Attachment 1 SPECIFICATIONS VKAG 10-1042E .doc
DOC document 612 KB Posted
- Attached to
- Repair Lighting for Ammo Area Federal contract opportunity
- Solicitation number
- FA4809-11-R-0002
About this file
Solicitation No. FA4809-11-R-0002 Repair Lighting For Ammo Area
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and answers 8 Feb 11.docx | DOCX document | |
| Questions and answers 4 Feb 11.docx | DOCX document | |
| Questions and Answers 1 Feb 11.docx | DOCX document | |
| Revised Drawing Sheet E-1.pdf | ||
| Amendment 0001.doc | DOC document | |
| Site Visit.pdf | ||
| 11-R-0002.doc | DOC document | |
| Cover Sheet and Instructions.doc | DOC document | |
| Attachment 5 Sheet 1 of 2 VKAG 10-1042E G-1.pdf | ||
| Attachment 7 Facility Inspection Assessment Letter.pdf | ||
| Attachment 3 DOR.doc | DOC document | |
| Attachment 6 Construction Cost Estimate Breakdown.pdf | ||
| Attachment 2 Wage Determination.docx | DOCX document | |
| Attachment 5 Sheet 2 of 2 KAG 10-1042E E-1.pdf | ||
| Attachment 4 AF66 VKAG 10-1042E.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP: FA4809-11-R-0002
Project No. VKAG 10-1042E
Attachment 1: Page 15 of 15
SEYMOUR JOHNSON
AIR FORCE BASE
NORTH CAROLINA
Specifications
FOR
REPAIR LIGHTING FOR AMMO AREA
PROJECT NUMBER VKAG 10-1042E
SEYMOUR JOHNSON AFB, NC
TABLE OF CONTENTS
DIVISION 1 ‑ GENERAL REQUIREMENTS
01000 - General Section Pages 3 - 4
01560 - Environmental Protection Pages 5 - 10
02051 - Asbestos Removal, Cleanup & Disposal Pages 11 - 12
16530 - Site Lighting Pages 13 - 15
END OF TABLE OF CONTENTS
SECTION 01000
GENERAL
1. SCOPE OF WORK: The work covered by this specification consists of furnishing all plant, labor, equipment and material, and performing all work in connection with the VKAG 10-1042E, Repair Lighting or Ammo Area in strict accordance with these specifications and drawings and subject to the terms and conditions of this contract.
2. LOCATION: The work is to be accomplished at Seymour Johnson Air Force Base, Goldsboro, North Carolina. This base is accessible by public highway.
3. WORKWEEK: The contractor shall observe the same regular workweek being observed by the Seymour Johnson AFB Civil Engineering shop forces, which is Monday through Friday 0730-1630, with Federal holidays excluded. Any deviation from this schedule will require 48 hours advance notice and approval of the Contracting Officer.
4. PRINCIPLE FEATURES: The work covered by this contract includes, but is not limited to the following:
Replace inefficient metal halide and high pressure sodium exterior luminaires with energy efficient induction luminaires. Reduce energy consumption and increase efficiency by installing area lighting induction luminaires on existing poles and sides of buildings.
Contractor shall replace any lighting removed with new lighting on the same working day. No area shall be left without lighting after completion of the workday.
This project will incorporate applicable US Air Force high performance green building (HPGB) objectives addressing energy use reduction (per EPAct 2005 and CFR Title 10 Part 433).
5. HAUL ROUTES: The Contractor shall use the haul routes indicated on the plans.
6. DISPOSITION OF NONSALVABLE MATERIALS: All non-salvable or unusable material shall be disposed of off base as directed by the Contracting Officer. All waste material generated by any work under this contract shall be handled, transported, stored, and disposed of off base, by the Contractor, in accordance with all applicable federal, state, or local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.
7. DISPOSITION OF SALVAGEABLE MATERIALS: Not Applicable
8. SUBMITTALS REQUIRED: Required submittals are listed on AF Form 66.
9. BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST, AF FORM 103: The Contractor shall obtain AF Form 103, Base Civil Engineering Work Clearance Request, prior to work commencement from the Contract Management Section in Bldg 3300, 1095 Peterson Avenue. Upon receipt of an AF Form 103, the Contractor shall be responsible for locating all underground utilities as well as coordinating with local utility companies to stake out utilities not owned by the base. Utilities include, but are not limited to electric, water, sewer, steam, communication, telephone, fiber optic, cathodic protection, cable television, fuel lines, and natural gas. Historical drawings, as-built drawings, and topographic drawings, the accuracy of which the government does not guarantee, are available for research and review at the 4th Civil Engineer Squadron, Design element located in Building 3300. The contractor shall promptly repair/replace contractor damaged utilities at no additional cost to the Government. The repair/replacement shall be accomplished in a manner that is acceptable to and approved by the Government.
10. SAFETY: All safety requirements of the U.S. Army Corps of Engineers Safety Manual 385-1-1, latest edition, will be strictly adhered to as related to all work covered under these specifications.
11. MATERIALS CONTAINING ASBESTOS: In the event the Contractor discovers materials suspected of containing asbestos that is not identified to be removed in the plans and specifications, the Contractor shall notify the Contracting Officer. The Contractor’s work shall proceed unless the materials suspected of containing asbestos are damaged or disturbed. Any suspected materials damaged or disturbed by the Contractor without permission from the Contracting Officer shall be removed by the Contractor at his expense IAW all applicable Federal, State, and local laws, ordinances, regulations, court orders, or other types of rules or rulings having the effect of law.
12. LABELING OF STORAGE DRUMS: All 55 gallon or larger drums brought on base for use under this contract and containing new material or used for storage of waste materials or hazardous waste must be labeled with a Department of Transportation (DOT) Proper Shipping Name, DOT Hazardous Identification Number, the Contractor’s name, a Contractor representative, and the Contractor’s telephone number. Label lettering should have a minimum height of one half inch painted in white paint or other color that is in contrast with the color of the drum. The label should be sufficiently durable to equal or exceed the life (including storage and disposal) of the drum.
13. CONTRACTOR STORAGE TRAILER(S) AND BUILDING(S): The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the Contractor can be reached. The trailer(s) and building(s) shall be complete with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean. This includes the mowing of grass during the growing season. The lawn mower shall be supplied by the Contractor.
14. The Contractor will be given a lot in the Contractor Storage Area for the life of the contract. The Contractor’s progress schedule shall include a line item for final cleanup of this storage lot. Final payment will not be made until this final cleanup is performed by the Contractor and accepted by Seymour Johnson AFB.
15. CONVENIENCE FACILITIES: Existing restroom facilities shall not be used by construction personnel. The contractor shall provide and maintain, in a neat and sanitary condition, such accommodations for the use of his employees.
16. CONSTRAINTS: The Contractor shall maintain clear passage of all building and facility exits at all times and no tools, equipment or debris shall be left unattended on the job site during execution of this work. Access to buildings and facilities shall be maintained during construction and shall be maintained in a safe manner.
The Contractor shall provide a minimum 5 day advance notice to the Munitions Control NCOIC, MSgt Patrick Murtha at 919-722-7071, prior to beginning any on-site work that will affect vehicle traffic flow, and a 5 day advance notice to each facility manager where work on a particular building is to be performed.
17. All contractor and subcontractor personnel shall carry an identification tag showing their picture and the name of the company they represent, and their base pass at all times. All vehicles operated by the contractor or subcontractors shall have visible identification showing name of represented company.
18. PHASING/PERIOD OF PERFORMANCE:
The first 45 calendar days following the notice to proceed shall be designated for submittal approvals and material ordering and delivery. No on-site work will be allowed during this 45 day submittal period.
The remaining 45 calendar days following completion of the 45 calendar day submittal period will be designated for all on-site construction.
The total performance period for this contract shall be 90 calendar days after issuance of the notice to proceed.
END OF SECTION 01000
SECTION 01560
ENVIRONMENTAL PROTECTION
1.
DEFINITIONS:
1.1 Oil: Any kind of oil in any form, including, but not limited to: fats, oils, or greases of animal, fish, or marine mammal origin; vegetable oils, including oils from seeds, nuts, fruits, or kernels; and, other oils and greases, including petroleum, fuel oil, sludge, synthetic oils, mineral oils, oil refuse, or oil mixed with wastes other than dredged spoil.
1.2 Hazardous Material (HAZMAT): Includes all items (including medical supply items, but excluding drugs in their finished form and pharmaceuticals in individually-issued items) covered under Emergency Planning & Community Right-To-Know Act (or other host nation, federal, state, or local) tracking requirement, the OSHA HAZCOM Standard, and all Class I and Class II Ozone Depleting Substances.
2.
ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain during the life of the contract, environmental protection as defined herein. Provide environmental protection measures as required to control pollution that develops during normal construction practice. Provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Comply with all federal, state, and local regulations pertaining to environmental requirements. Develop proposals for an environmental protection plan for the project and, prior to the commencement of the work, meet with the Contracting Officer and discuss the proposed environmental protection plan. The meeting shall develop mutual understanding relative to details of environmental protection, including measures for protecting natural resources, required reports, and measures to be taken should the Contractor fail to provide adequate protection in a timely manner. Perform a preconstruction survey of the project site and take photographs as necessary to enhance the survey.
3.
ENVIRONMENTAL MANAGEMENT SYSTEM – Seymour Johnson AFB has an Environmental Management System in place. The Contractor shall support and comply with the Environmental Management System operational and administrative requirements. The contractor and all associated employees shall maintain an awareness of potential environmental impacts associated with the duties they are performing. Actions must be taken to minimize those environmental impacts during any service, design and/or construction activity. The Contractor and all appropriate personnel shall complete Environmental Management System awareness training and ensure all employees working on SJAFB are knowledgeable of EMS policies and procedures. An Executive Summary of Seymour Johnson’s EMS shall be provided to the contractor. EMS awareness training is available to contract personnel at the following Air Force sponsored training site: http://esohtn.com. The contractor shall provide written certification of training completion to the Contracting Officer within 30 days of contract start up.
4.
PROTECTION OF NATURAL RESOURCES: The natural resources within the project boundaries and outside the limits of permanent work performed under this contract shall be preserved in their existing condition or restored to an equivalent or improved condition upon completion of the work.
4.1 Land Resources: Except in areas indicated to be cleared, do not remove, cut, deface, injure, or destroy trees or shrubs without special permission from the Contracting Officer. Do not fasten or attach ropes, cables, or guys to any existing trees for anchorages unless specifically authorized. Where such special emergency use is authorized, the Contractor shall be responsible for any resultant damage.
4.1.1 Protection: Protect existing trees which are to remain and which may be injured, bruised, defaced, or other wise damaged by construction operations.
4.1.2 Repair or Restoration: Repair or restore to their original condition all trees or other landscape features scarred or damaged by the equipment or operations. Obtain approval of the repair or restoration from the Contracting Officer prior to its initiation.
4.1.3 Temporary Construction: Obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, foundations of temporary structures, stockpiles of excess or waste materials, and all other vestiges of construction. Temporary roads, materials, and all other vestiges of construction. Temporary roads, parking areas, and similar temporary use areas shall be graded in conformance with surrounding areas, tilled, and seeded. Include topsoil of nutriment during the seeding operation as necessary to reestablish a suitable stand of grass.
4.2 Fish and Wildlife Resources: During the performance of the work take such steps as required to prevent interference or disturbance to fish and wildlife. Do not alter water flows or otherwise significantly disturb native habitat adjacent to the project area which are critical to fish and wildlife except as may be indicated or specified.
5.
EROSION AND SEDIMENT CONTROL MEASURES: If the work associated with this project disturbs more than one acre of land, the contractor shall follow all requirements set forth in North Carolina General Statute 143-215.1, Permit No. NCG010000. This includes but is not limited to the design/application of an erosion and sedimentation control plan, paying the associated fee, the proper control of the Certificate of Approval (granted by NCDENR), implementation of the plan, and all the inspection type requirements during the actual construction period along with the proper documentation. These required documents shall be provided and/or made available to appropriate government personnel upon request. At least one copy of each NOI, NPDES Permit, SWPPP PLAN, Certificate of Approval, and Certificate of Termination Document shall be given to the 4 CES/CEA Office.
5.1 If the work associated with this project disturbs less than one acre of land, the contractor shall provide properly and adequately designed/implemented erosion and sedimentation control practices as to not contribute pollution to the base’s regulated storm water discharges. This includes but is not limited to protection of storm drains, ditches, or other waters of the State from sedimentation runoff; and controlling disposal of discarded building materials, concrete truck washout, chemicals, litter, and sanitary wastes at the construction sites that may cause adverse impacts to water quality.
5.1.1 Burn-off: Burn-off of ground cover is not permitted.
6.
CONTROL AND DISPOSAL OF SOLID, CHEMICAL, AND SANITARY WASTES: Pick up solid wastes and place in containers which are emptied by the contractor on a regular schedule. The preparation, cooking, and disposing of food are strictly prohibited on the project site. Conduct handling and disposal of wastes to prevent contamination of the site and other areas. On completion, leave areas clean and natural looking. Obliterate signs of temporary construction and activities incidental to construction of the permanent work in place.
6.1 Removal from Government Property: Remove rubbish and debris from Government property and dispose of it in compliance with federal, state, and local requirements.
6.2 Chemical Waste: Store chemical waste in corrosion resistant containers labeled to identify type of waste, date filled, and contractor name. Remove containers from the project site, and dispose of chemical waste in accordance with federal, state, and local regulations. Chemical waste has the potential to become hazardous waste. The contractor shall conduct sample analysis sufficient to determine if the waste is a hazardous waste as defined in 40 CFR Part 261. Any waste meeting the definition of hazardous shall be accumulated and manifested in accordance with federal, state, and local regulations and coordinated with the 4 CES/CEA office. The contractor shall notify the Contracting Officer immediately in the event of any chemical waste spill.
6.3 Petroleum Products: Conduct fueling and lubricating of equipment and motor vehicles in a manner that affords the maximum protection against spills and evaporation. Dispose of lubricants to be discarded and excess oil in accordance with approved procedures meeting federal, state, and local regulations.
7.
DUST CONTROL: Keep dust down at all times, including non-working hours, weekends, and holidays. Sprinkle or treat, with dust suppressors, the soil at the site, haul roads, and other areas disturbed by operations. No dry power brooming is permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Air Blowing is permitted only for cleaning non-particulate debris, such as steel reinforcing bars. No sandblasting is permitted unless dust there from is confined. Only wet cutting of concrete blocks, concrete, and asphalt is permitted. No unnecessary shaking of bags is permitted where bagged cement, concrete mortar and plaster is used.2 8.
SOLID WASTE DIVERSION AND RECYCLING
All solid waste generated as a result of project activities are the responsibility of the Contractor. The Contractor shall provide necessary dumpsters, roll-offs, containers, etc. for proper storage, removal, and ultimate disposal the solid waste. The Contractor shall not use base dumpsters, roll-offs, or containers for the disposal of solid waste. Solid waste debris, including construction & demolition debris shall be recycled and/or diverted away from landfill disposal to the extent practical for the project.
A. Construction debris that cannot be recycled: Demolition and/or construction materials that cannot be reused, recycled, or otherwise diverted must be segregated from other solid waste and disposed at an approved C&D landfill. The Wayne County C&D landfill is adjacent to the Municipal Solid Waste Landfill. The Contractor shall maintain records of construction debris diverted and disposed.
B. Recyclables: The contractor shall remove recyclables from the solid waste stream to the extent practicable. Disposing of recyclables in a municipal solid waste landfill (MSWLF) is not acceptable and may constitute violation of the contract. Local county ordinance prohibits the disposal of solid waste with greater than 10% recyclables. In the event the county sites the Contractor for excessive recyclables within a load, the Contractor is solely responsible for fines and/or increased tipping fees. Recyclables shall be taken to off-base facilities for recycling with all profit from those materials being those of the Contractor. The Contractor shall maintain records (by weight) of all materials recycled and disposed.
Use of demolition debris (rubble) as fill material is considered recycling. The contractor shall report reuse of such material in the monthly Solid Waste Diversion report (see format below).
The contractor will report, monthly, no later than the last day of the following month, the total weight of solid waste and construction/demolition waste he disposed, and percentage diverted through recycling. The report will be made in two copies. The following format will be used:
Solid Waste Report Project #:
Contract #:
Facility #:
Contractor :
Contractor Point of Contact:
Contractor Phone #:
4 CES QAE:
Report Period: dd/mm/yyyy to dd/mm/yyyy
| LBS |
| RECEIVING FACILITY |
A. Total Amount of Solid Waste Taken to Municipal Solid Waste Landfill
B. Total Amount of C&D Debris Taken to C&D Landfill For Disposal
C. Total Amount of Recyclables Retained for Consumption by Contractor
D. Total Amount of Recyclables Taken to Wayne County Recycling Center
1. Cardboard
2. Scrap Metal
3. Other
E. Total Amount of C&D/Recyclables Taken/Sold to Other Recycling Points or
Reused On-Site
1. Cardboard
2. Scrap Metal
3. Other
4. Fill Material
F. Total Solid Waste Generated (A+B+C+D+E) (includes all material generated from the project)
G. % Diverted from Municipal Solid Waste Landfill ((C+D+E)/F) *100
This report must be submitted to the 4 CES project QAE monthly.
QAE: 1 copy; CEA 1 copy as distributed by QAE
9.
HAZARDOUS MaterialS/HAZARDOUS WASTES. The Contractor shall obtain approval from the Hazardous Material Management Program (HMMP) team prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products for this contract that require an MSDS. The Contractor shall identify these materials on a Contractor Hazardous Material Authorization, Inventory, & Usage Form (AF Form 3952 – Contractor Equivalent). The Contractor shall provide this inventory list and one copy of the MSDS for each item to HAZMART for review and HMMP approval prior to any chemicals being brought onto Seymour Johnson AFB.
This Inventory & Usage Form will also be used by the Contractor to report hazardous material usage. At project completion, the contractor shall submit a final report (AF Form 3952 – Contractor Equivalent) to the Contracting Officer detailing overall project hazardous material usage.
For projects extending over 6 months in duration, the inventory (AF Form 3952 – Contractor Equivalent) shall be used to provide monthly usage reports to the Contracting Officer and a final report at project completion. The Contractor shall maintain one copy of the MSDS for each hazardous material line item used within the work center.
Contractor Hazardous Material Authorization, Inventory, and Usage Form (AF Form 3952 – Contractor Equivalent)
| 1. Prime Contractor/Organization: |
| 2. PriMe Cont/POC |
3. Phone
4. Fax
5. Date
| 2. |
| 6. Prime CONT EMAIL |
| 7. CONTRACT NUMBER |
| 8. EXPECTED START DATE |
9. EXPECTED END DATE
10. CONTRACTOR SIGNATURE
11. WORKPLACE/BLDG
12. SUB-CONTRACTOR
13. DELIVERY ORDER
14. CONTRACT ADMINISTRATOR
15. CONTRACTING ADMINISTRATOR SIGNATURE
16. PHONE
17. FAX
18. DATE
19. Government QAE/OPR
20. SIGNATURE
21. PHONE
22. FAX
23. DATE
24. PROJECT/TASK DESCRIPTION
25. Usage Reporting Schedule
FORMCHECKBOX
Contract Term FORMCHECKBOX Monthly ______________(month reported)
| Product Name/Part Number |
| Manufacturer |
| Storage Location While On-base2 |
| Physical Form (S,L,G) |
| Amount & Unit of Issue3 |
| Container Type |
| Max Amount Onsite at any Time 4 |
| Anticipated Amount Used for Project |
| Actual Amount Used During |
Period5 Intended Use
| FOOTNOTES: 1. This form is used for initial notification of hazardous materials intended for use on associated project and to report subsequent actual usage. Include all materials, which contain an EHS, TRI, CERCLA hazardous substance, toxic chemical, generates a hazardous waste after use, and/or requires a Material Safety Data Sheet. |
| 2. Will temporary storage be established or kept in vehicles and taken off-base daily. |
3. Identify amount in container & the units item is measured in, i.e. gallon, ounces, lbs, etc.
4. Identify maximum amount present (stored and used) at any one time on SJAFB.
5. Report actual quantities used. Quantities should reflect the reporting schedule identified in line 25.
END OF SECTION 01560
SECTION 02051
ASBESTOS REMOVAL, CLEANUP & DISPOSAL
1. GENERAL: The term abate, as used in the plans and specifications, shall mean to remove, clean up, and dispose of asbestos containing materials (ACM). The work covered by this section includes the removal, cleanup, and disposal of materials containing asbestos.
2. DOCUMENTATION OF PERFORMANCE IN ASBESTOS REMOVAL:
2.1 The Contractor shall furnish documentation of successful performance in asbestos removal. This documentation will include names and addresses of purchasers of services and location of work performed.
2.2 The Contractor shall have at all times in his possession at his office (one copy) and in view at the job site (one copy) OSHA Regulation 29 CFR 1926.1101; Asbestos and Environmental Protection Agency 40 CFR, Part 61, Subpart M: National Emission Standard for Asbestos, Asbestos Stripping Work Practices, and Disposal of Asbestos Waste; N.C. General Statute 130A, Article 19, Asbestos Hazard Management.
3. REGULATORY REQUIREMENTS:
3.1. All asbestos removal cleanup, and disposal shall be made in accordance with:
3.1.1 N.C. General Statute 130A, Article 19 and OSHA Regulation 1926.1101 - Asbestos, permissible exposure limits for asbestos shall apply to all air samples:
3.1.1.1 Amosite
0.01 fibers/cc
3.1.1.2 Chrysotile
0.01 fibers/cc
3.1.1.3 Crocidolite
0.01 fibers/cc
3.1.1.4 All others
0.01 fibers/cc
3.2 EPA 40 CFR, Part 61, Subpart M - National Emission Standard for Asbestos, Asbestos Stripping, Stripping Work Practice, and Disposal of Asbestos Waste.
3.3 Other State and Local Agency Requirements.
4. SUBMITTALS:
4.1 Pre-Removal Plan: Submit a detailed plan of the work procedures to be used in the removal and demolition of materials containing asbestos. The pre-removal plan must be approved and signed by an N. C. State accredited Asbestos Abatement Project Designer. Such plan shall include location of asbestos control areas, change rooms, layout of change rooms, interface of trades involved in the construction, sequencing of asbestos related work, disposal plan, type of wetting agent and asbestos sealer to be used, air monitoring, and a detailed description of the method to be employed in order to control pollution. Provide copies of all notifications sent to agencies. This plan must be approved prior to the start of any asbestos work. Include North Carolina Asbestos Accreditation Certificates for each worker and Accredited Supervisor and Asbestos Removal Permits/Notifications when removal quantities require by N.C. Statute 130A, Article 19.
4.2 Submit personnel and space air monitoring and final clearance reports.
4.3 Training: Submit certificates signed by each employee that the employee has received current accredited training within 14 months of scheduled removal work in the proper handling of materials that contain asbestos; understands the health implications and risks involved, including the illnesses possible from exposure to airborne asbestos fibers; understands the use and limits of the respiratory equipment to be used; and understands the results of monitoring of airborne quantities of asbestos as related to health and respiratory equipment.
4.4 Return manifest signed by company or landfill accepting custody of asbestos waste within 24 hours. Minimum information on the manifest shall include: date of disposal, quantity, sources of asbestos waste type of insulation (pipe, duct, etc.), name of certified/licensed asbestos removal Contractor.
5. REMOVAL, CLEANUP AND PREPARATION: The Contractor shall have proper dress and equipment for all personnel. The Contractor shall provide proper decontamination facilities. The method of asbestos removal shall be conducted as required by regulation. Work areas shall be decontaminated prior to resuming other activities.
6. PHASING AND SCOPE: Phasing of asbestos removal will be coordinated by the general Contractor and approved by the Contracting Officer.
END OF SECTION 02051
SECTION 16530
SITE LIGHTING
PART 1
GENERAL
1.1
SECTION INCLUDES
A.
Exterior luminaires and accessories.
1.2
REFERENCES
A.
ANSI C136.38-2009 ‑ Electric Lamps - American National Standard for Roadways and Area Lighting Equipment - Induction Lighting.
B.
IES RP‑8 ‑ Recommended Practice for Roadway Lighting.
C.
IES RP‑20 ‑ Lighting for Parking Facilities.
D.
NFPA 70 ‑ National Electrical Code.
1.3
SUBMITTALS FOR REVIEW
A.
Shop Drawings: Indicate dimensions and components for each luminaire which is not a standard Product of the manufacturer.
B.
Catalog Data: Provide dimensions, ratings, and performance data for each luminaire which is a standard product of the manufacturer.
C.
Warranty Information: The luminaire manufacturer shall warrant each fixture and lamp to be free from defects in material, design and workmanship to provide reliable performance for a 5 year life. The warranty assumes the luminaire is installed and maintained in accordance to the manufacturer’s recommendations. When the manufacturer and the owner mutually determine a luminaire is defective, the supplier shall furnish a replacement for the defective luminaire. The replacement luminaire shall comply with this specification and be delivered to the original delivery point free of any charge to the Government.
1.4
SUBMITTALS FOR INSTALLATION
A.
Manufacturer’s Instructions: Submit manufacturer's installation instructions. Indicate application conditions and limitations of use stipulated by Product testing agency specified under Regulatory Requirements. Include instructions for storage, handling, protection, examination, preparation, installation, and starting of Product.
1.5
SUBMITTALS FOR CLOSEOUT
A.
Maintenance Data: For each luminaire.
1.6
QUALIFICATIONS
A.
Manufacturer: Company specializing in manufacturing the Products specified in this section with minimum three years documented experience.
1.7
REGULATORY REQUIREMENTS
A.
Conform to requirements of NFPA 70.
B.
Products: Listed and classified by Underwriters Laboratories, Inc. as suitable for the purpose specified and indicated.
1.8
DELIVERY, STORAGE, AND HANDLING
A.
Store and handle solid wood poles in accordance with ANSI O5.1.
1. 9
COORDINATION
A.
Furnish bolt templates and pole mounting accessories to installer of pole foundations.
1.10
EXTRA PRODUCTS
A.
Furnish one of each type and wattage lamp installed.
PART 2
PRODUCTS
2.1
LUMINAIRES AND ACCESSORIES
A.
Furnish Products as scheduled.
1.
Description: Roadway type luminaire.
2.
Description: Wall pack type luminaire.
B.
Material: Extruded aluminum housing with cast aluminum bracket.
C.
Enclosure: Clear glass with gasketing between enclosure and frame and between frame and luminaire body.
D.
Photometric Control: Anodized specular aluminum reflector.
E.
Photometric Performance: IES 3.
F.
Installation Conditions: Wet Location.
G.
Mounting: Provide pole mount bracket.
H.
Ballast: Manufacturer's standard, matched to lamp characteristics, multi-tap.
I Lamp: Induction.
PART 3
EXECUTION
3.1
INSTALLATION
A.
Install lamps in each luminaire.
3.2
FIELD QUALITY CONTROL
A.
Operate each luminaire after installation and connection. Inspect for improper connections and operation.
3.3
ADJUSTING
A.
Aim and adjust luminaires to provide illumination levels and distribution as directed.
3.4
CLEANING
A.
Clean electrical parts to remove conductive and deleterious materials.
B.
Remove dirt and debris from enclosure.
C.
Clean photometric control surfaces as recommended by manufacturer.
D.
Clean finishes and touch up damage.
3.5
PROTECTION OF FINISHED WORK
A.
Relamp luminaires which have failed lamps at Substantial Completion.
3.6
SCHEDULE
A.
See Fixture Schedule.
END OF SECTION 16530
DATE: 09 Dec 10
PROJECT NO: VKAG 10-1042E
PROJECT TITLE: Repair Lighting for Ammo Area
PROJECT MANAGER: Carlos Alfaro
_1355927465.doc