Questions and Answers 1 Feb 11.docx
DOCX document 12 KB Posted
- Attached to
- Repair Lighting for Ammo Area
- Solicitation number
- FA4809-11-R-0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and answers 8 Feb 11.docx | DOCX document | |
| Questions and answers 4 Feb 11.docx | DOCX document | |
| Revised Drawing Sheet E-1.pdf | ||
| Amendment 0001.doc | DOC document | |
| Site Visit.pdf | ||
| 11-R-0002.doc | DOC document | |
| Cover Sheet and Instructions.doc | DOC document | |
| Attachment 1 SPECIFICATIONS VKAG 10-1042E .doc | DOC document | |
| Attachment 7 Facility Inspection Assessment Letter.pdf | ||
| Attachment 5 Sheet 2 of 2 KAG 10-1042E E-1.pdf | ||
| Attachment 6 Construction Cost Estimate Breakdown.pdf | ||
| Attachment 3 DOR.doc | DOC document | |
| Attachment 2 Wage Determination.docx | DOCX document | |
| Attachment 4 AF66 VKAG 10-1042E.pdf | ||
| Attachment 5 Sheet 1 of 2 VKAG 10-1042E G-1.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4809-11-R-0002
Repair Lighting For Ammo Area
VKAG 10-1042E
Questions & Answers 1 Feb 2011
1. QUESTION: Will the potential prime contractors in the bid for the Repair Lighting for Ammo Area (FA4809-11-R-0002) solicitation be required to have the certifications if the sub that will perform the work has them? In other words, can the prime use the certifications of their sub to meet the technical certification requirements?
ANSWER: The prime does not have to hold the certification as long as all work is installed by appropriately licensed contractor as defined in contract specifications.
2. QUESTION: Would a potential prime contractor be penalized in the evaluation if they were not able to make the site visit, but their sub was there?
ANSWER: No consideration (negative or positive) is given for attendance to the site visit.