diameter as contained in sub-items.
0062Reinforced Concrete Pipe, EllipticalLFContains all work (labor, material, equipment, excavation, bedding, testing, and backfill) required to install Class III concrete pipe. Not related to other items. Unit of measurement based on linear foor and diameter as contained in sub-items.
0063Reinforced Concrete StructuresEAContains all work (labor, material, equipment, excavation, bedding, testing and backfill) required to install pre-cast concrete structures with cast iron grate or ring and cover. Not related to other items. Unit of measurement based structure type as contained in sub-items.
0064Mitered End Section, Round PipeEAContains all work (labor, material and equipment) required to construct mitered end section.
0065Mitered End Section, Elliptical PipeEAContains all work (labor, material and equipment) required to construct mitered end section.
0066Rip-Rap w/ Geotextile FabricTNContains all work (labor, material, transport and equipment) required to install rip-rap.
0067Manhole / Inlet, AdjustEAContains all work (labor, material and equipment) required to modify concrete manhole and inlet resulting from grade adjustments.
0068Valve Box / Hand Hole, AdjustEAContains all work (labor, material and equipment) required to modify cast iron valve box and hand hole resulting from grade adjustments.
0069Replace Manhole Cover/Inlet GrateEAContains all work (labor, material and equipment) required to replace cast iron grate and/or ring and cover resulting from damage or missing from structure.
SECTION 33 71 00 - UNDEGROUND UTILITY DUCT
0070Utility DuctLFContains all work (labor, material equipment, excavation and backfill) required to construct reinforced concrete duct bank. Not related to other items.
SECTION 01 31 13 PROJECT COORDINATION
0071Weekend / Night Work (% of project required)JBApplied when outlined in the SOW based requiremet from Government for emergency, night, and/or weekend work due to mission and operational conflicts. Unit of measure is based per job (task order) and percent of work determined to be performed outside standard hours.
SECTION 01 31 13.90 PERFORMANCE BOND
0072BondingJBUnit of measure per job (task order) and percent of total direct project cost
SECTION 01 71 13 - MOBILIZATION
0073Mobilization / Demobilization (Task ≤ $300K)JB* SEE NOTE
0074Mobilization / Demobilization (Task > $300K)JB* SEE NOTE
* Contains all work (labor, material and equipment) required to mobilize and de-mobilize construction equipment. Unit of measure based per job (task order) and cost for performing task contained in sub-item for individual task according to threshold. Examples include 1) concrete pavement and storm sewer project include sub-item, 2) asphalt shoulder replacement include sub-item, 3) utility cut and patch in asphalt pavement do not include sub-item, 4) mill and overlay runway include sub-item, 5) slurry seal overrun inlcude sub-item, rubber and paint removal for runway with re-painting include sub-item, 6) paint pavement markings for pavement affected by entire taxiway full depth replacement include sub-item, 7) paint section pavement affected by concrete slab replacement do not included sub-item. Multiple moblizations can occur based on required tasks contained in SOW and task order. Dollar threshold based on individual task related to mobilization and not based on task order total