This is a Questions and Answers document for federal contract opportunity RH – Base Course at Avon Park, solicitation number FA481426Q0010. The document addresses five clarifications regarding material specifications and delivery requirements for a base course project.
Regarding material specifications, crushed concrete (Recycled Concrete Aggregate) is acceptable for use provided it consists of previously hardened Portland cement or concrete containing pozzolanic binder material, maintains constant gradation, and is free of reinforcing steel, bituminous concrete surfacing, and foreign materials. The work scope involves stockpiling rather than spreading material. Operational parameters include working hours from 0600 to 1700, with no specific truck type requirements for deliveries. Material delivery requirements are established at a minimum of 1,500 units and maximum of 3,500 units per day.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions
RH – Base Course - AVON PARK FA481426Q0010
1. Would it be possible to use crushed concrete material for the base course?
Answer: Yes. Provided that the RCA consists of previously hardened
Portland cement or other concrete containing pozzolanic binder material.
Provided that it consists of a constant gradation and is free of all reinforcing steel, bituminous concrete surfacing, and any other foreign material.
2. Are we spreading the material or stockpiling?
Answer: Stockpiling.
3. What are the working hours?
Answer: 0600 - 1700
4. Are there required types of dump trucks to be used for deliveries?
Answer: NO
5. Is there a minimum or maximum material delivery requirement per day?
Answer: 1,500 Min / 3,500 Max