Attachment 2 Wage Determination.docx

DOCX document 20 KB Posted

Attached to
Repair Lighting for Ammo Area Federal contract opportunity
Solicitation number
FA4809-11-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 2 Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Repair Lighting for Ammo Area, newest first.
File Type Posted
Questions and answers 8 Feb 11.docx DOCX document
Questions and answers 4 Feb 11.docx DOCX document
Questions and Answers 1 Feb 11.docx DOCX document
Revised Drawing Sheet E-1.pdf PDF
Amendment 0001.doc DOC document
Site Visit.pdf PDF
11-R-0002.doc DOC document
Attachment 5 Sheet 2 of 2 KAG 10-1042E E-1.pdf PDF
Attachment 4 AF66 VKAG 10-1042E.pdf PDF
Cover Sheet and Instructions.doc DOC document
Attachment 1 SPECIFICATIONS VKAG 10-1042E .doc DOC document
Attachment 5 Sheet 1 of 2 VKAG 10-1042E G-1.pdf PDF
Attachment 7 Facility Inspection Assessment Letter.pdf PDF
Attachment 3 DOR.doc DOC document
Attachment 6 Construction Cost Estimate Breakdown.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4809-11-R-00002

Attachment 2
Page 3 of 3

General Decision Number: NC100053 03/12/2010 NC53

Superseded General Decision Number: NC20080053

State: North Carolina

Construction Type: Building

County: Wayne County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 03/12/2010

SUNC1997-001 03/13/1997

Rates Fringes

Carpenter _(does not include acoustical ceiling installation, batt and/or blown insulation, carpet laying, drywall hanging, form work, and overhead doors)..........$ 10.62 1.08

Cement mason/concrete finisher.....................$ 10.66 .95

Electrician _(does not include HVAC control wiring)..........$ 10.88 .93

Glazier........................$ 10.41 1.42

Ironworker, structural.........$ 10.15 .97

Laborers:

_General....................$ 7.25 _Landscape worker...........$ 7.31

Painter _(includes paperhanging, does not include drywall finishing).......$ 9.00 .35

Plumber _(does not include HVAC piping)..................$ 11.59 1.67

Power equipment operators:

_Backhoe....................$ 10.00 _Dozer......................$ 10.00 _Grader.....................$ 13.83

Roofer.........................$ 8.42 .26

Sheet metal worker _(does not include HVAC duct work)...............$ 10.34 1.06

Truck driver _Tandem dump................$ 10.00

Drywall hanger..................$ 12.00 .63

ACOUSTICAL CEILING MECHANIC......$ 11.50 .43

Drywall Finisher/Taper...........$ 12.00

HVAC-Heating & A/C Mechanic......$ 13.75 1.13

INSTALLER - OVERHEAD DOOR........$ 9.50 .52

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .