Attachment 2 Wage Determination.docx
DOCX document 20 KB Posted
- Attached to
- Repair Lighting for Ammo Area Federal contract opportunity
- Solicitation number
- FA4809-11-R-0002
About this file
Attachment 2 Wage Determination
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and answers 8 Feb 11.docx | DOCX document | |
| Questions and answers 4 Feb 11.docx | DOCX document | |
| Questions and Answers 1 Feb 11.docx | DOCX document | |
| Revised Drawing Sheet E-1.pdf | ||
| Amendment 0001.doc | DOC document | |
| Site Visit.pdf | ||
| 11-R-0002.doc | DOC document | |
| Attachment 5 Sheet 2 of 2 KAG 10-1042E E-1.pdf | ||
| Attachment 4 AF66 VKAG 10-1042E.pdf | ||
| Cover Sheet and Instructions.doc | DOC document | |
| Attachment 1 SPECIFICATIONS VKAG 10-1042E .doc | DOC document | |
| Attachment 5 Sheet 1 of 2 VKAG 10-1042E G-1.pdf | ||
| Attachment 7 Facility Inspection Assessment Letter.pdf | ||
| Attachment 3 DOR.doc | DOC document | |
| Attachment 6 Construction Cost Estimate Breakdown.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4809-11-R-00002
| Attachment 2 |
| Page 3 of 3 |
General Decision Number: NC100053 03/12/2010 NC53
Superseded General Decision Number: NC20080053
State: North Carolina
Construction Type: Building
County: Wayne County in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010
SUNC1997-001 03/13/1997
Rates Fringes
Carpenter _(does not include acoustical ceiling installation, batt and/or blown insulation, carpet laying, drywall hanging, form work, and overhead doors)..........$ 10.62 1.08
Cement mason/concrete finisher.....................$ 10.66 .95
Electrician _(does not include HVAC control wiring)..........$ 10.88 .93
Glazier........................$ 10.41 1.42
Ironworker, structural.........$ 10.15 .97
Laborers:
_General....................$ 7.25 _Landscape worker...........$ 7.31
Painter _(includes paperhanging, does not include drywall finishing).......$ 9.00 .35
Plumber _(does not include HVAC piping)..................$ 11.59 1.67
Power equipment operators:
_Backhoe....................$ 10.00 _Dozer......................$ 10.00 _Grader.....................$ 13.83
Roofer.........................$ 8.42 .26
Sheet metal worker _(does not include HVAC duct work)...............$ 10.34 1.06
Truck driver _Tandem dump................$ 10.00
Drywall hanger..................$ 12.00 .63
ACOUSTICAL CEILING MECHANIC......$ 11.50 .43
Drywall Finisher/Taper...........$ 12.00
HVAC-Heating & A/C Mechanic......$ 13.75 1.13
INSTALLER - OVERHEAD DOOR........$ 9.50 .52
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION